NM
Nick Mierzejewski Portfolio
Academic 01
National Institute of Material Research
02
The Political Circus
Professional 03
16 Agden Park Lane
04
Casa de Debora
05
Casa de Diones
06
Girls of Steel
01
National Institute of Material Research
Programme: Greater London Authority Headquarters Location: St Peter’s Seminary, London This 5th year project started out with two main conflicting interests. Brutalism and Sustainablity. What happened next was an exploration of both, to see whether they could cohabitate, whether sustainable brutalism was acheivable and would the juxtaposition between the two create interesting results. An exploration of Brutalism was my starting point, the current state of Brutalism, its tropes and characteristics and could this be procedurally generated, this was an attempt to see if it was possible to take theses findings and apply them to sustainably. Next was an investigation into sustainable materials, during which I came to realise that finding the answer to all our problems with a miracle material was highly unlikely for a sole researcher such as myself. Perhaps instead I could design a project that would allow others to carry on the pursuit of creating more sustainable materials for the future. Thus NIMR or the National Institute of Material Research was born. By saving and adaptively reusing a brutalist relic, designing with brutalist tropes in mind. The project came to life.
01
National Institute of Material Research Section
01
National Institute of Material Research Aerial
01
National Institute of Material Research Renders
01
National Institute of Material Research Flame Testing
01
National Institute of Material Research Hydraulic Altar
02
The Political Circus
Programme: Greater London Authority Headquarters Location: Finsbury Circus, London Born from an interest in the layering of architecture in London and in particular long the rremaining roman walls, the project developed into a proposal for the new GLA headquarters. Reusing an existing building that formed the perimeter of Finsbury Circus Gardens. The centre piece of the project is a contoured public ramp that flows up through the building, providing a false sense of transparency to the proceedings of the GLA which have in the past been questioned. Whilst areas remain secretive and hidden for the GLA’s dodgey dealings to still occur. The ramp, made of glue laminated timber, was designed using contours based on the existing buildings grid. The ramp was then created by connecting the various contours together to form a political landscape within the political programme of the building.
02
The Political Circus
Initial Triptych
02
The Political Circus Contouring of Ramp
33.20M 32.70M 32.20M 31.70M 31.20M 30.70M 30.20M 29.65M 29.15M 28.55M 27.95M
27.35M 26.85M 26.35M 25.80M 25.35M 25.00M 24.50M 24.00M 23.50M 23.00M 22.50M 22.00M 21.45M 21.00M 20.50M 20.00M 19.50M 19.00M 18.50M 18.00M 17.50M 16.90M 16.30M 15.80M 15.30M
14.80M 14.20M 13.60M 13.20M 12.70M 12.20M 11.70M 11.20M 10.70M 10.20M 09.70M 09.30M 08.80M 08.30M 07.80M 07.30M 06.80M 06.30M 05.80M 05.50M 05.00M 04.50M 04.00M 03.50M 03.00M 02.50M 02.00M 01.50M 01.00M 00.50M 00.00M
02
The Political Circus
Building Triptych
16 Agden Park Lane
Ground Floor
Practice: Kimble Roden Architects Programme: Rear Extension Location: Lymm, Cheshire
First Floor
Loft
Total Area and % Increase
Exisiting Plan 119m²
72m²
ground floor plan
47m²
ground floor ground plan floor plan
Permitted Development
first floor plan
loft floor plan
first floor planfirst floor plan
loft floor planloft floor plan
shower 4800
The project was to re-develop the existing property. The extensive works included; Opening up and increasing the area of the ground floor for a kitchen, living, dining area. Creating a large master bedroom on the first floor, on top of the current ground floor roof, and replacing the remaining roof whilst adding a 4th bedroom as a loft. When I joined this project there were pre-planning concerns over the extent of the works and area increase being proposed. I was therefore tasked with complete a set of drawings and accompanying statistics showing that the proposed works increased the area within the house by no more than what was allowed through permitted develop and that our proposal was to a better standard overall. This was submitted as a part of our planning arguement and the planning application was in the end successful.
