SEMESTER OVERVIEW
BAM Architects chose the initial design by Cameron Sherrodd from ABC Design for its structural purity and strong connection to the original MSU Danforth Chapel. Sherrodd’s design placed the utmost importance on the remaining stone masonry wall from the previous chapel. The building's relationship to this wall and structural purity were important to maintain throughout development in order to continue Sherrodd’s vision and intent of a spiritual space.
Due to project requirements, major changes occurred including a second story with stair access and an elevator for ADA access to the second floor. Additionally, the original design had the building orient itself around this wall at a slight angle, resulting in awkward spaces and corridors. In order to resolve this awkwardness, the building was oriented parallel to the wall, making it a prominent part of the building's facade and the private meditation space.
As the second floor was added, there were further additions that added life and program to the accessible space on the roof level. The roof was altered to include planter spaces and walkways to invite activity and meditation outside during warmer times of the year. The addition of these planter spaces meant thickening the ceiling to floor depth for the growing medium and further developing the timber structure to support greater loads.
The ceiling cavity has been added through the utilization of hung baffles in order to conceal the mechanical ducts, electrical lighting fixtures, and vents below the CLT panels. These baffles are wood and spaced in a way to maintain the structural expression of the design. Furthermore, these baffles enhanced acoustical quality and even light distribution throughout the meditation spaces.
With much of the ceiling height being occupied by growing medium and hung baffles, we implemented a UFAD air supply in a plenum space beneath the building’s slabs in order to maximize the floor-to-ceiling height.
The MSU Spiritual Center was modified to include a second-floor hosting mechanical rooms, offices, and occupiable outdoor gardens while maintaining and enhancing the ground level’s meditation spaces. Based on our initial assumptions upon receiving the project, we attempted to include an interior staircase that links the first floor to the second. However, the building's grid and the ceiling-to-floor depth did not allow for code-compliant interior stairs. Instead, we corrected this mistake by adding two exterior code-compliant stairways for adequate egress.
Author: Nick Mazen and Daniel Bassolino
Checker: Eduardo
Issue Date: 5/14/23
MSU
Eric and Eduardo
SPIRITUAL CENTER
G1.1 Semester Overview, Design Drawings
Current Floor Plan by BAM Architects
Original Floor Plan by Cameron Sherrod with Annotations for Future Edits by BAM Architects
Sketches by BAM Architects for Redesigned Floor Plan
Developed Structure to Support Additional Loads Current Developed Design Rendering Featuring Second Floor with Planter Spaces and Stairs by BAM Architects
Original Schematic Design Rendering by Cameron Sherrodd
Revision Schedule Revision Number Revision Description Revision Date
