Portfolio_Nitish_Bhat

Page 1

NITISH BHAT

ARCHITECTURAL PORTFOLIO 2013-2017


Resume

Nitish Bhat 746 Eastgate Ave, Apt 3N, University City, MO - 63130 +1 314-250-7651 nitishbhat@gmail.com

Professional Registration: AIA Associate, 2018: 38790263 Council of Architecture since July 2014. Registration No: CA/2014/63680

Technical Skills Autocad | Revit | Formit Sketchup | Rhinoceros | Adobe CC Lumion | V-Ray | Maxwell MIcrosoft Office | Wufi-Passive | GIS 3D Printing | Cura | Ideamaker

Core Skills Graphic Design Photography

Education and Honors: Washington University In St.Louis | 2015 - 2017 - Master of Architecture (M.Arch 2+) - Solar Decathlon 2017, Second place for Architecture - First place: Washington university Patent Challenge 2017 - Leading role on executive board for UMANG | 2015 - 2017 BVB college of engineering and technology | 2008 - 2013 - Bachelor of Architecture - Pidilite award for design excellence 2012 - Shortlisted at Annual NASA Design Competition (ANDC 2009) - First prize for inter-college ad making competition

Experience: Creative Exchange Lab, St Louis +1 408 209 9252

|

ja@creativeexchangelab.com

- Designer (April 2018 - Current) - HSSU Masterplan. - East St Louis Art and Cultural District. Part of NEA ‘Our Town’ grant. - Organized symposium on ‘Divided Cities’.

Olin Library, Washington University, St Louis +1 314 935 4137

|

gail.walters@wustl.edu

References

- Peer leader at the ARC (Jan 2016 - Dec 2017) - Organized and conducted free Adobe creative suite workshops. - Video creation and editing projects. - Graphic design projects for the library.

Jasmin Aber. RA. RIBA i&ii Creative Exchange Lab (CEL)

Fluid space architects and space planners, Bangalore.

Sketching

(Executive Director & Co-founder)

+91 80 2657 3789 |

Relationship: Supervisor Email: ja@creativeexchangelab.com

- Junior Architect (Aug 2014 – Feb 2015) - Worked on CDs and specifications - Documentation of built project for competition entry - Worked on 90 unit apartment building

Kathryn Dean. AIA FAAR Washington University in St Louis

fluidspacearchitects@gmail.com

(JoAnne Stolarof Cotsen Professor of Architecture) Relationship: Professor / Mentor Email: kathryn@dean-wolf.com

V.K.Thaygarajan and associates, Bangalore.

Robert McCarter. M.Arch Washington University in St Louis (Ruth and Norman Moore Professor of Architecture)

- Junior Architect (Dec 2013 – May 2014) - Worked with senior architect on mass housing project. - Designed a community center for mass housing complex.

Relationship: Professor / Mentor Email: rmccarter@wustl.edu

Hegde and Hegde architects, Bengaluru.

Additional Information Website: nitishbhat.wixsite.com/portfolio Linked-In: linkedin.com/in/nitish-bhat Photography on 500px: 500px.com/nitishbhat

+91 80 41122722 | info@vkts.in

+91 80 26721672

|

hegdearchitects@gmail.com

- Freelance work on Farmhouse project (Jul – Nov 2013) - Visualization and presentation work for various projects.

Ojas Hirani Architects and Engineers, Ahmedabad. +91 79 40032591 | ojashirani@hotmail.com

- Architectural Internship (Jan – Jun 2013) - Research and conceptual design for Buddhist Tourist Destination - Corresponded with client and site supervision for hostel project


Fall 2017 | Degree Project

In-Between Spaces Spring 2017 | Design Studio

Earth-Work and Sky-Spaces 21 | Fall 2016 | Design Studio | Design-Build

Solar Decathlon: The Crete House Professional Work Sketches Photography

On textures and patina: Architecture that celebrates patina never has to worry about weathering. For it, time is an ally and it only grows more beautiful with age. The textures of natural materials, celebrated through simple yet precise design is something that I find fascination.


