P R O F E S S I O N A L
W
O
R
K
SELECTED EXAMPLES FROM MY PROFESSIONAL EXPERIENCE.
0
5
NLP
0
6
NLP
B A N K
ROLL- OUT
MOODY NOLAN - 2021-2022
25+ VARIOUS BANK ROLL-OUTS ALL OVER THE SOUTH-EAST
0
7
NLP
HEAVILY INVOLVED IN RETAIL BANK ROLL-OUT FOR MAJOR CLIENT. THESE BANKS HAD A ‘PROTOTYPE’ BUT WERE ALMOST NEVER ‘PROTOTYPICAL’. THEY USUALLY INCLUDED DESIGN EXERCISES WHERE WE WERE COORDINATING CLOSELY EVERY WEEK WITH THE CLIENT DESIGN LEAD. I INTRODUCED THE ENSCAPE TOOL TO OUR TEAM AND TO THE CLIENT.
0
8
NLP
0
9
NLP
010
NLP
THESE DESIGN EXERCISES WOULD REQUIRE US TO BUILD VERY DETAILED & ACCURATE MODELS SO THAT WE COULD TAKE THEM ON VIRTUAL WALKTHRUS USING ENSCAPE. PART OF THE CHALLENGE WITH THE ‘PROTOTYPE’ MODELS WE RECEIVED WERE THAT NOTHING IN THE MODEL WAS “LIVE”. THE PREVIOUS ARCHITECT HAD TRIED TO USE REVIT AS IF IT WERE AUTOCAD.
011
NLP
THE BANK ROLL-OUT PROJECT ALSO INVOLVED A SCHEMATIC DESIGN PHASE FOR PROPERTIES WHERE THEY WERE RENOVATING AN EXISTING BUILDING TO HAVE AN INTERIOR FIT-OUT USING THEIR PROTOTYPE PIECES.
012
NLP
013
NLP
BROUGHT MODELS INTO ENSCAPE FREQUENTLY AS PART OF WEEKLY DESIGN MEETINGS WITH THE CLIENT. THIS SPECIFIC EXERCISE WAS TO REVIEW SCOPE AND DESIGN OPTIONS. UTILIZING ENSCAPE THIS WAY ALLOWED FOR US TO COME TO QUICKER RESOLUTION FOR ANY UNDECIDED AREAS.
014
NLP
015
NLP
E
F
MEN'S
EXIST. NIGHTDROP
WORKROOM
EX. ELEC.
WOMEN'S
EX. ROOF HATCH CORRIDOR
B TRANSACTION BAR
LIBRARY
STORAGE
BREAKROOM
PHONE ROOM
NOT IN SCOPE
MEETING ROOM
LOBBY
D GATHERING AREA
EXIST. COUPON BOOTH
RELAXED SEATING
EXIST. VAULT BOOTH
016
NLP
VESTIBULE
I CREATED A STANDARDIZED BIM LIBRARY WITH PREASSIGNED COMPONENT MODEL GROUPS TO ALLOW FOR QUICK SCHEMATIC LAYOUTS. THIS HELPED THE TEAM BE MORE EFFICIENT WHEN DOING TEST FITS BECAUSE THEY DIDN’T HAVE TO TRACK DOWN THE PROTOTYPE PIECES THAT MADE UP THE BANK BRANCH
017
NLP
C
A. ALL INTERIOR DIMENSIONS ARE TO FINISH FACE OF WALL B. EDGE OF DOOR JAMB SHALL BE MINIMUM 4" FROM INTERSECTING WALL U.N.O. OR AS REQUIRED FOR HARDWARE INSTALLATION C. SEE SHEET G001 FOR PARTITION TYPES D. BANK EQUIPMENT TO BE SUPPLIED AND INSTALLED BY VENDOR E. CONTRACTOR SHALL PROVIDE BLOCKING FOR ALL WALL-MOUNTED EQUIPMENT AND ACCESSORIES. F. CONTRACTOR SHALL COORDINATE ALL WOOD BLOCKING, STEEL SUPPORTS, AND ANY OTHER ITEMS WHICH ARE IMBEDDED IN DRYWALL PARTITIONS OR ENCLOSURES, WHICH RELATE TO THEIR WORK OR THE WORK OF ANY SEPERATE CONTRACTORS. ALL WOOD BLOCKING, BRIDGING, BRACING, FRAMING, ETC., SHALL BE FIRE RETARDANT TREATED AS CALLED FOR BY THE GOVERNING BUILDING CODE AND THE CONTRACTOR MUST SUBMIT AFIDAVITS OF SUCH FIRE TREATMENT TO THE OWNER
A
B 7
P44
A203
P26
P26
9 1
6'-0"
MEETING ROOM 104 157 SF
108
104
2'-2 1/4"
114
10'-0 1/4"
D
2'-1 1/4"
4C
MENS 120 85 SF
117
1
4C
P17 P18 P19 P20 P21 P22 P23 P24 P25 P26 P27 P29
A808
3C
3C
P7
3G
P44
WHITE BOX 119 210 SF
9'-8" 2
7'-8"
2'-3 3/4"
JAN/STORAGE 118 128 SF
118
P16
1
3G BOOTH 112 68 SF
P37
P37
2 A800
P15
2 3 3/4"
3G 3G
P14 P15
P26
4 1/2"
6 1/4"
4'-3 1/2"
120
3C
8'-0 3/4" P39
9 1/2"
P8
8'-0"
P12
P19
9'-7"
8'-9" 3C
P10 P11
P13
1'-1 1/2" P39 2'-9 3/4" BE-12
8'-2"
7'-5 1/2"
F P27
IT 117 48 SF
P9
3
1
4'-0"
3C
4
1 A300
P19
ALIGN
8'-5"
CORRIDOR 113 133 SF
4C
6'-0"
ALIGN
ALIGN
5'-7 1/4"
116
WOMENS 116 68 SF
1 A800
P18
P8
x100
A805
3 3/4" P19 4'-9" P32
P4 P29
x101
BOOTH 111 90 SF
LIBRARY 110 238 SF
P19
115 3C NIGHT DROP 115 52 SF 3C P10
P11
3 A533
P3 P4 P7
4C
P39
1 A803
4'-4 1/4"
P43
P44
5
P4
1'-1 1/4" P29
3C
3C
P23
P1 P2
6
P29 P13 VESTIBULE 100 45 SF
1'-5"
P14
P41 EMPLOYEE LOUNGE 114 131 SF 1 A807
P25
P41
4C
P31 P32
A809
P33 P34
119
P35 P36 P37
x113
F
P20
P22
P26 PRINT DATE: 5/18/2021 4:07:53 PM FILE INFO: BIM 360://Fifth Third Bank Store Roll Out/20177.06 State Bridge Road GA - Branch_3600r - ARCH.rvt
P22
F
4 1/4"
P23
P22
P38 P39
x121
P40 P41
P40
EQ
EQ
P43 P44
P38 P26
ALIGN CENTERLINE OF WALL WITH CENTERLINE OF EXISTING MULLION
CL
P42
MECH 121 269 SF
EQ
EQ EXISTING DRIVE-THRU WINDOW
6"
PHONE: (513) 914-5835
KEY NOTES - FLOOR PLAN
P1 4C
1 A801
3C
P24
BARLOW MOTORS BUILDING 40 W. CENTRAL PKWY • FIRST FL CINCINNATI, OH 45202
P18
TRANSACTION BAR 109 368 SF
P12
2
7
P3
2'-1 1/4" 3C
8'-5 1/4"
A532
P2
3 3/4"
1'-4 3/4"
1
P17 P16
P26 ATM 101 92 SF
P9 A533
A532
1
8 P19
1
3'-6"
2
2
A301
P35 A
6'-7 1/4"
A701
3C
A101
P18 P16
3C
3C
6 1/4" 2'-9 3/4"
P31
4G
P44
11'-10"
P41
9 1/2"
P19
P33
14'-1"
WORK ROOM 108 111 SF
1 A806
4C
P32
7'-8 1/2"
P36
3G
1'-0" P21
3C
3C
P43
BE-12
CORRIDOR 105 70 SF 9'-0"
PHONE ROOM 107 50 SF
P3
3K 3C 3G
107
P42
G. ALL INTERIOR FINISHES ARE TO COMPLY WITH THE REQUIREMENTS AS SET FORTH IN THE CURRENT STANDARD EDITIONS OF ALL GOVERNING CODES, REGULATIONS, AND ORDINANCES HAVING JURISDICTION OVER THE SCOPE OF WORK. H. CONTRACTOR WILL SECURE ALL BUILDING PERMITS & INSPECTIONS NECESSARY FOR THE CONSTRUCTION OF THE PROJECT I. DRAWINGS ARE NOT TO BE SCALED J.. LOCATION AND NUMBER OF FIRE EXTINGUISHERS ARE TO BE INSTALLED PER THE DIRECTION OF THE LOCAL AUTHORITIES AND NFPA 13 K. FURNITURE AND MILLWORK TO BE PROVIDED BY OWNER VENDOR. G.C. TO COORDINATE LOCATION OF BLOCKING, PLUMBING, ELECTRICAL AND ALL OTHER REQUIREMENTS L. REFERENCE ENGINEERING PLANS FOR PLUMBING, ELECTRICAL EQUIPMENT, AND SYSTEMS. CONTRACTOR TO VERIFY AND COORDINATE PLUMBING ROUGH-IN DIMENSIONS WITH PLUMBER. (TO BE PROVIDED BY CONTRACTOR) M. CONTRACTOR TO SET BANKING EQUIPMENT TEMPLATES. EQUIPMENT VENDOR TO VERIFY CORRECT PLACEMENT AND TO COORDINATE WITH CONTRACTOR FOR PROPER PLACEMENT N. NO ADJUSTMENT TO THE CONTRACT AMOUNT WILL BE GIVEN FOR THE CONTRACTOR NOT FULLY ACQUAINTING THEMSELVES WITH EQUIPMENT VENDOR REQUIREMENTS. O. PINK NOISE IS TO BE PROVIDED BY THE CONTRACTOR. COORDINATE PINK NOISE LOCATION WITH MOOD MEDIA VENDOR. REFER TO ELECTRICAL DRAWINGS. P. REFER TO SHEET A700 FOR DOOR AND WINDOW SCHEDULE Q. APPLIANCES PROVIDED AND INSTALLED BY G.C. U.N.O
RELAXED SEATING AREA 102 176 SF
GATHERING AREA 103 184 SF
P34
4C
x106
P42 P18
3K
P37
13'-8 1/4"
P34
3C
P42 P42
5'-4"
VAULT 106 118 SF
P20
3K
A809 CASH ROOM 106a
3C
FRONT LOADED ATM BY BANK VENDOR RECESSED KNOX BOX WITH TAMPER SWITCH, MODEL # 3200R VERIFY LOCATION WITH LOCAL MUNICIPALITY TO INSURE COMPLIANCE WALL MOUNTED MONITOR BY BANK VENDOR. COORDINATE W/ OWNER POWER ACTUATOR LEAF FRP ON WET WALLS AT MOP SINK - REFER TO PLUMBING DRAWINGS HIGH-LOW DRINKING FOUNTAIN, REFER TO PLUMBING DRAWINGS. ENSURE THAT LOW HEIGHT DRINKING FOUNTAIN IS LOCATED CLOSEST TO CORRIDOR. SINGLE SIDED VAT TUBES BY BANK VENDOR G.C. TO PROVIDE MITERED BLACK ANGLED ALUMINUM FRAME (BOTH SIDES) AROUND VAT TERMINAL. G.C. TO COORDINATE OPENING SIZE AND LOCATION WITH BANK VENDOR DUAL CONTROL KEY BOX COMBO NIGHT DEPOSIT BOX/CASH VAULT. FURNISHED BY NATIONAL VENDOR AND INSTALLED BY NATIONAL VENDOR. PREPARATION BY G.C. G.C. TO PROVIDE INSULATION AND WOOD TRIM ON INTERIOR UPON COMPLETION OF ALL ELECTRIC & ALARM WIRING. PHONE AND WALL MOUNTED DRIVE-THRU MONITOR BY BANK VENDOR. COORDINATE W/ OWNER AND MEP CARMERA TO BE MOUNTED IN CEILING. COORDINATE WITH SECURITY VENDOR LOCKERS INSTALL FIRE RETARDANT PLYWOOD ON ALL WALLS WITHIN IT/ELEC ROOM. PLYWOOD TO BE 8' TALL AND PAINTED WITH A FIRE RETARDANT PAINT TO MATCH ADJACENT WALL. G.C. TO MAINTAIN VISIBILITY OF FIRE TREATED MARKING ON PLYWOOD. NEW PLATE MOUNTED 6" BOLLARD, SLEEVED 5/3rd GREY TYPICAL ALL NEW BOLLARDS. DRIVE UP ATM BY BANK VENDOR LINE OF EXISTING CANOPY ABOVE LINE OF SOFFIT ABOVE EXISTING ASPHALT PAVEMENT - REFER TO A010 MECHOSHADE CONTROLS CARD READER. REFER TO ELECTRICAL DRAWINGS. EDGE OF EXISTING CONCRETE CURB REMOTE TELLER TERMINAL ADJUSTABLE PLASTIC LAMINATE SHELVES. REFER TO 2/809 EXISTING DOWNSPOUT AND BOOT TO REMAIN, TYP. DATA RACK. COORDINATE WITH MEP SLIM PROFILE FRAME MOUNTED ADA DOOR ACTUATOR. REFER TO ELECTRICAL DRAWINGS DRIVE-THRU INDICATOR LIGHT, REFER TO ELECTRICAL RECESSED FIRE EXTINGUSHER CABINET, 10 AB UL RATED 4A:80B:C LOCATION OF MOOD MEDIA CONTROLS LEVEL 5 FINISH REQUIRED. WALL TO BE PRIMED AND READY TO RECEIVE FINAL FINISHES. JOHN RYAN CONTROL PANEL. COORDINATE WITH VENDOR. EXISTING CONCRETE PAVEMENT - REFER TO A010 INFILL TO MATCH EXISTING. PATCH AND REPAIR AS NECCESSARY. NEW METAL WALL. REFER TO EXTERIOR ELEVATIONS FOR MORE INFORMATION. PNL-1. REFER TO FINISH PLAN AND SCHEDULE FOR MORE INFORMATION WALL MOUNTED FIRE EXTINGUISHER EXISTING WINDOW TO RECEIVE PRIVACY FILM TREATMENT. REFER TO FINISH SCHEDULE FOR MORE INFORMATION 6" BOLLARD SLEEVE OVER EXISTING BOLLARD. TYPICAL ALL EXIST TO REMAIN BOLLARDS. REFER TO 3/A532 FOR MORE DETAILS NEW PLATE MOUNTED 6" BOLLARD, SLEEVED YELLOW TYPICAL ALL NEW BOLLARDS. ALL EXISTING WALLS TO BE PATCHED, REPAIRED, AND FINISHED TO RECEIVE NEW PAINT. AREAS OF WALL EXPOSED DURING CEILING DEMOLITION TO HAVE NEW GYPSUM BOARD ADDED TO EXTEND A MINIMUM OF 6" ABOVE THE FINISHED CEILING LEVEL.