gym
store
kimble rodenkimble roden kimble roden ARCHITECTS
ARCHITECTS ARCHITECTS
master suite
kitchen
master suite master suite
kitchen kitchen bathroom sitting
85%
bathroom bathroom
sitting sitting
ensuite
utility
bed 4
ensuite ensuite
ensuite
utility utility
bed 2 living room study
2170
220m²
3000
2100 2100
dining dining
3000
dining
3000
2100
3000
3000
boot boot room room
3000
boot room
4000
4000
rear extension sujectrear to rear extension extension suject suject to to approval of prior notification approval approval of prior of prior notification notification for for 8m8m rearrear extension proposal for 8m rear proposal extension proposal extension
4000
2170 2170
bed 1
9066
bedbed 4 4
ensuite ensuite
bedbed 2 2
living living room room
study study
bedbed 1 1
9066 9066
ground floorground plan groundfloor floorplan plan
first floor plan first firstfloor floorplan plan
150m²
loft floor plan loft loftfloor floorplan plan
58m²
12m²
Prior Notification
2100
160m²
8000
2100
8000
dining
34%
dining
dining utility
utility
sitting
sitting
kitchen
8M SINGLE 8M SINGLE STOREY STOREY REAR EXTENSION REAR EXTENSION sitting
113m² utility
WC
18
47m²
ground floor planground floor plan
first floor plan
loft floor plan
first floor plan
16
18
loft floor plan
store
Proposed Plan living room study
214.5m²
dining
kitchen
ensuite
ensuite
80%
bathroom bathroom 8000
8000
3500
bed 3
3500
bed 3
sitting
dressing room dressing room
utility
ground floor plan
WC
bed 4
store Datum 19.00m
front elevation
Datum 19.00m
Datum 19.00m
front elevation
ensuite
Datum 19.00m
side elevation
side elevation
bed 2
bed 2
living room
master suite
study
112m²
master suite
81.5m²
ground floor plan
21m²
first floor first plan floor plan
ensuite
bed 4
(Without Loft 62%) SCALE
SCALE
1M
1M
kimble roden
ARCHITECTS
3500
3500
3500
ARCHITECTS
8000
10M
AGDEN PARK AGDE LA
10M
BLOCK PLAN BLOCK 1:200 PLAN 1:200
loft floor loft plan floor plan
kimble roden
3500
03
16 Agden Park Lane - Areas
8000
kimble kimble roden roden ARCHITECTS ARCHITECTS
20M
03
16 Agden Park Lane
ensuite
bathroom bed 3
dressing room
bed 4
ensuite
bed 2
master suite
first floor plan
loft floor plan
kimble roden
ARCHITECTS
04
Casa da Debora
Practice: Zarya Arquitetos e Engenharia Programme: New Construction Location: Guara 2, Brasilia, Brazil Situated in a neighbourhood just outside Brasilia, this project was a complete new build following the demolition of the previous house. Debora, the client, expressed a desire for a cosy yet functional space that they could also use to entertain family and guests, on the restricted plot. The project took the overall volume of the plot before carving it into three main sections, the enternainment spaces seperated from the private spaces by the central circulation space.
04
Casa da Debora
Joelho 90° Agua Fria Soldavel Joelho 90° Redução Agua Fria Soldavel Te Redução Agua Fria Soldavel Bucha de Redução Curta Agua Fria Soldavel Joelho 90° Aquatherm Agua Quente Bucha de Redução Aquatherm Agua Quente Te Redução Aquatherm Aqua Quente $4