View from Grand Center looking South


Fall 2017 | Degree Project Professor: Kathryn Dean

In-Between Spaces

Grand Center Music Conservatory and Powell Hall Expansion

Revit | Autocad | Rhino | Cura Photoshop | Illustrator

Located in a once culturally rich and dense urban context, the conservatory aims to bring back some of the vibrant street life by reconfiguring the public space around it. The scope of the project includes a new music conservatory, an expansion of the historic Powell hall (home to the St. Louis symphony) and a cafĂŠ that would serve the public, students and patrons of the symphony. The core idea behind the project being that new construction, especially institutional projects in an urban context has the potential to have a positive influence on the street life in the way it handles its non-programmatic areas. These leftover spaces, created either intentionally or unintentionally can have a significant effect on how one perceives the urban context. Here, the leftover space in between the two main programs creates an opportunity for the institute to have a meaningful interaction with the public in the form of the alley plaza and cafĂŠ.

A

B

A

B

A

B

C

A

B

A

B


View from Grand Center looking East



Leftover (effect)

Co ns tra in ts

Program (Cause)

Conceptual sketches

City owned (public)

The leftover space can be formed as a consequence of site, form, function or other constraints like building code.

The volume of the project takes cues from its context to create intimate in-between spaces that are of a human scale, hence allowing for various public activities to take place. Drawing in the public into the inbetween spaces through the carved-out frontage is the new café and courtyard in the heart of the project. This, in conjuncture with the Main lobby area that spills into the in-between space and the patio that communicates with the street help in creating a volume that engages its urban context. The facade is designed to act as a monolithic neutral backdrop for such social interactions, while providing the necessary privacy and sound insulation needed to study music.

The form finding exercise went through several iterations, while always keeping the “In-Between space” at the heart of the project.


Structural strategy: The large cantilever over the lobby is achieved with structural concrete shear walls acting as massive beams.

Connectivity: The symphony hall at Powell and the Recital hall at the conservatory are connected thematically and physically by the new entrance plaza, emphasized by the cantilevered form.

Structural strategy II: The rest of the building follows a regular grid that is dictated by the site context.

In-Between space: The alley plaza flows through the project to direct the public towards the cafe court for three sides.

Program: The public programs such as cafe and recital halls are located on the street level, while the conservatory sits above it.

Massing: The massing of the conservatory is designed to wind its way through the site, slowly transitioning into the Powell hall expansion, where it gently attaches itself to the back wall of the symphony hall.


Practice Room

Orchestra Practice Room Patio

Digital Studio

Office Entrance Lobby

Office

Office

Office

Cafe Mezzanine

Recital Room Backstage

Parking Parking

Section A-A

South Elevation

(Right) View of the cafe courtyard and plaza which would be used by the patrons of the symphony, cafe and the conservatory. This plaza also serves as the city’s gateway to the annual Circus Flora that takes place in the grounds beyond.

West Elevation


First floor plan

Third floor plan

Isometric section: Since the majority of the structure is made of exposed concrete, the acoustic spaces such as the practice rooms and recital hall are treated with acoustically insulated boxes. The skylights above the practice rooms not only provide light, but the non-parallel surfaces also help diffuse sound. The building uses a combination of radiant heating system and a low velocity high volume cooling system to regulate internal comfort levels.


View inside the “In-Between space” looking out towards the city.


View of the Cafe Courtyard


View from Grand Blvd

View Main lobby bottom looking west.


View of the student lounge and porch.


View of the museum addition with parts of Utzon’s design in view.


Spring 2017 | Design Studio Professor: Robert McCarter

Earth-Work and Sky-Spaces

An addition for Jorn Utzon’s unbuilt Asger Jorn Museum

Autocad | Rhino | Sketchup | Maxwell | Photoshop | Illustrator The scaled physical model of Utzon’s unbuilt museum in this project was a group effort

Following the footsteps of the great Jorn Utzon, this project explores ways to expand the gallery spaces of Utzon’s unbuilt design for the Asger Jorn museum at Silkeborg, Denmark. The project calls for an addition of 750 sqm of gallery spaces and library. Since Utzon’s museum is predominantly underground, with conical skylights illumination its shell-like interiors, the addition had to be located north of it, so that it does not cast a shadow on the skylights. A conscious decision was also made to make the addition entirely above ground, so as to not compete with Utzon’s work. Since Utzon’s museum was never built, a detailed sectional model was built using Utzon’s hand drawings. The site model was built as a group at 1/8th scale and used as the basis for our individual designs.