PROGRESS DRAWING NOT FOR CONSTRUCTION
05/17/2021
# 1 2
DATE
DRAWING TITLE:
FLOOR PLAN
P44 2 A301
1
05/17/2021
PLAN
OVERALL FIRST FLOOR PLAN
DRAWN BY: NP/AS
1/4" = 1'-0"
1" = 1'-0"
20177.06
A101
WALL DETAIL REF: 1 / A101
BID & PERMIT
6'-9 3/4" 5'-10 3/4"
11"
4
WATERFALL EDGE
CHECKED BY: BL
MOODY NOLAN PROJ#:
MULLION MATE
2
CHANGE DESCRIPTION
05.04.2021 90% OWNER REVIEW 05.17.2021 BID & PERMIT
P26
BACKER ROD AND SEALANT, TYP.
DETAIL
for
D 12'-3 1/2"
FIFTH THIRD BANK
E 12'-6"
STATE BRIDGE ROAD 5960 STATE BRIDGE ROAD DULUTH, GA 30097
F 12'-6"
106a
© 2020 Moody•Nolan Inc.
GENERAL NOTES - FLOOR PLAN
2 A300
G
FIFTH THIRD BANK (K1062526)
© 2020 Moody•Nolan Inc.
EXAMPLE CD PAGES FROM A RETRO-FIT BANK BRANCH FOR OUR ROLL-OUT CLIENT. THE CD PHASE HAPPENED AFTER OUR SCHEMATIC DESIGN PHASE AND A DUE DILIGENCE REPORT WHERE WE RESEARCHED ALL OF THE ZONING REQUIREMENTS FOR THE LOCAL JURISDICTION. IT WAS A ‘SITE VIABILITY’ STUDY.
4
SLD-1
A802
WATERFALL EDGE
A802 SLD-1
UNDERCOUNTER STEEL BY VENDOR
SLD-1
SLD-1
4"
3'-9 3/4"
3'-9 3/4"
PL-4
PL-4
BARLOW MOTORS BUILDING 40 W. CENTRAL PKWY • FIRST FL CINCINNATI, OH 45202
PL-5
PHONE: (513) 914-5835
TRANSACTION BAR SECTION
ELEVATION
7
3/4" = 1'-0"
3/4" = 1'-0"
TRANSACTION BAR - SIDE REF: 1 / A801
6'-9 3/4"
2'-11 1/2" 3'-10 1/4"
WATERFALL EDGE
1
SLD-1
A802
3
2'-6"
OPEN BELOW
AXONOMETRIC
A801 7
6
3/4" = 1'-0"
TRANSACTION BAR - SIDE @ DESK REF: 1 / A801
6'-8 1/4"
5 3/4"
ELEVATION
1 1/2"
4"
3/4" = 1'-0"
TRANSACTION BAR SECTION TO DESK REF: 1 / A801
11"
1 1/4"
1 1/4"
10
ELEVATION
TRANSACTION BAR
OPEN BELOW
SLD-1
MOCKETT LINEAR GROMMET MAX6 WITH COVER FOR COMPUTER CABLES
4'-1 3/4"
5 1/4"
12'-10 1/2"
FIFTH THIRD BANK
3'-7"
PL-5 PL-5
STATE BRIDGE ROAD 5960 STATE BRIDGE ROAD DULUTH, GA 30097
BE-06
for
SLD-1
SLD-1
PL-4
FIFTH THIRD BANK (K1062526)
2'-11 1/2" SLD-1
1 1/2"
11
3'-9 3/4"
WT-3
4
BE-06
12'-10 1/2"
9'-8"
1'-10"
11 A801 10
0"
018
NLP
10'-7"
11"
2 A802
11 1/4"
2'-3 1/2" 1'-4 1/4"
SLD-1
2'-0"
1'-3 3/4"
PL-4 SLD-1
3 1/2"
3'-9 3/4"
BE-08 BE-06
3"
2'-6"
3'-1"
BE-08
1 2
1 1/2"
3'-10 1/4" 6'-9 3/4"
SLD-1
6
OPENING IN CABINET DOOR ROUTED OUT FOR AIR FLOW
A801
LINE OF MILLWORK RECESS BEYOND
4
ELEVATION 3/4" = 1'-0"
TRANSACTION BAR - BACK REF: 1 / A801
EQ
1'-0"
MOCKETT LINEAR GROMMET MAX6 WITH COVER FOR COMPUTER CABLES
EQ
11"
SLD-1
UNDER COUNTER STEEL BY VENDOR
#
MOCKETT LINEAR GROMMET MAX6 WITH COVER FOR COMPUTER CABLES
PENCIL DRAWER BY FURNITURE VENDOR PL-4
PROGRESS DRAWING NOT FOR CONSTRUCTION
05/17/2021
3'-8 1/4"
3 A802
3"
WATERFALL EDGE
4"
TCR BY BANK VENDOR
A801
5 1/4"
1 1/2" 11 1/2"
3/4" = 1'-0"
TRANSACTION BAR - FRONT REF: 1 / A801
HOLD CLEAR
PRINT DATE: 5/18/2021 4:08:26 PM FILE INFO: BIM 360://Fifth Third Bank Store Roll Out/20177.06 State Bridge Road GA - Branch_3600r - ARCH.rvt
5
ELEVATION
5
MOCKETT LINEAR GROMMET MAX6 WITH COVER FOR COMPUTER CABLES
1
ENLARGED PLAN 3/4" = 1'-0"
TRANSACTION BAR REF: 1 / A101
2'-6" 2'-11 1/2"
DATE
CHANGE DESCRIPTION
05.04.2021 90% OWNER REVIEW 05.17.2021 BID & PERMIT
DRAWING TITLE:
TRANSACTION BAR ENLARGED PLANS & ELEVATIONS
4"
05/17/2021 DRAWN BY: NP/AS
CHECKED BY: BL
MOODY NOLAN PROJ#:
20177.06
A801 BID & PERMIT
4'-0" SEE NOTE 1
SITE PLAN GENERAL NOTES
TACK COAT AT 0.15 GAL./S.Y.
1" MIN
1" MIN
EXIST. BASE COURSE
TACK COAT AT 0.15 GAL./S.Y.
EXIST. AGGREGATE BASE. EXIST. SUGBRADE
1.
SITE PLAN IS FOR REFERENCE ONLY TO DEFINE SCOPE OF MAINTENANCE ITEMS. SCALE IS APPROXIMATE.
2.
INSTALL NEW FOUNDATION VENTS THROUGHOUT.
3.
G.C. TO SAW CUT AND REMOVE DAMAGED AREAS OF ASPHALT PAVING TO SUB-BASE AND PROVIDE NEW ASPHALT IN-FILL.
4.
REMOVE SEALANT JOINTS AND PROVIDE NEW SEALANT.
5.
CLEAN, RESEAL, AND RESTRIPE ENTIRE ASPHALT LOT.
6.
REPLACE ANY AND ALL BROKEN CURB STOPS.
7.
INSTALL NEW GUTTERS AND DOWNSPOUTS THROUGHOUT.
8.
HATCHED AREAS DENOTE THE APPROXIMATE LOCATION OF LOW OR DAMAGED ASPHALT PAVING TO BE SAW CUT, REMOVED AND REPLACED WITH NEW ASPHALT. G.C. TO VERIFY LOCATIONS OF PAVEMENT REPLACEMENT / REPAIR.
NOTES: 1.
PAVEMENT DAMAGED DURING CONSTRUCTION TO A DEPTH GREATER THAN 1.25" SHALL BE REPLACED FULL-DEPTH. EXCEPT FOR MILLING AND OVEERLAY NO ADDITIONAL PAYMENT WILL BE MADE FOR REPAIR OF DAMAGE OCCURING DURING CONSTRUCTION.
2.
MILL PAVEMENT TAPERING TO A MINIMUM DEPTH OF 1" OVER FOUR FEET. APPLY TACK COAT BEFORE PLACING ASPHALT OVERLAY.
DETAIL
2
Overlay at Pad
PHONE: (513) 914-5835
KEY NOTES - FLOOR PLAN
N.T.S.
SP1 SP2 SP3 SP4 SP5
SP6
SP6 SP7
SP1 SP8
SP2
SP2
BARLOW MOTORS BUILDING 40 W. CENTRAL PKWY • FIRST FL CINCINNATI, OH 45202
1
NEW GUTTERS AND DOWNSPOUTS MATCH EXISTING SIZE, PROFILE, AND LOCATIONS. CLEAN AND REPAIR EXISTING FENCE AS NECCESSARY. NEW PRE-FABRICATED CANOPY NEW TREE TO REPLACE PREVIOUS TREE. TO BE 2INCH CALIPER NEW EVERGREEN BUSH. MAX HEIGHT OF TWO AND A HALF FEET. CONTRACTOR SHALL OVERLAY ACCESSIBLE PARKING SPACES AND ACCESS AISLES HAVING MORE THAN 2.00% MAXIMUM SLOPE IN ALL DIRECTIONS AND ENSURE FLUSH TRANSITION TO MATCH PROPOSED PAD/AREA OUTSIDE READ ENTRANCE. REFER TO DETAIL 2/A010 FOR MORE INFROMATION ONCE OVERLAY IS COMPLETED AS NOTED, REPAINT STRIPES FOR PARKING SPACES AND ACCESS AISLES TO MATCH MINIMUM WIDTHS FOR VAN-ACCESSIBLE OR CAR-ACCESSIBLE AISLES.
