ARCHITECTURAL PORTFOLIO

Page 1

PORTFOLIO NISHIGANDHA SAWANT


NISHIGANDHA SAWANT SOLVING THE PROBLEM FROM IT’S CORE

PERSONAL INFORMATION

HOBB

-CLA -PO -RE -DE

CONTACTS PLOT NO , 164/ SEC. NO. 28 PRADHIKARN NIGDI ,PUNE 410044 nishigandhavijay02@gmail.com

6857996503 8657996503

NISHIGANDHAVIJAY

LANG

-ENG

-MA -HIN -SA

EDUCATION PURSUEING ARCHITRECURE [4 TH YR.] IN S.B. PATIL COLLEGE OF ARCHITECTURE AND DESIGN, PUNE

2012 S.S.C BOARD EXAMS

IES RAJA SHIVAJI VIDYALAYA , DADAR , MUMBAI

2016 DIPLOMA IN CIVIL ENGINEERIN R S D G E COLLEGE OF ENGINEERING , TATHAVDE , PUNE

SOFTWERE

EXP

-3B - COM - WA - EVE


INDEX

BIES

ASICAL DANCING OETRY EADING ECORATION

1. MEMORIAL

GUAGES

GILISH ARATHI NDI ANSKRIT

2. DENTAL HOSPITAL

PERIENCE

BHK INTERIOR -2019 MPOUND WALL DESIGN - 2019 ALL PAINTINGS - 2017 ENT DECORATION-2017

3. OTHER ACDEMICS -COMPITITIONS -BUILDING TECHNOLOGY AND MATERIALS -WORKING DRWAINGS

4.SKILLS MODEL MAKING , SKETCHING , PHOTOGRAPHY


JOURNEY

OF ART & ARCHITECTURE

MEMORIAL : BRIFE IS TO DEIGN A MEMORIAL FOR LE CORBUSIER WHICH REFLECTS THE TRIBUTE TO THE ARCHITECT FOR HIS WORKS IT MUST BE A SPACE TO EXHIBITE HIS ART WORK SITE IS A PART OF LE CORBUSIER’S STUDIO AT CHANDIGHAR

AIM: TO DESIGN A MEMORIAL FOR ARCHITECT LE CORBUSIER IT MUST BE AN EXHIBITION SPACE WHERE HIS ART WORKS ARE TO BE EXHIBITE



PROCESS PROGRAME SPACES

THOUGHT OCCU

AREA SQ.

SECURITY

1

8

ENTERANCE LOBBY

8

30

WAITING AREA

12

50

ADMIN

2

20

STORE MAINTENANCE

1 1

COMMON TOILETS(M/F)

A MEMORIAL FOR AN ARCHITECT SHOULD NOT BE LIMITED TO HIS ART WORK ,IT MUST BE REFLECT HIS JOURNEY OF THE ART WORK

40 40 60

THE AIM IS TO MAKE A STRUCTURE WHICH REFLECTS JOURNEY OF THE ARTCHITECT AS THE ARCHITECT

15

120

PHOTO GALERY

15

120

HIS ARCH WORKS

20

240

LIBRARY

15

150

AUDITORIUM

60

150

CAFÉ WITH SITTING

20

60

WATCH

CONCEPT IS TO REFLECT LIFE JOURNEY OF THE ARCHITECT, AN ARTIST HAS A DIFFERENT JOURNEY WITHIN THEMSELVES

ART GALLERY

A

LE CORBUSIER STARTED AS A FAILURE BUT HE DID’NT STOP THERE HE SUFFERED A LOT THEN HE STARTED WRITING ABOUT ARCHITECTURE AND THEN ONWARD HE GOT LOTS OF WORK TO DO IN HIS CARIER HE DID SO MANY MASTER PIECES BUT STILL FOR AN ARTIST HIS WORK IS NOT ENOUGH LIKE WISE TRIANGLE COVERS LARGER AREA IN LESER PERIMETER THAT SHOWS WORK OF THE ARCHITECT IS MORE BUT THE JOURNEY S LESS I TOOK THE TRIANGLE AS A CORE OF THE STRUCTURE ALONG THAT TRIANGLE SPACES ARE ORIENTED

