Architecture carries within it the ability to address the issues of our time, of a program, of a place, through the assembly of fundamentally rudimentary elements: materials and construction, tectonics and proportions, sky and ground, light and shadow, senses and emotions. Their subtle composition offers sensitive spaces, capable of welcoming the diverse and varied expression of life. In this, the primary objective of architecture should be the design and defense of quality and human spaces. It is a fact of exchanges, sharing, collaborations and intuitions. This objective is accompanied by a commitment to the tectonic quality of the built space, an architecture that combines finesse and constructive rigor. Architecture is conceived in phase with the problems of its time, political, social, environmental, and must respond with simplicity, humility, sobriety, foresight and critical spirit. In an age of acceleration and globalization, architecture also has the potential to make us take a step aside if we want to. This by focusing on the meaning of things during the design process, by trying to reveal what is already there, the site or the things themselves. But also by giving more importance to the acts of life and the acts of architecture itself and their meaning beyond the purely aesthetic. I am looking for a practice that defends a strong architectural commitment, precise proposals that respond to the questions of the site and the commission, and an ambitious and prospective approach to environmental issues..

NICOLAS WERTHEIMER ARCHITECT - HMONP

1


Professional Experience Atelier Tardy & associés

Nov. 2017 - Feb. 2021, Project Leader, Besançon (FR) Main projects Fine Jewellery Factory, Confidential client and location, 2700m², 6,3 M€, completed. Programming, Project Studies, Building permit, Construction administration Professional school and Administration Office, Institution Notre-Dame Saint-Jean, Besançon (FR), 3900m², 7 M€, ongoing studies Programming, Project Studies Competitions Construction of a Primary School, Chamblay (FR) - 3rd prize Rehabilitation / Extention of a School, Amance (FR) - selected Rehabilitation / Extension of a High School, Dole (FR) - 2nd prize

Rue Royale Architectes

Feb. 2017 - Oct. 2017, Assistant Architect, Lyon (FR)

NICOLAS WERTHEIMER ARCHITECT - HMONP

Nursery and Elementary school, City of Vaulx-en-Velin, Vaulx-en-Velin (FR), 3600m², 6,9 M€, completed Project Studies, Permitting Boarding for Sport High School, City of Villeurbanne, Villeurbanne (FR), 2000m², 4,1 M€, completed Project Studies

Taillandier Architectes Associés

Mar. 2015 - Aug. 2016, Assistant Architect, Toulouse (FR)

Infos Citizenship : French Age : 30 Contact : +33 (0)6 77 28 40 20 nicolas.wertheimer@gmail.com instagram : wertheimer_architecture Language : French (native) English (fluent - C1, TOEIC 950) Italian (basic) Driving licence

Private and Public Housing Complex (212 flats), ADIM SO and OPH31, Toulouse (FR), completed With Scalène Architectes Project Studies, Permitting Pedestrian Access of an underground parking lot, Indigo, Toulouse (FR), completed With Scalène Architectes Project Studies

Atelier Tardy & associés

Sep. 2014 - Jan. 2015, Assistant Architect, Besançon (FR)

Pierre Vurpas et Associés Architectes 2013, 2 months internship, Lyon (FR)

AREP

2012, 2 months internship, Paris (FR)

PARC Architectes

2011, 1 month internship, Paris (FR) 2


Education Habilitation à la Maitrise d’Œuvre en Nom Propre

2018 -2019, Architecture National Superior School of Lyon (FR), Jury Unanimous approval. French equivalent to architect final qualifying examination. Dissertation title : «The Exigency»

Architect Studies Diploma (Master)

2009 -2014, Architecture National Superior School of Lyon (FR), With disctinction. Diploma studio : Architecture, Environnement and Building Culture.

Preparatory Class for Postgraduate school

2008 -2009, High School Victor Hugo, Besançon (FR).

Baccalaureate Skills Softwares : - Revit, Autocad, Vectoworks, Sketchup - Illustrator, Indesign, Photoshop - Artlantis - Word, Excel Cartboard model, Lasercutting Soft skills : Architectural and technical rigor Care and sensitivity for details Group work effectivness Team work management Deadlines respect Proactive attitude Oral presentation ease Client relational ease Autonomous

2008, High School Louis Pergaud, Besançon (FR), With disctinction.

Awards / Competitions / Personal Europan 14 «Productive City», Aurillac

2017, 7th rank With Victor Dauxerre, Gilles Malzac, Rovy Pessoa Ferreira

First Prize of the Young Architecture of the city of Lyon

2015, Jury organised by the city concil of Lyon (FR) Diploma Project «Between the walls, Ambert», with Rovy Pessoa Ferreira and Nicolas Schaad

ENSAL Governing Board

2011 -2013, Architecture National Superior School of Lyon (FR), Elected student representative

Lyon Festival of Lighs Student’s Competition

2010, Architecture National Superior School and City of Lyon (FR), Winning project. Lightning installation

References Atelier Tardy & Associés : P. Barbat, CEO of Dalloz Joaillerie, client. F. Stenger, head of the Institution Notre-Dame Saint-Jean, client. Rue Royale Architectes : Michel Essertier, architect & partner Reference letters and contacts available upon request.

Teaching Architecture National Superior School of Toulouse

2015 -2016, part-time contract teacher Tutoring classes about Light and Adaptation to people with disabilities, with 2nd and 3rd year’s students.

Architecture National Superior School of Lyon

2013 -2014, student monitor Intensive week of technical drawing learning and Project courses with 1st year’s students. 3


4


Selection of professional projects Atelier Tardy & associés Fine Jewellery Factory Professional School and Office Refurbishment of former industrial buildings in a moutain village Rehabilitation / Extension of a High School Construction of a Primary School Rue Royale Architectes Nursery and Elementary School Boarding for Sport High School Taillandier Architectes Associés 212 flats housing complexe Emergences of a new underground parking Refurbishment of an heritage market parking

5


Fine Jewellery Factory Atelier Tardy & Associés Private commission Client : confidential Location : confidential Surface : 2700m² Budget : 6,3 M€ Status : Livré Photos : Nicolas Waltefaugle

Developped to be a standardbearers of the company, this project dealed with an especially high quality expectations. The whole building is based on a 2m by 2m grid coming from the industrial layout. A rigorous work with the client and the contractors had allowed to stage the technical elements and magnify the stucture with the realisation of custom-made drilled steel beam. The construction is made from noble materials, concrete, steel, zinc, all implemented to showcase the skills of the craftsmen. The concrete walls were poured with great caution following a meticulous layout work of the panels and electrical equipments. The zinc cladding revisit the traditional flake cladding from the context, with an central embossed stamp, in reference to the factory activity. In close relationship with the client, I oversaw the whole developpement and design of the project, from programming to its completion.