SIM
Andrew Jackson Parkway 4715 Andrew Jackson Parkway Hermitage, TN 37076
SP2
FIFTH THIRD BANK (K1074012)
A533
SP2
SP5
SP3 SP2
8'-0" MIN
18'-0"
5'-4"+/5'-0" MIN
SP7
11'-0"
MIN
SP8
SP4
SP6
for
EXISTING SURFACE COURSE
FIFTH THIRD BANK
© 2020 Moody•Nolan Inc.
PART OF THE CHALLENGES OF THE RETRO-FIT RENOVATIONS FOR THESE ROLL-OUTS IS THE EXISTING CONDITIONS, AND THE JURISDICTION REQUIREMENTS. WE WANTED TO COMPLETE SITE “MAINTENANCE” ITEMS WITHOUT TRIGGERING ZONING SO WE COULD GET OUR PERMIT QUICKLY. THE CLIENT WANTED TO OPEN 20 BRANCHES BY THE END OF THE YEAR.
SP2 SP5
PRINT DATE: 4/11/2022 11:13:18 AM FILE INFO: BIM 360://Fifth Third Bank Store Roll Out/20177.15 Andrew Jackson Pkwy Nashville TN - Branch_2700r.rvt
SP2
# 0 1
DATE
CHANGE DESCRIPTION
03/21/2022 90% Owner Review 04/08/2022 Issued for Bid and Permit
DRAWING TITLE:
SITE PLAN MAINTENANCE 04/08/2022 DRAWN BY: NP
CHECKED BY: BL
MOODY NOLAN PROJ#:
OVERALL FIRST FLOOR PLAN
1
20177.15
A010
1" = 10'-0"
BID & PERMIT
© 2020 Moody•Nolan Inc.
GENERAL NOTES - ALTERNATE 1 JAN. CL. 110
1.
2 B
P16
3'-8 3/8"
1 A300
P7
11D
EMPLOYEE LOUNGE 109a
P15
P14
2. 110
3 A302
3'-6"
1 A531
SP1 P12
109a
ATM
P25
1
TYP.
SIM
A810a
DEMOLITION SCOPE: A. REMOVAL OF EXISTING CASEWORK THROUGHOUT BOTH EMPLOYEE BREAK ROOMS: a. WALL CABINETS b. BASE CABINETS c. COAT CABINETS B. DEMOLITION OF WALL BETWEEN THE TWO BREAK ROOMS C. REMOVAL OF EXISTING FLOORING IN EMPLOYEE BREAKROOM D. REMOVAL AND RELOCATION OF EXISTING FIRE EXTINGUSHER CABINET E. DEMOLITION OF CEILING IN ROOM EMPLOYEE LOUNGE(109) NEW WORK SCOPE: A. INSTALL NEW CASEWORK & LONGER COUNTER IN EMPLOYEE LOUNGE a. COUNTER WITH SEATING ALONG NORTH WALL b. BASE AND WALL CABINETS AGAINST NORTH WALL c. WALL TILE ON SOUTH WALL d. ADDITIONAL BASE CABINETS ON SOUTH WALL B. NEW CLOSET IN NORTHWEST CORNER OF EMPLOYEE LOUNGE C. NEW WALL MOUNTED SHELVES IN SOUTH SIDE NICHE OF EMPLOYEE LOUNGE D. NEW WALL AT BACK SIDE OF THE REFRIDGERATOR E. FLOOR TILE IN ROOM 109 F. INSTALL NEW CEILING TO MATCH EXISTING CEILING
FLOOR PLAN GENERAL NOTES 1.
ALL DIMENSIONS ARE TO FINISH FACE OF WALL
2.
EDGE OF DOOR JAMB SHALL BE MINIMUM 4" FROM INTERSECTING WALL U.N.O OR AS REQUIRED FOR HARDWARE INSTALLATION.
3.
SEE SHEET G001 FOR PARTITION TYPES
4.
BANK EQUIPMENT TO BE SUPPLIED AND INSTALLED BY FIFTH THIRD'S EQUIPMENT VENDOR.
5.
CONTRACTOR SHALL PROVIDE BLOCKING FOR ALL WALL-MOUNTED EQUIPMENT AND ACCESSORIES.
6.
CONTRACTOR SHALL COORDINATE ALL WOOD BLOCKING, STEEL SUPPORTS, AND ANY OTHER ITEMS WHICH ARE IMBEDDED IN DRYWALL PARTITIONS OR ENCLOSURES, WHICH RELATE TO THEIR WORK OR THE WORK OF ANY SEPARATE CONTRACTORS. ALL WOOD BLOCKING, BRDIGE, BRACING, FRAMING, ETC., SHALL BE FIRE RETARDENT TREATED AS CALLED FOR BY THE GOVERNING BUILDING CODE AND THE CONTRACTOR MUST SUBMIT AFIDAVITS OF SUCH FIRE TREATMENT TO THE OWNER.
7.
ALL INTERIOR FINISHES ARE TO COMPLY WITH THE REQUIREMENTS SET FORTH IN THE CURRENT STANDARD EDITIONS OF ALL GOVERNING CODES, REGULATIONS, AND ORDINANCES HAVING JURISDICTION OVER THE SCOPE OF WORK.
8.
CONTRACTOR WILL SECURE ALL BUILDING PERMITS & INSPECTIONS NECESSARY FOR THE CONSTRUCTION OF THE PROJECT.
9.
DRAWINGS ARE NOT TO BE SCALED.
ALTERNATE 1 2'-10" VIF
109
2'-11"+/-
1. 2.
INSTALL WALL TILE ON EAST AND WEST WALLS IN RESTROOM ( 108) INSTALL WALL TILE ON SOUTH, EAST, AND WEST WALLS IN RESTROOM (111)
P30
2'-1"
BARLOW MOTORS BUILDING 40 W. CENTRAL PKWY • FIRST FL CINCINNATI, OH 45202 PHONE: (513) 914-5835
10. LOCATION AND NUMBER OF FIRE EXTINGUISHERS ARE TO BE INSTALLED PER THE DIRECTION OF THE LOCAL AUTHORITIES AND NFPA 13.
VAT
P1
P14
GENERAL NOTES - ALTERNATE 2
111
11D
11. FURNITURE AND MILLWORK TO BE PROVIDED BY FIFTH THIRD'S MILLWORK VENDOR. G.C. TO COORDINATE LOCATION OF BLOCKING, PLUMBING, ELECTRICAL AND ALL OTHER REQUIREMENTS. 12. REFERENCE ENGINEERING PLANS FOR PLUMBING, ELECTRICAL EQUIPMENT, AND SYSTEMS. CONTRACTOR TO VERIFY AND COORDINATE PLUMBING ROUGH-IN DIMENSIONS WITH PLUMBER. (TO BE PROVIDED BY CONTRACTOR.)
ENLARGED PLAN
2
P27
TYP.
ALTERNATE 1 - OVERALL FIRST FLOOR PLAN REF: 1 / A101
1/4" = 1'-0"
13. CONTRACTOR TO SET BANKING EQUIPMENT TEMPLATES. EQUIPMENT VENDOR TO VERIFY CORRECT PLACEMENT AND TO COORDINATE WITH CONTRACTOR FOR PROPER PLACEMENT. FIFTH THIRD'S EQUIPMENT VENDOR TO INSTALL.
17. APPLIANCES PROVIDED AND INSTALLED BY G.C. U.N.O. 18. SEE FINISH SCHEDULE FOR ADDITIONAL INFORMATION ON LOCATIONS AND TYPES OF FINISH MATERIALS.
FLOOR PLAN LEGEND
11G
P3
11D
11D
4'-8" 1 A532
115
P23
P10
ROOM NAME XXX
11G
P25
1'-2 1/4"
SERVICE COUNTER 113
EMPLOYEE LOUNGE 109
P8
1
1
A803
A806
TECH/LIBRARY 112
P19
1 A809
NEW CONSTRUCTION
2 A101
EXISTING DOOR
ALTERNATE 1
EMPLOYEE LOUNGE 109a
NEW DOOR
KEY NOTES - FLOOR PLAN
P12
P3
P1 P2 P3
P24
1
11D
A801
1'-7"
1 LOBBY 101
A301
100
1
P21
A302
P5 P24
P28
11D
P22
9 A800a
P6
ALTERNATE 2
P5
A300
P29
1'-6"
P28
P19 P28
A801
P24
P18
107
P28
2
VESTIBULE 107
A302 107a
P10 P11 P12 P13
106
104
105
103
102
P9
P18
5
P14
STORAGE 106
P24
RELAXED MEETING RM. 102
MEETING RM 103
P24
MEETING RM. 104
P24
P15 P16 P17 P18 P19 P20 P21
WORK ROOM 105 x106a
PRINT DATE: 4/11/2022 11:13:21 AM FILE INFO: BIM 360://Fifth Third Bank Store Roll Out/20177.15 Andrew Jackson Pkwy Nashville TN - Branch_2700r.rvt
P7 P8
2
ALIGN P7
EAST UNISEX RESTROOM 111
P6
P17
101
P18
P4 P5
1 A800
WEST UNISEX RESTROOM 108
P18
ALIGN
A811
VESTIBULE 100
2
108
P28
P4
P4
P17
P25
P5 P18
P16
109
ALIGN
P13
IDF 106a
P20 P22 P23 P24
A
P25 P26 P27 P28 P29
1
PLAN 1/4" = 1'-0"
OVERALL FIRST FLOOR PLAN
4
1
A302
A301
ROOM NUMBER EXISTING CONSTRUCTION
P2
13'-6 1/2" 114a
8 1/2" TRANSACTION BAR P18 114
WORK ROOM 115
BE-02
8'-8 1/2"
AE-07 AE-06
110
A807
NIGHT DROP 114a
111
P11 11X P9
BE-12
2'-4"
1
BE-03a
2'-5 3/4"
1'-2 1/2"
B
P30
LINE OF CANOPY ABOVE RECESSED KNOX BOX WITH TAMPER SWITCH, MODEL #3200R VERIFY LOCATION WITH LOCAL MUNICIPALITY TO INSURE COMPIANCE WALL MOUNTED MONITOR BY BANK VENDOR. COORDINATE W/ OWNER POWER ACTUATOR LEAF WALL GRAPHIC AREA. AREA TO BE KEPT FREE OF ALL OBSTRUCTIONS. REFER TO EGD PACKAGE FOR MORE INFROMATION SALVAGED DRINKING FOUNTAIN TO BE MOUNTED TO PROVIDE 27" MINIMUM KNEE CLEARANCE BELOW. RELOCATED FIRE EXTINGUISHER AND CABINET. JOHN RYAN CONTROL PANEL. COORDINATE EXACT LOCATION WITH VENDOR. SINGLE SIDED VAT TUBES BY BANK VENDOR. G.C. TO PROVIDE MITERED BLACK ANGLED ALUMINUM FRAME (BOTH SIDES) AROUND VAT TERMINAL. G.C. TO COORDINATE OPENING SIZE AND LOCATION WITH BANK VENDOR. DOOR TO SWING TOWARDS BACK OF COUNTER
FIFTH THIRD BANK
2
for
16. REFER TO SHEET A700 FOR DOOR SCHEDULE. JAN. CL. 110
3 A532
P26
Andrew Jackson Parkway 4715 Andrew Jackson Parkway Hermitage, TN 37076
15. PINK NOISE IS TO BE PROVIDED BY THE CONTRACTOR. COORDINATE PINK NOISE LOCATION WITH MOOD MEDIA VENDOR. REFER TO ELECTRICAL DRAWINGS.
