Anh Nguyen Portfolio

Page 1

PORTFOLIO NGUYỄN NHẬT ANH

Architecture 2008 - 2014


PROFILE

EDUCATION

SKILL

Bachelor of Architecture Sep 2008 - Jul 2013. Ho Chi Minh City University of Architecture 196 Pasteur Street, District 3, Ho Chi Minh City.

Hand Sketching. Paper Concept Modeling. Software: Advance at: Revit Architecture (from 2010), Lumion 3d Visualization (from 2011), Adobe Indesign, Microsoft Word, Excel and Power Point. Good at: Google Sketchup, Adobe Photoshop. Good Soft-Skill: Organizition, Management, Teamwork, Presentation,...

Vietnamese: Native English: Good Janpanese: Beginner

ACHIEVEMENTS PERSONAL Full Name: Date of Birth: Place of Birth: ID Card: Issued Date: Issued Place: Address: Mobile: Email:

WORKING EXPERIENCES

HCMC University of Architecture Scholarship in 2009, June 2009, 2010: Volunteer at Vietnam Architectural ExhiINFORMATION 2010, 2012, 2013 for Good Study. bition - VietArch 2009, 2010. HUYNH TAN PHAT Scholarship in 2009, 2010. NGUYEN NHAT ANH July 2011 to Sept 2011: Worked at ABBO Community 2011: 3rd Place of Western Coach Terminal Competition. (Trainee Architect) January 7th 1990. (Teamwork with Nguyen Tang Quang, Tran My Kim, Ho The Khoa and Tram Vinh Dat). Sept 2013 to Present: Management and Revit Training at Long Thanh Town, Dong Nai. d.o.t Studio. 2011: 2nd Place in The International Summer Workshop for 272084333 Students of HCMU.ARCH: Project on “Local Indentity in Ar- 2012 to Present: Freelancer Designer. chitecture” with Prof. Maxime-Alexis Frappier from University May 24th 2007. of Montreal. May 2014 to Present: Architect at LOOK Architects Vietnam. Dong Nai Province. 2012: Participated in the project “The Digital Days at University College of Northern Denmark” from 18-20 April 2012 144/15 Nguyen Khoai Street, Ward 2, (workshop with Prof. Walter Terry Jackson, Prof. Carl Red- INTERESTS District 4, Ho Chi Minh City. mond and Students from UCN). Movie, Piano. +84 (0) 938 577 002 2012: Shortlisted Project at World Architectural Festival: Traveling, Cycling, Football. Rethink and Renew - Student Competition in Marina Bay anh.nguyennhat.kts@gmail.com Sands, Singapore. 2014: Revit team leader for the Public Housing Project (HDB) in the LOOK Architects’ Head Office in Singapore.


with love and patience,

nothing is impossible.

01|02


CONTENTS

ACTIVITIES

01. PROFILE 03. ACTIVITIES 05. INDOOR SPORT ARENA 09. CERAMIC TILES FACTORY 11. WESTERN COACH TERMINAL 15. OFFICE TOWER 21. RACH CHIEC STADIUM 29. RENCENT WORKS 31. WORKS IN PROGRESS 33. WORKS IN COMPANY

Seminar “Project Management in Revit Architecture”

Seminar “Lumion 3d Visualization - Experiences Images Movies”

October 2013 d.o.t Studio, District 4, Saigon.

April 2014 d.o.t Studio, District 4, Saigon.

We discussed Project Management for designing projects in We discussed Lumion 3d version 4.0.2 for Rendering Imthe university when using Revit Architecture. And we shared ages and making Movies on projects. And we shared the the experience of working group effectively. experience of working group effectively.


“Life is like riding a bicycle, to stay balanced you must keep moving!!!� Albert Einstein

03|04


Individual Academic Project, Semester 8 MULTI-PURPOSE INDOOR SPORT ARENA 2000 SEATS April 2012 District Tan Binh, Saigon. DArch. Trinh Duy Anh.