10x10x10 meter cube: In order to explore design possibilities, a sub-project was done. The imaginary cubic space is suspended 3m above ground, and was to house 12 selected works of the situationist lists art group, COBRA. In the study, I explored various ways to introduce diffused natural light into the museum without letting direct views to the outside or harsh glare from the sunlight. Thus, I ended up with the curved skylight devices that would drive the design of my final project.

C

B

C

B

C

B

3

A

A

A

2

1

Plan At LevelPlan 1 at Level 1

Plan At Level Plan2at Level 2

Plan At Level 3 at Level 3 Plan


Initial 2 week long sketch project helped me understand the light quality in my design.

3

3

2

2

1

1

Section A-ASection A-A

Section B-BSection B-B

Section C-C Section C-C


Conceptual sketches

The design process on this project was all about exploring ways of manipulating natural light similar to how Utzon’s shells did the same. Drawing from the ideas explored during the 10X10X10m cube exercise, a giant version of the light catching device is at the heart of the design, which catches the low Danish sun and diffuses it to the galleries below. The final design is a series of linear winding galleries which transition from the horizontal earth space to the vertical Sky space, while being anchored to the curved concrete wall. Hence, the addition becomes an inversion of Utzon’s strategy, which was winding galleries that transition from the sky to the ground. Section through both vertical and horizontal space.


The horizontal gallery offers views towards Utzon’s museum as well as the surrounding landscape, whereas, the vertical galleries are designed to block direct views to the outside.

View from the horizontal gallery to the vertical.


Sectional model of Utzon’s design


Dismantled physical model

Section model through Utzon’s Design


View of the museum expansion from Utzon’s cafe area

View of the vertical space from the second level gallery


View inside the horizontal gallery

View of vertical gallery behind the curved wall


View of the Porch/Deck area


Fall 2016 | Design Build Professor: Pablo Moyano and Ryan Abendroth

Solar Decathlon: The Crete House International Design-Build competition for solar houses

Revit | Autocad | Sketchup | Vray Photoshop | Illustrator This project was a collaborative effort as part of the WashU team. All drawings, renderings and photographs presented here where made by Nitish Bhat

The “Crete House” as it was called, was a one of a kind Solar Decathlon entry for its innovative use of pre-cast concrete as its primary building material. The 900sqft solar house was designed and built in St Louis over a period of four academic semesters, then shipped to Colorado in 2017 for the competition. As part of the initial core team, I got to be involved in every step of the design-build process; from schematic design to CDs; from construction to competition. Due to the collaborative nature of the project, Revit was extensively used to produce the 3D models and final CDs. As the name implies, the use of concrete was key to the building’s performance as a passive solar house, by leveraging the thermal mass of concrete to create a flywheel effect, reducing the load on active mechanical systems. The exterior of the pre-cast concrete panels is finished with a 1.5” thin layer for ultra-high-performance concrete called Ductal. This thin layer of concrete is strong enough to protect the insulation behind from weathering and also greatly reduces the weight of the panels, when compared to traditional concrete.


Iterative design process

From the very beginning, the project consisted of a concrete box surrounded by sun shading devices, which went through several iterations. In the end, the vertical gutters with hydroponic system was selected. The vertical

Isometric View

gutters are conceived as strips that are cut and displaces from the concrete box, the voids created as a result become windows. The interior is an open floor plan with the service core acting as the divider between public

and private spaces. The lines from the gutters continue into the house through floor to ceiling windows and run across the floor and ceiling.


View showing the patina of interior concrete walls

D

A

B

D

SITE PLAN

D

Close-up of one of the gutters with hydroponics

C

A

A

B

B

D

FIRST FLOOR PLAN

C


1.

PRECAST CONCRETE FOOTINGS

2.

PRECAST FLOOR PANELS

3.

CORE UNIT

Construction Sequence:

2.

RETE FOOTINGS

1. Precast concrete footing

4.

CORE UNIT

PRECAST WALL PANELS

4. Precast Wall Panels

3.

1.

3.

PRECAST FLOOR PANELS

2.

CORE UNIT PRECAST CONCRETE FOOTINGS

7. Decking and ramp

4.