NIGHT DROP
FIFTH THIRD BANK (K1074012)
14. NO ADJUSTMENT TO CONTRACT AMOUNT WILL BE GIVEN TO THE CONTRACTOR FOR NOT FULLY AQUANTING THEMSELVES WITH EQUIPMENT VENDOR REQUIREMENTS.
1
DUAL CONTROL KEY BOX PHONE AND WALL MOUNTED DRIVE-THRU MONITOR BY BANK VENDOR. COORDINATE W/ OWNER AND MEP. LOCKERS. GREAT OPENINGS. REFER TO EQUIPMENT SCHEDULE FOR MORE DETAIL INSTALL FIRE RETARDANT PLYWOOD ON ALL WALLS WITHIN IT/ELEC ROOM. PLYWOOD TO BE 8' TALL AND PAINTED WITH A FIRE RETARDANT PAINT TO MATCH ADJACENT WALL. G.C. TO MAINTAIN VISIBILITY OF FIRE TREATED MARKING ON PYWOOD. # DATE CHANGE DESCRIPTION NEW PLATE MOUNTED 6" BOLLARD, SLEEVED 5/3RD GREY 0 03/21/2022 90% Owner Review TYPICAL ALL NEW BOLLARDS. 1 04/08/2022 Issued for Bid and Permit DRIVE UP ATM BY BANK VENDOR LINE OF EXISTING CONCRETE PATIO LINE OF SOFFIT ABOVE CARD READER. REFER TO ELECTRICAL DRAWINGS EXISTING RECESSED FIRE EXTINGUISHER CABINET TO REMAIN DATA RACK. COORDINATE WITH MEP DRAWING TITLE: EXTERIOR DOOR OPERATOR BUTTON AND CARD READER PLACEMENT MOUNTED ON THE MULLION. DOOR OPERATOR BUTTON TO BE MOUNTED ABOVE CARD READER. TOP OF DOOR OPERATOR BUTTON TO BE MOUNTED AT 46" AFF DRIVE-THRU INDICATOR LIGHT AT 8'-0" AF. ALSO REFER TO ELECTRICAL. MOOD MEDIA CONTROLS LEVEL 5 FINISH REQUIRED. WALL TO BE PRIMED AND READY TO RECEIVE FINAL FINISHES. INFILL TO MATCH EXISTING. PATCH AND REPAIR AS NECCESSARY DEMO EXISTING DRIVE-THRU WINDOW AND DRAWER. INFILL TO MATCH EXISTING, PATCH AND REPAIR AS NECCESSARY. DRAWN BY: NP CHECKED BY: BL REMOTE TELLER BY BANK VENDOR. INTERIOR VESTIBULE DOOR OPERATOR BUTTON PLACEMENT IN DRYWALL TOP AT 46" AFF MOODY NOLAN PROJ#: EXTERIOR DOOR OPERATOR AND CARD READER PLACEMENT MOUNTED ON THE FRAME. HARDWARE TO BE MOUNTED TO THE FRAME CLOSEST TO THE ADA PARKING SPOT. DOOR OPERATOR TO BE MOUNTED ABOVE CARD READER. TOP OF DOOR OPERATOR TO BE MOUNTED AT 46" AFF
FLOOR PLAN
04/08/2022
20177.15
PLASTIC LAMINATE SHELVES. 12" DEEP
A101 BID & PERMIT
019
NLP
ONE STUDY THAT WE ALSO DO WITH EACH OF THE INTERIOR RENOVATION - RETRO FIT BRANCHES IS AN EXTERIOR COLOR PALLETTE. ON SOME BUILDINGS THEY WANTED TO KEEP THE EXISTING FINISHES, BUT ON OTHERS THEY WANTED TO EXPLORE THE IDEA OF UPDATING FINISHES TO BETTER MATCH THEIR NEW BRAND
RCP GENERAL NOTES
© 2020 Moody•Nolan Inc.
CEILING SCHEDULE TAG
SIZE
SERIES
COLOR
USG
24" x 24" x 7/8" 88135 - MARS HIGH NRC
ACOUSTICAL CEILING GRID
USG
DL 15/16"
DONN BRAND DX/DXL
ACOUSTICS
ACOUSTICAL CEILING TILE
ARMSTRONG
ACOUSTICAL CEILING GRID
ARMSTRONG
ML 15/16"
ACOUSTICAL CEILING TILE
EXISTING
24" X 24" X 7/8 EXIST
EXIST
EXIST
EXIST
EXISTING ACOUSTICAL CEIING GRID BEAM BAFFLE
EXIST
EXIST
EXIST
EXIST
EXIST
GORDON
SEE PLAN
G1
-
EDGE: SQUARE 0.70 NRC / LAY-IN 40 CAC -
WOOD LOOK DARK WOOD
-
EXISTING ACOUSTICAL CEILING TILE PAINTED GYP. BD FINISH -
TECH BLACK
PRELUDE EXPOSED TEE TECH BLACK
EXIST
-
-
-
-
PT-1
COMMENTS
-
G2
PAINTED EXTERIOR GYP. BD FINISH
EXIST
EXIST
EXIST
PT-1
EXIST
G3
EXISTING INTERIOR GYP BD CEILING.
EXIST
EXIST
EXIST
PT-1
EXIST
1.
PAINT DESIGNATED FOR EXPOSED OVERHEAD STRUCTURE IS TO INCLUDE ALL EXPOSED COMPONENTS INCLUDING (BUT NOT EXCLUSIVE TO) DECKING, STRUCTURAL MEMBERS, MECHANICAL AND ELECTRICAL DELIVERY SYSTEMS, FIRE PROTECTION SYSTEMS (EXCLUDING SPRINKLER HEADS), AND ALL OTHER MISCELLANEOUS BUILDING SYSTEMS LOCATED OVERHEAD. EACH OF THE AFOREMENTIONED CATEGORIES IS TO INCLUDE ANY AND ALL ASSOCIATED SUPPORTS, FASTENERS, HANGERS, STRUTS, BRACES, BRACKETS, ETC.
2.
LIGHT FIXTURES SHOWN TO INDICATE PROPOSED FIXTURES & GENERAL DESIGN INTENT.
3.
FINISHED CEILING HEIGHTS ARE MARKED FROM TOP OF FINISH FLOOR (UNLESS NOTED OTHERWISE).
4.
COORDINATE LOCATION OF FIXTURES WITH MECHANICAL, ELECTRICAL, PLUMBING, FIRE SUPPRESSION AND TECHNOLOGY DRAWINGS. ANY CONFLICT BETWEEN TRADES, NOTIFY ARCHITECT PRIOR TO INSTALLATION.
5.
FACE OF BULKHEADS ARE TO ALIGN WITH FACE OF ADJACENT WALLS TO WHICH BULKHEADS ARE PARALLEL , UNLESS NOTED OTHERWISE OR DIMENSIONED.
BARLOW MOTORS BUILDING 40 W. CENTRAL PKWY • FIRST FL CINCINNATI, OH 45202
6.
ALL GYPSUM BOARD SOFFITS & CEILINGS TO BE PAINTED FLAT CEILING WHITE UNLESS NOTED OTHERWISE).
PHONE: (513) 914-5835
7.
PAINT DUCTWORK INSIDE AIR GRILLES FLAT BLACK.
8.
CEILING GRIDS ARE CENTERED ON ROOM, U.N.O. OR DIMENSIONED.
9.
WHERE EXIT SIGNS OCCUR OVER A DOOR OR PAIR OF DOORS, CENTER SIGN ON DOOR OPENING.
0.85 NRC / 35 CAC -
A3 GRID B1
EXPOSED CEILING
24" x 48" x 5/8" 1729 - FINE FISSURED
NOTES
FLAT WHITE 050 EDGE: SHADOWLINE TAPERED FLAT WHITE 050 -
A2 GRID A3
EXA1
CP3
MFR
ACOUSTICAL CEILING TILE
E-1
CP4
DESCRIPTION
A1 A1 GRID A2
-
-
EXISTING CEILING PADS & GRID TO REMAIN EXISTING CEILING GRID TO REMAIN. SEE A3 NOTES. CONTACT: SOUTHEASTERN ARCHITECTURAL SYSTEMS, AUSTIN CLAYTOR, 704.896.5805, austin@seas-tr.com EXISTING TRUSS MOUNTED GYP. BD. TO STAY. EXISTING LOWER CEILING TO BE REMOVED
REFER TO FINISH SCHEDULE FOR PAINT DETAILS EXISTING EXTERIOR GYP CEILING TO BE PATCHED AND REPAIRED AS NECCESSARY. PREPPED TO RECEIVE NEW PAINT. REFER TO FINISH SCHEDULE FOR PAINT DETAILS
10. ALL CEILING DEVICES TO BE CENTERED IN TILE, U.N.O.
EXISTING INTERIOR GYP CEILING TO BE PATCHED AND REPAIRED AS NECCESSARY.
11. CONTRACTOR TO INSTALL HVAC DUCTOWRK AS HIGH AS POSSIBLE AND COORDINATE LIGHT FIXTURE LOCATION TO MAINTAIN DESIGN AT INTENDED CEILING HEIGHTS. 12. CLEAN AND RELAMP ALL EXISTING LIGHT FIXTURES. REFER TO MEP FOR MORE INFORMATION. 13. CLEAN AND PAINT ALL EXISTING SUPPLY AND RETURN DIFFUSERS WHITE.
CP2
B G1 G1
G1
8'-6"
8'-6"
ALIGN
A202
9'-7"
A203
OR
A3
EXIST
A202
3
2
A202
A202
A203
ALTERNATE 3
CP9
A202
A3
EXIST
A3
EXIST
A3
EXIST
CP1 CP2 CP3
G1
EXIST
A3
EXIST
A3
EXIST
CP4
CP7
CP5 CP6
PRINT DATE: 4/11/2022 11:13:31 AM FILE INFO: BIM 360://Fifth Third Bank Store Roll Out/20177.15 Andrew Jackson Pkwy Nashville TN - Branch_2700r.rvt
CP7 CP8 CP9
A3
CP6
EXIST
A3
EXIST
A3
A3
EXIST
EXIST
A3
EXIST 2.
A
1
RCP
ALIGN CEILING GRID WITH EXISTING CEILING GRID. TOOTH IN CEILING AS NECCESSARY TO CREATE AN EVEN FLUSH PLANE. VAT TUBE. COORDINATE WITH BANK EQUIPMENT VENDOR. SURFACE MOUNTED SIGNAL FIXTURE TO BE CENTERED OVER DRIVE-THRU LANE. SURFACE MOUNTED SIGNAL "DO NOT ENTER FIXTURE TO BE CENTERED OVER DRIVE-THRU LANE. BAR-1, BEAM BAFFLE SYSTEM BY GORDON. SEE CEILING SCHEDULE FOR ADDITIONAL INFORMATION. NO ARCHITECTURAL SCOPE IN THIS AREA. REFER TO ELECTRICAL FOR ELECTRICAL SCOPE. DRIVE-THRU INDICATOR LIGHT AT 8'-0" AF. ALSO REFER TO ELECTRICAL. NEW PRE-FABRICATED CANOPY. COORDINATE WITH OWNER'S VENDOR FOR INSTALL AND EXACT LOCATION. ALIGN GYP SOFFIT WITH EXISTING CEILING
# 0 1
DATE
CHANGE DESCRIPTION
03/21/2022 90% Owner Review 04/08/2022 Issued for Bid and Permit
GENERAL NOTES - ALTERNATE 1
EXIST 1.