The idea of the project is inspried by the UFO’s form with two long roof span for spectators and event organization entrances. There are two large bus station for public transports for spectators. Thus the project will be improve public space for communitity and outdoor events.

Site Plan


Event Organization

Concourse

Players Athletes

Playing Field

VIP Room

Concourse

3d Section 02

Section 01

Section 02

05|06


Level 01


Level 02

Level 03

07|08


Individual Academic Project, Semester 7

CERAMIC TILES FACTORY October 2012 North West Cu Chi Industrial Zone, Saigon. MArch. Quach The Vinh.

The idea of the project is inspried by the Folding Paper with many module for whole the factory. This form will be improve natural lighting and ventilation.

Site Plan


Level 01

Section 01

Section 02

Elevation South

Elevation West

09|10


Competition Teamwork Project

3rd prize, WESTERN COACH TERMINAL COMPETITION

CRYSTAL July 2011 Binh Chanh District, Saigon.

Located in Binh Chanh Village, Saigon, Wester Coach Terminal has been playing an eminent role in transfering passengers and ware between Saigon and Western. It was designed like a complex building with many functions: Station, Shopping Mall, Hotel, Entertainment,... From the many sketching step, familiar images of inhabitants in Western of Vietnam, such as nipa palm, fishing net,... were noticed deeply. Therefore, an important duty was set up: combining dynamic and young life of Saigon with specific features of Western. And all characteristics were Crystallized together in whole mass. This building’s shape can The progress of developing mass from a Basic Form 120x80x22m to to final proposal reflect a animated modern life, on the other hand, it can evoke feeling about Western existence in Vietnam through its space, facades, details,... Crystal is a beautiful image which can share an message about filtering, combination and reflection. Influency of wind in progress of developing mass


Aluminium Panel

Stell Truss

L5: Offices Hotels L4: Offices Hotels L3: Shopping Entertainments L2: Service Departure Hall

L1: Hall Station Departure Gates

B1: Parking & Taxi

B2: Parking

Diagram of Function

11|12


Level 02

Level 01

Level 03


Section 01

Level 04

Section 02

Level 05

13|14


Individual Academic Project, Semester 9 18 STORIES OFFICE TOWER December 2012 District 10, Saigon. BArch. Doan Trinh Hien.

The idea of the project is inspired by Ramdon Pixels for reducing sun radiation on the facade. The tower 18 floors contain grade A office space and 2 floors for material construction shopping mall.

Site Plan


Basement 01

Level 01

Basement 02

15|16


Level 02

Level 03

Level 04

Level 05


1

645m2

Layout 1 Office

1

2

325m2

320m2

Layout 2 Offices

1

3

210m2

210m2

2

225m2

Layout 3 Offices

1

110m2

2

215m2

Layout 4 Offices

4

110m2

3

210m2

Section B-B’

17|18


Thermal Radiation Analysis results

Random aluminium panel

Insulated double glass

Steel curtain frame

Based on the analysis result, the facade is used different module and density for different orient facade and functions. The tower is used two kinds of panel: 1. Insulated Double Glass 2. Aluminium Panel

Elevation North West

Facade Solutions


Details of Air Conditioning System

19|20



2013 Graduation Project RACH CHIEC STADIUM 35.000 SEATS July 2013 District 2, Saigon. MArch. Tran Dinh Nam. The Stadium will be an new Saigon Iconic beside many others: Saigon Notre-Dame Basilica, Municipal Theatre, Ben Thanh Market, Bitexco Financial Tower,... The idea of masterplan is insprired by the flow of water through the stones naturally. The end of water flow is a Stadium with many circle twisted together to improve natural lighting and ventilation for public space.