6


Septembre 2020

COM_05

dessiné par : Concepteur

N° PLAN

Ground floor

CRéé LE

Cross section

Elevation Sud-Ouest

Elévations

Elevation Nord-Est

Upper floor

Elevation Nord-Ouest

Main façade Elevation Sud-Est

7 0

5

10

Manufacture Beaunoise

Longitudinal section


3

Zone bouchardée

Ensemble menuisé acier, RAL7012

4

Ensemble menuisé acier, RAL7012

5

Poutre Reconstituée Soudée, laquée RAL 7012

5

Poutre Reconstituée Soudée, laquée RAL 7012

6

Béton fini

6

Béton fini

7

Carrelage Grès Cerame U4P4S Périphérie contrastée

7

Carrelage Grès Cerame U4P4S Périphérie contrastée

Ecailles zinc pigmento bleu

3

Châssis fixe acier, RAL7012

4

Habillage alu laqué RAL 7012, valeur vue 7cm

5

Encadrement zinc formant bavette, avec arrête saillante et retour sur zinc Canal soudé aux angles, Zinc pigmento bleu

6

Allège béton préfa, tête penté, arrêtes vives, garnissage ciment / résine, en retrait teinte dito béton

7

Poutre reconstituée soudée, laquée RAL 7012

8

Béton fini

9

Carrelage Grès Cerame U4P4S Périphérie contrastée

Manufacture Beaunoise

Couvertine zinc, façonnage en 3 pièces, zinc pigmento bleu

dessiné par : Concepteur

1 2

COM_05

Zone bouchardée

4

N° PLAN

3

dessiné par : Concepteur

Couvertine zinc, façonnage en 3 pièces, zinc pigmento bleu Lambrequin et cadre béton préfabriqué

COM_05

1 2

CRéé LE

Couvertine zinc, façonnage en 3 pièces, zinc pigmento bleu Lambrequin et cadre béton préfabriqué

N° PLAN

1 2

Principe de calepinage

Detail section of the South façade Elevation of the precast concrete frame 1

Couvertine zinc, façonnage en 3 pièces, zinc pigmento bleu

2

Ecailles zinc pigmento bleu

3

Châssis fixe acier, RAL7012

4

Habillage alu laqué RAL 7012, valeur vue 7cm

5

Encadrement zinc formant bavette, avec arrête saillante et retour sur zinc Canal soudé aux angles, Zinc pigmento bleu

6

Allège béton préfa, tête penté, arrêtes vives, garnissage ciment / résine, en retrait teinte dito béton

7

Poutre reconstituée soudée, laquée RAL 7012

8

Béton fini

9

Carrelage Grès Cerame U4P4S Périphérie contrastée

Ecailles zinc pigmento bleu

3

Châssis fixe acier, RAL7012

4

Habillage alu laqué RAL 7012, valeur vue 7cm

5

Encadrement zinc formant bavette, avec arrête saillante et retour sur zinc Canal soudé aux angles, Zinc pigmento bleu

6

Allège béton préfa, tête penté, arrêtes vives, garnissage ciment / résine, en retrait teinte dito béton

7

Poutre reconstituée soudée, laquée RAL 7012

8

Béton fini

9

Carrelage Grès Cerame U4P4S Périphérie contrastée

Ecaille de Zinc

Principe de calepinage

Detail section of the North façade Details of the zinc cladding 8

COM_05

Couvertine zinc, façonnage en 3 pièces, zinc pigmento bleu

dessiné par : Concepteur

1 2

N° PLAN

Ecaille de Zinc

CRéé LE

Manufacture Beaunoise

Principe de calepinage


9


8.20 AC1

280.0

5.00 AC0 4.93 AC0 GO

4.16 TO0

Toiture - bas

60.0

100.0

BHUM radio

280.0

axé sur porte boite traversante

PRS - haut

⌀600

Cadre HEA porte auto

60.0

PRS - bas

3.0

60.0

63.0 boite traversante, alim porte auto.

