ARCHITECTURE, DESIGN & PLANNING NGUYEN N.K TRAN
PORTFOLIO-2019
c
o E C O .
P L G
A
R
N
O
K
E
I
D A
N
&
E Y S T A
N
E S
U
R T L
L
L
R
P R O R
H
R
E S I
H
R I
C
H
Y
V
I
L
L
P R O J H
A T
R
E S I A
C
E C
P P A
D
E
H
N
N I
D
E
N
T
D
H C
A
t
s
T S
E S S
C L
n
E C
C
E S I
M O
E
D
e
P R O J
I T
N N
I
T O
G
O W D
F A C
t
N
A S Q N
n
E S C
I
&
I
L C R
I
E
4
E
6
I
10
A
R
E
20 24
T S
E
N
R T
T I M
E
A N
L
28 T
6
PLANNING & PROCESSES What can I do? My everyday tasks are correcting and producing the architectural from the sketches and corresponding to the requirements from councils and engineers. I participate in providing innovative Architectural and Interior Design solutions with a professional team at our studio, with an emphasis on both economical and ecological factors. I have the capacity to take after all the stages of building design project with thousands of hours of experience with a variety of projects from concept through to completion and beyond. At the studio, colleagues and I approach each project with vital importance; acquire in-depth understanding of our client’s requirements to create an environment that addresses people and place. We focus on providing quality service and create solutions with the best interest of our clients’ in mind. I have been involved in various project types including Childcare Centres which has equipped us with relevant understanding of NCC/BCA & Australian Standards related to design for children services.
SC HE
M
IC AT
C PRO
ESS
SITE A
NA LYS IS
G R E Y S T A N E S r e s i d e n c e YEAR 2017
YEAR 2017 DRAWN: NGUYEN TRAN CAD: ARCHICAD VISUALLISATION: TWINMOTION
A S Q U I T H r e s i d e n c e YEAR 2019 DRAWN: NGUYEN TRAN CAD: ARCHICAD VISUALLISATION: TWINMOTION
19,380 5,230
3,760 250
8,240
3,510
250
180
3,320
1,550
90
3,600
4,470
180
5,630
3,890
180
W-14
90
15
1
16
W-01
DN
W-11
BATH 2.9X2.8
250
250
250
W-09
250 250
3,600
90
W-12
LINE OF GROUND FLOOR BELOW
11,760
600 4,375 900
W-01
BED 2 3.5x3.6
1,340
BED 1 4.1x3.8
BED 3 3.6x4.0
RUMPUS 3.9x4.3 3,860
1,100
250
2,300
W-11
1,090
W-11
3,670
2,830
4,510
4,010
WIR 2.3x1.6
LINE OF GROUND FLOOR BELOW
LINEN W-04 LINE OF GROUND FLOOR BELOW
90
250
250 250 90 1,100
4,540
11,760
3,200
90 1,165
2,100
100
W-11
100
90
WIR 3.3x2.1
14
2
5,590
MASTER BED 4.4x4.5
13
VOID
3
9,520
4
2,225
2,050
5
90
11
12
6
7
8
9
10
250
2,300
ENS 3.3x2.3
W-15
4,615
1,660
180
W-07
W-04
W-04
1,360
2,900
90
2,310
90
90
1,100 90
3,500
1,110 90
90
2,900 3,500
10,680
90 600
90
3,890
3,515
180
4,585
600
19,380
DRAFT NOM. ARCH: Paul Henningham 7770 NSW Suite 107 LVL 1 53-59 Great Buckingham Redfern NSW 2016, Australia t:1300 ecofactor e:info@ecofactor.com.au w:www.ecofactorarchitects.com.au GSPublisherVersion 0.0.100.100
COPYRIGHTS - The drawing and design is the property of Eco Factor Architects and shall not be used or reproduced wholly or in part without permission - The builder is to be held responsible for all levels and setting out of all works in doubt contact Eco Factor Architects - Figured dimensions are to take preference over scaling - Existing dimensions are to be maintained where applicable. - All materials are to be used in accordance with manufacturer's specifications and instructions, and to comply with relevant Australian Standards.
REV A B C D E F
AMENDMENTS SKETCH DESIGN SKETCH DESIGN SKETCH DESIGN SKETCH DESIGN SKETCH DESIGN CLIENT REVIEW
DATE 26.10.18 21.12.18 11.01.19 16.01.19 22.02.19 12.03.19
CLIENT
SCALE
DATE
REVISION
MR. & MRS. IAN MALCOLM
1:100
26.10.18
G
PROJECT
JOB NO.
DRAWN
DWG NO.