A3
CEILING TAG WITH HEIGHT
KEYNOTE LEGEND
CP8
8'-6"
EXIST
XX'-XX"
NOTE: COORDINATE ARCHITECTURAL REFLECTED CEILING PLANS WITH THE MECHANICAL AND ELECTRICAL DRAWINGS FOR NUMBER OF, AND LOCATIONS. OF, AND TYPES OF FIXTURES AND GRILLES. NOT ALL ITEMS SHOWN ON LEGEND MAY BE PRESENT IN PROJECT. 6
G3
RECESSED CAN LIGHT
EXHAUST/RETURN GRILLE
XX
CP1
9'-4"
2
BEAM BAFFLE SYSTEM
EXIST
G1
8'-6"
A3
ALIGN
4
PLASTIC LAMINATED PANEL
BAR-1
SUPPLY DIFFUSER
CP5
G2
OR
ALTERNATE 1
9'-7"
9'-4"
EXIST
GYPSUM BOARD CEILING OR SOFFIT
PL-1
1x8 LIGHT FIXTURE (SHADING DENOTES EMERGENCY FIXTURE)
2
CP6 A1
A3
EXPOSED STRUCTURE ABOVE
G1
1x4 LIGHT FIXTURE (SHADING DENOTES EMERGENCY FIXTURE)
ALIGN
5 A2
ACOUSTIC CEILING TYPE 2: 2'x4' LAY-IN CEILING
E1
2x4 LIGHT FIXTURE (SHADING DENOTES EMERGENCY FIXTURE)
8'-6"
CP6
ACOUSTIC CEILING TYPE 1: 2'x2' LAY-IN CEILING
A2
for
2
A1
FIFTH THIRD BANK
CP3
CP4
Andrew Jackson Parkway 4715 Andrew Jackson Parkway Hermitage, TN 37076
1
RCP LEGEND
EXIST
FIFTH THIRD BANK (K1074012)
G2
DEMOLITION SCOPE: A. REMOVAL OF EXISTING CASEWORK THROUGHOUT BOTH EMPLOYEE BREAK ROOMS: a. WALL CABINETS b. BASE CABINETS c. COAT CABINETS B. DEMOLITION OF WALL BETWEEN THE TWO BREAK ROOMS C. REMOVAL OF EXISTING FLOORING IN EMPLOYEE BREAKROOM D. REMOVAL AND RELOCATION OF EXISTING FIRE EXTINGUSHER CABINET E. DEMOLITION OF CEILING IN ROOM EMPLOYEE LOUNGE(109) NEW WORK SCOPE: A. INSTALL NEW CASEWORK & LONGER COUNTER IN EMPLOYEE LOUNGE a. COUNTER WITH SEATING ALONG NORTH WALL b. BASE AND WALL CABINETS AGAINST NORTH WALL c. WALL TILE ON SOUTH WALL d. ADDITIONAL BASE CABINETS ON SOUTH WALL B. NEW CLOSET IN NORTHWEST CORNER OF EMPLOYEE LOUNGE C. NEW WALL MOUNTED SHELVES IN SOUTH SIDE NICHE OF EMPLOYEE LOUNGE D. NEW WALL AT BACK SIDE OF THE REFRIDGERATOR E. FLOOR TILE IN ROOM 109 F. INSTALL NEW CEILING TO MATCH EXISTING CEILING
DRAWING TITLE:
REFLECTED CEILING PLAN 04/08/2022 DRAWN BY: NP
1.
1/4" = 1'-0"
CHECKED BY: BL
MOODY NOLAN PROJ#:
20177.15
A201
GENERAL NOTES - ALTERNATE 3
OVERALL FIRST FLOOR RCP
NEW WORK SCOPE: A. EXTEND LENGTH OF INSTALL FOR A2 CEILING AND FOR BAR-1 BLADES TO REACH THE SERVICE COUNTER. B. CHANGE SOFFIT TO STRETCH ACROSS THE ENTIRE BAR-1 SYSTEM
BID & PERMIT
© 2020 Moody•Nolan Inc.
FINISH SCHEDULE ITEM
SAMPLE FINISH
EXTERIOR FINISH
COLOR
PT-7
PAINTED SOFFITS, TRIM, COLUMNS
BENJAMIN MOORE WHALE GREY
PT-8
PAINTED HEADERS, SILLS ON DOORS, WINDOWS
SHERWIN WILLIAMS PASSIVE GREY
PT-9
PAINTED BRICK, EIFS
SHERWIN WILLIAMS EXTRA WHITE
BARLOW MOTORS BUILDING 40 W. CENTRAL PKWY • FIRST FL CINCINNATI, OH 45202
B
PT-7
PT-7
ROOF EAVE 113'-0" PT-8
PT-8
PT-7 ROOF EAVE 113'-0"
PT-7
PT-7 PT-8
LEVEL 01 100'-0"
4
PT-7
PT-8 PT-9
PT-9
PT-8
FIFTH THIRD BANK
A
PT-9
for
2
Andrew Jackson Parkway 4715 Andrew Jackson Parkway Hermitage, TN 37076
1
FIFTH THIRD BANK (K1074012)
PHONE: (513) 914-5835
ELEVATION 1/8" = 1'-0"
LEVEL 01 100'-0"
SOUTH REF: 1 / A101
2
2
ELEVATION 1/8" = 1'-0"
EAST REF: 1 / A101
1
B
#
A
0 1
DATE
CHANGE DESCRIPTION
03/21/2022 90% Owner Review 04/08/2022 Issued for Bid and Permit
DRAWING TITLE: PT-7
PT-9
PT-7
PT-7
ROOF EAVE 113'-0"
PT-7 PT-7
PT-7 PT-7
PT-7
PT-7 PT-8
PT-8
020
NLP
ROOF EAVE 113'-0"
ELEVATION 1/8" = 1'-0"
NORTH REF: 1 / A101
COLOR ELEVATIONS
PT-8
PT-9 LEVEL 01 100'-0"
3
PT-7
PT-7
PT-7
PT-9
1
ELEVATION 1/8" = 1'-0"
WEST REF: 1 / A101
PT-9
04/08/2022 LEVEL 01 100'-0"
DRAWN BY: NP
CHECKED BY: BL
MOODY NOLAN PROJ#:
20177.15
A302 BID & PERMIT
NOTE: REFER TO ELEVATIONS FOR FINISHES
NOTE: REFER TO ELEVATIONS FOR FINISHES
FINISH WALL PROFILE
1 1/2"
10 1/2"
FINISH WALL PROFILE
10 1/2"
P-LAM OVER PLYWOOD DOOR FACE & EDGES
ALL INTERIOR SURFACES TO BE WHITE MELAMINE OVER MDF
ALL INTERIOR SURFACES TO BE WHITE MELAMINE OVER MDF
2'-6"
1
2
A810
A810
1'-3"
P-LAM OVER PLYWOOD DOOR FACE & EDGES
ADJ P-LAM SHELVES ON RECESSED STANDARDS, TYP.
ADJ P-LAM SHELVES ON RECESSED STANDARDS, TYP.
3/4" THICK CONSTRUCTION, U.N.O.
3/4" THICK CONSTRUCTION, U.N.O.
2'-6"
BARLOW MOTORS BUILDING 40 W. CENTRAL PKWY • FIRST FL CINCINNATI, OH 45202 PHONE: (513) 914-5835
3 A810
SOLID WOOD BLOCKING AS REQ'D
2'-6"
2'-10"
EQ
1 1/2"
8" MIN
2'-10"MAX
1'-3"
2'-6"
1 1/2"
Employee Lounge North 3/4" = 1'-0"
OUTLINE OF REQUIRED ADA KNEE & TOE CLEARANCES
TO TOP OF SINK
REFUSE CONTAINER DRAWER ALL INTERIOR SURFACES TO BE WHITE MELAMINE OVER MDF
2
PROFILE OF 3/4" MDF SIDE PANEL, BOTH SIDES
P-LAM OVER PLYWOOD DOOR FACE & EDGES
3/4" MDF REMOVABLE PANEL W/ ANCHOR CLIPS FOR SERVICE ACCESS
1/2" DRAWER BOTTOMS U.N.O. , 100# CAPACITY DRAWER SLIDES
PROFILE OF ADJ MILLWORK BEYOND
AE-02
SECTION
5
FINISH BASE BY GC PER SCHEDULE
LEVEL 01 100'-0"
6" MAX
4
MILLWORK @ TRASH REF: 3 / A809
1 1/2" = 1'-0"
2'-1"
4"
FINISH BASE BY GC PER SCHEDULE
3"
SECTION
LEVEL 01 100'-0"
11" MIN
MILLWORK @ SINK REF: 3 / A809
1 1/2" = 1'-0"
for
PL-1 1/4" THICK BACKING PANEL
6'-5"+/-
ADA SINK
FIFTH THIRD BANK
2 3/4"
2'-4 1/4"
EQ
110
Andrew Jackson Parkway 4715 Andrew Jackson Parkway Hermitage, TN 37076
1 1/2"
P-LAM COUNTERTOP
2'-9 3/4"
AE-02
P-LAM COUNTER TOP & BACKSPLASH
1'-6 1/2"
82 1/2"
SOLID WOOD BLOCKING AS REQ'D
1 1/2"FP
FIFTH THIRD BANK (K1074012)
4'-0 1/2"
1 1/2"
1'-8"
© 2020 Moody•Nolan Inc.
ON THIS PARTICULAR BANK BRANCH, WE HAD A 3 ALTERNATE PACKAGE INCLUDED IN THE BIM & PERMIT SET. THE CLIENT HAD A STRICT BUDGET, BUT WANTED TO SEE WHERE THEY HAD ROOM TO SPEND ON THE MORE FAVORABLE DESIGN CHOICES. ENSCAPE PLAYED A BIG PART IN THIS.
EMPLOYEE LOUNGE 109a 4
5
A809
A809
2
4'-5 1/2" (2) EQUAL CABINETS
1'-6"
A809 3
PRINT DATE: 4/11/2022 11:15:03 AM FILE INFO: BIM 360://Fifth Third Bank Store Roll Out/20177.15 Andrew Jackson Pkwy Nashville TN - Branch_2700r.rvt
2'-6"
PL-3
# 0 1
DATE
CHANGE DESCRIPTION
03/21/2022 90% Owner Review 04/08/2022 Issued for Bid and Permit
1'-7"
PT-1
PL-2
DRAWING TITLE:
2'-1"
EMPLOYEE LOUNGE - ENLARGED PLAN & DETAILS
2'-9 1/2"
PL-1 AE-04
AE-03
04/08/2022 DRAWN BY: NP
1'-6"
3
ELEVATION 3/4" = 1'-0"
3 1/2"+/-
1'-6" HOLD
2'-8" HOLD
1'-6" HOLD
CHECKED BY: BL
MOODY NOLAN PROJ#:
3'-5"HOLD
1
Employee Lounge South REF: 1 / A809
LEVEL 01 - OVERALL PLAN - Callout 1 REF: 1 / A101
3/4" = 1'-0"
20177.15
A809
ENLARGED PLAN
BID & PERMIT
6'-0 1/2" (2) EQUAL CABINETS
1 1/2"FP 1
4
A810
A809
2'-0"
5 A809 2.
PL-3
2'-6"
2'-6"
PL-3
3 A810
WT-9
DEMOLITION SCOPE: A. REMOVAL OF EXISTING CASEWORK THROUGHOUT BOTH EMPLOYEE BREAK ROOMS: a. WALL CABINETS b. BASE CABINETS c. COAT CABINETS B. DEMOLITION OF WALL BETWEEN THE TWO BREAK ROOMS C. REMOVAL OF EXISTING FLOORING IN EMPLOYEE BREAKROOM D. REMOVAL AND RELOCATION OF EXISTING FIRE EXTINGUSHER CABINET E. DEMOLITION OF CEILING IN ROOM EMPLOYEE LOUNGE(109) NEW WORK SCOPE: A. INSTALL NEW CASEWORK & LONGER COUNTER IN EMPLOYEE LOUNGE a. COUNTER WITH SEATING ALONG NORTH WALL b. BASE AND WALL CABINETS AGAINST NORTH WALL c. WALL TILE ON SOUTH WALL d. ADDITIONAL BASE CABINETS ON SOUTH WALL B. NEW CLOSET IN NORTHWEST CORNER OF EMPLOYEE LOUNGE C. NEW WALL MOUNTED SHELVES IN SOUTH SIDE NICHE OF EMPLOYEE LOUNGE D. NEW WALL AT BACK SIDE OF THE REFRIDGERATOR E. FLOOR TILE IN ROOM 109 F. INSTALL NEW CEILING TO MATCH EXISTING CEILING
BARLOW MOTORS BUILDING 40 W. CENTRAL PKWY • FIRST FL CINCINNATI, OH 45202
WT-1
PHONE: (513) 914-5835
9'-10"+/-
1 1/2"END PANEL
ELEVATION 3/4" = 1'-0"
1'-3"
1'-6"
1'-6"
2'-6" 1 1/2"FP
2
Employee Lounge North REF: 1 / A810a
ELEVATION 3/4" = 1'-0"
AE-03 GRAIN
AE-04
1'-10 1/2"+/(2) EQUAL WIDTH
2'-8" HOLD
1'-6" HOLD
2'-0"+/1'-6" MINIMUM
3'-5" HOLD
Employee Lounge South REF: 1 / A810a
4'-4"
9'-10" 110
4'-1 1/8"
Andrew Jackson Parkway 4715 Andrew Jackson Parkway Hermitage, TN 37076
5'-10"
FIFTH THIRD BANK (K1074012)
4'-4" HOLD
2'-10"
2'-6"
PL-1 PL-1
2'-10"MAX TO TOP OF SINK
EQ
EQ
3
AE-02
PL-2
EQ-01
GRAIN
1'-6"
WT-2 PL-2
1'-0" 7' - 0" MAX
1'-0"
SCHEDULED PARTITION PROVIDE BLOCKING IN WALL TO ACCOMMODATE SHELF LOADING
109a
1'-0"
EMPLOYEE LOUNGE 109a
FIFTH THIRD BANK
2'-6"
for
© 2020 Moody•Nolan Inc.