80.5

Axonometric view of the structure and the technical network

= 340.0

237.0

280.0 359.0

359.0

10.0

2.702.70 FXPFXP RDC RDC

1.75

2.50

0.000.00 00 00 -0.02 -0.02 00 GO 00 GO

130.0130.0

vestiaire vestiaire 1 1

2.50

25.0 25.0

valid vali

1 : 150: 50

V10 V10

V11 V11 V2

V9 V9

8.208.20 AC1AC1 8.138.13 7.50 AC1AC1 GOACM GO

V3

10.0

7.43 ACM GO 7.457.45 TO1TO1

25.0

25.0

20.0 50.5 50.5

280.0

280.0

354.3

354.3

356.0

356.0

280.0

16.0

280.0

2 x ⌀25mm

412.0

25.0

hallhall

237.0

237.0

L014

120.0

311.0

222.0

salle salle de de réunion réunion

2 fourreaux ⌀ 40mm dans clavetage

2 fourreaux ⌀ 40mm dans

2 fourreaux ⌀ 40mm dans clavetage

V6 V6clavetage

Fixé sous CC

2.702.70 FXPFXP RDC RDC

316.0

300.0

285.0

285.0

59.0

3.20 3.523.52M

013.05 01 3.50 3.50 Sous-face poutre 01 GO 01 GO

362.0

boite traversante

260.8

35.5

2 alims Dyson

2 x ⌀25mm

2.0

2.0

600.0

226.0

279.0

120.0

279.0

209.0

56.4

209.0

214.0

214.0

2 fourreaux ⌀ 40mm dans

V6' V6'clavetage

4.16 TO0

sol fini sol+0.00 fini +0.00 m / 00 m / 00

180.0180.0 25.0

10

65.0

65.0

362.0 alim fontaine

25.0

30.0

30.0

456.9456.9

70.0 70.0

187.0187.0

25.0

330.0

330.0

45.0

45.0 2 fourreaux ⌀ 40mm dans clavetage

V5 V5

120.0

214.0

54.5 54.5

116.0116.0

loge loge

sassas / salon / salon visiteurs visiteurs

à côté du joint de banche

boite dans linteau

sur joint de banche

95.0 95.0 Station murale Lave-oeil

81.8

25.0

200.0200.0

hallhall

67.538.1 38.1

Vannes Arrêt d'urgence

293.0

25.0

alim fontaine

à côté du joint de banche

L004L004 == ==

147.0 125.0 147.0 125.0

209.0

2 alims Dyson

209.0

210.5

81.8

214.0

147.0

Thermostat Thermostat

56.4

15.0

15.0 ⌀25

147.0

sol fini sol+3.52 fini +3.52 m / 00 m / 00

226.0

Mi002a Mi002a

30.0

57.5

Boite Boite d'attente d'attente dansdans le plenum le plenum du R+1 du R+1

60 0

sol brut sol +3.50 brut +3.50 m / 00 m / 00 63.0

openspace openspace

25.0

210.5

210.5

147.0

235.0

125.0

110.8 125.0 110.8

63.0

292.5

DO003 DO003

362.0

362.0

30.0

ø

44.6 44.6

103.8103.8

60.0

25.0

2 x ⌀25mm

695.0

695.0

50.0

226.0

289.3

210.5

25.0 ⌀25

⌀25

235.0

20.0

2 x ⌀25mm

210.5

235.0

235.0

420.0

412.0

16.0

16.0 362.0

289.3 237.0 120.0

237.0

35.5

125.0

boite dans linteau

Mi002b Mi002b

226.0

310.0

310.0

209.0

209.0 147.0

125.0

25.0

25.0 ⌀25

⌀25

362.0

305.0 147.0

1 : 150: 50

60.0

200.0

Ecl. + Ecl. BSO + BSO

20.0

Boite Boite d'attente d'attente dansdans le plenum le plenum du R+1 du R+1

E1E1 - V9, - V9, V10, V10, V11 V11

8.208.20 AC1AC1 8.138.13 AC1AC1 GOGO

400.0

210.5

1 x ⌀25mm

147.0

125.0

125.0

25.0

25.0 574.0

10.0

10.0 305.0

boite dans linteau

106.5

5.00 AC0 4.93 AC0 GO 25.0

0 60

42.4 42.4 94.0 94.0

103.8103.8

vestiaire vestiaire 1 1

bureau bureau nomade nomade

6.706.70 FXPFXP R+1R+1

ø

57.5

898.0

431.5

Alim Alim plinthe plinthe élec élec sur refend sur refend

0 60

28.7 28.7

44.6 44.6 41.0 41.0

0 60

VALIDÉ validé validé

168.5

506.9506.9 527.0

ø

1 : 50

= = = =

45.0

ø

sur joint de banche

571.8

130.0130.0

P3 - V1, V2, V3

62.6 62.6 67.5

= = = =

33.0 33.0

alignement alignement horizontal horizontal trou trou de banche de banche

83.5 83.5

157.0

0 60

137.0137.0

347.5347.5

55.0 55.0 90.0

16.0

ø

Station murale Lave-oeil

49.0 49.0

25.0

0 60

0 60

0 60

0 60

carrotage carrotage ⌀12,5cm ⌀12,5cm

150.0

ø

ø

ø

478.5478.5

600.0

25.0

20.0

⌀300 ⌀300 ⌀300 ⌀300

21.5 21.550.0 50.0

2.702.70 FXPFXP RDC RDC

90.0

168.5

ø

147.0

210.5

Fixé sous CC 45.0

125.0

103.8103.8

63.0

refectoire refectoire

2x ⌀25 ⌀25

2x ⌀25

326.0

45.0 431.5

0 60

0 60

63.0

370.0

370.0

400.0

108.0108.0

25.0

20.0

20.0

1004.0

71.0 71.0

= = = =

Ecl. + Ecl. BSO + BSO

210.5

235.0

90.0

41.0 41.0 44.6 44.6

ø

3.523.52 01 01 3.503.50 01 GO 01 GO

370.0 340.0

910.0

200.0

235.0

25.0

340.0

25.0

359.0

51.9 51.9

359.0

56.1 56.1

16.0 45 .0

⌀25

r.

25.0

25.0

90.0

326.0 370.0

666.4666.4

⌀25

43.0

527.0

.0 45

10.0

⌀450 ⌀450

176.5176.5

6.706.70 FXPFXP R+1R+1

50.0 50.0 38.3 38.3 25.0 25.0

79.1 79.1 106.5106.5

⌀400 ⌀400

20.0

25.0 25.050.0 50.025.0 25.0

300.0

480.0480.0

7.457.45 TO1TO1

Fixé sous CC

0.00 00 -0.02 00 GO 0.00 0.00 00 00 -0.02 -0.02 00 GO 00 GO

8.208.20 AC1AC1 8.138.13 AC1AC1 GOGO

526.1526.1

Toiture

282.2

120.0

2.00

282.2

DEP

237.0

2.50

dgt.dgt. 103.8103.8 vestiaires vestiaires

237.0

310.0

305.0

310.0 209.0

209.0

305.0

310.0

310.0

722.0

226.0

78.8

Alim Alim luminaire lumin

A l'axe de la poutre Au milieu des baies

226.0

210.5

210.5

209.0

209.0

237.0

237.0

DEP

= 116.8116.8

escalier escalier de de secours secours

2.50

200.0200.0

sol brut sol -0.02 brut -0.02 m / 00 m / 00

688.0

722.0 =

181.0

237.0

237.0

214.0

2.50 sol fini sol+0.00 fini +0.00 m / 00 m / 00

116.0116.0

sol fini sol+3.20 fini +3.20 m / 00 m / 00

688.0

280.0

DC027

M2M2 - V12 - V12

V1

20.0

141.0

349.8349

3.523.52 01 01 296.0 3.50 3.50 01 GO 01 GO Me056

50.0 50.021.5 21.5

A62.6 l'axe62.6 de la poutre 49.0 49.0 12.3 12.3 Au milieu des baies carrotage carrotage ⌀12,5cm ⌀12,5cm

78.8

10.0

90.0

10.0 90.0

Me055 ⌀300 ⌀300 496.0496.0

280.0

108.0108.0

296.0

⌀300 ⌀300

210.5

210.5

141.0

125.0 25.0

25.0

=

DC026

90.0

22.0

394.5 10.0 22.0

121.0

121.0

678.0

10.0

722.0

678.0 722.0

90.0

695.0

214.0 2.50

187.0187.0

286.0

125.0

210.5

209.0

209.0 141.0

210.5

458.0 141.0

458.0

340.0

⌀25

⌀25

2x ⌀25

226.0 120.0

100.0

25.0

25.0

214.0

214.0

BBG005 BBG005

1.73

25.0

hallhall

L005L005

=

⌀300 ⌀300

boiteboite dansdans linteau linteau

== ==

10.0

701.9701.9

237.0

50.0 50.0

1 : 150: 50

8.208.20 AC1AC1

7.457.45

65.3 65.3

Voile V3

D2D2 - V9, - V9, V10, V10, V11 V11

8.138.13 AC1AC1 GOGO

0.000.00 00 00 -0.02 -0.02 00 GO 00 GO

⌀450 ⌀450

32.8 32.8

6.706.70 FXPFXP R+1R+1

179.1179.1

sol fini sol+3.52 fini +3.52 m / 00 m / 00 sol brut sol +3.50 brut +3.50 m / 00 m / 00

