Portfolio | Nidal Abutarbush | Architect

Page 1

PORTFOLIO Nidal Abutarbush

Architect


PROFESSIONAL ARCHITECTURAL DESIGN Marsa Zayed Development Jordan 2011


PROFESSIONAL ARCHITECTURAL DESIGN Mina Zayed Waterfront UAE 2010


PROFESSIONAL ARCHITECTURAL DESIGN Rawashdeh Residence Jordan 2013

115.5 114.70

111.15

0.40

0.65

111.15

0.65

111.15

108.95 108.2

108.10 0.35

0.60

0.70

107.5

2.75

2.90

Car Parking

2.80

2.80

2.25

0.55

106.5

2.75

0.60

107.5

0.60

3.00

3.00

3.00

109.7

Dining

107.5

Master Suite

104.85

104.70

2.85

104.10

Kitchen

101.40

101.23

115.50 114.70

114.70 07 09

06

05

06

05 04 03

111.15

111.15

03

04

01 02

02 01

FFC

+109.70 34 32

04

02

108.20 107.50

27 26

GL - 01

25 24

23

22 20

21

ST - 02

19

104.85

17

104.85

16 15

FFC

14 13 12

11

10 08

05

03 01

GL - 01

04

05

03

04 02

FFC

07 06

09 07

06

03

29

28

18

05

108.95

33 31

30

06

02 01

+101.40

+101.40

+101.40

+101.10

+101.40

01


PROFESSIONAL ARCHITECTURAL DESIGN Rawashdeh Residence Jordan 2013 12

13

14

5.50

15

5.00

16

4.65

17

7.95

4.10

18

19 20

3.90

2.95

12

1.15

13

14

5.50

15

5.00

16

4.65

7.95

17 4.10

18

19 20

3.90

2.95

1.15

107.5 C A-212

D A-212

C A-212

111.15

A Bedroom

B A-211

3.85

3.85

2.37

B

A1

3.85

A 2.37

A

B

2.37

2.37 3.85

B A-211 A1

Shower

A1

A1 Fireplace

D A-212

FFL 104.5 proposed

A

Dressing

B

B

111.15

112.30

3.20

3.20 3.25

3.20

3.20 3.25

Toilet

Living

Kitchen

Bedroom

C

D

E

E

F

F

G

G

C

111.15

3.25

C

D

3.25

C

111.15

Fill

D.T.

Boiler

pump

4.45 3.25

kitchen

3.25

3.25

Fireplace

Office

G1

G1

0.55

Living Room

0.55

Courtyard 0.55

3.25

0.55

G1

F

D.T.