MSU SPIRITUAL CENTER Eric and Eduardo Author Checker G2.1 Envelope Axonometrics Issue Date: 5/14/2023 1 SW Axonometric 2 NE Axonometric 3 NW Axonometric 4 SE Axonometric Revision Schedule Revision Number Revision Description Revision Date
NumberNameFloor
1 VESITBULEPolished Concrete Rubber Trim Exposed CLT White Plaster on Gypsum (N,E,S,W)
2 GATHERING SPACE Polished Concrete Rubber Trim Exposed CLT White Plaster on Gypsum (N,E,S,W)
3 MEDITATION SPACE Polished Concrete Rubber Trim Exposed CLT White Plaster on Gypsum (N,E,W), Exposed Stone Masonry (S)
4 W.C. Polished Concrete Rubber Trim Exposed CLT White Plaster on Gypsum (N,E,S,W)
5 W.C. Polished Concrete Rubber Trim Exposed CLT White Plaster on Gypsum (N,E,S,W)
6 MECHPolished Concrete Rubber Trim Exposed CLT White Plaster on Gypsum (N,E,S,W)
7 OFFICEPolished Concrete Rubber Trim Exposed CLT White Plaster on Gypsum (N,E,S,W)
8 STO. Polished Concrete Rubber Trim Exposed CLT White Plaster on Gypsum (N,E,S,W)
9 JANITORPolished Concrete Rubber Trim Exposed CLT White Plaster on Gypsum (N,E,S,W)
10MECHPolished Concrete Rubber Trim Exposed CLT White Plaster on Gypsum (N,E,S,W)
11OFFICESPolished Concrete Rubber Trim Exposed CLT White Plaster on Gypsum (N,E,S,W)
12JAN. Polished Concrete Rubber Trim Exposed CLT White Plaster on Gypsum (N,E,S,W)
13STO. Polished Concrete Rubber Trim Exposed CLT White Plaster on Gypsum (N,E,S,W)
Existing Wall to South
0"FFE Stainless Steel Oak Wood
27Door-Exterior-Single -Two_Lite 7' - 0"3' 0"FFE Stainless Steel Oak Wood
29Single-Flush7' - 0"3' 0"FFE WoodOak Wood45 min
30Single-Flush7' - 0"3' 0"FFE WoodOak Wood45 min
31Door-Exterior-Single
- 0"3' 0"FFE Stainless Steel Oak Wood
32Single-Flush7' - 0"3' 0"FFE WoodOak Wood45 min
34Door-Exterior-Single -Two_Lite
7' - 0"3' 0"T.O. BeamsStainless Steel Oak Wood
Author: Daniel Bassolino and Nick Mazen
Checker: Eduardo
MSU SPIRITUAL CENTER Eric and Eduardo
G3.1 Outline Specs Issue Date: 5/14/2023 Door Schedule Mark FamilyHeightWidthLevel Frame Material FinishFire RatingComments 15Door-Exterior-Single -Two_Lite 7' - 0"3' 0"FFE Stainless Steel Oak Wood 19Door-Exterior-Single -Two_Lite 7' - 0"3' 0"FFE Stainless Steel Oak Wood 20Single-Flush7' - 0"3' 0"T.O. Green Roof/Floor 2 WoodOak Wood45 minPair 21Single-Flush7' - 0"3' 0"T.O. Green Roof/Floor 2 WoodOak Wood45 minPair
- 0"3' 0"T.O. Green Roof/Floor 2 WoodOak Wood45 minPair
- 0"3' 0"T.O. Green Roof/Floor 2 WoodOak Wood45 minPair 24Door-Exterior-Single -Two_Lite 7' - 0"3' 0"T.O. Green Roof/Floor 2 Stainless Steel Oak Wood 25Door-Exterior-Single -Two_Lite 7' - 0"3' 0"FFE Stainless Steel Oak Wood 26Door-Exterior-Single -Two_Lite 7' - 0"3'
22Single-Flush7'
23Single-Flush7'
-Two_Lite
7'
Room Finish Schedule
FinishBase Finish Ceiling Finish Wall FinishComments
Revision Schedule Revision Number Revision Description Revision Date
17' - 110'3/16" - 0 1/32" 32'2 21/32" 4915' 0" 4914' 8" 4914' 4" 4914' 0" 4913' 8" 4913' 4" 4913' 0" 4912' 8" 4912' 4" 4912' 0" 4911' 8" 4911' 4" 4911' 0" 4910' 8" 4910' 4" 4910' 0" 15' 0 5/8" 16'4 7/8" 1 2 3 4 5 7 6 69'1 21/32" 72'2 5/32" 9 8 FFE = 4913' 0" 11' 7 1/8" 4' 0" 4' 0" 4' 0" A3.1 1 MSU SPIRITUAL CENTER Eric and Eduardo 1" = 20'-0" Author:
Checker: Eduardo A2.1 Site Plan Issue Date: 5/14/23 1" = 20'-0" 1 Site 1 2 3 4 5 6 First Floor Plan Original (Dotted) and new topo lines New paved walkway Drainage scheme ADA parking, sidewalk ramp, and path Gas (Orange) and Electric (Red) Site Plan Legend Water (Blue) and Sewage (Green) 7 Existing Landscape 8 New Landscape 9 S 7th Ave Eagle Lot 16 Revision Schedule Revision Number Revision Description Revision Date
Nick Mazen and Daniel Bassolino
UP UP DN DN 1 2 3 4 5 6 7 8 9 10 A C 1 A4.1 1 A4.2 B 11 12 13 14 15 16 2 A6.1 A5.3 1 A5.2 2 164 SF VESITBULEVESITBULE White Plaster on Gypsum (N,E,S,W) 1242 SF GATHERING SPACE A-3 White Plaster on Gypsum (N,E,S,W) 398 SF MEDITATION SPACE 3 A-3 White Plaster on Gypsum (N,E,W), Exposed Stone Masonry (S) 56 SF W.C.W.C. White Plaster on Gypsum (N,E,S,W) ø 5' 0" 4' - 2" 6' 5 1/2" 3'4 3/4" 3' - 9 1/4" 3' 9 1/4" 36' - 4" 4' - 2" 15'0" 15'0" 15' - 0" 1'6" 2' 10" 2' 2" 3' 6" 12'9 1/8" 26 27 25 15 29 19 30 31 32 1 1 1 1 1 1 1 3 2 2 3 4 12 Polished Concrete Finish FFE = 100'-0"1 2 3 4 5 6 7 8 9 10 A C 1 A4.1 1 A4.2 B 11 12 13 14 15 16 95 SF MECHMECH 10 White Plaster on Gypsum (N,E,S,W) 125 SF OFFICESOFFICES 11 White Plaster on Gypsum (N,E,S,W) 56 SF JAN.JAN. 12 White Plaster on Gypsum (N,E,S,W) 56 SF STO.STO. 13 White Plaster on Gypsum (N,E,S,W) 2 A6.1 20 21 22 23 24 1 1 1 1 1 13'6" MSU SPIRITUAL CENTER Eric and Eduardo 1/8" = 1'-0" Author: Daniel Bassolino Checker: Eduardo A2.2 Floor Plans Issue Date: 5/14/2023 1/8" = 1'-0" 1 1st Floor 1/8" = 1'-0" 2 2nd Floor Revision Schedule Revision Number Revision Description Revision Date
UP UP 1 2 3 4 5 6 7 8 9 10 A C 164 SF VESITBULEVESITBULE 1 White Plaster on Gypsum (N,E,S,W) 1242 SF GATHERING SPACE A-3 White Plaster on Gypsum (N,E,S,W) 56 SF W.C.W.C. White Plaster on Gypsum (N,E,S,W) ø 5' 0" 4' 2" 6' 5 1/2" 3'4 3/4" 3' - 9 1/4" 3' 9 1/4" 36' 4" 4' - 2" 398 SF MEDITATION SPACE A-3 White Plaster on Gypsum (N,E,W), Exposed Stone Masonry (S) 39 39 90 90 11 11 11 11 140 22 65 64 87 86 B 11 12 13 14 15 16 1 2 3 4 5 6 7 8 9 10 A C B 11 12 13 14 15 16 Not Enclosed MECHMECH U White Plaster on Gypsum (N,E,S,W) Not Enclosed OFFICEOFFICE White Plaster on Gypsum (N,E,S,W) Not Enclosed STO.STO. 8 S-2 White Plaster on Gypsum (N,E,S,W) Not Enclosed JANITORJANITOR 9 S-2 White Plaster on Gypsum (N,E,S,W) 11' - 6" 15' - 0" 7' - 0" 7' 0" 3' 0" 3' - 0" 9'0" 4'6" 36'11" 137' 9 1/2" 3' 6 1/2" 78 INHABITABLE GREEN ROOF 1,000 SF WALKABLE 143 OCCU. A-3 72 72 72 56 SF W.C.W.C. 5 White Plaster on Gypsum (N,E,S,W) ø 5' 0" 32 MSU SPIRITUAL CENTER Eric and Eduardo As indicated Author: Nick Mazen and Daniel Bassolino Checker: Eduardo A2.3 Egress Plans + Code Issue Date: 5/14/2023 1" = 10'-0" 1 Floor 1 Egress 1" = 10'-0" 2 2nd Floor Egress 3/4" = 1'-0" 3 ADA Bathroom Revision Schedule Revision Number Revision Description Revision Date
FFE 4' - 0" 1 2 3 4 5 6 7 8 9 10 1 A5.2 1 A5.2 11 12 13 14 15 16 Parapet Top Flr 2 33' - 8" T.O. Green Roof/Floor 2 18' - 7 1/8" 2 A-8 2 A-8 3' 4 1/8" FFE 4' 0" A C 1 A5.1 1 A5.1 B Parapet Top Flr 2 33' 8" T.O. Green Roof/Floor 2 18' 7 1/8" 18 3' 4 1/8" MSU SPIRITUAL CENTER Eric and Eduardo As indicated Author: Nick Mazen and Daniel Bassolino Checker: Eduardo A3.1 Exterior Elevations Issue Date: 5/14/23 1/8" = 1'-0" 1 Elevation 5 a 1/4" = 1'-0" 2 Elevation 4 a 1 2 3 4 5 Mass Timber for Timber Swisspearl Fiberboard Panels Black Painted Steel Stair Structure Double Pane Low-E Glazing Pre-existing Stone Masonry Wall Material Legend 1 2 3 4 5 6 7 8 9 10 11 A5.5 Detail 2 A6.2 Drawing 1 A5.6 Drawing 1 A5.3 Drawing 1 A5.4 Drawing 1 A6.2 Drawing 3 Detail Callout Legend Prominent Grade Line Prominent Grade Line 6 7 8 9 10 11 Revision Schedule Revision Number Revision Description Revision Date