42.4 42.4

DO003 DO003 Mi002a Mi002a

100.0

271.0 120.0

DEP

209.0

209.0

209.0

209.0

2.50

180.0180.0

296.0

DV004 DV004 69.5 69.5 8.0 8.0 Me054

boiteboite traversante traversante = = = =

= = = =

DSF

98.7

120.0

279.0

296.0

déclencheur manuel BBG010

Me014

2.50

VALIDÉ validé validé

286.0

25.4 25.4

DC025 espace espace détente détente

103.8103.8

Me053

A l'axe de la poutre

120.0

120.0

P1 - V1, V2, V3, V4, V5

10.0

=

25.0

226.0

279.0

52.0

695.0

140.0

DC024

29.5

120.0

DEP

286.0

340.0 2x ⌀25

1x ⌀25

1x ⌀25

210.5

2x ⌀25

210.5

18.6 19.9

=

Aligné au trou de banche

BBG008

2.50

Boite Boite d'attente d'attente dansdans le plenum le plenum du R+1 du R+1

DO+C005

29.5

38.1 38.1

Mi004

2.50

10.0

=

Mi002b Mi002b

1 : 50

10.025.0 10.025.050.0 50.025.0 25.0

56.4 56.4

Voile V2

BUZ01

Boite traversante BBG013 supprimé, remplacé par BP éclairage

271.0

95.0 95.0

286.0

21.3 21.3

22.0 394.5 121.0

45.0

45.0

140.0

Au milieu de la porte

103.8103.8

=

121.0412.0 22.0

22.0 60.0

60.0

22.0

hallhall

85.5

Traversée pour projecteur

=

141.0

209.0

209.0

235.0

235.0 A l'axe de la poutre

escalier escalier rdcrdc

7.457.45 TO1TO1

⌀450 ⌀450

Au milieu de la baie et des poutres fixé aux CC

10.0

141.0

1x ⌀25

330.0

330.0

356.0

356.0

354.3

354.3

110.0

10.0 38.1 38.1

DO+C004

2.702.70 FXPFXP RDC RDC

2x ⌀25

Au milieu de la baie et des poutres fixé aux CC

110.0

=

0.000.00 00 00 -0.02 -0.02 00 GO 00 GO

8.208.20 AC1AC1 8.138.13 AC1AC1 GOGO

1600.0 Longueur réduite par un BAES fixé sous charpente

Traversée 2 Trilux + 1 détecteur Traversée pour projecteur sur Me143

escalier escalier r+1r+1

0.00 00 -0.02 00 GO

90.0 90.0

Toiture

3.523.52 01 01 3.503.50 01 GO 01 GO

215.0

Attentes Dyson

176.5176.5

10.0 71.0 71.0

Voile V1 500.0500.0

36.8

⌀400 ⌀400

36.0 36.0 20.0

15.0

25.0

25.0

20.0

6.706.70 FXPFXP R+1R+1

56.4

91.9 91.9

55.0 55.0 28.1 28.1 50.0 50.0

=

63.6

V10 V10

154.2154.2 20.0

360.0360.0

25.0 25.0

56.4

V11 V11

20.0

7.457.45 TO1TO1

V9 V9

36.8

Attente fontaine

170.0

15.0

1 : 50

=

62.5

25.0

35.5

VALIDÉ

P2 - V1, V3

62.5

20.0

Attente fontaine

Samples of the wall layouts 8.208.20 AC1AC1 8.138.13 AC1AC1 GOGO

62.5

226.0

Déclencheur manuel sur le refend prévoir fourreau vers alim

ECL C1 ECL C2 ECL C3

BSO C1 BSO C2 BSO C3

226.0

Déclencheur manuel sur le refend prévoir fourreau vers alim

25.0

62.5

10.0

Attentes Dyson

36.8

Symétrie à l'axe de la banche

35.5

56.4

120.0

63.6

120.0

56.4

120.0

226.0

36.8

=

280.0

62.5

226.0

305.0

125.0

=

47.5 270.0

62.5

=

226.0

=

90.0

47.5 280.0

=

368.0

=

=

362.0

340.0

90.0

=

3.05 Sous-face poutre

168.5 231.5

=

=

280.0

=

boite traversante, alim porte auto.

80.5

r.

280.0

V1

8.13 AC1 GO

ø

280.0

V3

91.9 91.9

21.8 21.8 59.0 59.0

Event Event

174.4174.4

20.0 20.0

395.6395.6

7.457.45

2 fourreaux ⌀ 40mm dans clavetage


11


Professional school and administration office

U

T

S

R

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

A

21

20

19

Atelier Tardy & Associés Private commission Client : Institution Notre-Dame Saint-Jean Location : Besançon (FR) Surface : 3900m² Budget : 7 M€ Status : Ongoing studies Renders : Artefactory (p.14) & Asylum (p.15)

18

17

16

15

14

13

12

11

10

9 Cloison modulaire avec stratifié de communication Cloison acoustique

Cloison modulaire vitrée

modulaire des salles de classes

asse 0m²

Insertion topographique

edulaire

des salles de classes

asse 0m²

é interne ouvert droit Espace servant

The ND SJ Institution is a private school, deeply engaged into a reconsideration of the way schools should teach. This project which group a professionnal graduate school, the administration of the whole Institution and multipurpose hall, was the occasion to translate into space the Institution philosophy. It led to a project of regular square teaching rooms, able to support a high variability of teaching organisation, gather around a large hall which was supposed to host a multiplicity of activity and to encourage the independant and work group. Draw like a square in a square, this project is also a work about geometrical composition, with a research about regulating lines and proportion. Following two years of exchanges with the client, it was plan to be built like 3 structural free plans, with a use of pre-cast concrete, to allow a great flexibility. In contrast, the tile cladded facade was expected to showcase the perenity of the construction. The documents shown here depict several phases of the project development. My function was to develop the design of the project, in close relationship with the client and with assistance from two junior collegues, from programming to the construction documentation. Décomposition géométrique

Extérieur / Intérieur

Usage périphérique Décomposition

Double carré Insertion

Salle de classe 35m²

asse 0m²

/ Intérieur

3m

5m

7

PRO 6

B04

5

CRÉE LE

Janvier 2021

ÉCHELLE

Comme indiqué

AUTEUR

Atelier Tardy & Associés

DATES

INDICE

19/01/2021 25/01/2021 29/01/2021 01/02/2021 02/02/2021 04/02/2021

0 A B C D E

4

Réunion du 20/01/2 Modifications admin Modification admini Modification structu Tirage réunion du 0 Modification accuei

S UR CO

EN

MAITRISE D'OUVRAGE MAITRE D'OUVRAGE 3

Institution Notre-D 1, chemin de l'Esp 25000 BESANCON

SOCOTEC Besan 4 rue du Colonel M 25000 BESANCON

CONTROLEUR TECHNIQUE S.P.S.

SOCOTEC Besan 4 rue du Colonel M 25000 BESANCON

GEOTECHNICIEN

B3G2 10 Rue de la Coup 25 410 SAINT VIT

ARCHITECTE mandataire

atelier Tardy & as 5, avenue Edouard 25000 BESANCON

ECONOMISTE + OPC

ACTE ECO 14 route de Geneu 25870 DEVECEY

2

MAITRISE D'OEUVRE

1

U

T

S

R

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

BET STRUCTURE

C.S.B. 2 chemin des mais 39150 SAINT LAU

BET ELECTRIQUE et THERMIQUE

BET BELLUCCI 4 rue du Gay - Zi d 25220 CHALEZEU

BET HQE

Etamine 10 avenue des Ca 69120 VAULX-EN

BET NTIC

Atelier Audio Visu 13 avenue Barthél 69300 CALUIRE

A

21

20

19

18

17

16

15

14

13

12

11

10

9 Cloison modulaire avec stratifié de communication Cloison acoustique

Cloison modulaire vitrée Cloison vitrée Coupe Feu

Cloison pleine Coupe Feu

8 Cloison pleine

1m

3m

5m

7

Pôle E

PRO 6

Extérieur / Intérieur

1,

B03 CRÉE LE

Permanence / Mutabilité

Evénement

5

Janvier 2021

ÉCHELLE

Comme indiqué

AUTEUR

Atelier Tardy & Associés

DATES

INDICE

19/01/2021 25/01/2021 01/02/2021 02/02/2021 04/02/2021

0 A B C D

4

Réunion du 20/01/2021 Modifications administration Modification structure, ajout Tirage réunion du 03/02/202 Modification accueil et sanita

S UR CO

EN

Institution Notre-Dame S 1, chemin de l'Espérance 25000 BESANCON

MAITRISE D'OUVRAGE MAITRE D'OUVRAGE 3

SOCOTEC Besançon 4 rue du Colonel Maurin 25000 BESANCON

CONTROLEUR TECHNIQUE

SOCOTEC Besançon 4 rue du Colonel Maurin 25000 BESANCON

S.P.S.