B

ART SCHOO

C

TRANSITION S

D

AMPHITHEATER

ARCHITECT

CENTRAL CORE TRIANGLE

ORIENTING SPACES ALONG CENTAL AXIS

JOURNEY FROM OUT TO IN

BLOCK M


ZONING EXIBITION SPACE ZONING IS DONE LIKE HIS LIFE i.e. HE BELONGS TO A WATCH MAKING FAMILY SO BASICALLY HE IS AN WATCH MAKER AND HE DID SOME WORK IN THAT AT SCHOOL LEVEL THEN HE WENT TO ART CLASS IN WATCH MAKING SCHOOL WHERE HE LEARN ABOUT ABSTRACT PAINTING THERE IS A TRANSITIONAL SPACE BETWEEN HIS ABSTRACT ART WORK AND ARCHITECTURAL WORK THEN AFTER HE WENT TO ARCHITECTURAL SCHOOL AND HIS ATCHITECTURAL WORKS

OL EXHIBITION

CAFE AMPHI EXHIBITION A/V ROOM

SPACE

TURE

MODEL

SITE ANALYSIS

ENTRY

LIBRARY

RECEPTION

TOILETS

EXHIBITION

WAITING

OFFICE

CONFER -ENCE STORE

CLIMATE: COMPOSITE CLIMATE ZONE WINDS FROM THE S/SW 8KM/H HUMIDITY: 58% THE CLIMATE HERE IS MILD, AND GENERALLY WARM AND TEMPERATE. IN WINTER, THERE IS MUCH MORE RAINFALL IN CHANDIGARH THAN IN SUMMER. THE AVERAGE ANNUAL TEMPERATURE IN CHANDIGARH IS 24.1 째C. PRECIPITATION HERE AVERAGES 979 MM. PRECIPITATION IS THE LOWEST IN APRIL, WITH AN AVERAGE OF 7 MM. MOST PRECIPITATION FALLS IN JULY, WITH AN AVERAGE OF 280 MM. AT AN AVERAGE TEMPERATURE OF 33.2 째C, JUNE IS THE HOTTEST MONTH OF THE YEAR. IN JANUARY, THE AVERAGE TEMPERATURE IS 13.5 째C. IT IS THE LOWEST AVERAGE TEMPERATURE OF THE WHOLE YEAR. BETWEEN THE DRIEST AND WETTEST MONTHS, THE DIFFERENCE IN PRECIPITATION IS 273 MM. THE AVERAGE TEMPERATURES VARY DURING THE YEAR BY 19 .7 째C.


A'

A'

9

B 22

9

B

3000MM 450MM

8

21

450MM

8 450MM 1500MM

RY

3000MM

RA

LIB

7 450MM

7

13 450MM

13

450MM

6

11

450MM

450MM

12

11 12

6

1500MM

5

5

450MM

10 450MM

450MM

10

450MM

450MM

450MM 450MM

B'

450MM

B'

1

2

450MM

2

3

450MM

450MM

15 16

16 19

17

14

15

14

20

450MM

4

20

450MM

4

3

19 17

18

18

N

N

A

A

GROUND FLOOR PLAN

DRAWINGS:

FIRST FLOOR PLAN 1.ENTRY 2.RECEPTION 3.WAITING 4.TOILETS 5.COURT YARD 6.A/V ROOM 7.WATCH GALLERY 8.ABSTRACT ART GALLERY 9. TRANSITION SPACE. 10.ARCHITECTURAL GALLERY 11. PAINTINGS

00

00

00 00 00 00

00

00 00 00

00 00

00

12.LIBRARY 13.CENTRAL CORE 14.WAITING FOR OFFICE 15.OFFICE 16.MANNEGER CABIN 17.PANTRY 18.SERVICE COURT YARDS 19.STORE ROOM 20. CONFERENCE 21.AMPHITHEATER 11. CAFE


EXPLODED VIEW A'

6000MM

B

3000MM

3000MM

3000MM

3000MM

B'

N

3000MM

A

ROOF PLAN

00

00

00 00

00

00

00


SOUTH ELEVATION BOTH THE ELEVATION ALONG THE CENTRAL AXIS REFLECTS THE NATURE OF THE ARTIST i.e. SOLID TO POROUS .