UP UP Site Ground 0' 0" FFE 4' 0" T.O. Beams 16' 2" T.O Beams 2 30' 1" 1 2 3 4 5 6 7 8 9 10 1 A4.2 1 A4.2 11 12 13 14 15 16 Parapet Top 19' 9" Parapet Top Flr 2 33' 8" T.O. Baffles 14' 4" B.0. Plenum 2' 0" T.O. Green Roof/Floor 2 18' 7 1/8" T.O. Roof 31' - 10" B.O. Mechnical 13' 8" B.O. Baffles 13' 4" T.O. Baffles 2 28' 4" B.O. Mechanical 2 28' 8" B.O. Baffles 2 27' 4" A5.2 1 A5.1 1 1 2 3 4 5 6 7 8 9 10 A C 1 A4.1 1 A4.1 1 A4.2 1 A4.2 B 11 12 13 14 15 16 164 SF VESITBULEVESITBULE 1 White Plaster on Gypsum (N,E,S,W) 1242 SF GATHERING SPACE A-3 White Plaster on Gypsum (N,E,S,W) 398 SF MEDITATION SPACE 3 A-3 White Plaster on Gypsum (N,E,W), Exposed Stone Masonry (S) 56 SF W.C.W.C. White Plaster on Gypsum (N,E,S,W) ø 5' 0" 4' - 2" 6' 5 1/2" 3'4 3/4" 3' 9 1/4" 3' - 9 1/4" 36' - 4" 4' 2" 15'0" 15'0" MSU SPIRITUAL CENTER Eric and Eduardo 1/8" = 1'-0" Author: Nick Mazen and Daniel Bassolino Checker: Eduardo A4.1 Building Sections Issue Date: 5/14/2023 1/8" = 1'-0" 1 Section 1 1/8" = 1'-0" 2 Floor 1 Section Cuts Parapet GreenRoof GreenRoof Walkway Storefront Glazing Wall Elevator Shaft Plenum Space for HVAC Overhang Outdoor Space Exterior Stairs 02 Gathering Space 01 Vestibule 08 Outdoor Meditation 03 Meditation Space Revision Schedule Revision Number Revision Description Revision Date
Site Ground 0' - 0" FFE 4' - 0" T.O. Beams 16' - 2" T.O Beams 2 30' - 1" A C 1 A4.1 1 A4.1 B Parapet Top 19' - 9" Parapet Top Flr 2 33' - 8" B.0. Plenum 2' - 0" T.O. Green Roof/Floor 2 18' 7 1/8" T.O. Roof 31' - 10" B.O. Baffles 13' - 4" T.O. Baffles 2 28' - 4" A5.4 1 A5.3 2MSU SPIRITUAL CENTER Eric and Eduardo 1/2" = 1'-0" Author: Nick Mazen and Daniel Bassolino Checker: Eduardo A4.2 Building Sections Issue Date: 5/14/2023 1/2" = 1'-0" 1 Section 2 Parapet Wall Assembly Doubled Heavy Timber Beams 12" X 4" Greenroof Assembly Wooden Baffle System Concrete Walkway Floor Plenum Space w/ Mechanical Storefront Glass Wall Clerestory Window Existing Stone Masonry Wall Heavy Timber Column 12" X 12" Interior Partition Wall Beatrice 03 Meditation Space 05 Offices Revision Schedule Revision Number Revision Description Revision Date
Site Ground 0' 0" FFE 4' 0" T.O. Beams 16' 2" 1 Parapet Top 19' 9" T.O. Baffles 14' 4" B.0. Plenum 2' 0" T.O. Green Roof/Floor 2 18' 7 1/8" B.O. Baffles 13' 4" Site Ground 0' - 0" FFE 4' - 0" T.O. Beams 16' - 2" T.O Beams 2 30' - 1" C 1 A5.1 1 A5.1 B Parapet Top 19' - 9" Parapet Top Flr 2 33' - 8" T.O. Baffles 14' - 4" B.0. Plenum 2' - 0" T.O. Green Roof/Floor 2 18' - 7 1/8" T.O. Roof 31' 10" B.O. Baffles 13' - 4" T.O. Baffles 2 28' - 4" B.O. Baffles 2 27' - 4" 18 MSU SPIRITUAL CENTER Eric and Eduardo 1/2" = 1'-0" Author: Nick Mazen Checker: Eduardo A5.3 Wall Detail 1 with West Side Elevation Issue Date: 5/14/23 1/2" = 1'-0" 1 Section 1 Callout 2 1/2" = 1'-0" 2 Elevation nick Gravel Layer Drainage