B3G2 10 Rue de la Coupotte 25 410 SAINT VIT

GEOTECHNICIEN

2

atelier Tardy & associés 5, avenue Edouard Droz 25000 BESANCON

ARCHITECTE mandataire

MAITRISE D'OEUVRE

ACTE ECO 14 route de Geneuille 25870 DEVECEY

ECONOMISTE + OPC

1

BET STRUCTURE

C.S.B. 2 chemin des maisonnette 39150 SAINT LAURENT E

BET ELECTRIQUE et THERMIQUE

BET BELLUCCI 4 rue du Gay - Zi de Thise 25220 CHALEZEULE

BET HQE

Etamine 10 avenue des Canuts 69120 VAULX-EN-VELIN

BET NTIC

Atelier Audio Visuel 13 avenue Barthélémy Thi 69300 CALUIRE

Evénement

Carré interne ouvert droit Insertion topographique

Escalier Permanence

Double Extérieur carré

Synthèse Permanence

/ Mutabilité

U

T

Evénement

Escalier

S

R

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

A

21

20

19

18

/ Mutabilité

Carré interne ouvert droit Espace servant Carré interne ouvert gauche

/ Intérieur

Evénement Double carréPercement Insertion Extérieur

topographique

Synthèse Synthèse

Extérieur / Intérieur 17

Escalier

Permanence / Mutabilité

Evénement

16

Salle de classe 70m²

Carré Extérieur interne Extérieur ouvert droit / Percement

0420

Module Demi-carré décentré gauche Centre demi-carré

ouvert droit ble carré 2nterne

Synthèse Extérieur

servant

1Décomposition des salles de classesVariation géométrique Variation 2

1Insertion topographique é interne ouvert gauche Escalier 2UP

asse 0m²

Variation 1 Espace

Cloison pleine

1m

Insertion topographique

Permanence / Mutabilité

géométrique

topographique

Usage périphérique Grille modulaire Centre demi-carré

840

Espace servant

Cloison vitrée Coupe Feu

Cloison pleine Coupe Feu

8

Intérieur

DoubleSynthèse carré Permanence

/ Mutabilité

Usage Variation Variation 2 3périphérique

Evénement

Synthèse

15

14

13

12

Escalier

Variation 1 Double carré Carré interne ouvert gauche

Carré ouvert droit Intérieur -interne Structure filaire Extérieur Percement

Double carré Synthèse Synthèse

PRO Notice

Synthèse 11

Pôle Enseignement Supérieur & Administration 1, chemin de l'Espérance Escalier 25000 Besançon

a1 10

Salle de classe Salle de classe 35m² 35m²

Salle de classe 70m²

CRÉE LE 9

Janvier 2021

ÉCHELLE

1 : 500

AUTEUR

Atelier Tardy & Associés

Schémas de principe

DATES

INDICE

MODIFICATIONS

Cloison modulaire avec stratifié de communication Cloison acoustique

Cloison modulaire vitrée Cloison vitrée Coupe Feu

8

Cloison pleine Coupe Feu Cloison pleine

Bureau 17m²

1m

Escalier 2UP Escalier 2UP

0210

Double carré Intérieur - Structure filaire Carré interne ouvert gauche

Synthèse Synthèse Extérieur Percement

Escalier Synthèse

Demi-carré gauche Tramedécentré 840 Demi-carré décentré droite

Variation 3 4demi-carré Centre Variation

Double carré Variation Coupe topo 2

Salle de classe 70m²

Salle de classe 35m²

PRO Notice

Salle de classe 35m²

Pôle Enseignement Supérieur & Administration 1, chemin de l'Espérance 25000 Besançon Intérieur - Structure filaire gauche Carré interne Extérieur Intérieurouvert

a1

6

Synthèse Extérieur Percement

PRO Notice

Synthèse

ÉCHELLE

1 : 500

AUTEUR

Atelier Tardy & Associés

Schémas de principe

DATES

INDICE

MODIFICATIONS

4

MAITRISE D'OUVRAGE MAITRE D'OUVRAGE Janvier 2021 CRÉE LE CONTROLEUR 1 : 500 TECHNIQUE

ÉCHELLE 3

AUTEUR

Double carréPercement Extérieur Extérieur Intérieur

0

Tramedécentré 420 Demi-carré droite

Escalier 2UP

Escalier 2UP

PRO Notice

Intérieur - Structure filaire Synthèse

Synthèse

Demi-carré décentré gauche Variation 4

3 CoupeVariation topo

Double carré Extérieur Intérieur

MAITRISE D'OUVRAGE MAITRE D'OUVRAGE Salle de classe 70m²

CONTROLEUR TECHNIQUE

Salle de classe 35m²

S.P.S. GEOTECHNICIEN

Pôle Enseignement Supérieur & Administration 1, chemin de l'Espérance 25000 Besançon 1

12

Intérieur - Structure filaire

a1

Institution Notre-Dame Saint-Jean 1, chemin de l'Espérance CRÉE LE 25000 BESANCON

tél : 03 81 47 42 29 Janvier 2021 e-mail : elodie.champroy@notredamesaintjean.com

SOCOTEC Besançon 4 rue du Colonel Maurin ÉCHELLE 25000 BESANCON

81 51 80 63 tél : 103: 500 e-mail : bruno.masi@socotec.com

SOCOTEC Besançon 4 rue du Colonel Maurin 25000 BESANCON

B3G2 10 Rue de la Coupotte 25 410 SAINT VIT

AUTEUR DATES

Synthèse

INDICE

MODIFICATIONS

S.P.S. GEOTECHNICIEN

Bureau 17m²

MAITRISE D'OEUVRE

ARCHITECTE mandataire

atelier Tardy & associés 5, avenue Edouard Droz

tél : 03 81 51 59 25 e-mail : o.tardy@architecture-tardy.com

tél : 03 81 51 80 63 e-mail : bruno.masi@socotec.com

ACTE ECO 14 route de Geneuille 25870 DEVECEY

Comme indiqué Atelier Tardy & Associés

DATES

INDICE

PRO Notice

Etamine 10 avenue des Canuts 69120 VAULX-EN-VELIN Institution Notre-Dame Saint-Jean 1, chemin l'Espérance AtelierdeAudio Visuel 25000 13BESANCON avenue Barthélémy Thimonnier 69300 CALUIRE SOCOTEC Besançon 4 rue du Colonel Maurin 25000 BESANCON SOCOTEC Besançon 4 rue du Colonel Maurin 25000 BESANCON

