JACKON RETREAT Nicholas Guarna
WINDOWS AND DOOR SCHEDULES
SHEETS
Window Schedule Mark
1
9
1
1
1
3
Type (by type) JH (by type) JH Small 72x60 JH
Width 6' - 0" 5' - 0" 11' - 0"
Door Schedule Count
Mark
1
1
1
1 1 1 1 1
VICINITY MAP
11 2 3 4 5
Type
Width
Door-Curtai n-Wall-Sing le-Glass Door-Curtai n-Wall-Sing le-Glass Door-Curtai n-Wall-Sing le-Glass 68" x 80" 36" x 84" 36" x 84" 36" x 84" M10 x M21 Unclassifie dRight-hand ed JH
5' - 3 5/32"
Cover Sheet TITLE SHEET SITE PLAN FIRST FLOOR PLAN SECOND FLOOR PLAN ELEVATIONS ELEVATIONS SECTIONS SECTIONS ROOF PLAN Wall Section Detail Details Auxiliary Auxiliary Cost Estimate Prices
www.nicholas.guarna.com
Consultant Address Address Phone Fax e-mail
3' - 0 1/8"
5' - 8" 3' - 0" 3' - 0" 3' - 0" 3' - 6"
EXCEPTION: 1. RECESSED LIGHTING FIXTURES NOT OVER 56 LBS. IN WEIGHT, AND SUSPENDED AND PENDANT HUNG FIXTURES NOT OVER 20 LBS. IN WEIGHT, MAY BE SUPPORTED AND ATTACHED DIRECTLY TO THE CEILING SYSTEM RUNNERS BY A POSITIVE ATTACHMENT SUCH AS SCREWS OR BOLTS. 2. AIR DIFFUSERS WHICH WEIGH NOT MORE THAN 20 LBS., AND WHICH RECEIVE NO TRIBUTARY LOADING FROM DUCT WORK MAY BE POSITIVELY ATTACHED TO AND SUPPORTED BY THE CEILING RUNNERS. THE ABOVE REQUIREMENTS ARE INTENDED TO BE IDENTICAL TO THOSE CURRENTLY ENFORCED BY THE CITY OF LOS ANGELES. THE 2007 CBC STANDARD IS ALSO AN ACCEPTABLE BRACING METHOD. OTHER METHODS USING THE LOADS SPECIFIED IN CHAPTER 23 OF THE 2007 C.B.C. MAY BE USED, PROVIDED THEY ARE SUBSTANTIATED BY DESIGN CALCULATIONS RC-4 CONTRACTOR TO COORDINATE ELECTRICAL, MECHANICAL AND CEILING CONTRACTOR TO VERIFY THAT ADEQUATE DEPTH IS PROVIDED ABOVE CEILING TO ACCOMMODATE RECESSED LIGHTING FIXTURES. BEFORE PROCEEDING WITH WORK, ARCHITECT SHOULD BE NOTIFIED OF ANY OBSTRUCTIONS THAT WOULD INTERFERE WITH LIGHTING LAYOUT. RC-5 GENERAL CONTRACTOR TO SUBMIT CUT SHEETS FOR ALL FIXTURES AND EQUIPMENT INCLUDING LIGHTS, SWITCHES, PLATES, PLUGS, DIMMERS, SENSORS AND GRILLES TO ARCHITECT FOR APPROVAL, PRIOR TO PURCHASE AND INSTALLATION. RC-6 ARCHITECT'S DRAWINGS GOVERN OVER ENGINEER'S FOR ALL INFORMATION CONCERNING TYPE, AMOUNT AND LOCATION OF FIXTURES. ANY DISCREPANCIES SHOULD BE BROUGHT TO THE ATTENTION OF ARCHITECT PRIOR TO ORDER. RC-7 THE GENERAL CONTRACTOR AND SUBCONTRACTORS MUST CERTIFY THAT ALL MATERIALS, EQUIPMENT AND PROCESSES THAT ARE TO BE USED OR INSTALLED ON THE PROJECT ARE FREE OF ASBESTOS CONTAINING MATERIALS (ACM), AND POLYCHLORINATED BIPHENYSIS (PCB). RC-8 ALL WORK TO BE PERFORMED IN STRICT ACCORDANCE WITH THE CALIFORNIA MECHANICAL CODE AND ALL APPLICABLE LOCAL BUILDING CODES AND ORDINANCES. RC-9
0 A0.0 A1.0 A2.0 A2.1 A3.0 A3.1 A4.0 A4.1 A5.0 A6.0 A7.0 A8.0 A8.1 A9.0
SHEET NAME
3' - 6 1/2"
NOTES
Project Location
SHEET NO.