21|22


Section 1


Section 2

23|24


Level 01


Level 02

Level 03

Level 04

25|26



Aluminium Panel Roof

Steel Frame, Insulated Glass

Steel Truss Frame & Column

Seating Stand Precast Concrete Steel Frame Structure

Two Floor Plans

Diagram

Details of Seats and Columns

27|28


Teamwork Workshop at University “The Digital Days at University College of Northern Denmark” 18-20 April 2012 Aalborg, Denmark.. Prof. Walter Terry Jackson and Carl Redmond. In cooperation with the University of Architecture in HCMC Vietnam as a representative of the Bachelor Degree Programme in Architectural Tachnology and Construction Management at University College of Northern Denmark under the school of Technology. In the roll as BIM Coordinator working on the real life project to design the extension to the hospital in Aalborg Denmark. In the course of the three days, Danish and international students will work on a project at Aalborg Hospital – an extension of the radiation capacity of the Oncology department. All trade groups work in the same room and can thus instantly utilize each others knowledge and working capac- Day 3: Presentation Proposal ity. This gives them a unique opportunity to meet, experience and interact and helps creating a better insight into and understanding for the various approaches and working methods of the trades in a complex building process. As a result of the cooperation with University of Architecture, Ho Chi Minh City in Vietnam, a group of building construction students and their teachers are to be sent to Vietnam. This makes it possible to have a participant satellite at the university in which also Vietnamese architecture students participate. The purpose is to demonstrate that it is possible to cooperate in a digital building process across time and geography. Day 1: Concept

Day 2: Development Proposal


Teamwork Workshop at University “Local Indentity in Architecture� July - September 2011 District 1, Saigon. Prof. Maxime-Alexis Frappier, University of Montreal.

the PEARL

REVIVE AN ICON

The aim of the workshop is to design a skyscraper in one the provided sites near Saigon River, reflecting a local indentity within a limited time of three days. The workshop students worked mainly with models to explore the urban context and the impact when a new building is inserted. Through various of experiments with the site, the team reach the conclusion of a spherical form which stood out as total contradiction within the surrounding concrete boxex. The sphere creates a reminiscent feeling toward the history of the old Saigon when the city was known as the Pearl of the Far East. Thus the proposal is the revival of an icon, reflecting the distinctive indentity of the city, Saigon.

29|30


Recent Works DAISY HOTEL September 2013 Nha Trang, Khanh Hoa. Main Hall Interior. Schematic Design.

No.

Mark Revision note

Date

This DWG. is the property of............................... the information contained hereon may not be use or copied in manner without the written permission of the owner.

ISSUED FOR PHÁT HÀNH Tham khảo

Reference

Thiết kế sơ bộ

Preliminary

Trình duyệt

For approval

Đấu thầu

For tender

Thi công

For construction

Hoàn công

As-built

CHẤP THUẬN CỦA CHỦ ĐẦU TƯ APPROVAL OF THE OWNER

A

CHẤP THUẬN CỦA QUẢN LÝ DỰ ÁN

5,930

APPROVAL OF THE PROJECT MANAGER

UP

CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG QUỐC TẾ

1,000 10,280

INTERNATIONAL CONSTRUCTION CONSULTANCY JOINT STOCK COMPANY

B

UP

4,350

Head Office. 6th Floor, CentrePoint Building, 106 Nguyen Van Troi Street Phu Nhuan District, Ho Chi Minh City, Vietnam Tel: (+84 8) 3847 9227 Fax: (+84 8) 3847 9228 Email: info@iccjsc.vn Website: www.iccjsc.vn

Giám đốc - Director KS. Lê Duy Khôi Chủ trì - Presided by KTS. Nguyễn Đình Tâm Thiết kế - Designed by C

3,000

3,000

3,700

5,100

1

1

2

3

4

KTS. Lê Huy Cường Thiết kế - Designed by KTS. Hoàng Thị Bính Bạch Tuyết

5,360

Thiết kế - Designed by

20,160 5

MẶT BẰNG TẦNG 1 TL: 1 : 50

Floor Plan

6

KTS. Lê Ngọc Tú Kiểm - Checked by KS. Lê Duy Khôi Dự án - Project

DAISY HOTEL 71 Nguyễn Thị Minh Khai Nha Trang, Khánh Hòa

Hạng mục - Item

HOTEL

Tên bản vẽ - Drawing title

HOA LAN’S HOUSE

MẶT BẰNG TẦNG 1

Com. date Job No.

