N
Flooding direction
N
Flooding prediction
High risk Moderate Source: https://www.fmglobal.com/research-and-resources/nathaz-toolkit/flood-map#
S Elevations
N Elevations
E Elevations
W Elevations
Street view render
South Side View
Interior renders
South elevation
North elevation
East elevation
West elevation
Structure
Ground Level Plan
Lobby A Office
Lobby B
Performing art Loading dock
Performing art
Fire stairs/Exit
Food truck zone
Fire stairs/Exit
Fire stairs/ Exit
Mechanical Grass Retail space Bathroom
N
Hanging floor plan
Social space
Retail space
N
North Section
N
Circulation/Egress
N
Circulation/Egress - Plan
Fire stairs
N
Sustainability Plants, vagetation Extensive growing media Root-permeable filter Drainage layer Protection and storage layer Roof deck, insulation, waterproofing
Ventilation Duct
Chilled Beam
Heating & Piping
Air outlet
Outside Single glazing
Mechanical shading Inside double glazing
Air inlet
Source: https://www.lib.uchicago.edu/collex/exhibits/science-sustain bility/green-roofs/construction-components-green-roofs/ https://sites.google.com/site/deployableemergencyshelter/relevant-hvac-systems/primary-systems/chilled-beam Kilaire, A., and M. Stacey. “Design of a Prefabricated Passive and Active Double Skin Façade System for UK Offices.” Journal of Building Engineering, vol. 12, 2017, pp. 161–170., doi:10.1016/j.jobe.2017.06.001.
Section Perspective & Dropped ceiling diagram Wood Drop ceiling
Chilled beam
N
Chilled beam system Chilled beam Waterline Hot air Cool air Water storage Air handling unit
Air handling unit
Water storage Air handling unit
Chilled beam system - Plan
Chilled beam Sprinkler
Double glazed facade & Shading
Time 12:00PM Summer sun Natural ventilation due to stack effect removes solar gain
67.03
Winter sun
25
N
Source: https://www.sunearthtools.com/dp/tools/pos_sun.php https://www.sciencedirect.com/
Double glazed unit reduce heat loss and help control surface temperature
Solar energy
Junction box Back sheet Encapsulant - EVA Solar cells Encapsulant - EVA Tempered glass
Frame
N Source: https://www.cleanenergyreviews.info/blog/solar-panel-components-construction
Level 2 Plan
Assembly Assembly
Gallery
Gallery
Meeting room
Assembly
Fire stairs/Exit
Office
Office
Office
Fire stairs/Exit
Fire stairs/ Exit
Mechanical Bathroom
N
Level 3 Plan
Assembly Assembly
Gallery
Gallery
Meeting room
Assembly
Fire stairs/Exit
Office
Office
Office
Fire stairs/Exit
Fire stairs/ Exit
Mechanical Bathroom
N
Level 4 Plan
Assembly Assembly
Gallery
Gallery
Meeting room
Assembly
Fire stairs/Exit
Office
Office
Office
Fire stairs/Exit
Fire stairs/ Exit
Mechanical Bathroom
N
Level 5 Plan
Assembly Assembly
Gallery
Gallery
Meeting room
Assembly
Fire stairs/Exit
Office
Office
Office
Fire stairs/Exit
Fire stairs/ Exit
Mechanical Bathroom
N
Level 6 Plan
Assembly
Meeting room Gallery Assembly
Fire stairs/Exit
Office
Office
Office
Fire stairs/Exit
Gallery
Fire stairs/ Exit
Mechanical Bathroom
N
Level 7 Plan
Assembly
Meeting room Gallery Assembly
Fire stairs/Exit
Office
Office
Office
Fire stairs/Exit
Gallery
Fire stairs/ Exit
Mechanical Bathroom
N