LIGHT FIXTURES IN FIRE RATED CORRIDOR CEILINGS TO BE FIRE PROOFED PER LOCAL CODES.
RC-10 PROVIDE MOTORIZED FIRE DAMPERS AT ALL MECHANICAL DUCTS OR AIR RETURN OPENINGS WHICH PENETRATE FIRE RATED PARTITIONS. HVAC CONTRACTOR TO VERIFY EXISTING DAMPERS MEET CODE PRIOR TO BIDDING. RC-11 DIRECTIONAL EXIT SIGNS TO BE INSTALLED TO SATISFY REQUIREMENT OF LOCAL BUILDING AND FIRE CODES. ILLUMINATED EXIT SIGN TO BE DUAL CIRCUITED ON REGULAR POWER AND SELF-CONTAINED EMERGENCY BATTERY POWER OR PLEXIGLAS, MIRRORED LETTERS TO BE GREEN ON APPROVED EQUAL. ILLUMINATED FROM WITHIN CEILING, U.O.N. RC-12 PROVIDE NIGHT LIGHTING BY ASSIGNING SELECTED FIXTURES TO BE ON DUAL CIRCUIT REGULAR POWER AND SELF-CONTAINED BATTERY BACKUP (EMERGENCY), OR AS INDICATED ON PLANS. RC-13 WHERE ONE (1) SWITCH ONLY IS INDICATED ON PLAN, CONTRACTOR SHALL PROVIDE OTHER ADDITIONAL SWITCHES AS REQUIRED IN ACCORDANCE WITH CODE REQUIREMENTS AND BEST TRADE PRACTICE. SUCH ADDITIONAL SWITCHES SHALL BE IN LOCATIONS AS INDICATED ON PLAN AND GROUPED IN GANG PLATES AS REQUIRED. RC-14 WHERE LIGHT MOTION SENSORS ARE SPECIFIED, ENGINEERS TO LOCATE SENSORS FOR BEST APPLICATION. ARCHITECT TO APPROVE SENSOR
PARCEL INFORMATION ARCHITECT: ANNE FOUGERON ARCHITECTURE 720 YORK STREET #107 SAN FRANCISCO, CA 94110 P: 415.641.5744 F: 415.282.6434 CLIENT: MARILOUISE JACKSON 565 Bellvue Ave #801 Oakland, CA 94601 P:510.839.5420
JACKSON HOUSE
CONTRACTOR: ARDEN HANDSHY PO BOX 51758 PACIFIC GROVE, CA 93950 P: 831.649.6420 F: 831.649.1338 FACILITATOR: HAROLD GRICE 561 BRUNKEM AVE SUITE A SALINAS, CA 93901 P: 831.422.9619 CIVIL ENGINEER: JEFF NORMAN BOX 15 BIG SUR, CA 93920 P:831.667.2815 F:831.667.1105
Nicholas Guarna
BIOLOGICAL ENGINEER: JEFF FROKE 3158 BIRD ROCK ROAD PEBBLE BEACH, CA 93953 P: 831.649.3764. F: 831.649.3763 AMPHIBIAN STUDIES: PAUL ENDRES 2444 SPAULDING AVE BERKELEY,CA 94703 P: 510.845.4533 F: 510.845.3906 STRUCTURAL ENGINEER: ROY WEBSTER & ASSOCIATES 512 CAPITOLA AVE, #201 CAPITOLA CA 95010 P:831.462.6237 FORESTER: ARCHAEOLOGICAL RESOURCE MGMT. 496 N. 5TH ST. SAN JOSE, CA 95112 P: 408.295.1373 ARCHAEOLOGICAL: THOMAS GEORGE CONSTRUCTION 8716 CARMEL VALLEY ROAD CARMEL, CA 93923 P: 831.624.7315 F: 831.601.1319 SPEC WRITER: GEORGE TIEDERMAN P: 415.999.4713
Project number
Project Number Checker
Checked by
TITLE SHEET
A0.0
5/5/2019 8:49:03 PM
Count
SHEET INDEX
www.nicholas.guarna.com
Consultant Address Address Phone Fax e-mail
2
A
.1 A3
1
B
2
.0 A3
F
"
G
4" 1/
H I
"
DN
32 1/
-1
2 1/
11
6'
' 25
-4
E '24
6
4
5"
5
D