October 2013 Phu Nhuan District, Saigon. Interior Design. Design Development & Construction Documentation. Completed 2014

22-06-2013

Dwg No.

ICC.1207.SG.TOBA.010

A101 1 : 50


A3

A3 7,710

7,710

2,630

2,630 CHỈ GIỚI XD

P. RÁC

P. GIẶT SẤY

6,110

4 m²

SAUNA

1,150

P. NGỦ 3

8 m² +9,900

P. GIA NHÂN

6,110

7 m²

15 m² 1

BÃI XE 51 m²

+10,500

PHÒNG DULUXE

20 m²

P. THỜ

25 m²

11 m²

PHÒNG DULUXE

20 m²

28 m²

10,290

7 m²

GIAO THÔNG

890 2,760

PHÒNG S1 LAUNRY

10,290

PHÒNG S1

GIAO THÔNG

5,750

A106

5,750

A106

GIAO THÔNG

+0

+9,900

8,200

2,760 1

PHUONG’S HOUSE

SÀN LƯỚI THÉP

5,990

PHỤ TRỢ

GIAO THÔNG

SAN NUOC

PHÒNG S2

GHI CHÚ:

PHÒNG S2 21 m²

9

CHO THUÊ 3,200

22 m²

GIAO THÔNG 1,110

GIA CHỦ

CÂY XANH

1,110

CHO THUÊ

4,010

4,010

GHI CHÚ:

GIA CHỦ

6,090

L1

A3

CÔNG TY TNHH THIẾT KẾ & XÂY DỰNG

HOÀNG TRUNG ĐC: 106/5 BÀU CÁT 1, P.14, Q.TB, TP.HCM ĐT: (+84) 8 38492014 FAX: EMAIL:

5m

10m

DỰ ÁN

0

GIÁM ĐỐC:

CHỦ ĐẦU TƯ

CHỮ KÝ:

#

MÔ TẢ

NGÀY

TRƯƠNG QUANG HIỂN B 7,710

TRUNG NHẬT ANH THIẾT HOÀNG KẾ: NGUYỄN

5m

GIÁM ĐỐC:

CHỦ ĐẦU TƯ

3,200

MỤC ĐÍCH BAN HÀNH

HIỆU CHỈNH

VŨ VĂN TRỰC

CHỮ KÝ:

ĐC: 285/68C, CMT8, P12,Q10, TP.HCM 1 : 100 NGUYỄN NHẬT ANH TỈ LỆ:

VẼ:

10m

CHỮ KÝ:

KHU NHÀ Ở A101

ĐC: 106/5 BÀU CÁT 1, P.14, Q.TB, TP.HCM ĐT: (+84) 8 38492014 FAX: EMAIL:

HIỆU CHỈNH

C

03/29/14

NGÀY:

THI CÔNG

CHỮ KÝ:

ÔNG: ĐÀO MINH NHẬT

2m

DỰ ÁN

MẶT BẰNG TẦNG 1

THIẾT KẾ CƠ SỞ TRÌNH DUYỆT

A

CHỦ TRÌ:

L3

MỤC ĐÍCH BAN HÀNH CÔNG TY TNHH THIẾT KẾ & XÂY DỰNG

HIỆU CHỈNH

VŨ VĂN TRỰC

CHỮ KÝ:

KHU NHÀ Ở

ĐC: 285/68C, CMT8, P12,Q10, TP.HCM

1m

No rth

2m

A3

March 2014 District 10, Saigon. Architectural Design. Schematic Design. Complete in 2015.