MDR-3s Distribuidor c/ registro 3 saidas ø15 3/4" - Pex
¡ PP
MD-3s Distribuidor s/ registro 3 saidas ø15 3/4" - Pex
$) ¡ PP
9LGH 'HWDOKH
$)
$4
¡ PP
¡ PP
MDR-1s Distribuidor c/ registro 1 saidas ø15 3/4" - Pex MD-2s Distribuidor s/ registro 2 saidas ø15 3/4" - Pex Adaptador Curto com Bolsa é Rosca Conector Aquatherm Agua Quente Conexao Fixa Femea - Pex Conexao Fixa Macho - Pex
&+
Joelho com Base Fixa - Pex
9LGH 'HWDOKH $)
$4
¡ PP
¡ PP
9LGH 'HWDOKH
RG
RG
RG
RG
Torneira de boia p/ Caixa d´agua
6
01
$) ¡ PP
/9
¡ PP
$4 0'5 V
$)
$JXD SDUD -DUGLP
Registro de Galveta Base Registro Esfera VS Compacto
¡ PP
7XEXO )OH[ ¡
$4
'&+
$) 0'5 V
¡ PP
¡ PP
96
9LGH 'HWDOKH
':
':
'HWDOKH
/9
Lavatório
96
Vaso Sanitário
0&
Míctorio
'&+
Ducha Higiênica
&+
Chuveiro
01
Monocomando
74
Tanque
0/5
Máquina de Lavar Roupa
0/3
Máquina de Lavar Prato
/HJHQGD $JXD
¡ PP
$/
¡ PP
¡ PP
¡ PP
¡ PP
5HYLVmR
6HWRU 65,$ ,, (QGHUHoR 4( &RQMXQWR ' &DVD *XDUD OO ') 3URSULHWiULR 'pERUD &DUUDUD GD 6LOYD
3ODQWD 7HUUHR $JXD
$XW 3URMHWR 5XWKHUIRUG 2 2FDPSR &$8 %5
5HV 7pFQLFR
3URSULHWiULR $XWRU GR 3URMHWR
$) $)
$4
¡ PP
¡ PP
¡ PP $4
$)
¡ PP
¡ PP
5HVSRQViYHO 7pFQLFR
74
/9
/9 0/3
RG
0/5
$4 0' V
RG $) 0' V
RG
$4 0'5 V
'&+
7XEXO )OH[ ¡
$) 0'5 V 7XEXO )OH[ ¡
$) 0' V
7XEXO )OH[ ¡ 96
'HWDOKH
'HWDOKH
'HWDOKH
È*8$ )5,$ ( È*8$ 48(17(
Arquitetura & Engenharia
1~PHUR GH 3UDQFKDV
3/$17$ 7(55(2 5HYLVmR
(VFDOD
,QFDGD
'DWD
8QLGDGH
PHWURV
$ 7HUUHQR $UTXLYR
$ &RQVWUXtGD
= ?:RUN ?'pERUD?3URMHWRV?,16?(6* +,'?5(9?'(% ,16 (6* +,' 5 UYW
Casa de Diones
Practice: Zarya Arquitetos e Engenharia Programme: New Construction Location: Lago Sul, Brasilia, Brazil With stunning views of the surrounding countryside, this modern design is all about taking advantage of it. All windows are situated to frame the view and bring all the focus to it. With a challenging steep and steep site, we at Zarya took this challenge and made it our own, adding an infinity pool for residents to relax, unwind, eat barbecue and enjoy the wonderful nature that surrounds them.
92
J-10 92
Sumidour 92
N
Tanque
18,98
0,80
16,08
93
CASA DE BOMBA
RESERVATÓRIO EM CONCRETO DE 24000L (3x4x2) COLETA DE ÁGUAS PLUVIAIS COM VISITA EM ALUMINIO INSTALAÇÃO DE BOMBA 1/2H
93
70% dade isibila m-V H=2.2 Cerca
Filtro
3,30
05
7,00 2,50
4,30
3,75
ad Calc
22,62
Rua
93
Situaçã
Portão de
J-
3,85
36,85
93
PV1
Medidores de água e 2.2m a H= Cerc
3,97 Revisão
9,71
HABITACIONAL JARDIM BOTÂNICO Setor: Endereço:Cond. Solar da Serra Quadra J Lote 08. Proprietário:Diones dos Santos Lima Aut. Projeto:Rutherford O. Ocampo CAU/BR 26190-4 Res. Técnico: Proprietário
2,95
2,45
Autor do Projeto
Pingadeira de
13,76
93
2,73
N
7,12
Responsável Técnico H=2.2m Cerca
Pingadeira de
35,06
Pintura Textura
J-
93
Pintura Textura
Pingadeira de
1
Locação 1 : 100
Pintura Textura
J2
Pergolad
PROJETO DE ARQUITETURA
A r q u i t e t ur a & E n g e nh a r i a
Número de Pranchas
Locação e Fachada 4/Oeste 4
Fachada 4/Norte 1 : 50
Revisão Escala
05
Incad
Data
29/09/2017
Unidade
metros
A. Terreno Arquivo
-