GENERAL NOTES - ALTERNATE 1 1. 2 A810
1'-3"
3
1'-0"
A810a 2
ADJUSTABLE PLAM SHELVES ON HEAVY DUTY BRACKETS AND STANDARDS, SPACED EQUALLY (NOT TO EXCEED 2'-0")
5 A810a
1'-6"
1'-0"
4"
1'-6"
1'-10 3/4"
PL-3
P-LAM ON ALL EXPOSED SURFACES
# 0 1
DATE
CHANGE DESCRIPTION
03/21/2022 90% Owner Review 04/08/2022 Issued for Bid and Permit
AE-02
DRAWING TITLE:
EMPLOYEE LOUNGE - ALTERNATE 1
5
PL-1
A810a
109
5"
AE-03
ADJ P-LAM SHELVES ON RECESSED STANDARDS, TYP. ALL INTERIOR SURFACES AT TO BE WHITE MELAMINE OVER MDF
2'-10"
111
AE-04
PL-1
1"
1/4" THICK BACKING PANEL
A810a
4
04/08/2022 DRAWN BY: NP
4"
2'-10"
PRINT DATE: 4/11/2022 11:15:10 AM FILE INFO: BIM 360://Fifth Third Bank Store Roll Out/20177.15 Andrew Jackson Pkwy Nashville TN - Branch_2700r.rvt
2'-1"
1'-9"
5
SECTION 1 1/2" = 1'-0"
EMPLOYEE LOUNGE SHELVING REF: 1 / A810a
CHECKED BY: BL
MOODY NOLAN PROJ#:
FINISH BASE BY GC PER SCHEDULE
2'-8"+/1 1/2"FP
3"
4
ELEVATION 3/4" = 1'-0"
1 1/2"FP
EMPLOYEE LOUNGE SHELVING REF: 1 / A810a
1
ENLARGED PLAN 3/4" = 1'-0"
EMPLOYEE LOUNGE REF: 2 / A101
20177.15
A810a BID & PERMIT
021
NLP
022
NLP
F A M I L I E S
&
P LU G - I N S
SELECTED EXAMPLES OF FAMILIES & PLUG-INS I’VE CREATED/USED
023
NLP
OUR CLIENT ISSUED SEMI-MONTHLY CHANGES TO THEIR PROTOTYPE THAT THEY WANTED TO SEE IMPLEMENTED INTO ALL JOBS BASED ON WHERE EACH PROJECT WAS AT IN THEIR SCHEDULE. THEY WANTED US TO COME UP WITH A WAY TO TRACK THIS AND REPORT IT TO THEM BOTH IN THE DRAWING SET AND OUTSIDE. I WORKED WITH THE DIGITAL PRACTICE TEAM TO FIND A TOOL THAT WOULD ALLOW US TO LOG IT IN ONE PLACE, BUT HAVE IT UPDATE WITHIN REVIT AS WELL.
Applies
03/01/21
Electrical
YES
YES
07/29/21
08/12/21
Electrical
YES
Implemented YES
Architect
NO
Comments
Phase Released Bid and Permit Bid and Permit
N/A
Doing a 1 to 1 replacement of wood enclosure
Architect
NO
N/A
Doing a 1 to 1 replacement of wood enclosure
Architect
YES
YES
Architect
YES
YES
NO
NO
Architect
YES
YES
Bid and Permit
Arch/elec
YES
YES
Bid and Permit
05/25/21
Architect
YES
YES
Bid and Permit
05/25/21
Electrical
YES
YES
Bid and Permit
06/16/21
07/03/21
Arch/elec
YES
YES
06/16/21
07/03/21
Electrical
N/A
No phone room
06/16/21
07/03/21
All
NO
N/A
Interior Renovation
07/06/21
09/20/21
Electrical
YES
YES
Bid and Permit
21.012R - EMERGENCY GENERATOR CONNECTION
07/29/21
08/12/21
Electrical
YES
YES
Bid and Permit
21.013 - TRANSACTION BAR TILE AND ELECTRICAL CHANGES
07/06/21
07/20/21
Arch/elec
YES
YES
Bid and Permit
21.013R - TRANSACTION BAR TILE AND ELECTRICAL CHANGES
07/29/21
08/12/21
Arch/elec
YES
21.014 - PROTOTYPE FLOORING AND TRANSITION DETAILS
07/29/21
08/12/21
Arch
YES
YES
21.015 - ROOF HATCH
07/29/21
08/09/21
Arch
NO
DNA
No Roof hatch
21.016 - RELOCATE IHP-1 TO NEW LOCATIONS
07/29/21
08/09/21
Elec/Mech
NO
DNA
No IHP
Misc
YES
YES
Arch/Elec.
NO
DNA
No booth
DNA
No booth Existing Toilet Rooms
21.002 - TRASH ENCLOSURE AND DETAILS
02/15/21
03/01/21
21.003 - UPPER WALL CABINET DEPTH IN WORK ROOM
02/15/21
03/01/21
21.004 - UPPER WALL CABINET ABOVE TRANSACTION BAR MFD
02/11/21
02/25/21
21.004R - UPPER WALL CABINET ABOVE TRANSACTION BAR MFD
08/17/21
08/31/21
21.005 - ELIMINATED LINEAR DIFFUSER ABOVE TECH TABLE
03/08/21
03/22/21
Mechanical
21.006 - REVISED SERVICE BAR UPPER CABINETS
03/08/21
03/22/21
21.006R - REVISED SERVICE BAR UPPER CABINETS
03/09/21
03/23/21
21.007 REVISED TRANSACTION BAR GROMMET
05/11/21
21.008 - SURGE PROTECTIVE OUTLETS AT THE MFD/PRINTER/MONITOR LOCATIONS
05/11/21
21.009 - CLARIFY CONDUIT AND BOLLARDS AT ATM ISLAND 21.010 - PHONE ROOM OUTLET UNDER COUNTER 21.011 - 1900N PROTOTYPE UPDATES 21.012 - EMERGENCY GENERATOR CONNECTION
21.017 - A-170 FURNITURE AND EQUIPMENT CHANGES 21.018 - EMPLOYEE LOUNGE TABLE BLOCKING
07/29/21 07/29/21
08/09/21 08/09/21
NO
21.018R - EMPLOYEE LOUNGE TABLE BLOCKING AND POWER AND DATA
08/17/21
08/31/21
Electrical
21.019 - HOLD DIMENSIONS AT TOILET ROOMS
07/29/21
08/09/21
Arch
NO
DNA
N/A
N/A
Bid and Permit Bid and Permit
N/A N/A Bid and Permit
N/A N/A N/A
21.020 - REPLACE ROUND OUTLET PLUG WITH SQUARE OUTLET AND PLATE
07/29/21
08/09/21
Electrical
YES
YES
Bid and Permit
08/17/21
08/31/21
Electrical
YES
YES
Bid and Permit
21.021 - WORK ROOM LIGHT SWITCH REPROGRAMMING
08/17/21
08/31/21
Electrical
YES
YES
Bid and Permit
21.023 - DOOR OPERATOR PLACEMENT - FOR ISSUANCE
11/24/21
12/08/2021
Arch/Elec
YES
21.024 - SECURITY CAMERA ON EXTERIOR
11/24/21
11/24/21
Misc
NO
21.025 - 1900n PROTOTYPE REVISIONS (TECHWALL, LIBRARY, EMPLOYEE LOUNGE)
11/24/21
11/24/21
Elec
NO
N/A
Interior Renovation
21.027 - POWER AND DATA MOUNTING HEIGHTS BOOTH MEETING ROOM
12/02/21
12/02/21
Misc
NO
DNA
No Booth
21.028 - BANK EQUIPMENT DETAILS AND CUT SHEETS
12/02/21
12/02/21
Misc
YES
YES
Bid and Permit
21.028R1 - BANK EQUIPMENT DETAILS AND CUT SHEETS
01/31/22
02/14/22
Arch/Misc
YES
YES
Bid and Permit
22.001 - EMPLOYEE LOUNGE BOOTH AND MILLWORK CHANGES
01/14/22
02/14/22
Arch
NO
N/A
no booth in lounge
22.001R - EMPLOYEE LOUNGE BOOTH AND MILLWORK CHANGES
04/05/22
04/19/22
Mechanical
NO
N/A
no booth in lounge
22.002 - RTU BASIS OF DESIGN CHANGE TO CARRIER
01/14/22
02/14/22
Mechanical
NO
N/A
22.003 - GENERATOR CONNECITON FOR NEW BUILDINGS
01/14/22
02/14/22
Mechanical
NO
N/A
22.004 - PROTOTYPE DOOR HARDWARE UPDATES
01/31/22
02/14/22
Arch
YES
YES
22.005 - JANITOR CLOSET CEILING
04/05/22
04/19/22
Arch
NO
N/A
Arch
YES
YES N/A
04/05/22
04/19/22
PHONE: (513) 914-5835
N/A
21.020R - REPLACE ROUND OUTLET PLUG WITH SQUARE OUTLET AND PLATE
22.006 - EMPLOYEE LOUNGE DISHWASHER
BARLOW MOTORS BUILDING 40 W. CENTRAL PKWY • FIRST FL CINCINNATI, OH 45202
N/A
Bid and Permit
YES
NO
N/A
Bid and Permit Bid and Permit DNA - existing building
YES
Bid and Permit
YES
Bid and Permit
N/A N/A
N/A N/A
for
Discipline
02/15/21
FIFTH THIRD BANK
Issue Date
Andrew Jackson Parkway 4715 Andrew Jackson Parkway Hermitage, TN 37076
Change Directive
Effective Date
21.001 - CUSTOMER FACING USB CHARGING OUTLETS 21.001R - CUSTOMER FACE USB CHARGING OUTLETS
FIFTH THIRD BANK (K1074012)
R20177.15 ANDREW JACKSON
N/A renovation
N/A Bid and Permit
existing jan. closet
N/A Bid and Permit
22.007 - 1900S PROTOTYPE REVISIONS
04/05/22
04/19/22
Arch
NO
22.008 - ATM ISLAND POWER REQUIREMENT
04/05/22
04/05/22
Arch
YES
YES
Bid and Permit
22.009 - MULTI-FUNCTION DEVICE - COPIER SPECIFICATIONS
04/06/22
04/06/22
Arch
YES
YES
Bid and Permit
Interior Renovation
N/A
# 0 1
DATE
CHANGE DESCRIPTION
03/21/2022 90% Owner Review 04/08/2022 Issued for Bid and Permit
DRAWING TITLE:
CHANGE DIRECTIVES LIST 04/08/2022 DRAWN BY: NP
CHECKED BY: BL
MOODY NOLAN PROJ#:
20177.15
G003 BID & PERMIT
024
NLP
DEVELOPED A DYNAMO SCRIPT FROM WATCHING YOUTUBE TUTORIALS TO BATCH CREATE SHEETS. WE OFTEN USE THE SAME SHEETS FOR EACH BANK ROLLOUT PROJECTS, AND THIS WAS ABLE TO SAVE US MUCH TIME SINCE WE WERE NO LONGER CREATING EACH SHEET MANUALLY.