Pipe Concrete Footer 4" XPS Rigid Insulation, R=20 Water Proof Membrane Vapor Retarder Metal Flashing CLT to Concrete Knifeplate attatched with anchor bolts Glazing Wall Mullion with Silicon Sealant HVAC Duct 6" x 12" Plenum Steel Supports Double Pane Low-E Glazing Insulated Plenum Tiles with a Concrete Finish 1' x 1' Mass Timber Column Wood Baffles with Suspended Metal Carrier Suspended Lighting System Glazing Wall Exposed Mass Timber Structure Fiber Cement Panel Finish on Parapet Shaped Wood Cap Metal Flashing 2 X 6 Stud 5.5" Celluosic Insulation R=18.5 1.5" Continuous XPS Rigid Insulation R=7.5 Fiber Cement Panels w/ 1/2" Air Space Bolts Metal Beam Cap Wood Cant 18" Growing Media Filter Layer Water Proofing 8" XPS Rigid Insulation R=40 5-Ply CLT Panel Gravel Vapor Retarder Gypsum Board Bruce Revision Schedule Revision Number Revision Description Revision Date
Site Ground 0' 0" FFE 4' 0" T.O. Beams 16' 2" T.O Beams 2 30' 1" 8 15 Parapet Top 19' 9" Parapet Top Flr 2 33' 8" T.O. Baffles 14' 4" B.0. Plenum 2' 0" T.O. Green Roof/Floor 2 18' 7 1/8" T.O. Roof 31' - 10" B.O. Baffles 13' 4" T.O. Baffles 2 28' 4" B.O. Baffles 2 27' 4" Site Ground 0' - 0" FFE 4' - 0" T.O. Beams 16' - 2" T.O Beams 2 30' - 1" C 1 A5.1 1 A5.1 B Parapet Top 19' - 9" Parapet Top Flr 2 33' - 8" T.O. Baffles 14' - 4" B.0. Plenum 2' - 0" T.O. Green Roof/Floor 2 18' - 7 1/8" T.O. Roof 31' 10" B.O. Baffles 13' - 4" T.O. Baffles 2 28' - 4" B.O. Baffles 2 27' - 4" MSU SPIRITUAL CENTER Eric and Eduardo 1/2" = 1'-0" Author: Nick Mazen Checker: Eduardo A5.4 Wall Detail 2 with East Side Elevation Issue Date: 5/14/23 1/2" = 1'-0" 1 Section 1 - Callout 1 1/2" = 1'-0" 2 Elevation nick 3 Gravel Layer Rigid Insulation Water Proof Membrane Vapor Retarder HVAC Duct 6" x 12" Plenum Steel Supports Insulated Plenum Tiles with a Concrete Finish 1' x 1' Mass Timber Column Metal Door Threshold 1-1/2" Metal Door Exterior Pre-Hug Door Assembly 2" x 6" Door Jamb with Rigid Insulation Vapor Retarder 5.5" Celluosic Insulation R=18.5 See A-13 for Parapet Detail Labels See A-13 for Baffle and Lighting System Labels Gravel Layer Plenum Steel Supports 1-1/2" Metal Door White Plaster Finish 1.5" XPS Rigid Insulation Continuous Concrete Exterior Wall 2" x 6" Stud 5-Ply CLT Panel R=7.5 Wood Cant Steel C-Channel Water Proof Membrane Steel Angle 4" XPS Rigid Insulation R=20 Exterior Stairs Exposed Mass Timber Structure Fiber Cement Panel Finish on Parapet Planter Box Betty Revision Schedule Revision Number Revision Description Revision Date
FFE 4' 0" T.O. Beams 16' 2" 5 6 12 13 Parapet Top 19' 9" Parapet Top Flr 2 33' 8" T.O. Green Roof/Floor 2 18' 7 1/8" T.O. Roof 31' - 10" B.O. Baffles 13' 4" B.O. Baffles 2 27' 4"Site Ground 0' - 0" FFE 4' - 0" T.O. Beams 16' - 2" T.O Beams 2 30' - 1" B Parapet Top 19' - 9" Parapet Top Flr 2 33' - 8" B.0. Plenum 2' - 0" T.O. Green Roof/Floor 2 18' - 7 1/8" T.O. Roof 31' 10" B.O. Baffles 13' - 4" B.O. Baffles 2 27' - 4" MSU SPIRITUAL CENTER Eric and Eduardo 1/2" = 1'-0" Author: Daniel Bassolino Checker: Eduardo A5.5 Wall Detail 3 South Face Elevation Issue Date: 5/14/23 1/2" = 1'-0" 1 Elevation 1 - a 1/2" = 1'-0" 2 Section 2 - Callout 2 Shaped Wood Cap Metal Flashing 2 X 6 Stud 5.5" Celluosic