B3G2 10 Rue de la Coupotte 25 410 SAINT VIT

CONTROLEUR TECHNIQUE

tél : 03 81 87 60 41 e-mail : b3g2@b3g2.fr

BET BELLUCCI 4 rue du Gay - Zi de Thise 25220 CHALEZEULE

tél : 03 84 45 34 76 e-mail : contact@csb.bet

MAITRISE D'OEUVRE

Pôle Enseignement Supérieur & Administration 1, chemin de l'Espérance 25000 Besançon

tél : 03.81.88.22.25 e-mail : contact@bet-bellucci.com

a1

tél : 04 37 45 34 21 e-mail : vianney.charmette@etamine.coop tél : 03 81 47 42 29

Janvier 2021 CRÉE e-mailLE : elodie.champroy@notredamesaintjean.com tél : 09 72 31 29 66

e-mail : contact@atelier-av.net tél : 03 81 51 80 63 1 : 500 ÉCHELLE e-mail : bruno.masi@socotec.com

Atelier Tardy & Associés AUTEUR tél : 03 81 51 80 63

e-mail : bruno.masi@socotec.com

DATES

tél : 03 81 87 60 41 e-mail : b3g2@b3g2.fr

INDICE

Réunion du Modification Modification Tirage réun Modification

U CO

MAITRISE D'OUVRAGE MAITRE D'OUVRAGE

e-mail : bruno.masi@socotec.com

tél : 06 86 90 99 86 e-mail : jr@acte-eco-25.com

0 A B C D

EN

MODIFICATIONS

tél : 03 81 51 59 25 e-mail : o.tardy@architecture-tardy.com n.wertheimer@architecture-tardy.com

Janvier 2021

AUTEUR

Schémas de principe tél : 03 81 51 80 63

C.S.B. 2 chemin des maisonnettes, BP19 39150 SAINT LAURENT EN GRANDVAUX

BET STRUCTURE

MAITRISE D'OUVRAGE MAITRE D'OUVRAGE BET NTIC CONTROLEUR TECHNIQUE

SOCOTEC Besançon 4 rue du Colonel Maurin 25000 BESANCON

atelier Tardy & associés 5, avenue Edouard Droz 25000 BESANCON

ARCHITECTE mandataire ECONOMISTE + OPC

BET HQE

Schémas de principe

tél : 03 81 87 60 41 e-mail : b3g2@b3g2.fr

MAITRISE D'OEUVRE

tél : 03 81 47 42 29 e-mail : elodie.champroy@notredamesaintjean.com

B3G2 10 Rue de la Coupotte 25 410 SAINT VIT

BET ELECTRIQUE et THERMIQUE

Atelier Tardy & Associés

tél : 03 81 51 80 63 e-mail : bruno.masi@socotec.com

S.P.S.

INDICE

GEOTECHNICIEN

2

Institution Notre-Dame Saint-Jean 1, chemin de l'Espérance 25000 BESANCON

SOCOTEC Besançon 4 rue du Colonel Maurin 25000 BESANCON

Atelier Tardy & Associés

DATES Bureau 17m²

3nterne pe topoouvert gauche

B02 CRÉE LE ÉCHELLE

19/01/2021 25/01/2021 01/02/2021 02/02/2021 04/02/2021

a1

Janvier 2021

5m

PRO

Pôle Enseignement Supérieur & Administration 1, chemin de l'Espérance 25000 Besançon

5

CRÉE LE

3m

7

Schémas de principe MODIFICATIONS

Institution 1, chemin 25000 BES

SOCOTEC 4 rue du C 25000 BES

S.P.S.

SOCOTEC 4 rue du C 25000 BES

GEOTECHNICIEN

B3G2 10 Rue de 25 410 SA

ARCHITECTE mandataire

atelier Tar 5, avenue 25000 BES

ECONOMISTE + OPC

ACTE ECO 14 route d 25870 DE

BET STRUCTURE

C.S.B. 2 chemin d 39150 SAI

BET ELECTRIQUE et THERMIQUE

BET BELL 4 rue du G 25220 CH

BET HQE

Etamine 10 avenue 69120 VAU

BET NTIC

Atelier Au 13 avenue 69300 CA


TO1

NIVEAU 2

NIVEAU 1

NIVEAU 0

13


Professional school and administration office Previous iterations

14


15


Rehabilitation / Extension of a High School Atelier Tardy & Associés Public competition Client : Conseil Départemental du Jura Location : Dole (FR) Surface : 7700m² Budget : 8,3 M€ 2nd prize Render : Artefactory

This proposal display a refurbishment and extension project for an high school. The existing building, from the 70’s, is made with modular and prefab technical solutions. The choice made is to reorganise the circulations and to add a wing on the right side of the building and to form an H shape. By that way, the building and it’s internal organisation become clearer. To this aim, a work is made to bring light in the circulation and offer richer spatial experience with few double storey rooms. The extension is build simply, with insulated bricks, a thermal insulation and a plaster as external finish to be efficiant about the cost and that to be able to renovate the former building with the same quality than for the new. My role was to work on the conception and to manage the work of two other colleagues on the production of graphic documents.

16


CTA

Salle de classe

Rangement

Salle de classe

Corridor

Préau couvert

Hall

CTA

Salle d’arts plastiques

Vestiaires

Salle de musique

Salle de classe

Hall

Salle de classe

Réfectoire

17


Construction of a primary school Atelier Tardy & Associés Public competition Client : SIDEC du Jura Location : Chamblay (FR) Surface : 1500m² Budget : 3,2 M€ 3rd prize

The site for the construction of the new school is at the edge of a small one-road village, located in a narrow valley. The project is seen as an interface between the village as a dwelling space and the nearby fields, forest and hill, as a landscape. It is basically a long roof set on a field, with the classroom underneath. The organisation of the different functions is made in the same direction as the village, whereas the school covered courtyard are set transversally as a space in between the village and the landscape. The building is made by a succession of arches to give it a more human scale and a rythm referring to the close church. Planned in wood construction, the building would have express the local and traditional constructive know-how. My role was to work on the conception and to manage the work of two other colleagues on the production of graphic documents.