1m

6,090

No rth

0

#

MÔ TẢ

NGÀY

MẶT BẰNG TẦ

THIẾT KẾ CƠ SỞ TRÌNH DUYỆT

A

CHỦ TRÌ:

TRƯƠNG QUANG HIỂN B ÔNG: ĐÀO MINH NHẬT

C

03/29/14

NGÀY:

THI CÔNG

THIẾT KẾ:

NGUYỄN NHẬT ANH

HIỆU CHỈNH

VẼ:

NGUYỄN NHẬT ANH

CHỮ KÝ:

2,630 CHỈ GIỚI XD

570

TẦNG MÁI NHÀ GIA CHỦ

2,620

1

10,290

3,300

4,010

21 m²

#

MÔ TẢ

PHỤ TRỢ

TRƯƠNG QUANG HIỂN B

A4

BHQ’S HOUSE

1

03/29/14

TRÌNH DUYỆT

NGÀY:

THI CÔNG

THIẾT KẾ:

NGUYỄN NHẬT ANH

HIỆU CHỈNH

VẼ:

NGUYỄN NHẬT ANH TỈ LỆ:

CHỮ KÝ:

C

ĐC: 106/5 BÀU CÁT 1, P.14, Q.TB, TP.HCM ĐT: (+84) 8 38492014 FAX: EMAIL:

MẶT BẰNG TẦNG 2

THIẾT KẾ CƠ SỞ

2

DỰ ÁN

GIÁM ĐỐC:

CHỦ ĐẦU TƯ

ĐC: 285/68C, CMT8, P12,Q10, TP.HCM

CHỮ KÝ:

MỤC ĐÍCH BAN HÀNH

HIỆU CHỈNH

VŨ VĂN TRỰC

CHỮ KÝ:

KHU NHÀ Ở

HOÀNG TRUNG

MỤC ĐÍCH BAN HÀNH NGÀY

A

CHỦ TRÌ:

ÔNG: ĐÀO MINH NHẬT

GIAO THÔNG

Level 1 0

CÔNG TY TNHH THIẾT KẾ & XÂY DỰNG

ĐC: 285/68C, CMT8, P12,Q10, TP.HCM

GIA CHỦ

3,200 Level 1 0

HIỆU CHỈNH

VŨ VĂN TRỰC CHỮ KÝ:

KHU NHÀ Ở

3,600

BÃI XE

Section GIÁM ĐỐC:

CHỦ ĐẦU TƯ

CHO THUÊ

GIAO THÔNG

3,300

1,110

PHÒNG DULUXE

No rth

10m

CHỮ KÝ:

GHI CHÚ: Level 2 3300

10

9

GIAO THÔNG

DỰ ÁN

SÂN TRƯỚC

Level 2 3300

L2 CÔNG TY TNHH THIẾT KẾ & XÂY DỰNG

HOÀNG TRUNG

P. KHÁCH + ĂN + BẾP

PHÒNG S2

6,090

ĐC: 106/5 BÀU CÁT 1, P.14, Q.TB, TP.HCM ĐT: (+84) 8 38492014 FAX: EMAIL:

GIAO THÔNG

P. NGỦ 2

Level 3.1 6900

19

5m

PHÒNG DULUXE

GIAO THÔNG

3,600

890 8,200

2m

GIAO THÔNG

P. GIẢI TRÍ

Level 3 6600

+3,300

GIA CHỦ

1m

PHÒNG DULUXE

GIAO THÔNG

3,300

25 m²

GIAO THÔNG

5,990

0

GIAO THÔNG

Level 4.1 10500

PHÒNG DULUXE

20 m²

11

CHO THUÊ

PHÒNG DULUXE

Level 4 9900

PHÒNG S1

SÂN TRƯỚC +2,900

2,760

Level 5.1 14100

TẦNG MÁI KHU NHÀ CHO THUÊ Level 5 13200

3,300

5,750

6,110

KHO

3,300

1

3,330

WC

P. KHÁCH + ĂN + BẾP 63 m² +3,300

A106

MÁI LẤY SÁNG GIẾNG TRỜI

1,150

600

4,030

2,150

3,600

2,470

1,240

2,760

GHI CHÚ:

#

MÔ TẢ

NGÀY

MẶT CẮT

THIẾT KẾ CƠ SỞ

TRƯƠNG QUANG HIỂN B

THIẾT KẾ:

NGUYỄN NHẬT ANH

HIỆU CHỈNH

VẼ:

NGUYỄN NHẬT ANH TỈ LỆ:

A102 1 : 100

3

3,750

4

4,250

5

3,500

4,850

C

REF. BẾP

4,500

PHÒNG NGỦ 1

1 A301

PHÒNG KHÁCH

7,673

+0

PHÒNG ĂN

B

1

WC 2

3

HỒ CÁ

WC 1

PHÒNG NGỦ 2

3,173

5 7 9

SÂN TRƯỚC

-150

L1

BDH’S HOUSE

A

3,810

CÔNG TY TNHH THIẾT KẾ & XÂY DỰNG

DỰ ÁN

CHỦ ĐẦU TƯ CHỮ KÝ:

HOÀNG TRUNG ĐC: 106/5 BÀU CÁT 1, P.14, Q.TB, TP.HCM ĐT: (+84) 8 38492014 FAX: EMAIL:

L1

L3

L2

L5

NHÀ PHỐ ĐC: Trần Hưng Đạo, Q.5, Tp.HCM

GIÁM ĐỐC: CHỮ KÝ:

CHỦ TRÌ:

# A

TRƯƠNG QUANG HIỂN B Ông: Owner

Section

MỤC ĐÍCH BAN HÀNH

HIỆU CHỈNH

VŨ VĂN TRỰC

MÔ TẢ

NGÀY

TRÌNH DUYỆT

NGÀY:

THI CÔNG

THIẾT KẾ: NGUYỄN NHẬT ANH

HIỆU CHỈNH

VẼ:

CHỮ KÝ:

C

MB TRỆT

THIẾT KẾ CƠ SỞ

A106

THI CÔNG

CHỮ KÝ:

C

03/29/14

NGÀY:

TRÌNH DUYỆT

A

CHỦ TRÌ:

ÔNG: ĐÀO MINH NHẬT

20,950 4,600

March 2014 District 5, Saigon. Architectural Design. Schematic Design. Complete in 2014.

April 2014 Thu Dau Mot City, Binh Duong. Architectural Design. Schematic Design. Complete in 2015.

P. GIẶT SẤY

15 m² P. GIẢI TRÍ

1

2,150

6 m²

570

570

3,330

14 m²

4,030

2,620

600

WC KHÁCH

P. TIẾP KHÁCH

2,760

1,150

15 m²

2,470

2,150

BẾP + P. ĂN

600

2,470

P. MÁY PHÁT ĐIỆN

1,240

4,030

1,240

2,760

2,620

CHỈ GIỚI XD

3,330

Works in Progress

12/04/14

A101

NGUYỄN NHẬT ANH TỈ LỆ:

1 : 100

31|32

1 : 100


Recent Works in Company FUZHOU PARK - FOREST IN THE CITY May 2014 to present. Fuzhou, China. LOOK Architects Vietnam.

BRIDGE 1

WEST STATION

Bridge 1 is 80m long span in the West Entrance. This is the connection to the West Station and the Walkways. The facade is made from many folded steel modules to create difference feelings from difference postions.

West Station is the main station in West Entrance. From this point, we can walk on the sloped roof of station to connect to the Bridge 1 or the beginning of Walkways. This is also a rest stop with a small shop and rest room.

Fuzhou Park is the complex project with many buildings, park and brigdes in the Fuzhou’s central big mountain. This project will be a new public space for walking, sight seeing, picnic and many outdoor activities. The idea is “Bring the forest to the central city” to make people easy to enjoy the forest enviroment and encourage them to protect our natural enviroment. In Fuzhou Park, we have three entrances : West, East and North. Bridge 1 and West Station are in West Entrance. Zuohai is in the East Entrance. And Meifeng is in the North Entrance. There are another buildings such as : Bridge 2, Observation Tower, Tea Houses, Vistor Center and the Walkway Systems to connect all of the buildings in Fuzhou.

1600

Level 7 26700

Level 6 25100 1500

MAJOR PROJECT

Level 5 23600

1500

10200

1700

Level 2 18800

2300

Level 2 18800

2300

1500

Level 3 20300

10200

Level 3 20300

1600

Level 5 23600 Level 4 22000

Level 4 22000

1500

Level 6 25100

1700

1600

Level 7 26700

1600

MAJOR PROJECT

Level 1 16500

Level 1 16500

Level 0 16200

Level 0 16200

EAST ELEVATION

SECTION A

ELEVATION DETAILS

Scale: 1 : 150

Scale: 1 : 100

1600 10200

1700 Level 2 18800

2300

Level 2 18800

1:10

Level 1 16500

10 1:9

Level 1 16500

Level 0 16200

Level 0 16200

16500

S

2300

1500

Level 3 20300

7100

Level 3 20300

1600

Level 5 23600 Level 4 22000

Level 4 22000

1500

Level 6 25100

18800

1500

Level 7 26700

26700

1700

10

1600

Level 5 23600

WEST ELEVATION

WATER FEATURE

SECTION B

Scale: 1 : 150

NO REV

AMENDMENT

Scale: 1 : 100

1:17

20300

AMENDMENT

DATE

Level 7 26700

1600

NO REV

1500

Level 6 25100

1:10

10200

Level 4 22000

1600

Level 5 23600

22000

TENURE OF LAND : ...

1500

Level 3 20300

1700

23600

25100

OWNER :

2300

Level 2 18800

Level 1 16500 Level 0 16200

SECTIONAL DETAILS

16450

............................................................................................... Owner Enter address here

SOUTH ELEVATION Scale: 1 : 150

DECLARATION : I, Mr. LOOK BOON GEE, NRIC NO : S 2567932F , HEREBY DECLARE THAT : a) I AM NOT THE OWNER(S) OF THE LAND WITHIN THE MEANING OF THE TERM "OWNER" AS DEFINED IN SECTION 2 OF THE PLANNING ACT 1998: AND

b) I HAVE SHOWN THIS PLAN TO THE OWNER(S) OF THE LAND, AND HAVE OBTAINED THECONSENT OF THE SAID SUBMIT THIS PLAN TO THE COMPETENT AUTHORITY UNDER THE PLANNING ACT 1998.

TENURE OF LAND : ...

16500

......................................

OWNER :

1

..................................

Mr. LOOK BOON GEE R.E.G 1 2 2 4

DATE

301

Level 6

PROJECT : PROPOSED ERECTION OF .....

1600

Level 7 26700

10200

Level 4 22000

I, Mr. LOOK BOON GEE, NRIC NO : S 2567932F , HEREBY DECLARE THAT :

1700

23600

DECLARATION :

2

1600

1500

............................................................................................... 25100 Owner Level 5here Enter address

Level 3TERM "OWNER" a) I AM NOT THE OWNER(S) OF THE LAND WITHIN THE MEANING OF THE AS DEFINED IN SECTION 2 OF THE PLANNING ACT 1998: AND 20300

LOOK

1500

301

b) I HAVE SHOWN THIS PLAN TO THE OWNER(S) OF THE LAND, AND HAVE OBTAINED THECONSENT OF THE SAID OWNER(S) TO SUBMIT THIS PLAN TO THE COMPETENT AUTHORITY UNDER THE PLANNING ACT 1998. ......................................

Level 2 18800

..................................

Mr. LOOK BOON GEE R.E.G 1 2 2 4

DATE

LOOK ARCHITECTS PTE LTD

Level 1 16500

18 B O O N L A Y W A Y # 0 9 - 1 3 5 T R A D E H U B 2 1 S I N G A P O R E 6 T. 6 3 1 6 8 6 7 6 F. 6 3 1 6 8 6 9 0 E. e n q u i r y @ l o o k a r c h i t e c t s . c

Level 0 16200

PROJECT :

DRAWING TITLE :

PROPOSED ERECTION OF .....

NORTH ELEVATION Scale: 1 : 150

ELEVATION 1,2,3,4

DATE : 05/2014

DRAWN BY : Author

SCALE : 1 : 150

CHECKED BY : Checker

PROJECT NO : 2014_WEST STATION

N

LOOK

C

architects LOOK ARCHITECTS PTE LTD

18 B O O N L A Y W A Y # 0 9 - 1 3 5 T R A D E H U B 2 1 S I N G A P O R E 6 0 9 9 6 6 T. 6 3 1 6 8 6 7 6 F. 6 3 1 6 8 6 9 0 E. e n q u i r y @ l o o k a r c h i t e c t s . c o m . s g

DRAWING TITLE :

SITE PLAN Scale: 1 : 150

SITE PLAN

DATE : 05/2014

DRAWN BY : Author

C

architects

2300

27900

DC

URA


Meifeng is in the North Entrance with a shopping mall bellow and the public hill park. There are a complex ramp system from the bottom to the top of hill to connect the walkway. A part ramp system is in the central lake to make more interesting feeling.

54600 38000

54518 39000

54108

46000

47000

45000

44000

43000

41000 40000

52649

42000

1:18

50000

48000

1:18

51000

49000

52000 53000

54000

48934 36000

1:18 37000

55000 56000

38000

50485 40000

39000

57000

1:18 41000

57000

42000

43000

44000

45000 56000

46000

48000

47000

50000

55000

51000

54000

49000

53000

46441 1:15

52000

51000 50000

30000

49000

1:18

48000

20300

47000

46000

51000

45000

50000

43000

29100

49000

44000

17100

42000

23100

45054

1:5

41000

48000

21900 21900

27500

1:18

24100

23590

40000

39000

38000

23900

26500

43229

34975

47000

43000

44000

42000

40000

24600

40600

38000

39000

42000

40500

43000

41700

24600

41000

22100

14000

28500

27700

1:18

40600

34940

33894

29100

30500

28700

13798

24100

26500

45000

28500

24900

26980

29500

46000

14000

18600

24900

24900

29000

1:66

34500

36000

42500

36500

29100

1:23

29000

[No Slope]

41000 42000

31316

33600

35334

42000

1:14

39700

1:37

25200 25200

29600

1:13

1:14

29600

1:15

24600

1:10

35000

[No Slope]

32500

40600

40600

37000

1:14

29600 28100

30500

1:9

25200

1:12

29600

29600

43800 28000

27000

26360

29000

35000

1:16

42500

45500

36790

37500

39500

29600

41000

31000

1:16

24900

28096 37500

34000

46500

42500

48500

31400

45000

39000

31600

24800

35500

29600

1:16

Bridge 2 is in the abyss mountain with 38m long span at Zuohai is in the East Entrance with a complex ramp shelter 93.00m sea level. This bridge is also the rest point in the system to connect the walkway from the small park and middle of walkway with a shelter, canopy and rest room. lake. This is also the end of Fuzhou Park.

MEIFENG

35000

ZUOHAI

37000

BRIDGE 2

1:8

38000

41000

36500 1:15

42970

28100

45000

46500

49000 42500

45500 43500

42860 1:46

33|34


Recent Works in Company

PUBLIC HOUSING

KALLANG WHAMPOA C21 from NIMBY* to GIMBY* July 2014 to present. Kallang, Singapore. LOOK Architects Singapore. As part of the larger urban fabric, public housing draws its strength and unique character from the dynamics that are set up with its surroundings. Through an extension of these relationships, we have formulated a rich matrix of shared spaces within the precinct to celebrate the vibrancy and diversity of living that can be experienced only in the heartlands. The challenge lies in the unobtrusive integration of these common spaces and abolishing the negativity tied to the currently pervasive ‘NIMBY’ syndrome. *NIMBY - Not In My Backyard *GIMBY - Good In My Backyard S I T E L AY O U T DESIG N CO NSIDER AT IO N S -

Optimised views

-

North-south facing units

-

Seamless connectivity to Park Connector Network (PCN) and surrounding precincts BLK 3

BLK 1

MSCP BLK 2 “STEPPED” BUILDING HEIGHTS (HIGH-RISE HOUSING BLOCK & MSCP) ALONG SERANGOON ROAD FOR INTERESTING STREETSCAPE

N


35|36



THANK YOU FOR YOUR REGARDS


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.