Boiler

G

E

Gas Cylinders

F pump

4.45

3.15

3.15

Fill Gas Cylinders

3.15

E

D

3.15

4.45

4.45

D

G G1

1.52

3.15

H H1 H2

1.37

H3

H3

5.30

H2

0.75 0.83

A A-211

H H1

H3

Maid

0.75 0.83

H H1 H2

1.37 Guest

5.30

11

Dining

H3

G2

10

20

Laundry

0.75 0.83

1

0.75 0.83

H2

Pavement Level

G2

5.30

A A-211 H1

1.52

3.15

1.52

G2

H

5.30

3.15

3.15

1.52

Shower

Pavement Level

G2

Dining

I

J

K

K

I1

5.50

I2 Guest

I

I1

2.14

I2

I2

5.50

I

J

0.35

I1

2.14

I2

5.50

5.50

2.15

I1

2.15

0.41

0.35

I

0.41

Store

Toilet

Clinic/Office

1.70

1.70

1.70

Guest Toilet Pavement Level

K

J 1.70

J

Pavement Level

K

Pavement Level

1.70

01

3.15

02

4.11

7.09

03

04

4.10

5.70

05

2.90

06

2.85

07

08

2.45

09

3.45

10

1.70

11

01

3.15

02

4.11

7.09

03

4.10

04

5.70

05

06

2.90

07

2.85

08

2.45

09

3.45

10

11

Level 03 Plan

Level 00 Plan GRAVEL 2CM CONCRETE SCREED 2MM WATERPROOFING FOAM CONCRETE SLOPE TO DRAIN 35CM RFC SLAB

12

13

14

15

5.00

4.65

16

17

7.95

4.10

18

19 20

3.90

2.95

1.15

1 3

10%

C A-212 Fill

FFL 106.5 4

21%

7

10%

D A-212

0.35

107.5

106.0

104.15 103.65

0.60

0.25

5.50

A

FFC

A 15

Store Laundry

22

Guest Toliet

105.4

3.85

3.85

2.37

2.37

1

103.65 B A-211

A1

16

Kitchen

A1

FFL 107.5 Shower

Dirty Kitchen

Guest Bedroom

Toilet Maid

B

B

Dressing Fill

107.5

Bedroom/Sitting Area

3.25

Dining

C

Toilet

Living Room

Bedroom 3.25

Fireplace

Guest

Tub Shower

4.45

D

4.45

D

E

104.85

3.15

2

3.15

104.85

0.25

1

E

2-3CM TILING 2-3CM CEMENT MORTAR 20CM FILL 35CM RFC SLAB ON GRADE

2.75

107.5

104.15

102.9

2.75

107.5

3.20

3.20

104.15 or 103.65

C

4

I2

I2

0.60 3.15

3.15

1.37

5.30

0.75 0.83

DOUBLE GLAZED ALUMINUM WINDOW

I

I1

2.14

2.15

I1

5.50

H H1 H2

H3

0.41

H3

0.35

5.30

H2

5.50

H1

0.75 0.83

H

ROLLER SHUTTER

G2 A A-211

I

0.35

3.25 0.55 Pavement Level

G2

FFC

G G1

1.52

3.15

1.52

G1

3.15

G

0.55

3.25

F

7.10

3

F

1.70

J 1.70

J Pavement Level

K

10

11

Level 01 Plan

Wall Section

0.25

GRAVEL 2CM CONCRETE SCREED 2MM WATERPROOFING FOAM CONCRETE SLOPE TO DRAIN 35CM RFC SLAB

FFC

0.35

09

3.45

ROLLER SHUTTER OUBLE GLAZED ALUMINUM WINDOW

2.75

08

2.45

2-3CM TILING 2-3CM CEMENT MORTAR 20CM FILL 35CM RFC SLAB ON GRADE

104.85

0.25

07

2.85

0.35

06

2.90

2.85

05

5.70

0.25

04

4.10

2-3CM TILING 2-3CM CEMENT MORTAR 20CM FILL 15CM RFC SLAB ON GRADE WATERPROOFING 10CM PLAIN CONCRETE 15CM RUBBLE STONE COMPACTED EARTH

101.40

0.15

03

7.09

0.60

02

4.11

2.75

01

3.15

101.10

0.15

101.10

Pavement Level 1.70

0.25

K

Level 02 Plan

Wall Section


PROFESSIONAL ARCHITECTURAL DESIGN Union Bank, Irbid Branch Jordan 2009

Cafe

Offices

Open to Above Lobby

Offices

Open to Below

Exchange

Branch

Level 00 Plan

Offices

Offices

Rateb Batineh Street

Dealing Room

Level 02 Plan

Rateb Batineh Street

Rateb Batineh Street

Branch

Level 01 Plan


PROFESSIONAL ARCHITECTURAL DESIGN Residence Jordan 2009

+100.90

+100.90

+101.20

+101.20

Master Bedroom 4.75 x 4.00 m Terrace

Living Room 4.25 x 6.85 m

Kitchen & Breakfast Area 5.90 x 5.65

Master Bedroom 4.75 x 4.00 m

Toilet 2.50 x 2.30 m +98.25

+98.25

Toilet 2.50 x 2.30 m Bedroom 4.15 x 4.00 m Master Bedroom 5.25 x 3.80 m Reciption & Dining 5.55 x 10.70 m

+100.50

Dressing Room 2.20 x 1.70 m

+100.90 +100.90

+104.65

+100.50

Living Room 4.80 x 5.30 m

Toilet 3.00 x 1.70 m

Toilet 2.50 x 2.30 m

Toilet 2.50 x 1.90 m

+101.20

Bedroom 4.15 x 4.00 m

Master Bedroom 3.55 x 3.25 m Guests' Toilet 2.30 x 2.00 m

Terrace

+101.20

+101.20

+100.00

+100.00


PROFESSIONAL ARCHITECTURAL DESIGN Roof Top Jordan 2010


INTERIOR FIT OUT AND SUPERVISION Union Bank Branches and Headquarters Jordan 2008-2011

D03

Toilet F GR 107

Toilet M GR 107

Safe Room GR 105

Server Room GR 106

Storage

Safe Deposit Boxes GR 104

Brinks Park

Filling

D03 D04

Security Counter

Operation GR 103

Lobby

Safe

Auditorium

Operators

+98.00

+97.75

+97.95

D02

D02

D02

D02

Tellers D05 D03

D05

+97.95

D01 E-banking GR 102

Customer Service GR 102

+97.50

D A-005

C FFL Existing Lobby Level

00.00

A-005

Lounge GR 102

ATM Room GR 101

Waiting Area

+97.80

FFL +0.16 +00.15

D02

D02 Branch Manager GR 102

2ed Management Offices 6.40 x 4.90

Meet & Greet GR 102

FFL +0.50 ( Ceramic) FFL +0.16

Server Room 8.00 x 6.80

FFL +0.16

Waiting Area

FFL +0.50 ( Ceramic)

FFL +0.50 ( Raised Floor)

Office

FFL +0.16

A A-003

+97.50

Support Dept.

IT Governors

3.95 x 5.95

3.95 x 5.95

Reception/Secretary

+00.15

Dev. Department 7.95 x 5.95

Operators Test Room Printers

Help Desk 5.95 x 2.40

Seniors

D02

6.30 x 4.15

IT Manager Office 7.00 x 4.05

B A-004 FFL +0.50 ( Raised Floor)

Manager Office


CONTSRUCTION DESIGN Queen Alia International Airport Jordan 2014


CONTSRUCTION SITE ENGINEER Public Building Saudi Arabia 2012


STUDENT ARCHITECTURAL DESIGN Wadi Rum Village Relocation Jordan 2007


STUDENT ARCHITECTURAL DESIGN School of Architecture Jordan 2006

Plan Ground Floor

Plan ClassRoom Floor

Plan Design Studios

Plan Design Studios


STUDENT ARCHITECTURAL DESIGN Mixed-Use Building Jordan 2004

shop

shop

shop

shop

shop

resturant

resturant

resturant

resturant

shop

shop

shop

shop

Level 00 Plan

Longitudinal Section

office

office

office

office

office

Levels 04-06 Typical Plan

living room

living room

kitchen

kitchen

living room

kitchen

living room

kitchen

bath

bath

bath

bath

bath

bath

bath

bath

bath

bath

kitchen

kitchen

kitchen

kitchen

kitchen

living room

living room

kitchen

living room

living room

living room

living room

Levels 07-08 Typical Plan

Cross Section


STUDENT ARCHITECTURAL DESIGN House Jordan 2005

master bedroom

guest room and dining

swimming pool area

bedroom sitting area

bedroom

lobby

guest bedroom

kitchen

dining room

livingroom

bedroom

Level 00 Plan

Level 01 Plan


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.