Insulation R=18.5 1.5" Continuous XPS Rigid Insulation R=7.5 Fiber Cement Panels w/ 1/2" Air Space Bolts Metal Beam Cap 18" Growing Media Filter Layer Water Proofing 8" XPS Rigid Insulation R = 40 5-Ply CLT Panel Double Pane Low-e Glazing Wood Cant Gravel Concrete Panel 4" XPS Rigid Insulation Metal Clip Attachment from Column to Panel Existing Stone Masonry Wall Wood Baffles w/ Suspended Metal Carriers Vapor Retarder Insulated Plenum Tiles w/ Concrete Finish Concrete Slab on Grade XPS Rigid Insulation Water Proofing Underfloor Air-Distribution System Lighting System w/ Suspended Metal Carriers Aluminum Mullion w/ Silicon Attachment to Stud Wakk Vapor Barrier Gypsum Board Benjamin Revision Schedule Revision Number Revision Description Revision Date Exposed Mass Timber Structure Fiber Cement Panel Finish on Parapet Glazing Wall Clerestory Window Existing Stone Masonry Wall
Site Ground 0' - 0" FFE 4' - 0" T.O. Beams 16' - 2" T.O Beams 2 30' - 1" A Parapet Top 19' - 9" Parapet Top Flr 2 33' - 8" B.0. Plenum 2' - 0" T.O. Green Roof/Floor 2 18' - 7 1/8" T.O. Roof 31' 10" B.O. Baffles 13' - 4" B.O. Baffles 2 27' - 4" FFE 4' 0" 7 8 14 15 Parapet Top Flr 2 33' 8" T.O. Green Roof/Floor 2 18' 7 1/8" B.O. Baffles 13' 4" B.O. Baffles 2 27' 4" MSU SPIRITUAL CENTER Eric and Eduardo 1/2" = 1'-0" Author:
Checker: Eduardo A5.6 Wall Detail 4 North Face Elevation Issue Date: 5/14/23 1/2" = 1'-0" 1 Section 2 Callout 1 1/2" = 1'-0" 2 Elevation 2 - a Gravel Layer Drainage Pipe Concrete Footer Rigid Insulation Water Proof Membrane Vapor Retarder Metal Flashing CLT to Concrete Knifeplate attatched with anchor bolts Underfloor HVAC Duct + Vent Punched Window Double Pane Low-E Glazing Insulated Plenum Tiles with a Concrete Finish 1' x 1' Mass Timber Column See A-15 for Parapet + Green Roof Details 2 X 6 Stud 5.5" Celluosic Insulation R = 18.5 Vapor Retarder Gypsum Board White Plaster Metal Flashing 2 X 6 Stud Header 2 X 6 Stud Sill Metal Flashing 1.5" XPS Rigid Continuous Insulation 0.5" Air Gap Fiber Cement Panel Hung w/ Bolts 5-Ply CLT Panel R = 7.5 Waterproofing Plenum Steel Supports Concrete Floor Panels Doubled Heavy Timber Beams Column to Column Metal Plate Connection Gravel Brittany Revision Schedule Revision Number Revision Description Revision Date Exposed Mass Timber Structure Fiber Cement Panel Finish on Parapet Office Windows
Daniel Bassolino
10 A C B 2 A6.1 4' - 2" 10'11 1/2" 4'2" 12'11 1/2" 4'2" 4' - 6" 5' 2 1/16" 5' 2 1/16" 3' 8" 1' - 6 1/16"A C B 1'3" 2'10"4' - 0" 10' - 9 13/16" 4'7 1/2" 0'7 1/2" 4'0" 0'3" 0'8" 4'3 5/32" 3'0 29/32" 13'9"A6.2 1 MSU SPIRITUAL CENTER Eric and Eduardo As indicated Author: Daniel Bassolino Checker Eduardo A6.1 Stair Plans + Sections Issue Date: 5/14/2023 1/4" = 1'-0" 1 Stair Plan 3/8" = 1'-0" 2 Ext. Stair Section Code Min: 4'-0" Landing Depth Code Min: Width of Stair (4'-2") Landing Required Every 12' Min. Cane Detection Area Doubles as Planter Steel Connection w/ Column + Landing for Support Landing Bolted to Steel Channel + Welded to Steel Stringer Cane Detection Bumpout Under Stairs (planter) Guardrail Exceeds 44" Min. Height Handrail Height Between 34-38" Steel Stringer as Support Revision Schedule Revision Number Revision Description Revision Date