3. 5.

PRECAST PANELS PRECAST FLOORWALL PANELS

ROOF PANELS COREPRECAST UNIT

6.

5.

PRECAST ROOF

9.

PV

PLANTERS

7.

PLANTERS PRECAST CONCRETE GUTTERS

DECKING, RAMP

3. Core Unit

3.

PRECAST WALL PANELS

8.

DECKING, RAMP

8.

6.

4.

PRECAST CORE UNIT ROOF PANELS

7.

CORE UNI

8. Planters

3. 5.

PRECAST WALL PANELS PRECAST FLOOR PANELS

3.

PRECAST ROOF PANELS PRECAST FLOOR PANELS

5. Precast roof panels

2. 4.

RETE GUTTERS

PLA

2. 5.

PRECAST WALL PANELS PRECAST CONCRETE FOOTINGS

2. Precast floor panels

8.

DECKING, RAMP

1. 4.

CORE UNIT

PRECAST WALL PAN

7.

PRECAST CONCRETE GUTTERS

3.

4.

9.

6. Precast concrete gutters

4.

8.

PV PANELS, FURNITURE, ETC PLANTERS

9. PV panels, furniture, etc

5.

CORE UNIT concrete elements had toPRECAST WALL with PANELS PRECAST ROOF elements PANELS The Precast be designed transportation in mind. These large needed to be shipped on semi trucks from St. Louis to Denver and then shipped back once the competition was done. The above construction sequence helped us plan moving the massive panels and core elements 9. 8. the logistics of 6. 7. and to communicate the assembly PV PANELS, FURNITURE, PLANTERScrew on site. PRECAST CONCRETE GUTTERS DECKING, RAMP ETC process with the construction


Close up of one of the planters/gutters

Wall section shows the composition of sandwich panels


L

L

Final built project Photograph by Nitish Bhat

GENERAL NOTES 1.

K

ALL ELECTRICAL SYSTEM TO COMPLY WITH NEC 2014.

K

M J

4

5

1

6

2

A

CONSULTANTS

BARRY GREENBURG, AIA ARCHITECTURAL DESIGN GUILD E3BLVD. 2710 SUTTON ST. LOUIS, MO- 48 63143 LP1 (P) 314.344.1234 EXTERNAL LIGHTING 2

LP1- 42 HALLW AY OUTLETS

B

STRUCTURAL ENGINEER OF RECORD: Z1 E3

LP1- 35/37 CLOTHES DRYER

Z1 G

MCB

LP1- 6 PV PANEL

GFI

LP1 - 24 LIVING, DINING, KITCHEN LIGHTING

GFI

C

E

LP1- 15 REFRIGERATOR 2

Z7

LP1 - 26 BED, BATH, HALL LIGHTING

Z5

D D GFI

E1

E

LP1 - 48 EXTERNAL LIGHTING 2

F

LP1- 40 LIVING ROOM DINING ROOM OUTLETS

LP1- 32 OUTDOOR OUTLETS

MARK

G LP1- 14 RAIN WATER PUMP

D

DATE

LOT NUMBER:

C

DESCRIPTION

DRAWN BY:

Washington University in St. Louis NB

CHECKED BY:

Checker

COPYRIGHT:

NONE: PROJECT IS PUBLIC DOMAIN

SHEET TITLE

E

ELECTRICAL DISTRIBUTION PLAN

B

11/16/2016 8:14:32 PM

F

1

Z5

U.S. DEPARTMENT OF ENERGY E1 E2 Z2 Z3 SOLAR DECATHLON 2017 LP1 - 24 WWW.SOLARDECATHLON.GOV

LP1 - 50 EXTERNAL LIGHTING 1

LP1- 42 HALLWAY OUTLETS

C

1

Z5

CLIENT

Z2

E2 LP1- 42 BATHROOM OUTLET

B

Z7

Z3

GFI

LP1- 17 REFRIGERATOR 1

Z8

Z7 Z9

R

E

C

Z6

Z8 F

LP1- 8 GARBAGE DISPOSAL

LP1- 36 KITCHEN OUTLET 2

D

Z4 LP1 - 26

DW

GFI

DW R

LP1- 34 BEDROOM OUTLETS

LP1- 19 DISHWASHER LP1- 18/20 OVEN

Z4

TIM MICHELS ENERGY RESOURCES GROUP 6744 OLIVE BLVD. ST. LOUIS, MO 63130 (P) 314.644.0000

LP1- 2/4 SMART LP1- 22 METER RADIANT PUMP LP1- 21 LP1- 11 MECH CLOSET + CLOTHES MONITORING WASHER LP1- 43/45 WATER HEATER