18


19


Refurbishment of former industrial buildings in a moutain village Atelier Tardy & Associés Private commission Client : confidential Location : confidential Surface : 4800m² Budget : 11 M€ Status : On-going studies

This project was commissioned by a fine jewellery company located in the Jura’s mountain (FR). They possess an important number of buildings in a village historically engaged in jewellery activity. The most promeminent of those buildings are 3 former factories, currently used as office for one of them and not used anymore for the others. They’re also the owner of few smaller building serving as housing. Since their porperty portfolio reprensent a significant part of the village and is situated in the center, to engage a project on those buildings imply to work on a more large scale intervention. So this project combine a very operative part about an indutrial refurbishment but also a wider reflexion on how to bring attractiveness to a declining moutain village. Starting with an extensive analysis process, the project indentify a singularity in the developpement of the plots of the center, related to the creation of a new road coming from the valley an hundred of years ago. It propose to bring an answer to this problematic by the use of geometry, by making a clearing in the center of the village, to bring more light and air, to create public space more significant than the roadsides. It result in a square shape, support by the façades of close buildings. With this geometric operation, the remaining buildings are expressed in their singularity, high rise industrial buildings in a village mostly made of two storey housing. My role on this project was to work one the analysis, the programming and the first drafts, displayed here, with another colleague, in direct relationship with the client. 20


21


Nursery and Elementary School Rue Royale Architectes Public competition (2016) Client : Vaulx-en-Velin City Location : Vaulx-en-Velin (FR) Surface : 3600m² Budget : 8,1 M€ Status : Under construction

This project of 9 elementary classes, 6 nursery classes, a pre-school and a dedicated restaurant is part of an urban project in Vaulx-en-Velin. Organised around the schoolyard and a patio, this project is made from 2 L-shaped volumes, one downstairs made with stamped concrete, one upstairs made in timber framed walls with a ply-wood pannel covered by a corrugated polycarbonate layer as finish. My role was to work with the architect in charge on the project studies, the permitting and the construction element, with among other things the developpement of the BIM 1 model and a cartboard model work about the timber-framed façade details.

22


23

auvent

auvent


Boarding for Sport High School Rue Royale Architectes Public competition (2016) Client : Region Auvergne Rhône-Alpes Location : Villeurbanne (FR) Surface : 2000m² Budget : 4,1 M€ Status : Completed

This project follows a wining entry for a public competition for the construction of a new «excellence» boarding for the lycée Fays. Its purpose is to host sport students and technical students. An existing building, part of the heritage ensemble of the high school is refurbished in 3 flats, while a building in continuation is demolished to make room for the new building which respect the former footprint. The proposal articulate an old building as gable, a ground floor porous to host collective functions like a student house, and a tectonic volume upstairs with the student rooms, made with stone cladding. The project is read as tectonic mass and a traditional construction articulated by a ribbon of glass and metal. Following the competition, my role on this project was to assist the architect in charge on the project studies, the permitting the developpement of the BIM 1 model and a cartboard model.

24


25


Public and private housing complex (212 f.) Taillandier Architectes Associés With scalene architectes Public competition (2015) Clients : Oppidea, Vinci Immo, Habitat Toulouse Location : Toulouse Surface : 6400m² Budget : 9,4M€ Status : Completed

Final element of an urban project, this open block act as joint between two districts and provide the continuity of the public space. The 5 buildings composing the block handle with a complex context. They’re seen as a assembling of several carved mass, linked by the brick materiality and the rythm of the loggia façade. Their shapes follow the need for bringing sun light and views inside the block. My role on this project was to work on the public part with about 110 flats, all along the project studies and the permitting, and to ensure the developpment of the BIM model, in conjunction with scalène architectes, in charge of the private part.

26


90

36

15

21

45

90

180

30

212

4

Détail fenetre

Elévation

212 LOGEMENTS ET COMMERCES

TAA

20 cm

1. 27

PRINCIPE 1

40 cm


Taillandier Architectes Associés With scalene architectes Public consultation (2016) Clients : Vinci Park & Indigo Location : Toulouse Render : scalene architectes

Following a wining entry for a public consultation for the construction of a new underground parking under one of the biggest artery of the city, Taillandier Architect and Associates with Scalene Architect were in charge of the design of the pedestrian exits. The concept of those urban emergences, develop in close relation with the Ramblas project of Joan Busquets, was to provide a cover, to protect the access but also and mainly as an opportunity for mutualization and concentration of uses. I’ve been in charge of the conception, in direct link with scalene architectes, the client and the engineering office, from the competition to the Coupes et détails construction documentation.

154

154

+5.06 m /TN

Poutre acier finition inox

2

Cage d'ascenseur en verre blanc satiné

AP4 - élévation Nord-Est 1 : 100

230

Signalétique sérigraphiée

Porte ascenseur en verre blanc satiné et menuiserie thermolaquée blanc Signalétique sérigraphiée Garde-corps vitré avec lisse inox

+0.00 m /TN

100

Main courante inox Allège en pierre matérialité et calepinage dito plan d'aménagement urbain

Signalétique sérigraphiée

120

+0.20 m /TN

508

Toiture Alu : surface galva peint en blanc sous-face alu poli-mirroir

Poteau acier thermolaqué blanc

+0.00 m /TN

28 AP4 - élévation Nord-Ouest 1 : 100

+1.20 m /TN

+0.20 m /TN

20

2 506

230 100

+1.20 m /TN

120

Poutre acier finition inox

+3.52 m /TN

Toiture Alu : surface galva peint en blanc sous-face alu poli-mirroir Cage d'ascenseur en verre blanc satiné avec fronton Indigo sérigraphié

20

OITURE

Emergences of a new underground parking


se tec ed eélov erèimerp tnattemrep étnalp sicalg us seélov seL .eiov ala.ed eC .2-N te 1-N uaevin el U .tnemellerutan élitnev t ellerutan noitalitnev ed vin ua eéutis tse sècca’d

Tout d’une trans prem glacis de la le niv venti de ve d’acc

oQRF WVH HUXWUHYXRF HQ8 uf enu’d troppus trevuoc uos tse erutrevuoc etteC sicalg el snad sétnalpmi éutis xuaetop ertauq rap e eéssuorter ertuop enU .erutcurts lues nu emmoc euçreP bmes essil tse ecaf-suos s iuq elapicnirp ertuop al sicalg el snad sétnalpmi nad euçnoc ruesnecsa’d pédni emulov nu emmoc .erutiot al ’d egac al ed noitisopb.aL negremé’l ed noitcerid al snotéip tnemenimehc el

8QH couv .bCette impla par q Une struc Perçu sous la po impla d’asc comm la toi La po la dir le ch

d tircsni’s notéip sècca’L p ed nosiail al rap niabru aniplac el te tnerapsnart ed eétnom aL .steuqsuB .elliv-ertnec ud noitcerid sissa’d tnemeganéma’L pODQJLV HG WH HJDKF¿ID¶G .étivitcelloc al rap « 4°n notéip sèccA

in ua eutis es sècca teC

29

L’acc urbai trans Busq direc


Refurbishment of an heritage market parking Taillandier Architectes Associés With scalene architectes Public consultation (2016) Clients : Vinci Park & Indigo Location : Toulouse Renders : Artefactory

This project is linked to the previous one and to the same consultation. The market-parking Victor Hugo is an heritage building from J. & P. Guénard associated to P. Lafitte, completed in the fifties. While the program was only concerning the accessibility and the renovation of the parking, the project aim to go beyond by thinking an overall rehabilitation, market included. The project’s objective is to switch from a closed perception to a more open and urban one, with a more porous facade and some room inside to foster gathering. But at the same time to offer an efficient work tool to the shopkeepersand to keep the ambiance of the place which is its main appeal. This project was also developped in relation with the urban project led by the architect Joan Busquets. My role on this project was to take part to the conception, the realization of graphic documents and the making of a laser cutted model.