PROPOSED TWO STOREY RESIDENCE AT 11 QUEENS ROAD, ASQUITH
1920
NT
A-1.04
DWG
Plan | First Floor
© Copyrights Eco Factor Architects
25,280 2,320
10,060 180
5,820
4,850 180
4,960
W-13
1,660
180
3,740
W-03
4
13
3
14
2
15
1
16
POOL POCKET SLIDING DOOR
955
RL+173.220
150
13,840
UP
ENTRY
PORCH
RL+173.120
RL+173.220
W
MEDIA ROOM 5.1x4.1
L'DRY 1.8x3.2
CT
WC 1.5x1.6
W-12
250
RWT
LINE OF FIRST FLOOR OVER
DW
W
BATH 2.7x1.9
RL+173.170
KITCHEN 3.9x4.8
W-06
SK
SK
BBQ
250
OFFICE 4.2x4.0
4,940
ALFRESCO 5.5x5.9
SK
W-05
900
W-10
4,080 OFFICE 1,910 90 BATH 4,170 MEDIA ROOM
F
P'TRY 1.5x3.1
6,145
HALLWAY LINE OF FIRST FLOOR OVER
LINE OF FIRST FLOOR OVER 1.5m SIDE SETBACK LINE W-01
1,500
250
4,715
FAMILY 4.0x4.5
4,535
STORAGE
W-01
11
DINING 3.8x4.5
12
10
7
8
6
COURTYARD 5.0x3.7
9
FLOOR SINK
3,660 ENTRY HALL 90 1,490 HALLWAY
2,300
180
3,385
K
DOUBLE GARAGE 5.8x6.6
RL+173.120
UP
180
7,880
2,270
R SETBAC
GOLF CART PARKING 3.8x3.5
5
180
13,840 2,300 1,210
90
90
S PO 2 m 24
3,300
8,230 3,600
1,800
W-07
NEIGHBOU
3,550 GOLF CART PARKING
DRIVEWAY CONC.
180
6,670 DOUBLE GARAGE
W-07
3,780 COURTYARD
7,030
180
1.3m SIDE SETBACK LINE
250
5,450
AVERAGE
1,060
3,320
W-07
W-08 H/L WINDOW
180 250
600
3,600
90
4,700
2,450 2,700
250 90
2,380
9,507
5,110
90
1,800
90
5,610
1,580
90
3,985 7,635
250
5,540 3,985
1,550
24,300
DRAFT NOM. ARCH: Paul Henningham 7770 NSW Suite 107 LVL 1 53-59 Great Buckingham Redfern NSW 2016, Australia t:1300 ecofactor e:info@ecofactor.com.au w:www.ecofactorarchitects.com.au GSPublisherVersion 0.0.100.100
COPYRIGHTS - The drawing and design is the property of Eco Factor Architects and shall not be used or reproduced wholly or in part without permission - The builder is to be held responsible for all levels and setting out of all works in doubt contact Eco Factor Architects - Figured dimensions are to take preference over scaling - Existing dimensions are to be maintained where applicable. - All materials are to be used in accordance with manufacturer's specifications and instructions, and to comply with relevant Australian Standards.
© Copyrights Eco Factor Architects
REV A B C D E F
AMENDMENTS SKETCH DESIGN SKETCH DESIGN SKETCH DESIGN SKETCH DESIGN SKETCH DESIGN CLIENT REVIEW
DATE 26.10.18 21.12.18 11.01.19 16.01.19 22.02.19 12.03.19
CLIENT
SCALE
DATE
REVISION
MR. & MRS. IAN MALCOLM
1:100
26.10.18
G
PROJECT
JOB NO.
DRAWN
DWG NO.
PROPOSED TWO STOREY RESIDENCE AT 11 QUEENS ROAD, ASQUITH
1920
NT
A-1.03
DWG
Plan | Ground Floor
MAX RIDGE LEVEL
RL+180.975
2.055
W-11
CW FIRST FLOOR CEILING LEVEL
OW
W-04
RP
CW
W-11
2.700
W-15 W-11
CW CW
CW CLD
RP
FIRST FLOOR LEVEL
W-07
OW
CLD
CW
RL+176.220
CLD
W-07
3.000
CW
W-03
7.755
W-07
RL+178.920
D-09
CL GROUND FLOOR LEVEL
E-01
RL+173.220
West Elevation
MAX RIDGE LEVEL
2.055
RL+180.975
1:100
RL+178.920
FIRST FLOOR CEILING LEVEL
0.300
RL+176.220
W-01
W-14
CW
2.700
7.755
CLD
FIRST FLOOR LEVEL
CW
CW
RL+ 175.920 GROUND FLOOR CEILING LEVEL W-10
2.700
D-02
RL+173.220
Suite 107 LVL 1 53-59 Great Buckingham Redfern NSW 2016, Australia t:1300 ecofactor e:info@ecofactor.com.au w:www.ecofactorarchitects.com.au
ED
RP2 CW
RL+173.120
GROUND FLOOR LEVEL
E-02
NOM. ARCH: Paul Henningham 7770 NSW
D-01
GD
South Elevation
COPYRIGHTS - The drawing and design is the property of Eco Factor Architects and shall not be used or reproduced wholly or in part without permission - The builder is to be held responsible for all levels and setting out of all works in doubt contact Eco Factor Architects - Figured dimensions are to take preference over scaling - Existing dimensions are to be maintained where applicable. - All materials are to be used in accordance with manufacturer's specifications and instructions, and to comply with relevant Australian Standards.