ENTRANCE


TANSITION SPACE TRANSITION SPACE IS THE SPACE BTEWEEN ABSTARCT ART GALLERY AND ARCHITECTURAL GALLERY IT IS THE TURNING POINT OF LECOURBUSIER FROM ARTIST TO ARCHITECT

NORTH ELEVATION


DENTAL HOSPITAL DESIGN BRIEF: DESIN A DENTAL HOSPITAL IN RAVET, PUNE



PROCESS: SITE ANALYSIS

CONCEPT:

-LOCATION : RAVET , PUNE -CLIMATE ZONE : MODERATE -WIND : WIND FLOWS FROM SW/NE -AVG. RAINFALL : 401mm -HIGH TEMP : 32 degree -LOW TEMP : 8 degree

- THE DESIGN PROBLEM IS TO DESIGN MAIN THING IS TO CALM DOWN THE PA AS WELL AS BY FEELING

-SITE IS LOCATED IN RAVET, PUNE NEAR TO RAVET BASKET BRIDGE AS THE SITE IS IN MIDDLE AREA OF RAVET IT CAN BE EASLY ACCESIBLE BY HIGH WAY

- KEPT THESE POINT IN MIND I DESIGN FACING TOWADS RIVER , SO THAT PA WILL GO AT THE REVER AND NOT ON T

- AT THE BACK SIDE OF THE SITE THAT IS SOUTHERN SIDE IS OPEN TO PAVANA RIVER WHICH IS THE MAIN RIVER IN PCMC AND IT HAS FULLY WATERED THROUGHOUT YEAR. -SITE IS BLESSED WITH THE RIVER AND THE MOST IMPORTANT WIND , AS THE SITE OPENS UP MAXIMUM TO THE RIVER THE WIND IS COMING FROM ALL THE SOUTHERN SIDE. -SITE PARAMETERS -SITE IS EASY TO ACCESS -VIEW OF PAVANA RIVER

- AND THE WING COMMING FROM THE BY CREATING SPACE BETWEEN ADJE ROTATING PAPER FAN

- CENTRAL COURTYARD IS GIVEN OPPO DIRECTION SO THAT USED AIR WILL GE

PROGRAME: REQUREMENTS: PARKING FOUR WHEELER TOW WHEELER CYCLE RECEPTION TOILETS WAITING CONSULTATION ROOM DOCTORS ROOM STERALIZATION ROOM X- RAY TREATMENT ROOM CONFERENCE CAFE


FORM EVOLUTION:

N A DENTAL HOSPITAL. PATIENTS VISUALY , HOT WIND

NED ALL THE OPDS ATIENT S FOCOUS THE DENTAL CHAIR

SOUTH IS COLLECTED ECENT OPD’S LIKE A

OSITE TO THE WIND ET OUT EASILY

ADMIN BLOCK

NO.s

AREA IN SQM

10 30 45

OPD’S

1

15

1 1 5 1 1 1 1

100 35 175 20 20 60 30

COOL WIND

OPD


D R A W I N G S

GROUND FLOOR PLAN

SOUTH ELEVATION


ROOF PLAN

FIRSTFLOOR PLAN

SECTION B-B’

SECTION A-A’


VIEWS

CENTRAL COURT YARD AT OPD’S ENTRANCE

WAITING ARE

ENTRANCE


EA

E


COMPETITION Sculpting the pioneers of Architecture is an International Design competition that gives one the opportunity to reflect on the design philosophy of the chosen Architect. Globally acclaimed architects with variety in style and cultural background have been selected to give broader perspective to this competition.



BUILDING THECHNOLIGY


Y AND MATERIALS


BTM



WORKING DRAWINGS



SKETCHES



MODEL MAKING



PHOTOGRAPHY


Y


|THANK YOU |


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.