FFE 4' 0" 10 T.O. Green Roof/Floor 2 18' 7 1/8" Top of Landing 10' 11 17/32" A6.2 3 FFE 4' - 0" 10 0'4" 0' - 0" 4' - 4" 0' - 6" 0'1 1/2" 0'2 1/4" 0'6" 0'3" 1'0" 0'0" 0' - 1 1/4" 0'-7" 1' 3 3/4" 0' 2 7/8" 0' 9 1/32" 0' 3 27/32" 0'4 1/2" 0'5 1/16" 0'3 9/32" 0'-4 1/4" 0'-3 3/32" MSU SPIRITUAL CENTER Eric and Eduardo As indicated Author: Nick Mazen Checker: Eduardo A6.2 Stair Details Issue Date: 5/14/2023 1/2" = 1'-0" 2 Stair 1 Section 3" = 1'-0" 3 3 A-11 Steel Handrail Support Welded to Baluster Steel Handrail Welded to Guardrail Extension 4"H Concrete Riser w/ Wood Finish Steel Tube String on Center of Steps Steel Angle Welded to Stringer and Screwed to Concrete Slab 4"H Concrete Landing Slab with Slabe Edge Steel Anchor Bolts into Timber Column Screw Cable into Steel Guardrail Adjustable Angle Turnbuckle Crimp Using a Crimper 3/16" Cable 3"H x 6"W Black Painted Guardrail Steel Angle Screwed to Timber Column and Welded to Guardrail Code Min: 4" Max Opening Between Treads Code Max: 7" riser Code Min: 11" Tread Depth Steel Stringer Steel Bolts in Concrete Steel Channel Wood Sheathing Concrete for Grip + Structure Welded Steel Connection Steel Cable Balusters (4" Max) 3" = 1'-0" 1 Tread Support Detail Revision Schedule Revision Number Revision Description Revision Date
Stainless Steel Guardrail 2" Diameter
Risen Concrete Grip Tread
Wood Finish Risers
Black Steel Stringer
Concrete Planter Box w/ Wood Panel Benches
Steel Stringer Connection to Concrete Slab
Black Painted Steel Guardrail
Angled Steel Baulsters
Steel Cables 4" Spacing
Planter Box/Cane Detection
Concrete Landing Slab
Upright Steel Balusters
Connection to Roof Assembly
Concrete Landing w/ Wood Finish
Author: Daniel Bassolino
Revision Schedule
Issue Date: 5/14/2023
Checker: Eduardo A6.3
MSU SPIRITUAL CENTER Eric and Eduardo
Stair perspectives
Guardrail to Column Connection
Revision Number Revision Description Revision Date
GREEN ROOF OVERHANG
WALL ASSEMBLY
CLERESTORY ON EXISTING WALL
MSU SPIRITUAL CENTER Eric and Eduardo Author: Nick Mazen Checker: Eduardo A7.1 Wall to Greenroof 3D Detail Issue Date: 5/14/23 5-ply CLT Panels 8" Rigid Foam Insulation Vapor Retarder Filter Sheet Growing Media 12" Mass Timber Beams with Notching 18" Timber Columns Concrete Slab Vapor Retarder Rigid Insulation Gravel Layer Gravel Layer Drainage Pipe Footer Anchor Bolts 8" thick Pre-existing Stone Wall Sealant Flashing Silicon Mullions Clerestory Glazing Fiber Board Concrete Concrete Anchor Screws 2 x 4 Stud @ 18" O.C. Assembly with BATT Insulation Vapor Barrier 1/2" Plywood Interior Plaster Finish scale: 1'-0" = 1/2" 1/2" Air Space
Revision Schedule Revision Number Revision Description Revision Date
MSU SPIRITUAL CENTER Eric and Eduardo Author: Daniel Bassolino Checker: Eduardo A7.2 Wall to Ground Detail Issue Date: 5/14/23 Growing Medium Filter Layer Waterproofing + Vapor Barrier 8" Ridgid Foam Insulation 5-Ply CLT Panel 12" Doubled Heavy Timber Beams 18" Heavy Timber Columns Storefront Glass Assembly Waterproofing/ Vapor Barrier