REV A B C D E F
AMENDMENTS SKETCH DESIGN SKETCH DESIGN SKETCH DESIGN SKETCH DESIGN SKETCH DESIGN CLIENT REVIEW
1:100
DATE 26.10.18 21.12.18 11.01.19 16.01.19 22.02.19 12.03.19
DRAFT
CLIENT
SCALE
DATE
REVISION
MR. & MRS. IAN MALCOLM
N.T.S.
26.10.18
F
PROJECT
JOB NO.
DRAWN
DWG NO.
PROPOSED TWO STOREY RESIDENCE AT 9A QUEENS ROAD, ASQUITH
1920
NT
A-2.01
DWG
ELEVATIONS 01
© Copyrights Eco Factor Architects
GSPublisherVersion 0.0.100.100
2.055
MAX RIDGE LEVEL
2.700
7.755
FIRST FLOOR CEILING LEVEL
3.000
FIRST FLOOR LEVEL
GROUND FLOOR LEVEL
E-03
East Elevation
MAX RIDGE LEVEL
2.055
180.975 (RL)
W-11
FIRST FLOOR CEILING LEVEL
2.700
178.920 (RL)
7.755
1:100
176.220 (RL)
W-12
W-11
W-13
W-14
W-12
CW
CW
CW
CW
CW
W-01
FIRST FLOOR LEVEL
3.000
W-12
W-01
D-05
CW
D-03
CW GLZ
173.220 (RL)
GROUND FLOOR LEVEL
E-04 NOM. ARCH: Paul Henningham 7770 NSW Suite 107 LVL 1 53-59 Great Buckingham Redfern NSW 2016, Australia t:1300 ecofactor e:info@ecofactor.com.au w:www.ecofactorarchitects.com.au GSPublisherVersion 0.0.100.100
COPYRIGHTS - The drawing and design is the property of Eco Factor Architects and shall not be used or reproduced wholly or in part without permission - The builder is to be held responsible for all levels and setting out of all works in doubt contact Eco Factor Architects - Figured dimensions are to take preference over scaling - Existing dimensions are to be maintained where applicable. - All materials are to be used in accordance with manufacturer's specifications and instructions, and to comply with relevant Australian Standards.
© Copyrights Eco Factor Architects
REV A B C D E F
AMENDMENTS SKETCH DESIGN SKETCH DESIGN SKETCH DESIGN SKETCH DESIGN SKETCH DESIGN CLIENT REVIEW
North Elevation DATE 26.10.18 21.12.18 11.01.19 16.01.19 22.02.19 12.03.19
1:100
DRAFT
CLIENT
SCALE
DATE
REVISION
MR. & MRS. IAN MALCOLM
N.T.S.
26.10.18
F
PROJECT
JOB NO.
DRAWN
DWG NO.
PROPOSED TWO STOREY RESIDENCE AT 9A QUEENS ROAD, ASQUITH
1920
NT
A-2.02
DWG
ELEVATIONS 02
A S Q U I T H r e s i d e n c e ( s u b d i v i s i o n ) YEAR 2019
DRAWN: NGUYEN TRAN CAD: ARCHICAD VISUALLISATION: TWINMOTION
NORTH RICHMOND c h i l d c a r e YEAR 2018 84 (CHILDRENS) DRAWN: NGUYEN TRAN CAD: SKETCHUP VISUALLISATION: TWINMOTION
K E L L Y V I L L E c h i l d c a r e YEAR 2018 44 (CHILDREN) DRAWN: NGUYEN TRAN CAD: ARCHICAD VISUALLISATION: TWINMOTION
DINH r e s
MOUNTAIN i d e n c e
DESIGN: NGUYEN TRAN DRAWN: NGUYEN TRAN CAD: ARCHICAD VISUALLISATION: TWINMOTION
Dinh Mountain is one of my projects. The clients are my parents and the site is located in a hill of Dinh mountain in Baria City, Vietnam. My parents have a plan to move to the suburban area to live a peaceful life. As a son, I understand their wishes, therefore, I started design a beautiful place for them. By retaining the inherent topography of the area, the building blends into the natural setting. The main direction of the building is to the southeast, so the building receives natural light for hours. This will help the building owner save energy on a sunny day. Open design gives the building a good temperature circulation system. The main purpose of this design is to create an open space for the house to communicate with the outside space.