1
'26
3
C
J
DN
K L '40
M
4 4" 1/ 2'
DN
' 11
'23 1 2" 1/
' 25
2" 1/
"
"
1
-2
-1
2 1/
/ 15
7'
JACKSON HOUSE
"
.1 A3
6' 8" 5/
6'
16 5/
-4
-7
" 32
-2
-9
'22 8 16 1/ "
'35
6
1 1/
6"
Nicholas Guarna
Project number
Project Number
SITE PLAN
True North
1
Site 1/16" = 1'-0"
A1.0
5/5/2019 9:42:23 PM
Checker
Checked by
A
B
C
D
14' - 2 1/4"
E
F
8' - 11 15/32"
G
H
I
16' - 8 3/4"
J
K
8' - 8 1/2"
L
17' - 7 5/8"
M
9' - 6 3/32"
2' - 9"
2' - 9"
www.nicholas.guarna.com
7' - 2 1/2"
7' - 2 1/2"
DN
Consultant Address Address Phone Fax e-mail
7' - 0"
1
15' - 4 15/32"
11
8' - 1 31/32"
2
3 1
LIVING ROOM 3
FIRE PLACE 2
BEDROOM 1
BEDROOM 4
4
12' - 9 1/2"
12' - 9"
A4.0
JACKSON HOUSE
5
5' - 1"
5' - 4"
4' - 10"
3
Nicholas Guarna
4
9' - 7 1/4"
2
21 DN
A4.0
20
KITCHEN 6
2
BATHROOM 7
BATHROOM 5
15
6
DN
6' - 5 1/4"
5' - 6 3/4"
5' - 6 3/4"
5' - 6 3/4"
5' - 6 3/4"
5' - 6 3/4"
6' - 1 1/4"
7' - 8 1/2"
5' - 6 1/2"
6' - 2 1/4"
Project number
Project Number Checker
Checked by
2
1
A4.1
A4.1
FIRST FLOOR PLAN Project North
1
02 - FIRST FLOOR 1/4" = 1'-0"
A2.0
5/5/2019 10:03:45 PM
3' - 8"
A
B
C
D
E
F
G
H
I
J
K
L
M
www.nicholas.guarna.com
14' - 2 3/4"
8' - 8 1/4"
16' - 11 1/4"
8' - 8 1/2"
11' - 2"
6' - 5 5/8"
Consultant Address Address Phone Fax e-mail
9' - 5 7/8"
4' - 5"
7' - 0"
4' - 9 1/2"
1
6' - 1 31/32"
8' - 4 19/32"
2
3 1
12' - 6 1/2"
A4.0
DN
LIBRARY 8
LOFT 9
JACKSON HOUSE
5' - 4"
5' - 4"
4' - 5 1/8"
4
5
5
9' - 10 1/4"
9' - 7 1/4"
Nicholas Guarna 2 A4.0
6
5' - 6 3/4"
5' - 6 3/4"
5' - 6 3/4"
5' - 6 3/4"
5' - 6 3/4"
6' - 1 1/4"
7' - 8 1/2"
2
1
A4.1
A4.1
6' - 1 1/4"
5' - 6 3/4"
6' - 2 1/4"
9' - 9 15/32"
Project number
Project Number Checker
Checked by
SECOND FLOOR PLAN Project North
1
03 - 2ND FLOOR 1/4" = 1'-0"
A2.1
5/5/2019 10:08:59 PM
6' - 2 1/4"
M
L
K
J
I
H
G
F
E
D
C
B
A
Chanel Glass
2
1
A4.1
A4.1
Concrete Wall With Stucco Finish
Cross Column
www.nicholas.guarna.com
05 - ROOF TOP 24' - 10"
Copper Finish
04 - ROOF BOTTOM 22' - 2 1/2"
Cherry Wood Fence
Consultant Address Address Phone Fax e-mail
03 - 2ND FLOOR 12' - 4"
02 - 1ST FLOOR 2' - 4" 01 - GROUND FLOOR 0' - 0" 00 - Below -2' - 4"
1
JACKSON HOUSE
North 1/4" = 1'-0"
A
B
C
D
E
F
G
H
I
2
1
A4.1
A4.1
J
K
L
M
05 - ROOF TOP 24' - 10"
Nicholas Guarna
04 - ROOF BOTTOM 22' - 2 1/2"
03 - 2ND FLOOR 12' - 4"
Project number
Project Number
02 - 1ST FLOOR 2' - 4" 01 - GROUND FLOOR 0' - 0" 00 - Below -2' - 4"
2
South 1/4" = 1'-0"
NORTH-SOUTH ELEVATIONS
A3.0
5/5/2019 10:14:51 PM
Checker
Checked by
6
5
4
3
2
1
A4.0
A4.0
2
1