30


31


32


Selection of personnal projects Diploma’s project «Between the walls, Ambert» Competitions Europan 14 - «L’Entre-temps», Aurillac

33


Diploma project Between the walls

The city of Ambert, despite a quality landscape and a cultural and built heritage, is marked by a certain isolation, an urban sprawl, and a strong vacancy and decay in the town center and in the Foch block. This diploma’s project seeks to address to the following issue at all scales : «How to rehabilitate a rural town district through a contextualised architecture that take advantage of local resources ?». We propose a reorganization of the block around a form of rural public space, the couderc. The latter, by its contemporary reinterpretation, allows the inhabitants to be associated with a quality landscaped outdoor space. This space and its constitution are likely to be a source of social dynamics and initiatives. This new couderc is also part of an urban network of movement and green space and thus connects the block to the territory.

Thier s

Master Diploma project (2014) Diploma studio : Architecture, Environnement and Building Culture Prof. : O. Balay With : Rovy Pessoa Ferreira et Nicolas Schaad

Le Puy

Foch block

Town center

Station

Leisure center Market place Schools

First Prize of the Young Architecture of Lyon 2014

Buidling refurbishment

Short term rental

A project composed by a lanscaped shared space, a rental flat building, some terraced houses, and some refurbishment suggestions. 34

Terraced Houses


Winter garden :

Community spaces between a pavilion and a garden hut.

Vegetable gardening space : Expenses reduction and social, educational and environmental activity.

Landscaped ditch :

Space of biodiversity changing with the rainfall, peaceful walk.

Pathway network :

Link the center of the block to the rest of Ambert through movement.

Rammed earth walls :

Enhance a local heritage and organize the space.

Contemporary communal pasture : The center of the block is reorganized by reinterpreting the characteristics of a village public space, while integrating contemporary issues.

35


Diploma project Between the walls

Project of a building of short term rental flats, built with rammed earth and wooden frame.

This project offers short-term rental housing for executives in training. Architecturally, the units are set between rammed earth walls that distribute the space. The furnished interior spaces are complemented by loggias offering a large opening to the park and an adaptation to the seasons. Technically, the project meets Passiv’haus standards and is also a photovoltaic energy producer. Built in wood and rammed earth - for its inertia, hygrothermal comfort and materiality - it was necessary to think about a prefabrication of the rammed earth. 1. a

2.

a’

1. 3D view of the building, from the garden 2. Typical floor plan 3. Interior atmosphere 4. Axonometry of an apartment 5. Section 36


3.

Double aspects : Natural ventilation

Equipped wall :

Temporality and adaptability.

Rammed earth wall : Inertia and materiality.

Loggia :

Variable use with the seasons. 4.

5. 37


Diploma project Between the walls

Project of a building of short term rental flats, built with rammed earth and wooden frame.

Prefabricated rammed earth block with lost wooden formwork at the top.

Installation and fixing of the edge beams on the rammed earth blocks (horizontal continuity).

Atmosphere of the shared attic.

Embedding of dovetail joint joists, installation of vertical guides.

1.

3.

The guides allow the correct successive positioning of the blocks.

2. 4.

1. Block of rammed earth 2. Wooden floor 3. Wooden gutter 4. Rail for hanging rail

Thanks to the shape of the blocks, the vertical continuity of the material is assured. 38


Une toiture légère en bo pose sur le bâtiment

A light wooden placed on the building.

Des circulations ouvertes sur le couderc et sur la ville

Circulations open to the garden and to the city.

Double façade vitrée au Sud, garantissant lumière et intimité

Double glazed facade to the south guaranteeing light and privacy.

Une structure bois légère entoure les murs de pisé.

A light wooden structure surrounds the rammed earth walls.

Les blocs de pisé préfabriqués sont mis en oeuvre rapidement

The prefabricated rammed earth blocks are quickly implemented. 39


Diploma project Between the walls

Project of terraced houses, rammed earth and wooden frame

This triplex terraced housing project represents the continuation of the previous one in terms of lifestyle. It is intended for people who have chosen to settle in Ambert. The terraced typology proposes a sobriety of land and new ways of living. Located on the other side of the block, the relationship to the street led us to propose a greenhouse space and a setback, allowing acoustic protection and the provision of light on the garden level. Constructively, the same principles are taken up. We have decided to work on the organization of the housing to allow it to be rearranged as its inhabitants evolve.

Garden level

1.

Ground floor

Upper floor 40

2.


3. 4.

1. View of the building from the garden 2. Floor plans 3. Ambiance of the garden courtyard 4. Axonometric section 41


Europan 14 «L’Entre-temps», Aurillac Open Competition - 7th rank with V. Dauxerre, G. Malzac, R. Pessoa Ferreira Location : Aurillac (FR) Year : 2017

This Europan project connect with the themes developed during my final year project with similar context and problems. To the theme of «productive cities», our response is based on the development of the act of making, as a way to reappropriate the intrinsic qualities of this rural territory, to take advantage of the rhythms and temporalities specific to an environment outside of the territories subject to the acceleration of the globalization. The project wants to be political and critical, refusing to develop an extensive urbanism and on the contrary proposing to develop the tools allowing the inhabitants to reappropriate their city. The main actions were the creation of a workshop on an industrial wasteland, the restitution of the fairgrounds currently covered by cars, the developpment of a networks of parking and finaly a constellation of micro-projects to foster appropriation.

2

1

4

5

cours

3

d’Ang

oulem

6

e

Aurillac Workshop Shared workspace for craft businesses and associations Aurillac Workshop in refurbished buildings. 1. shared workspace for craft businesses in a refurbished building area and learning center in new buildings 2. shared machine Training tool 3. shared workspace for associations in a refurbished building 4. training area in a new building 5. learning center in a refurbished building 6. shared workshop

42


Visitation common shed - refuge, shared workspace, sheep pen and gardening

Refurbished buron of the Jordanne spring

Community garden shed on the urban fringes

Monthyon’s common shed - community garden, shared workspace & market stall

Jordanne banks cluster - urban promenade

Refurbished block - periphery densified, garden in block hearth

Monthyon’s common outcrop - bases for Festival stages

Monthyon’s forecourt outcrop bases for market stalls & Festival stages

Chart legend - Yearly, Weekly and Daily Rythms

43


NICOLAS WERTHEIMER ARCHITECT - HMONP

Thanks for your attention. Contact : +33 (0)6 77 28 40 20 nicolas.wertheimer@gmail.com instagram : wertheimer_architecture

44



Nicolas Wertheimer, CV & Samples, 2021


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.