WALL ASSEMBLY ROOF PARAPET Metal Flashing 1/2" Plywood 1/2" Plywood Connetion Bolts 2X4 Stud Wall 18" O.C. Plywood w/ White Plaster Vapor Barrier 2X4 Wall 18" O.C. w/ Batt Insulation Ridgid Foam Continuous Insulation 1/2" Plywood Connection Bolts Fiber Cement Panels w/ 1/2" Air Space (Hung on Bolts) Fiber Cement Panels w/ 1/2" Air Space (Hung on Bolts) Revision Schedule Revision Number Revision Description Revision Date
GREENROOF
1 2 3 4 5 6 7 8 9 10 A C B 11 12 13 14 15 16 A.F.F with Baffles 9'-4" A.F.F 12'-2" Wood Baffle Drop Ceiling CLT Panel Ceiling 1 2 3 4 5 6 7 8 9 10 A C B 11 12 13 14 15 16 A.F.F with Baffles 9'-4" Wood Baffle Drop Ceiling CLT Panel Ceiling MSU SPIRITUAL CENTER Eric and Eduardo 1/8" = 1'-0"
A9.1 Reflected Ceiling Plan Issue Date: 5/14/23 1/8" = 1'-0" 1 Level 1 CP Copy 1 Revision Schedule Revision Number Revision Description Revision Date 1/8" = 1'-0" 2 Parapet Top
Author: Nick Mazen and Daniel Bassolino Checker: Eduardo
Checker:
MSU SPIRITUAL CENTER Eric and Eduardo
Author: Nick Mazen and Daniel Bassolino
S1.1 Structure Issue Date: 5/14/2023 1 Bearing Axon 2 Bracing Axo 3 Lifting Axo 4 Spanning Axo 5 Structure Interaction w/ Mech 72" x 48" x 18" Rectangular Concrete Footers Placed at 4 Corners of Site Footprint Concrete Slab Foundation With Slab Edge for Plenum Space Below 1'W x 1'L x 11'-2"H Glulam-Western Species Column with Top Pin Connection for Beams Bolted Anchor Column Connection to Footing 4"W x 1'H Glulam-Western Species Beam with Notched Beam to Beam Connection with 4" Offset for Column Pin Steel Reinforce Concrete Shear Wall and Elevator Core Revision Schedule Revision Number Revision Description Revision Date
Eduardo
Checker: Eduardo
MSU SPIRITUAL CENTER Eric and Eduardo
Author: Nick Mazen and Daniel Bassolino
E1.1 Electrical Axonometric Issue Date: 5/14/2023 1 Electrical 3D Recessed Lamp Round LED 4" Trimless Downlight Connected Flush with Bottom of Beams Downlight - Strip 24" 277V Connected FLush with Bottom of Baffles Lighting and Appliance Panelboard 280V MLO 100 A Connected to Interior Wall Panelboard Conduit Connecting to Transformer Off-site Transformer Revision Schedule Revision Number Revision Description Revision Date
Author: Nick Mazen and Daniel Bassolino
MSU SPIRITUAL CENTER Eric and Eduardo
E1.2 Electrical Plans Issue Date: 5/14/2023 Lighting and Appliance Panelboard 280V MLO 100 A Connected to Interior Wall Panelboard Conduit to Transformer Off-Site Transformer Box Wall with 1' Void for Electrical Wiring and Plumbing Lighting Fixture Conduits Routing back to Panelboard (Dotted Line) Lighting Fixtures (Blue) Floor Outlets Lighting Switch with Dimmer 3' 6" Electrical/Plumbing/Mechanical Service Entry Revision Schedule Revision Number Revision Description Revision Date
Checker: Eduardo
Air Handling Unit
Checker: Eduardo M1.1
Issue Date: 5/14/2023
MSU SPIRITUAL CENTER Eric and Eduardo
Author: Nick Mazen and Daniel Bassolino
Mechanical Axonometric
Revision Schedule Revision Number Revision Description Revision Date
Checker: Eduardo
MSU SPIRITUAL CENTER Eric and Eduardo
Author: Nick Mazen and Daniel Bassolino
Mechanical Plans Issue Date:
Revision Schedule Revision Number Revision Description Revision Date
M1.2
5/14/2023
5/14/2023
MSU SPIRITUAL CENTER Eric and Eduardo
Author: Nick Mazen and Daniel Bassolino
P1.1 Plumbing Axonometric
Revision Schedule Revision Number Revision Description Revision Date
Checker: Eduardo
Issue Date: