PORTFOLIO NGUYỄN NHẬT ANH
Architecture 2008 - 2014
PROFILE
EDUCATION
SKILL
Bachelor of Architecture Sep 2008 - Jul 2013. Ho Chi Minh City University of Architecture 196 Pasteur Street, District 3, Ho Chi Minh City.
Hand Sketching. Paper Concept Modeling. Software: Advance at: Revit Architecture (from 2010), Lumion 3d Visualization (from 2011), Adobe Indesign, Microsoft Word, Excel and Power Point. Good at: Google Sketchup, Adobe Photoshop. Good Soft-Skill: Organizition, Management, Teamwork, Presentation,...
Vietnamese: Native English: Good Janpanese: Beginner
ACHIEVEMENTS PERSONAL Full Name: Date of Birth: Place of Birth: ID Card: Issued Date: Issued Place: Address: Mobile: Email:
WORKING EXPERIENCES
HCMC University of Architecture Scholarship in 2009, June 2009, 2010: Volunteer at Vietnam Architectural ExhiINFORMATION 2010, 2012, 2013 for Good Study. bition - VietArch 2009, 2010. HUYNH TAN PHAT Scholarship in 2009, 2010. NGUYEN NHAT ANH July 2011 to Sept 2011: Worked at ABBO Community 2011: 3rd Place of Western Coach Terminal Competition. (Trainee Architect) January 7th 1990. (Teamwork with Nguyen Tang Quang, Tran My Kim, Ho The Khoa and Tram Vinh Dat). Sept 2013 to Present: Management and Revit Training at Long Thanh Town, Dong Nai. d.o.t Studio. 2011: 2nd Place in The International Summer Workshop for 272084333 Students of HCMU.ARCH: Project on “Local Indentity in Ar- 2012 to Present: Freelancer Designer. chitecture” with Prof. Maxime-Alexis Frappier from University May 24th 2007. of Montreal. May 2014 to Present: Architect at LOOK Architects Vietnam. Dong Nai Province. 2012: Participated in the project “The Digital Days at University College of Northern Denmark” from 18-20 April 2012 144/15 Nguyen Khoai Street, Ward 2, (workshop with Prof. Walter Terry Jackson, Prof. Carl Red- INTERESTS District 4, Ho Chi Minh City. mond and Students from UCN). Movie, Piano. +84 (0) 938 577 002 2012: Shortlisted Project at World Architectural Festival: Traveling, Cycling, Football. Rethink and Renew - Student Competition in Marina Bay anh.nguyennhat.kts@gmail.com Sands, Singapore. 2014: Revit team leader for the Public Housing Project (HDB) in the LOOK Architects’ Head Office in Singapore.
with love and patience,
nothing is impossible.
01|02
CONTENTS
ACTIVITIES
01. PROFILE 03. ACTIVITIES 05. INDOOR SPORT ARENA 09. CERAMIC TILES FACTORY 11. WESTERN COACH TERMINAL 15. OFFICE TOWER 21. RACH CHIEC STADIUM 29. RENCENT WORKS 31. WORKS IN PROGRESS 33. WORKS IN COMPANY
Seminar “Project Management in Revit Architecture”
Seminar “Lumion 3d Visualization - Experiences Images Movies”
October 2013 d.o.t Studio, District 4, Saigon.
April 2014 d.o.t Studio, District 4, Saigon.
We discussed Project Management for designing projects in We discussed Lumion 3d version 4.0.2 for Rendering Imthe university when using Revit Architecture. And we shared ages and making Movies on projects. And we shared the the experience of working group effectively. experience of working group effectively.
“Life is like riding a bicycle, to stay balanced you must keep moving!!!� Albert Einstein
03|04
Individual Academic Project, Semester 8 MULTI-PURPOSE INDOOR SPORT ARENA 2000 SEATS April 2012 District Tan Binh, Saigon. DArch. Trinh Duy Anh.
The idea of the project is inspried by the UFO’s form with two long roof span for spectators and event organization entrances. There are two large bus station for public transports for spectators. Thus the project will be improve public space for communitity and outdoor events.
Site Plan
Event Organization
Concourse
Players Athletes
Playing Field
VIP Room
Concourse
3d Section 02
Section 01
Section 02
05|06
Level 01
Level 02
Level 03
07|08
Individual Academic Project, Semester 7
CERAMIC TILES FACTORY October 2012 North West Cu Chi Industrial Zone, Saigon. MArch. Quach The Vinh.
The idea of the project is inspried by the Folding Paper with many module for whole the factory. This form will be improve natural lighting and ventilation.
Site Plan
Level 01
Section 01
Section 02
Elevation South
Elevation West
09|10
Competition Teamwork Project
3rd prize, WESTERN COACH TERMINAL COMPETITION
CRYSTAL July 2011 Binh Chanh District, Saigon.
Located in Binh Chanh Village, Saigon, Wester Coach Terminal has been playing an eminent role in transfering passengers and ware between Saigon and Western. It was designed like a complex building with many functions: Station, Shopping Mall, Hotel, Entertainment,... From the many sketching step, familiar images of inhabitants in Western of Vietnam, such as nipa palm, fishing net,... were noticed deeply. Therefore, an important duty was set up: combining dynamic and young life of Saigon with specific features of Western. And all characteristics were Crystallized together in whole mass. This building’s shape can The progress of developing mass from a Basic Form 120x80x22m to to final proposal reflect a animated modern life, on the other hand, it can evoke feeling about Western existence in Vietnam through its space, facades, details,... Crystal is a beautiful image which can share an message about filtering, combination and reflection. Influency of wind in progress of developing mass
Aluminium Panel
Stell Truss
L5: Offices Hotels L4: Offices Hotels L3: Shopping Entertainments L2: Service Departure Hall
L1: Hall Station Departure Gates
B1: Parking & Taxi
B2: Parking
Diagram of Function
11|12
Level 02
Level 01
Level 03
Section 01
Level 04
Section 02
Level 05
13|14
Individual Academic Project, Semester 9 18 STORIES OFFICE TOWER December 2012 District 10, Saigon. BArch. Doan Trinh Hien.
The idea of the project is inspired by Ramdon Pixels for reducing sun radiation on the facade. The tower 18 floors contain grade A office space and 2 floors for material construction shopping mall.
Site Plan
Basement 01
Level 01
Basement 02
15|16
Level 02
Level 03
Level 04
Level 05
1
645m2
Layout 1 Office
1
2
325m2
320m2
Layout 2 Offices
1
3
210m2
210m2
2
225m2
Layout 3 Offices
1
110m2
2
215m2
Layout 4 Offices
4
110m2
3
210m2
Section B-B’
17|18
Thermal Radiation Analysis results
Random aluminium panel
Insulated double glass
Steel curtain frame
Based on the analysis result, the facade is used different module and density for different orient facade and functions. The tower is used two kinds of panel: 1. Insulated Double Glass 2. Aluminium Panel
Elevation North West
Facade Solutions
Details of Air Conditioning System
19|20
2013 Graduation Project RACH CHIEC STADIUM 35.000 SEATS July 2013 District 2, Saigon. MArch. Tran Dinh Nam. The Stadium will be an new Saigon Iconic beside many others: Saigon Notre-Dame Basilica, Municipal Theatre, Ben Thanh Market, Bitexco Financial Tower,... The idea of masterplan is insprired by the flow of water through the stones naturally. The end of water flow is a Stadium with many circle twisted together to improve natural lighting and ventilation for public space.
21|22
Section 1
Section 2
23|24
Level 01
Level 02
Level 03
Level 04
25|26
Aluminium Panel Roof
Steel Frame, Insulated Glass
Steel Truss Frame & Column
Seating Stand Precast Concrete Steel Frame Structure
Two Floor Plans
Diagram
Details of Seats and Columns
27|28
Teamwork Workshop at University “The Digital Days at University College of Northern Denmark” 18-20 April 2012 Aalborg, Denmark.. Prof. Walter Terry Jackson and Carl Redmond. In cooperation with the University of Architecture in HCMC Vietnam as a representative of the Bachelor Degree Programme in Architectural Tachnology and Construction Management at University College of Northern Denmark under the school of Technology. In the roll as BIM Coordinator working on the real life project to design the extension to the hospital in Aalborg Denmark. In the course of the three days, Danish and international students will work on a project at Aalborg Hospital – an extension of the radiation capacity of the Oncology department. All trade groups work in the same room and can thus instantly utilize each others knowledge and working capac- Day 3: Presentation Proposal ity. This gives them a unique opportunity to meet, experience and interact and helps creating a better insight into and understanding for the various approaches and working methods of the trades in a complex building process. As a result of the cooperation with University of Architecture, Ho Chi Minh City in Vietnam, a group of building construction students and their teachers are to be sent to Vietnam. This makes it possible to have a participant satellite at the university in which also Vietnamese architecture students participate. The purpose is to demonstrate that it is possible to cooperate in a digital building process across time and geography. Day 1: Concept
Day 2: Development Proposal
Teamwork Workshop at University “Local Indentity in Architecture� July - September 2011 District 1, Saigon. Prof. Maxime-Alexis Frappier, University of Montreal.
the PEARL
REVIVE AN ICON
The aim of the workshop is to design a skyscraper in one the provided sites near Saigon River, reflecting a local indentity within a limited time of three days. The workshop students worked mainly with models to explore the urban context and the impact when a new building is inserted. Through various of experiments with the site, the team reach the conclusion of a spherical form which stood out as total contradiction within the surrounding concrete boxex. The sphere creates a reminiscent feeling toward the history of the old Saigon when the city was known as the Pearl of the Far East. Thus the proposal is the revival of an icon, reflecting the distinctive indentity of the city, Saigon.
29|30
Recent Works DAISY HOTEL September 2013 Nha Trang, Khanh Hoa. Main Hall Interior. Schematic Design.
No.
Mark Revision note
Date
This DWG. is the property of............................... the information contained hereon may not be use or copied in manner without the written permission of the owner.
ISSUED FOR PHÁT HÀNH Tham khảo
Reference
Thiết kế sơ bộ
Preliminary
Trình duyệt
For approval
Đấu thầu
For tender
Thi công
For construction
Hoàn công
As-built
CHẤP THUẬN CỦA CHỦ ĐẦU TƯ APPROVAL OF THE OWNER
A
CHẤP THUẬN CỦA QUẢN LÝ DỰ ÁN
5,930
APPROVAL OF THE PROJECT MANAGER
UP
CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG QUỐC TẾ
1,000 10,280
INTERNATIONAL CONSTRUCTION CONSULTANCY JOINT STOCK COMPANY
B
UP
4,350
Head Office. 6th Floor, CentrePoint Building, 106 Nguyen Van Troi Street Phu Nhuan District, Ho Chi Minh City, Vietnam Tel: (+84 8) 3847 9227 Fax: (+84 8) 3847 9228 Email: info@iccjsc.vn Website: www.iccjsc.vn
Giám đốc - Director KS. Lê Duy Khôi Chủ trì - Presided by KTS. Nguyễn Đình Tâm Thiết kế - Designed by C
3,000
3,000
3,700
5,100
1
1
2
3
4
KTS. Lê Huy Cường Thiết kế - Designed by KTS. Hoàng Thị Bính Bạch Tuyết
5,360
Thiết kế - Designed by
20,160 5
MẶT BẰNG TẦNG 1 TL: 1 : 50
Floor Plan
6
KTS. Lê Ngọc Tú Kiểm - Checked by KS. Lê Duy Khôi Dự án - Project
DAISY HOTEL 71 Nguyễn Thị Minh Khai Nha Trang, Khánh Hòa
Hạng mục - Item
HOTEL
Tên bản vẽ - Drawing title
HOA LAN’S HOUSE
MẶT BẰNG TẦNG 1
Com. date Job No.
October 2013 Phu Nhuan District, Saigon. Interior Design. Design Development & Construction Documentation. Completed 2014
22-06-2013
Dwg No.
ICC.1207.SG.TOBA.010
A101 1 : 50
A3
A3 7,710
7,710
2,630
2,630 CHỈ GIỚI XD
P. RÁC
P. GIẶT SẤY
6,110
4 m²
SAUNA
1,150
P. NGỦ 3
8 m² +9,900
P. GIA NHÂN
6,110
7 m²
15 m² 1
BÃI XE 51 m²
+10,500
PHÒNG DULUXE
20 m²
P. THỜ
25 m²
11 m²
PHÒNG DULUXE
20 m²
28 m²
10,290
7 m²
GIAO THÔNG
890 2,760
PHÒNG S1 LAUNRY
10,290
PHÒNG S1
GIAO THÔNG
5,750
A106
5,750
A106
GIAO THÔNG
+0
+9,900
8,200
2,760 1
PHUONG’S HOUSE
SÀN LƯỚI THÉP
5,990
PHỤ TRỢ
GIAO THÔNG
SAN NUOC
PHÒNG S2
GHI CHÚ:
PHÒNG S2 21 m²
9
CHO THUÊ 3,200
22 m²
GIAO THÔNG 1,110
GIA CHỦ
CÂY XANH
1,110
CHO THUÊ
4,010
4,010
GHI CHÚ:
GIA CHỦ
6,090
L1
A3
CÔNG TY TNHH THIẾT KẾ & XÂY DỰNG
HOÀNG TRUNG ĐC: 106/5 BÀU CÁT 1, P.14, Q.TB, TP.HCM ĐT: (+84) 8 38492014 FAX: EMAIL:
5m
10m
DỰ ÁN
0
GIÁM ĐỐC:
CHỦ ĐẦU TƯ
CHỮ KÝ:
#
MÔ TẢ
NGÀY
TRƯƠNG QUANG HIỂN B 7,710
TRUNG NHẬT ANH THIẾT HOÀNG KẾ: NGUYỄN
5m
GIÁM ĐỐC:
CHỦ ĐẦU TƯ
3,200
MỤC ĐÍCH BAN HÀNH
HIỆU CHỈNH
VŨ VĂN TRỰC
CHỮ KÝ:
ĐC: 285/68C, CMT8, P12,Q10, TP.HCM 1 : 100 NGUYỄN NHẬT ANH TỈ LỆ:
VẼ:
10m
CHỮ KÝ:
KHU NHÀ Ở A101
ĐC: 106/5 BÀU CÁT 1, P.14, Q.TB, TP.HCM ĐT: (+84) 8 38492014 FAX: EMAIL:
HIỆU CHỈNH
C
03/29/14
NGÀY:
THI CÔNG
CHỮ KÝ:
ÔNG: ĐÀO MINH NHẬT
2m
DỰ ÁN
MẶT BẰNG TẦNG 1
THIẾT KẾ CƠ SỞ TRÌNH DUYỆT
A
CHỦ TRÌ:
L3
MỤC ĐÍCH BAN HÀNH CÔNG TY TNHH THIẾT KẾ & XÂY DỰNG
HIỆU CHỈNH
VŨ VĂN TRỰC
CHỮ KÝ:
KHU NHÀ Ở
ĐC: 285/68C, CMT8, P12,Q10, TP.HCM
1m
No rth
2m
A3
March 2014 District 10, Saigon. Architectural Design. Schematic Design. Complete in 2015.
1m
6,090
No rth
0
#
MÔ TẢ
NGÀY
MẶT BẰNG TẦ
THIẾT KẾ CƠ SỞ TRÌNH DUYỆT
A
CHỦ TRÌ:
TRƯƠNG QUANG HIỂN B ÔNG: ĐÀO MINH NHẬT
C
03/29/14
NGÀY:
THI CÔNG
THIẾT KẾ:
NGUYỄN NHẬT ANH
HIỆU CHỈNH
VẼ:
NGUYỄN NHẬT ANH
CHỮ KÝ:
2,630 CHỈ GIỚI XD
570
TẦNG MÁI NHÀ GIA CHỦ
2,620
1
10,290
3,300
4,010
21 m²
#
MÔ TẢ
PHỤ TRỢ
TRƯƠNG QUANG HIỂN B
A4
BHQ’S HOUSE
1
03/29/14
TRÌNH DUYỆT
NGÀY:
THI CÔNG
THIẾT KẾ:
NGUYỄN NHẬT ANH
HIỆU CHỈNH
VẼ:
NGUYỄN NHẬT ANH TỈ LỆ:
CHỮ KÝ:
C
ĐC: 106/5 BÀU CÁT 1, P.14, Q.TB, TP.HCM ĐT: (+84) 8 38492014 FAX: EMAIL:
MẶT BẰNG TẦNG 2
THIẾT KẾ CƠ SỞ
2
DỰ ÁN
GIÁM ĐỐC:
CHỦ ĐẦU TƯ
ĐC: 285/68C, CMT8, P12,Q10, TP.HCM
CHỮ KÝ:
MỤC ĐÍCH BAN HÀNH
HIỆU CHỈNH
VŨ VĂN TRỰC
CHỮ KÝ:
KHU NHÀ Ở
HOÀNG TRUNG
MỤC ĐÍCH BAN HÀNH NGÀY
A
CHỦ TRÌ:
ÔNG: ĐÀO MINH NHẬT
GIAO THÔNG
Level 1 0
CÔNG TY TNHH THIẾT KẾ & XÂY DỰNG
ĐC: 285/68C, CMT8, P12,Q10, TP.HCM
GIA CHỦ
3,200 Level 1 0
HIỆU CHỈNH
VŨ VĂN TRỰC CHỮ KÝ:
KHU NHÀ Ở
3,600
BÃI XE
Section GIÁM ĐỐC:
CHỦ ĐẦU TƯ
CHO THUÊ
GIAO THÔNG
3,300
1,110
PHÒNG DULUXE
No rth
10m
CHỮ KÝ:
GHI CHÚ: Level 2 3300
10
9
GIAO THÔNG
DỰ ÁN
SÂN TRƯỚC
Level 2 3300
L2 CÔNG TY TNHH THIẾT KẾ & XÂY DỰNG
HOÀNG TRUNG
P. KHÁCH + ĂN + BẾP
PHÒNG S2
6,090
ĐC: 106/5 BÀU CÁT 1, P.14, Q.TB, TP.HCM ĐT: (+84) 8 38492014 FAX: EMAIL:
GIAO THÔNG
P. NGỦ 2
Level 3.1 6900
19
5m
PHÒNG DULUXE
GIAO THÔNG
3,600
890 8,200
2m
GIAO THÔNG
P. GIẢI TRÍ
Level 3 6600
+3,300
GIA CHỦ
1m
PHÒNG DULUXE
GIAO THÔNG
3,300
25 m²
GIAO THÔNG
5,990
0
GIAO THÔNG
Level 4.1 10500
PHÒNG DULUXE
20 m²
11
CHO THUÊ
PHÒNG DULUXE
Level 4 9900
PHÒNG S1
SÂN TRƯỚC +2,900
2,760
Level 5.1 14100
TẦNG MÁI KHU NHÀ CHO THUÊ Level 5 13200
3,300
5,750
6,110
KHO
3,300
1
3,330
WC
P. KHÁCH + ĂN + BẾP 63 m² +3,300
A106
MÁI LẤY SÁNG GIẾNG TRỜI
1,150
600
4,030
2,150
3,600
2,470
1,240
2,760
GHI CHÚ:
#
MÔ TẢ
NGÀY
MẶT CẮT
THIẾT KẾ CƠ SỞ
TRƯƠNG QUANG HIỂN B
THIẾT KẾ:
NGUYỄN NHẬT ANH
HIỆU CHỈNH
VẼ:
NGUYỄN NHẬT ANH TỈ LỆ:
A102 1 : 100
3
3,750
4
4,250
5
3,500
4,850
C
REF. BẾP
4,500
PHÒNG NGỦ 1
1 A301
PHÒNG KHÁCH
7,673
+0
PHÒNG ĂN
B
1
WC 2
3
HỒ CÁ
WC 1
PHÒNG NGỦ 2
3,173
5 7 9
SÂN TRƯỚC
-150
L1
BDH’S HOUSE
A
3,810
CÔNG TY TNHH THIẾT KẾ & XÂY DỰNG
DỰ ÁN
CHỦ ĐẦU TƯ CHỮ KÝ:
HOÀNG TRUNG ĐC: 106/5 BÀU CÁT 1, P.14, Q.TB, TP.HCM ĐT: (+84) 8 38492014 FAX: EMAIL:
L1
L3
L2
L5
NHÀ PHỐ ĐC: Trần Hưng Đạo, Q.5, Tp.HCM
GIÁM ĐỐC: CHỮ KÝ:
CHỦ TRÌ:
# A
TRƯƠNG QUANG HIỂN B Ông: Owner
Section
MỤC ĐÍCH BAN HÀNH
HIỆU CHỈNH
VŨ VĂN TRỰC
MÔ TẢ
NGÀY
TRÌNH DUYỆT
NGÀY:
THI CÔNG
THIẾT KẾ: NGUYỄN NHẬT ANH
HIỆU CHỈNH
VẼ:
CHỮ KÝ:
C
MB TRỆT
THIẾT KẾ CƠ SỞ
A106
THI CÔNG
CHỮ KÝ:
C
03/29/14
NGÀY:
TRÌNH DUYỆT
A
CHỦ TRÌ:
ÔNG: ĐÀO MINH NHẬT
20,950 4,600
March 2014 District 5, Saigon. Architectural Design. Schematic Design. Complete in 2014.
April 2014 Thu Dau Mot City, Binh Duong. Architectural Design. Schematic Design. Complete in 2015.
P. GIẶT SẤY
15 m² P. GIẢI TRÍ
1
2,150
6 m²
570
570
3,330
14 m²
4,030
2,620
600
WC KHÁCH
P. TIẾP KHÁCH
2,760
1,150
15 m²
2,470
2,150
BẾP + P. ĂN
600
2,470
P. MÁY PHÁT ĐIỆN
1,240
4,030
1,240
2,760
2,620
CHỈ GIỚI XD
3,330
Works in Progress
12/04/14
A101
NGUYỄN NHẬT ANH TỈ LỆ:
1 : 100
31|32
1 : 100
Recent Works in Company FUZHOU PARK - FOREST IN THE CITY May 2014 to present. Fuzhou, China. LOOK Architects Vietnam.
BRIDGE 1
WEST STATION
Bridge 1 is 80m long span in the West Entrance. This is the connection to the West Station and the Walkways. The facade is made from many folded steel modules to create difference feelings from difference postions.
West Station is the main station in West Entrance. From this point, we can walk on the sloped roof of station to connect to the Bridge 1 or the beginning of Walkways. This is also a rest stop with a small shop and rest room.
Fuzhou Park is the complex project with many buildings, park and brigdes in the Fuzhou’s central big mountain. This project will be a new public space for walking, sight seeing, picnic and many outdoor activities. The idea is “Bring the forest to the central city” to make people easy to enjoy the forest enviroment and encourage them to protect our natural enviroment. In Fuzhou Park, we have three entrances : West, East and North. Bridge 1 and West Station are in West Entrance. Zuohai is in the East Entrance. And Meifeng is in the North Entrance. There are another buildings such as : Bridge 2, Observation Tower, Tea Houses, Vistor Center and the Walkway Systems to connect all of the buildings in Fuzhou.
1600
Level 7 26700
Level 6 25100 1500
MAJOR PROJECT
Level 5 23600
1500
10200
1700
Level 2 18800
2300
Level 2 18800
2300
1500
Level 3 20300
10200
Level 3 20300
1600
Level 5 23600 Level 4 22000
Level 4 22000
1500
Level 6 25100
1700
1600
Level 7 26700
1600
MAJOR PROJECT
Level 1 16500
Level 1 16500
Level 0 16200
Level 0 16200
EAST ELEVATION
SECTION A
ELEVATION DETAILS
Scale: 1 : 150
Scale: 1 : 100
1600 10200
1700 Level 2 18800
2300
Level 2 18800
1:10
Level 1 16500
10 1:9
Level 1 16500
Level 0 16200
Level 0 16200
16500
S
2300
1500
Level 3 20300
7100
Level 3 20300
1600
Level 5 23600 Level 4 22000
Level 4 22000
1500
Level 6 25100
18800
1500
Level 7 26700
26700
1700
10
1600
Level 5 23600
WEST ELEVATION
WATER FEATURE
SECTION B
Scale: 1 : 150
NO REV
AMENDMENT
Scale: 1 : 100
1:17
20300
AMENDMENT
DATE
Level 7 26700
1600
NO REV
1500
Level 6 25100
1:10
10200
Level 4 22000
1600
Level 5 23600
22000
TENURE OF LAND : ...
1500
Level 3 20300
1700
23600
25100
OWNER :
2300
Level 2 18800
Level 1 16500 Level 0 16200
SECTIONAL DETAILS
16450
............................................................................................... Owner Enter address here
SOUTH ELEVATION Scale: 1 : 150
DECLARATION : I, Mr. LOOK BOON GEE, NRIC NO : S 2567932F , HEREBY DECLARE THAT : a) I AM NOT THE OWNER(S) OF THE LAND WITHIN THE MEANING OF THE TERM "OWNER" AS DEFINED IN SECTION 2 OF THE PLANNING ACT 1998: AND
b) I HAVE SHOWN THIS PLAN TO THE OWNER(S) OF THE LAND, AND HAVE OBTAINED THECONSENT OF THE SAID SUBMIT THIS PLAN TO THE COMPETENT AUTHORITY UNDER THE PLANNING ACT 1998.
TENURE OF LAND : ...
16500
......................................
OWNER :
1
..................................
Mr. LOOK BOON GEE R.E.G 1 2 2 4
DATE
301
Level 6
PROJECT : PROPOSED ERECTION OF .....
1600
Level 7 26700
10200
Level 4 22000
I, Mr. LOOK BOON GEE, NRIC NO : S 2567932F , HEREBY DECLARE THAT :
1700
23600
DECLARATION :
2
1600
1500
............................................................................................... 25100 Owner Level 5here Enter address
Level 3TERM "OWNER" a) I AM NOT THE OWNER(S) OF THE LAND WITHIN THE MEANING OF THE AS DEFINED IN SECTION 2 OF THE PLANNING ACT 1998: AND 20300
LOOK
1500
301
b) I HAVE SHOWN THIS PLAN TO THE OWNER(S) OF THE LAND, AND HAVE OBTAINED THECONSENT OF THE SAID OWNER(S) TO SUBMIT THIS PLAN TO THE COMPETENT AUTHORITY UNDER THE PLANNING ACT 1998. ......................................
Level 2 18800
..................................
Mr. LOOK BOON GEE R.E.G 1 2 2 4
DATE
LOOK ARCHITECTS PTE LTD
Level 1 16500
18 B O O N L A Y W A Y # 0 9 - 1 3 5 T R A D E H U B 2 1 S I N G A P O R E 6 T. 6 3 1 6 8 6 7 6 F. 6 3 1 6 8 6 9 0 E. e n q u i r y @ l o o k a r c h i t e c t s . c
Level 0 16200
PROJECT :
DRAWING TITLE :
PROPOSED ERECTION OF .....
NORTH ELEVATION Scale: 1 : 150
ELEVATION 1,2,3,4
DATE : 05/2014
DRAWN BY : Author
SCALE : 1 : 150
CHECKED BY : Checker
PROJECT NO : 2014_WEST STATION
N
LOOK
C
architects LOOK ARCHITECTS PTE LTD
18 B O O N L A Y W A Y # 0 9 - 1 3 5 T R A D E H U B 2 1 S I N G A P O R E 6 0 9 9 6 6 T. 6 3 1 6 8 6 7 6 F. 6 3 1 6 8 6 9 0 E. e n q u i r y @ l o o k a r c h i t e c t s . c o m . s g
DRAWING TITLE :
SITE PLAN Scale: 1 : 150
SITE PLAN
DATE : 05/2014
DRAWN BY : Author
C
architects
2300
27900
DC
URA
Meifeng is in the North Entrance with a shopping mall bellow and the public hill park. There are a complex ramp system from the bottom to the top of hill to connect the walkway. A part ramp system is in the central lake to make more interesting feeling.
54600 38000
54518 39000
54108
46000
47000
45000
44000
43000
41000 40000
52649
42000
1:18
50000
48000
1:18
51000
49000
52000 53000
54000
48934 36000
1:18 37000
55000 56000
38000
50485 40000
39000
57000
1:18 41000
57000
42000
43000
44000
45000 56000
46000
48000
47000
50000
55000
51000
54000
49000
53000
46441 1:15
52000
51000 50000
30000
49000
1:18
48000
20300
47000
46000
51000
45000
50000
43000
29100
49000
44000
17100
42000
23100
45054
1:5
41000
48000
21900 21900
27500
1:18
24100
23590
40000
39000
38000
23900
26500
43229
34975
47000
43000
44000
42000
40000
24600
40600
38000
39000
42000
40500
43000
41700
24600
41000
22100
14000
28500
27700
1:18
40600
34940
33894
29100
30500
28700
13798
24100
26500
45000
28500
24900
26980
29500
46000
14000
18600
24900
24900
29000
1:66
34500
36000
42500
36500
29100
1:23
29000
[No Slope]
41000 42000
31316
33600
35334
42000
1:14
39700
1:37
25200 25200
29600
1:13
1:14
29600
1:15
24600
1:10
35000
[No Slope]
32500
40600
40600
37000
1:14
29600 28100
30500
1:9
25200
1:12
29600
29600
43800 28000
27000
26360
29000
35000
1:16
42500
45500
36790
37500
39500
29600
41000
31000
1:16
24900
28096 37500
34000
46500
42500
48500
31400
45000
39000
31600
24800
35500
29600
1:16
Bridge 2 is in the abyss mountain with 38m long span at Zuohai is in the East Entrance with a complex ramp shelter 93.00m sea level. This bridge is also the rest point in the system to connect the walkway from the small park and middle of walkway with a shelter, canopy and rest room. lake. This is also the end of Fuzhou Park.
MEIFENG
35000
ZUOHAI
37000
BRIDGE 2
1:8
38000
41000
36500 1:15
42970
28100
45000
46500
49000 42500
45500 43500
42860 1:46
33|34
Recent Works in Company
PUBLIC HOUSING
KALLANG WHAMPOA C21 from NIMBY* to GIMBY* July 2014 to present. Kallang, Singapore. LOOK Architects Singapore. As part of the larger urban fabric, public housing draws its strength and unique character from the dynamics that are set up with its surroundings. Through an extension of these relationships, we have formulated a rich matrix of shared spaces within the precinct to celebrate the vibrancy and diversity of living that can be experienced only in the heartlands. The challenge lies in the unobtrusive integration of these common spaces and abolishing the negativity tied to the currently pervasive ‘NIMBY’ syndrome. *NIMBY - Not In My Backyard *GIMBY - Good In My Backyard S I T E L AY O U T DESIG N CO NSIDER AT IO N S -
Optimised views
-
North-south facing units
-
Seamless connectivity to Park Connector Network (PCN) and surrounding precincts BLK 3
BLK 1
MSCP BLK 2 “STEPPED” BUILDING HEIGHTS (HIGH-RISE HOUSING BLOCK & MSCP) ALONG SERANGOON ROAD FOR INTERESTING STREETSCAPE
N
35|36
THANK YOU FOR YOUR REGARDS