025
NLP
CUSTOM FAMILY MODELED AFTER NIGHT-DROP EQUIPMENT FROM VENDOR PROVIDED CUTSHEET
026
NLP
BACK WALL COMMONLY USED IN BANK BRANCH ROLL-OUTS
027
NLP
BASE RENDERING BY SCB FOR REFERENCE
028
NLP
1
7
2
1 W E B S T E R
SCB / SAN FRANCISCO / SPRING 2016 A MULTI-USE HI-RISE BUILDING LOCATED IN OAKLAND, CALIFORNIA
029
NLP
My primary repsonsibilities during my internship with SCB in San Francisco were documenting the individual unit elevations and plans, vertical circulation, conducting light studies, while also cleaning up the Revit model. I was also responsible for curating presentation documents and boards for different community hearing meetings with the City of Oakland, which is located in Northern California. I also would retouch renderings as needed and was responsible for creating schedules for doors, parking spaces, and typical units in the project. 030
NLP
RENDERING PROPERTY OF SCB. SMALL LIGHTING EDITS BY ME / INITIAL RENDERING BY SCB
031
NLP
032
NLP
U C L A
H O U S I N G
STUDIOS / SAN FRANCISCO / FALL 2017 A HOUSING PROJECT FOR UCLA’S WESTWOOD CAMPUS
033
NLP
034
NLP
During my time with Studios architecture located in San Francisco, CA I was largly responsible for the construction of a highly detailed, large scale model. I was held responsible for finding a company to complete the laser cutting and overseeing that the parts came back to us correctly. I then assembled all of these parts. I also 3D printed the sunshades and modeled the interior of the 1st level and the courtyardandlandscapingintheback.Themodelisat 3/32” = 1’-0”, with etch lines to show operable windows in the units, as well as panels lines on the facade. This model was used in most weekly client meetings. I also worked with Studios on their SD drawing set and DD drawing set, compiling facade studies and helping to curate different facade studies for meetings with consultants. I worked with them on 3D printing massing models for client meetings and overseeing documentation of the models.
035
NLP
036
NLP
P
&
G
LOBBY RENOVATION
BHDP / CINCINNATI / 2019 - 2020 A RENOVATION PROJECT FOR P&G FHCIC BUILDING
037
NLP
This project was focused on updating and renovation the main entry for P&G’s Family and Home Care Innovation Center. A large portion of my responsibility other than project documentation was designing and introducing 3 differenct ceiling options for the lobby, ranging from a more expensive statement wood slat ceiling or the salvage and reuse of existing ceiling tiles. I used Enscape3d for Revit to genereate 3 quick design render studies so the client could easily see what they liked the most.
038
NLP
039
NLP
040
NLP
1
2
3
4
5
6
7
8
9
13
Q
4"
HARDWARE: MOCKETT, SQUARE DRAW 4" RECESSED DP105C/6 - 6 11/16" X 3/8" SQUARE,WO POLI
MATCH WD1 (B3)
N12 A631
2'-1"
ALIGN EDGE OF HUTCH WITH MULLION BELOW
ELEVATION - RECEPTION DESKGRAIN - EXTERIOR SOU SS1
SS1
1/2" = 1'-0"
SS1
4"
GRAIN
ELEVATION - RECEPTION DESK - EXTERIOR EAST 1/2" = 1'-0"
12 GRAIN
WD1
4" RECESSED WOOD BASE TO MATCH WD1 (B3)
4"
N6
11
WD1
A631
WD1
2'-1"
SIM
E7 - EXTERIOR EAST ELEVATION - RECEPTION DESK A631
1/2" = 1'-0"
SIM
A7 A631
GRAIN
N12
4"
P
N6
A631
A7 A631
1/2" = 1'-0"
SIM
4" RECESSED WOOD BASE TO MATCH WD1 (B3)
N6
WD1
A631
N
E7 A631
SS1
SIM
A7 A631
GRAIN
N12
SIM
A7 A631SIM
SIM
E7 A631
A7 A631
WD1
L3
WD1
HARDWARE: MOCKE SQUARE DRAWER PU DP105C/6 - 6 11/16" X SQUARE, POLISHED
SIM
A631
E7 A631
M
E7 A631
1/2" = 1'-0"
SS1
SIM
4" RECESSED WO MATCH WD1 (B3)
Another portion of this project was providing two ELEVATION different- material for RECEPTIONoptions DESK - EXTERIOR SOU the reception desk. This piece was a custom ELEVATION made - RECEPTIONsecurity DESK - EXTERIOR EAST that needed to service ELEVATION - RECE desk the admin’s needs including allowing them to manage multiple security cameras and allow access through the security gates. The employee servicing this desk would also be printing out new badges for those that needed them as they accessed the building. 4" RECESSED WOOD BASE TO MATCH WD1 (B3)
1/2" = 1'-0"
HARDWARE: MOCKE SQUARE DRAWER PU DP105C/6 SIM - 6 11/16" X A7 SQUARE, POLISHED A631
SIM
L3
WD1
L3
SS1
2'-5"
4" 2'-1"
HARDWARE: MOCKETT, SQUARE DRAWER PULL, DP105C/6 - 6 11/16" X 3/8" SQUARE, POLISHED CHROME
A631
10
WD1
SS1
SS1
SS1
1'-6"
1'-6"
GRAIN
1'-6"
GRAIN
2"
L3
WD1
K6 A631
A631
K6
A631 K6
1'-3"
K
A631
1'-3" K12
1/2" = 1'-0"
RECEPTION DESK AXON 1'-6"
1'-6"
A631
1'-6"
ELEVATION - RECEPTIONL3 DESK - INTERIOR SOUT 1'-6"
1'-6"
1/2" = 1'-0"
L3
K12 A631
1/2" = 1'-0"
1 1/2"
2'-5"
6" 11" +/-
1/2" SOLID WOOD EDGE AT INSIDE EDGE OF WORK SURFACE - TO MATCH WOOD VENEER
8"
WOOD VENEER ON 3/4" MDF SUBSTRATE WITH SOLID WOOD EDGES. VENEER TO EXTEND OVER SOLID WOOD
(2) LAYERS 3/4" F.R.T. CABINET GRADE PLYWOOD
6 3/4"
1/2"
1' - 9 1/4"
3/4"
3/4"
3"
PAINTED WOOD BASE B2
3' - 0"
1' - 4"
SUPPORT MILLWORK FASCIA ON ADJUSTABLE FEET TO ALLOW FOR LEVELING IN THE FIELD.
2' - 0"
MILLWORK SECTION - NO HUTCH CABINET BELOW
A7
EDGE OF DESK BEYOND
5
6
7
A631
4" 4"
6 3/4"
MILLWORK SECTION 1 1/2" = 1'-0"
9
8
PLASTIC LAMINATE 1' - 9 1/4" 3" ON ALL EXPOSED SURFACES 1/2" SOLID WOOD EDGE AT INSIDE EDGE OF WORK SURFACE - TO MATCH WOODWITH VENEER HUTCH ABOVE DRAWERS
PAINTED WOOD BASE
3/4"
EDGE OF DESK BEYOND 10
BELOW
11
12
2'-5"
6" 6" 11" +/-
2'-5"
4" 4"
2 1/2"
6 3/4" 3/4" 1/2"
1' - 9 1/4"
3"
PAINTED WOOD BASE
3/4"
041
6
7
SUPPORT MILLWORK FASCIA ON
8
4"
4"
MILLWORK SECTION - HUTCH ABOVE WITH DRAWERS BELOW
TED WOOD BASE
13
PLASTIC LAMINATE ON ALL EXPOSED SURFACES
1 1/2" 6"
3' - 0"
2 1/2" 3/4" 1/2"
6"
4
2' - 6"
3
2' - 6"
TIC LAMINATE ON ALL SED SURFACES
2' - 1"
CABINET GRADE PLYWOOD FRAMING @ 16" O.C.
TWO ADJUSTABLE SHELVES
4"
4"
2 1/2"
8"
TED WOOD BASE
2' - 6"
1 1/2"
2' - 5"
1' - 11 1/2"
3/4"
4"
TIC LAMINATE ON ALL SED SURFACES ADJUSTABLE VES
2' - 5"
CUT-OUT FOR POWER TO EQUIPMENT PROVIDED. PROVIDE REMOVABLE PANEL AS REQUIRED TO ALLOW FOR ACCESS.
4"
1/2"
6 3/4" 3/4"
EDGE OF DESK BEYO PLASTIC LAMINATE ON ALL EXPOSED SURFACES
3' - 0"
6"
SOLID WOOD EDGE AT INSIDE EDGE OF WORK SURFACE TO MATCH WOOD VENEER
8"
E MELAMINE RIOR
1/2" SOLID WOOD ED EDGE OF WORK SUR MATCH WOOD VENE
2' - 0"
4"
3/4"
WHITE MELAMINE INTERIOR
2 1/2"
CABINET GRADE CUT-OUT FOR POWER PLYWOOD FRAMING TO EQUIPMENT @ 16" O.C. PROVIDED. PROVIDE REMOVABLE PANEL AS WOOD VENEER ON 3/4" REQUIRED TO ALLOW MDF SUBSTRATE WITH FOR ACCESS. SOLID WOOD EDGES. VENEER TO EXTEND OVER SOLID WOOD CABINET GRADE PLYWOOD (2) LAYERSFRAMING 3/4" F.R.T. @ 16" O.C. CABINET GRADE PLYWOOD WOOD VENEER ON 3/4" MDF SUBSTRATE WITH RECESSED WOOD SOLID WOOD EDGES. BASE (B3) VENEER TO EXTEND OVER SOLID WOOD SUPPORT MILLWORK FASCIA ON ADJUSTABLE FEET TO ALLOW FORLAYERS LEVELING IN F.R.T. THE FIELD. (2) 3/4" CABINET GRADE PLYWOOD A7 RECESSED WOOD A631 1 1/2" = 1'-0" BASE (B3)
ADJUSTABLE VES
1' - 4"
RECESSED WOOD BASE (B3)
1/2" = 1'-0" 3/4"1 MDF CUT-OUT FOR POWER SUBRSTRATE TO EQUIPMENT 2 PROVIDED. PROVIDE REMOVABLE AS COORDINATEPANEL GROMMET REQUIRED TO ALLOW LOCATION WITH FOR ACCESS. EQUIPMENT
E MELAMINE D WOOD EDGE AT INSIDE RIOR OF WORK SURFACE ATCH WOOD VENEER
1 1/2" = 1'-0"
11" +/-
A1 A631
3/4"
MILLWORK SECTION - NO HUTCH OPEN BELOW
COORDINATE GROMMET LOCATION WITH EQUIPMENT
PLASTIC LAMINATE ON ALL EXPOSED SURFACES
COORDINATE GROMMET SUPPORT MILLWORK FASCIA ON LOCATION ADJUSTABLE FEETWITH TO ALLOW FOR LEVELING IN THE FIELD. EQUIPMENT SS1
1
6 3/4" 3/4"
2' - 1" 2' - 5"
4"
1/2"
6 3/4" 3/4"
1 1/2"
This document is the product and property of Baxter Hodell Donnelly Preston, Inc. Neither the document nor the information it contains may be copied or used for other than the specific project for which it was prepared without the written consent of Baxter Hodell Donnelly Preston, Inc.