5/6 A. Construída
\\ZARYAARQUIVOS\Works\Work2017\Felipe e Diones\PROJETOS\ARQ\AP\F&D-ARQ-AP-R03.rvt
-
Casa de Diones
05
1
2/6
4/ Nort 4
0,15
0,15
0,15
1
2,12
2
-0,02
2,12
0,14
0,14
Quarto Master Suíte 7,8 m² 1 1
2
-0,02
2,12
0,14
Quarto Master Closet 5,1 m² 1 1
1 : 50
Planta Térreo
TIPO
PC1
2,71
PCV4
Quarto Master 14,9 m² 1 1 1 +0,00
3,47
0,14
2,75
PCV3
+0,00
Quarto 1 10,3 m² 1 1 1
PM1 0,14
PM1
8,90
0 1.500 900 0
COD. PARAPEITO
QUADRO DE JANELAS
J1 J2 J3 J4
0,13
2,06
-0,02
QUANT. 2 2 1 1
1,40
J1
-0,02
0,13
Quarto 2 Suíte 3,7 m² 1 1 2
PM2
PIS
2
3/6
2,48
PCV2
-0,02
Lavabo 2,2 m² 1 1
14,86
+0,00
Quarto 2 9,2 m² 1 1 1
2
DServiço 2,9 m² 1 1
2
PM1
PM1
J2
J2
-0,02
2,11
2
3/6
Alçapã
0,14
PMV1
0,15
Especifição Paredes
Descrição Piso 60x60cm Cerâmica Agua
Especifição Piso
Descrição Pintura Latex PVA Cerâmica 40x40cm Pintura Textura Acrilica
TETO
0,14 0,56 0,15
Cod. 1 2 3
PARED
21,00
0,12
J1
Quarto 1 Suíte 3,7 m² 1 1 2
PM1
Quarto 1 Closet PM1 4,0 m² 1 1 1
+0,00
Circulação 12,2 m² 1 1 1 +0,00
Cobog
DIMENSÃO 300 x 2600mm 600 x 900mm 2400 x 400mm 2156 x 2600mm
Cod. 1 2
Especifição Teto
5,87
PCV1
6,39
6,60
3
3/6
-0,02
Varanda 33,0 m² 3 1 1
3
3/6
-
-0,10
Piscina 30,1 m² 2 10,87
Pergolado
-2,80
Garagem 28,2 m² - -
0,14
PP1
J3
0,17
1
2/6
19,37
3,29 m² 12,18 m² 28,15 m² 2,24 m² 30,09 m² 10,33 m² 3,96 m² 3,73 m² 9,22 m² 3,67 m²
Area
QUADRO DE ÁREAS Nome Caixa D'Agua Circulação Garagem Lavabo Piscina Quarto 1 Quarto 1 Closet Quarto 1 Suíte Quarto 2 Quarto 2 Suíte
Sala, Jantar, Cozinha 49,2 m² 1 1 1
PCV2
Área 366.4m² 116.9m² 548.7m²
Área 181.4m² 30.1m²
5,73 0,14 7,66 0,14
3,99 5,26 0,60 7,66 0,14
0,14 3,71 1,55 1,06 0,14 1,56
0,15
0,14 3,01 0,13 2,12
0,14 1,81
0,14 1,78
0,14 1,40
0,14 1,26 0,14
1/ Leste 1 3
3/ Oest
5,40
0,14
Janela de Vidro Temperado - 01 Folha fixa, 01 Folha Maximar Janela em Aluminio de Maximar - 01 Folha Janela em Aluminio de Correr - 04 Folhas Janela de Vidro Temperado - 02 Folhas Maximar, 02 Folhas Fixa
0,14
4,55
Entrad
Nome
2
-
Área Construída
Área de Lote
2/ Su
Área
ÁREA CONSTRUÍDA
207 m² 207 m²
Porta Porta Porta Porta Porta Porta Porta Porta Porta Porta Porta Porta
Perímetr
88.119 88.119
05
Casa de Diones
06
Girls of Steel
Practice: Zarya Arquitetos e Engenharia Programme: New Development/ Condominium Location: Barbados Whilst working at Zarya, we had the chance to work for a UN funded project called Girls of Steel. The premise was to empower women in Barbados by training them in the construction industry. Women hold an unfortunately high percent of unemployment on the island. The on site training would then also produce low cost living oppotunities for the women and people of Barbados in general. We were tasked with designing a low cost multiple phase housing type. That could expand easier with the family if and when needed. The logo was also designed by myself in coordination with the Girls of Steel director.
Phase 2 - Ground Floor Plan
Phase 3 - Ground Floor Plan
Phase 3 - First Floor Plan
Phase 1
Phase 3
Phase 4 - First Floor Plan
Phase 2
Phase 4