05 - ROOF TOP 24' - 10" 04 - ROOF BOTTOM 22' - 2 1/2" www.nicholas.guarna.com
Consultant Address Address Phone Fax e-mail
03 - 2ND FLOOR 12' - 4"
02 - 1ST FLOOR 2' - 4" 01 - GROUND FLOOR 0' - 0" 00 - Below -2' - 4"
1
East 1/4" = 1'-0"
1
2
3
1 A4.0
4
5
2
JACKSON HOUSE
6
A4.0
05 - ROOF TOP 24' - 10" 04 - ROOF BOTTOM 22' - 2 1/2"
Nicholas Guarna
03 - 2ND FLOOR 12' - 4"
Project number
Project Number
02 - 1ST FLOOR 2' - 4" 01 - GROUND FLOOR 0' - 0" 00 - Below -2' - 4"
EAST-WEST ELEVATIONS
A3.1 2
West 1/4" = 1'-0"
5/5/2019 10:19:20 PM
Checker
Checked by
A
B
C
D
E
F
G
H
I
2
1
A4.1
A4.1
J
K
L
M
05 - ROOF TOP 24' - 10" www.nicholas.guarna.com
04 - ROOF BOTTOM 22' - 2 1/2"
Consultant Address Address Phone Fax e-mail
03 - 2ND FLOOR 12' - 4"
02 - 1ST FLOOR 2' - 4" 01 - GROUND FLOOR 0' - 0" 00 - Below -2' - 4"
1
JACKSON HOUSE
Section 1 1/4" = 1'-0"
A
B
C
D
E
F
G
H
I
2
1
A4.1
A4.1
J
K
L
M
05 - ROOF TOP 24' - 10" 04 - ROOF BOTTOM 22' - 2 1/2"
Nicholas Guarna
03 - 2ND FLOOR 12' - 4"
Project number
Project Number
02 - 1ST FLOOR 2' - 4" 01 - GROUND FLOOR 0' - 0"
SECTIONS
00 - Below -2' - 4"
2
Section 2 1/4" = 1'-0"
A4.0
5/5/2019 10:23:54 PM
Checker
Checked by
2
6
A4.0
1
5
4
A4.0
3
2
1
www.nicholas.guarna.com
Consultant Address Address Phone Fax e-mail
1 A6.0
1
JACKSON HOUSE
Section 3 1/4" = 1'-0"
2
6
A4.0
5
4
1 A4.0
3
2
1
Nicholas Guarna
Project number
Project Number
SECTIONS
2
Section 4 1/4" = 1'-0"
A4.1
5/5/2019 10:27:02 PM
Checker
Checked by
A
B
C
D
E
F
G
H
I
J
K
L
M
www.nicholas.guarna.com
Consultant Address Address Phone Fax e-mail
8' - 8 1/2"
1
2 40' - 4 1/4"
3' - 0"
32' - 3 1/4"
3 1
25' - 4 1/2"
A4.0
JACKSON HOUSE
4 1" / 1'-0"
1" / 1'-0"
5
Nicholas Guarna 2 A4.0
6
1 A4.1 Project number
Project Number Checker
Checked by
1
05 - ROOF TOP 1/4" = 1'-0"
ROOF PLAN
A5.0
5/5/2019 10:35:47 PM
2 A4.1
Truss C-Channel Beam Window Mullion www.nicholas.guarna.com Door Jam Swing Glass Door
Channel Glass
Consultant Address Address Phone Fax e-mail
3' - 6"
3' - 3 19/32"
0' - 2 13/16"
0' - 2 1/2"
1' - 9 15/16" 0' - 2 1/2" 1' - 0 19/32" 0' - 4"
Roof
0' - 4 1/4"
Second Floor Finish
Stud
0' - 4 1/4"
Gypsum Wall Board
Insulation
JACKSON HOUSE
11' - 8 1/2"
Insulation Board
Copper Finish
Nicholas Guarna
Joist Project number
Project Number Checker
0' - 11 7/32"
0' - 4 13/16"
Checked by
1
Wall Section Detail 3/4" = 1'-0"
Foundation Footing
Wall Section Detail
A6.0
5/5/2019 10:37:29 PM
0' - 11"
First Floor Finish
ALTERNATING DIAGONAL BRACING 4' O.C. MAX
UNDERSIDE OF STRUCTURE CEILING WHERE OCCURS
GLASS STUDS @ 16" O.C.
NOTE: PROVIDE ACOUSTICAL SEALANT BOTH SIDES OF FLOOR & CEILING GLAZING CHANNEL. BUTT JOINT PANELS WITH CLR SILICONE CALUKING
5/8" GYPSUM BOARD
5/8" GYPSUM BOARD, TYP.
1" MIN. CLR.
METAL STUDS @ 16" O.C.
METAL STUD TRACK SILL PLATE
ACOUSTICAL SEALANT CONT. BOTH SIDES
ACOUSTICAL SEALANT
TOP OF FLOOR
0' - 0 1/2"
1" MIN.
BATT INSULATION. CLR.
10"
PIPE CLAMP ALUM. THRESHOL: ATTACH WITH COUTNERSUNK FLAT HEAD SCREWS SET IN SEALANT AND CLOSED ENDS
CONC. SLAB CONT. BED OF SEALANT
1
SCALE: 3''= 1'-0''
AL. GLAZING ENTRANCE DOOR THRESHOLD SCALE: 3''= 1'-0''
2 1/4"
1"
11" MIN. SEE STAIR PLAN
2
CONCRETE FILL TREAD
3' - 6"
SCALE: 3''= 1'-0''
3"
CHECKERED PLATE TREAD AND RISERS
1/2"
SCALE: 3''= 1'-0''
EXISTING GLASS PANEL LINE OF PARTITION BEYOND CARPET PER FINISH PLAN CONT. CLEAR GLAZING SEALANT TOP AND BOTTOM CONT 1/8" THK CLR ANODIZED ALUMINUM GLAZING SILL CHANNEL
Consultant Address Address Phone Fax e-mail
4
CLOSURE PLATE CONCRETE DECK
STEEL STRINGER
JACKSON HOUSE
CHECKERED PLATE TREAD AND RISER
MT-15, PAINTED SEE ELEVATION FOR COLOR
STEEL STRINGER
FULL HEIGHT GLAZING
www.nicholas.guarna.com
3"
L 2X2" VERTICAL/HORIZONTAL FRAME SUPPORT, PAINTED SEE ELEVATION FOR COLOR
2' - 10"
SEE STAIR SECTION
7" MAX.
3
MCNICHOL #401 PAINTED STEEL "U" TRIM WELDED ALL AROUND MESH STEEL PIPE HANDRAIL 1-1/2" O.D. PAINTED TO MATCH GUARDRAIL
1/2" O.D. STEEL BAR, BENT WELDED TO SPACER PLATE
METAL ANGLE BRACKET
GUARDRAIL DETAIL
CONTINUOUS 1/8" MTL GLAZING RECESSED CHANNEL. SHIM AS REQUIRED
4"
AL. GLAZING ENTRANCE DOOR THRESHOLD
FINISH CEILING PER RCP
2 LAYERS OF 5/8" GYPSUM BOARD
BATT INSULATION. DOOR
MTL STUD 20 GA. CONT. HEADER & 25 GA. FRAMING @ 16" O.C. TO UNDERSIDE OF SLAB ABOVE.
0' - 1 1/2"
TOP PLATE
STEEL EMBED PLATE FLUSH TO FACE OF CONCRETE SLAB SEE STRUCTURAL FOR LOAD REQUIREMENTST.O. SLAB
6"
METAL ANGLE BRACKET AT EACH STRINGER
SEE SECTION
C.I.P. CONCRETE SLAB
TREAD & RISER SCALE: 1 1/2" = 1'-0"
5
ST005
GUARDRAIL DETAIL SCALE: 1 1/2''= 1'-0''
6
STRINGER AT TOP LANDING SCALE: 1 1/2" = 1'-0"
Nicholas Guarna
7
Project Number
Project number
Checker
Checked by
Details
A7.0
5/5/2019 10:39:11 PM
ST102
www.nicholas.guarna.com
Consultant Address Address Phone Fax e-mail
JACKSON HOUSE
Nicholas Guarna
Long Section Perspective
Project number
Project Number Checker
Checked by
Auxiliary
A8.0
5/5/2019 10:46:48 PM
1
www.nicholas.guarna.com
Consultant Address Address Phone Fax e-mail
1
Short Section Perspective
JACKSON HOUSE
Nicholas Guarna
Project number
Project Number
Auxiliary
2
Short Section Perspective 2
A8.1
5/5/2019 10:57:34 PM
Checker
Checked by
www.nicholas.guarna.com
Consultant Address Address Phone Fax e-mail
JACKSON HOUSE
Nicholas Guarna
Project number
Project Number Checker
Checked by
Cost Estimate Prices
A9.0
5/5/2019 11:01:07 PM
Total Estimate Cost: $ 363,723