2 1/2"
- 4" 2' - 0" MILLWORK SECTION - 1'NO HUTCH OPEN BELOW
A
1/2"
3/4" MDF SUBRSTRATE
WOOD VENEER ON 3/4" MDF SUBSTRATE WITH SS1 SOLID WOOD EDGES. VENEEER TO EXTEND E7 OVER SOLID WOOD
RECESSED WOOD BASE (B3)
2 1/2"
SS1
1'-0"
A631 1 1/2" = 1'-0" (2) LAYERS 3/4" F.R.T. 3/4" MDF CABINET GRADE PLYWOOD SUBRSTRATE
EDGE OF CABINET BEYOND
4"
2' - 1" 2' - 5"
A631
SUPPORT MILLWORK FASCIA ON CABINET GRADE FEET TO ALLOW ADJUSTABLE PLYWOOD FRAMING FOR IN THE FIELD. @ 16"LEVELING O.C.
B
D WOOD EDGE AT INSIDE OF WORK SURFACE ATCH WOOD VENEER
E7
MILLWORK SECTION - NO HUTCH OPEN BELOW
C
1/2" SOLID WOOD EDGE AT INSIDE EDGE OF WORK SURFACE - TO MATCH WOOD VENEER
SUPPORT MILLWORK FASCIA ON ADJUSTABLE FEET TO ALLOW FOR LEVELING IN THE FIELD.
VENEER TO EXTEND OVER SOLID WOOD
CUT-OUT FOR POWER TO EQUIPMENT RECESSED WOOD PROVIDED. PROVIDE E7 REMOVABLE BASE (B3)PANEL AS A631 1 1/2" = REQUIRED TO ALLOW FOR ACCESS.
3' - 0"
CONCEALED STEEL COUNTER SUPPORTS AT 4'-0" MAX O.C.
RECESSED WOOD BASE (B3)
(2) LAYERS 3/4" F.R.T. SUPPORT MILLWORK FASCIA ON CABINET GRADE WOOD VENEER ON 3/4" ADJUSTABLE MDF SUBSTRATEFEET WITH TO ALLOW PLYWOOD SOLIDLEVELING WOOD EDGES. FOR IN THE FIELD.
D
EDGE OF CABINET BEYON
(2) LAYERS 3/4" F.R.T. CABINET GRADE PLYWOOD
3' - 0"
CABINET GRADE PLYWOOD FRAMING @ 16" O.C. RECESSED WOOD BASE (B3)
E
1/2" SOLID WOOD EDGE A WORK SURFACE - TO MAT
EDGE OF CABINET BEYOND
CUT-OUT FOR POWER TO EQUIPMENT PROVIDED. PROVIDE REMOVABLE PANEL AS REQUIRED TO ALLOW FOR ACCESS.
CABINET GRADE PLYWOOD FRAMING @ 16" O.C.
CUT-OUT FOR POWER TO EQUIPMENT CABINET GRADE PROVIDED. PROVIDE PLYWOOD FRAMING REMOVABLE @ 16" O.C. PANEL AS REQUIRED TO ALLOW FOR ACCESS. (2) LAYERS 3/4" F.R.T. CABINET GRADE PLYWOOD
F
1/2" = 1'-0"
CONCEALED STEEL COUN AT 4'-0" MAX O.C.
CONCEALED STEEL COUNTER SUPPORTS AT 4'-0" MAX O.C. 1/2" SOLID WOOD EDGE AT INSIDE EDGE OF WORK SURFACE - TO MATCH WOOD VENEER
WOOD VENEER ON 3/4" MDF SUBSTRATE WITH SOLID WOOD EDGES. VENEER TO EXTEND OVER SOLID WOOD
3' - 0"
A631
ELEVATION - RECE
ELEVATION - RECEPTION DESK - INTERIOR SOUT
J
G
2" 1'-2 1/4"
K12
2" 1'-2 1/4"
1/2" = 1'-0"
CUT-OUT FOR POWER TO EQUIPMENT PROVIDED. PROVIDE WOOD VENEER ON 3/4" REMOVABLE PANEL MDF SUBSTRATE WITH AS SOLID WOOD REQUIRED TOEDGES. ALLOW VENEER TO EXTEND FOR ACCESS. OVER SOLID WOOD
L3
2"
ELEVATION - RECEPTION DESK - INTERIOR WEST
ELEVATION - RECEPTION DESK - INTERIOR WEST
H
1'-6"
1/2" = 1'-0"
2"
WOOD VENEER ON 3/4" MDF SUBSTRATE WITH SOLID WOOD EDGES. VENEER TO EXTEND OVER SOLID WOOD
L3
L3
ELEVATION - RECEPTION DESK L3- INTERIOR WEST K1
WD1
2" 1'-2 1/4"
L3
2'-5"
1'-3" L
4"
2 1/2"
9
6 3/4"
1' - 9 1/4"
10
3"
11
12
PAINTED WOOD BASE
13
14
NLP 15
042
NLP
P
N
C
SECURITY
DESK
BHDP / CINCINNATI / 2019 - 2020 A RENOVATION PROJECT FOR PNC’S CINCINNATI CORPORATE BUILDING
043
NLP
Renderings were the most useful tool in this project. PNC bank wanted to incorporate a new updated security desk to their main lobby so that someone could see who was entering and exiting the building. They were struggling to visualize what someone sitting at this new desk would be able to see based on different design options. We were able to pull quick renderings that helped them visualize their new desk and what it would look like, as well as being able to understand how it would function for security staff.
044
NLP
B
D C C
18'-0" COLUMN
VIEW C: VIEW OF ENTRY FROM DESK 6
VIEW D: VIEW OF LOBB
5
7
6
5
VIEW D: VIEWAOF LOBBY FROM DESK 18'-0" COLUMN
VIEW B: BRANCH ENTRY PNC 5TH & MAIN SECURITY DESK
B
OPTION 2
B
D C C
18'-0" COLUMN
7
6
0 4ENT 5 VIEW C: VIEW OF NLP 5
046
NLP
B A T H R O O M
R E N O VAT I O N
PERSONAL / SUMMER 2020 THE INTERIOR RENOVATION FOR A FRIEND
047
NLP
The 1950s built country home was perfect for my newlywed friends but they weren’t sure that that bathroom and laundry space were built to suit their needs. The bathroom that came with the house was entirely too small, and the laundry room was oversized. The client wanted a solution that would give them a walkin closet off the master suite, a double vanity, a stand alone tub, and a full sized walk in shower. They also wanted to keep an area to store their linens.
048
NLP
049
NLP
050
NLP
After meeting with the client multiple times to get a full understanding of what they needed to make the bathroom serve all of their needs while also giving space back to the master suite, I came up with a solution to demo the demising wall between the small bathroom and oversized laundry room, and then the wall between the master bedroom and the laundry room. We also decided to remove the diagonal wall to square off the entry into the bathroom which would also give space back to each of the rooms, and remove the awkward vestibule at the bathroom and bedroom doors. The final solution created a long and narrow bathroom, but still met all of the client’s needs. It provided a space for their washer and dryer machine, storage for their linens, a double vanity, a full sized tub and walk-in shower, as well as a walk-in closet for the Master Bedroom
051
NLP
052
NLP
053
NLP
0054
NLP
T
H
E
K
N
O
T
DAAP / STUDIO / SPRING 2020 ARCHITECTURE AS A BOUNDARY
0055
NLP
0056
NLP
0057
NLP
Given the challenge of thinking of what a border between two countries is and how architecture can be used to portray the relationship between two countries, we were to develop a border crossing station between two countries who did not have free travel across their borders. I chose the location of the Amur river between Heihe, China and Blagoveshchensk, Russia. I wanted to celebrate the new friendship that had formed between these two countries.
0058
NLP
0059
NLP
060
NLP
061
NLP
062
NLP
T
E
C
T
O
N
I
C
S
DAAP / STUDIO / SUMMER 2017 THE SCIENCE OR ART OF CONSTRUCTION
063
NLP
Tectonics is the art of construction and how it can be used as a basis for design. I began by looking at how columns and beams come together and what that joint then means to architecture. I developed a motif that can be see throughout my tectonic system. These joints also begin to create portals of space as you move through the promenade that was developed by my tectonic system.
064
NLP
065
NLP
066
NLP
067
NLP
As we progressed in developing our tectonic systems, we were then challenged to develop these into an enclosed space that still spoke to the languages of our tectonic systems. My program was to develop a visitor center for Trammel Fossil Park, located in Sharonville, Ohio. I understood that learning about this site and the fossils found on it as being the most important aspect of this project. I wanted to create a gallery in the visitor center that allowed you to look out over the hillside as you were learning about it.
068
NLP
069
NLP
070
NLP
071
NLP
NLP
NICOLE LAUREN POWERS
PROFESSIONAL EXPERIENCE
Nicolepowers16@gmail.com | 937.213.0214 | Cincinnati, OH
MOODY NOLAN ARCHITECTS Project Coordinator II | 3D Specialist | BIM Specialist BIM
●
Integrated Enscape into the project team workflow: ○ ○ ○
● ● ● ●
01.2021-PRESENT
Securing Moody Nolan as the “Gold Standard” Architect of Record with the Cincinnati Office’s main client. Allowing clients to make quicker turn-around on decisions between design options. Enabling the team to see and resolve Design Details during production, reducing the number of RFI’s during construction.
Creating Revit Tutorials for new hires leading to new hires being able to produce within Revit in 1-2 weeks. Manage BIM Library and Families: Responsible for building, finding and vetting our families to use within the firm and our project team. Designated BIM360 Admin for project team: Coordinated model sharing between multiple discipline models. Troubleshoot Revit issues and acted as Revit liaison for the Cincinnati office.
Architectural ● ●
● ● ● ●
Facilitate Roll-out effort that includes 25+ Retail Bank Branches that accounted for 5% of total firm revenue. Organize and delegate weekly project objectives for direct reports resulting in the completion of high quality contract documents meeting project deadlines 100% of the time. Coordinating project timelines and deliverables with multiple disciplines to ensure we were meeting deadlines. Utilized Bluebeam to issue redlines and QC/QA checklists with direct reports. Oversaw projects from Design Development through Construction Including the review of submittals and shop drawings, answering RFIs, and conducting punch lists to ensure we were meeting client’s expectations. Project Lead for retro-fitting Bank Prototype into Existing buildings through Design Exercises that resulted in the client trusting us with all Test Fit exercises for assigned Interior Renovation projects.
BHDP Architecture Architectural Project Coordinator I BIM
● ● ● ●
09.2019-01.2021
Designated Team BIM360 Admin: Oversaw transfer of models to consultants. Implemented and adhered to Firm’s BIM and Document standards. Creating accurate and detailed models to allow the team to efficiently meet deadlines. Designated team go-to for troubleshooting Revit issues and work-arounds.
Architectural ● ● ●
Experience with Workplace, Retail, and Industrial project types for Multiple Fortune 50 Companies. Facilitated quality of construction documents to meet deadlines 100% of the time. Oversaw the submission of High quality contract documents for permitting.
Works Progress Architecture Architectural Intern ●
● ● ●
Produced Construction Documents for multiple projects types including Affordable housing, High-rise residential, and Mixed-use projects within the Pacific Northwest area. Utilized Sketchup and Revit to generate models for Construction documents, permits, and proposals. Assisted Marketing Department with creating marketing portfolio templates and presentation templates Created and managed an Entourage asset library to make the production of renderings more efficient.
Studios Architecture Architectural Intern ● ●
08.2017-12.0217
Worked on a Hi-rise Student living project for UCLA through Schematic and Design Development. Collaborated with the Interior Design Team to prepare client presentation documents for SFMOMA’s Cafe Redesign.
SCB | Solomon Cordwell Buenz Architectural Intern ● ●
05.2018-08.2018
01.2017 - 05.2017
Worked on a Hi-rise residential and mixed use project in Oakland, CA Worked within Revit to develop construction documents from Schematic through Construction documentation.
TECHNICAL SKILLS
TOOLS: Revit, BIM 360/Autodesk Construction Cloud, Enscape, AutoDesk Recap, DiRoots, Dynamo, PyRevit, Rhino, Grasshopper, Sketchup, Unreal Engine, Autocad, Bluebeam, Smartsheet, Adobe Creative Suite, Microsoft Office, Avail For Revit.
EDUCATION University of Cincinnati | College of Design, Architecture, Art & Planning Bachelors of Science of Architecture