SANH LAU 1
THONG TANG
BEP
KHO BEP
PHONG SINH HOAT GIA DINH
BAN CONG BAN AN
S-02 SK 201
THANG XUONG PHONG NGU CHINH
PHONG PHONG TAMTAM
VAN PHONG/ PHONG HOC
NOTE
MAT BANG TANG 1 1:100
N G D U O
1. -
Project Partners
All boundaries and contours are subject to survey drawing W-01. All levels to Australian Height Data. It is the contractors responsibility to confirm all measurements on site and locations of any services prior to work on site.
Refer to consultant documentation when directed - BCA Consultant - #Certifier - Civil Engineer - #Civil Engineer - Hydraulic Engineer #Hydraulic Engineer - Landscape Designer - #Landscape Consultant - Mechanical Engineer - #Mechanical Engineer - Planning Consultant - #Planning Consultant - Services - #Services Consultant - Structural Engineer - #Structural Engineer - Surveyor - #Surveyor
N
The Builder shall check all dimensions and levels on site prior to construction. Notify any errors, discrepancies or omissions to the architect. Refer to written dimensions only. Do not scale drawings. Drawings shall not be used for construction purposes until issued for construction. This drawing reflects a design by GRADIENT DESIGN and is to be used only for work when authorised in writing by GRADIENT DESIGN.
DESIGN
Drawn | Checked NGUYEN TRAN | Plot Date: 28/04/2019 Project NO. 01 Project Status WIP
DRAWING TITLE :
Client Site:
PROJECT NAME :
REVISION NO.
SKETCH PLANS
MAT BANG TANG 1
TRAN CONG VAN NUI DINH BA RIA BA RIA VUNG TAU VIETNAM #Wind Region
Wind Region
G RAD I E N T
All documents here within are subject to Australian Copyright Laws.
GSEducationalVersion
PHONG NGU 2
DRAWING NO.
BIET THU NUI DINH
SK 102
10 9
V A O
8 7 6 5 4 3 2 UP
1
SAN TRUOC/ LOI VAO
I NU EN IL O L
SANH
VUON TUOC/ CAY CANH DOWN
UP
SAN SAU
4
3
2
1
UP
NHA XE
1
SAN DE XE
2
PHONG THAY DO
PHONG TAM
3 DOWN
4 1
2
3
4
5
6
7
8
9
11
S-02 SK 201
10
QUAY BAR
PHONG NGU 2 PHONG KHACH PHONG NGHE NHAC
D U O N G
TOILET
PHONG NGU 1
R A VUON SAU SAN PHOI DO MAT BANG TANG TRET 1:100
0. -
All documents here within are subject to Australian Copyright Laws.
GSEducationalVersion
Drawn | Checked NGUYEN TRAN | Plot Date: 28/04/2019 Project NO. 01 Project Status WIP
DRAWING TITLE :
Client Site:
PROJECT NAME :
REVISION NO.
SKETCH PLANS
MAT BANG TRET N
Project Partners Refer to consultant documentation when directed - BCA Consultant - #Certifier - Civil Engineer - #Civil Engineer - Hydraulic Engineer #Hydraulic Engineer - Landscape Designer - #Landscape Consultant - Mechanical Engineer - #Mechanical Engineer - Planning Consultant - #Planning Consultant - Services - #Services Consultant - Structural Engineer - #Structural Engineer - Surveyor - #Surveyor
N
NOTE The Builder shall check all dimensions and levels on site prior to construction. Notify any errors, discrepancies or omissions to the architect. Refer to written dimensions only. Do not scale drawings. Drawings shall not be used for construction purposes until issued for construction. This drawing reflects a design by GRADIENT DESIGN and is to be used only for work when authorised in writing by GRADIENT DESIGN. All boundaries and contours are subject to survey drawing W-01. All levels to Australian Height Data. It is the contractors responsibility to confirm all measurements on site and locations of any services prior to work on site.
DESIGN G RAD I E N T
Wind Region
TRAN CONG VAN NUI DINH BA RIA BA RIA VUNG TAU VIETNAM #Wind Region
DRAWING NO.
BIET THU NUI DINH
SK 101
D
T
ARCHITECTURE, DESIGN & PLANNING Nguyen Tran 2019 PORTFOLIO