LP1- 39/41 COOK TOP

ROY WALL, PE LP1 - 24 6529 SCANLAN AVE. ST. LOUIS, MO 63139 LIVING, DINING, (P) 314.302.8313 KITCHEN LIGHTING

MECHANICAL CONSULTANT:

LP1- 38 KITCHEN OUTLET 1

LP1- 27/29 AHU

6

ARCHITECT OF RECORD:

GFI

G

5

CONTACT:

H

B

F

4 TEAM WASHU 1 BROOKINGS DRIVE ST. LOUIS, MO 63130

ADDRESS:

LP1- 28 LIFE SAFETY

H

3 TEAM NAME:

LP1- 9 EXTERIOR OUTLET

LP1- 31/33 HVAC CPNDESER

LP1- 5/7 CAR CHARGER

Z8

LP1- 16 SUPPLY/WASTE PUMP

Z8

ELECTRIC METER

3

Z8

2

Z9

1

Z3 Z4

J

ELECTRICAL DISTRIBUTION PLAN 3/8" = 1'-0"

2

3

4

Electrical layout

5

6

7

8

9

10

11

1

1

E111

LIGHTING LAYOUT 1/4" = 1'-0"

12

2

13

3

14

4

Lighting layout

5

6

7

8

9

10


Kitchen area (Day)

Kitchen area (Night)

Porch/Deck area (Night)

Porch/Deck area showing exit ramp

Living/Dinning area



Fall 2014 |

Professional Work Fluidspace Architects

Quasitum Documentation Documentation and presentation of finished project

Autocad | Sketchup | V-Ray Photoshop | Illustrator

Quasitum is a state of the art office building for IT companies, constructed in Bengaluru, India. It was designed to meet high green building standards using concrete and porotherm bricks. The envelope also uses engineered sunshades to cut down on heat gain, while providing sufficient natural lighting to its open floor plates. A year after the project was completed, the firm decided to enter the project in the Wienerberger brick competition. As part of the final presentation, I had to photograph, make diagrams, renderings and 3D models.


Exploded Isometric view showing various building components

Exploded Isometric Sectional view perspective showing various showingbuilding office spaces components



Photograph by Nitish Bhat


North side Elevation

West side Elevation

South side Elevation

East side Elevation



Spring 2014 | Professional Work Hegde and Hegde Architects

Among the Mangoes

Farmhouse project inside mango plantation

Autocad | Sketchup | Lumion Photoshop | Illustrator

The site is located in the middle of a lush mango plantation on the outskirts of Dharwad. The client wanted a panoramic view from above the tree tops from his farm house. Hence, the living spaces are elevated above the treetops on columns, leaving space for parking and auxiliary programs. The form of the building comes from two intersecting triangular tubes. The steep slope of the roof ensures a large usable area in a triangular form, while allowing for a high ceiling which helps keep the room cool. The smaller of the two triangular tubes creates a reading nook on the eastern side, which can be used to watch the sun rise above the canopy. The living room overlooks the pool and the plantation beyond. An open to sky shower area is blended seamlessly with the curvature of the compound wall.


BALCONY

BATHROOM SIT OUT RAMP UP

UTILITY

BEDROOM

PARKING

KITCHEN

ENTRANCE

DINNING WN

DO

GARDEN

(SKYLIGHT ABOVE)

PORCH BA

OW

IND

YW

UP UP

LIVING

BALCONY

DECK

WN

DO

Second floor plan

SWIMMING POOL

DECK

OPEN TO SKY SHOWER

First floor plan

North Elevation

West Elevation


View inside living room looking south

South Elevation

East Elevation



Sketches



Photography


For more information please visit: Website:

nitishbhat.wixsite.com/portfolio LinkedIn:

linkedin.com/in/nitish-bhat Photography on 500px:

500px.com/nitishbhat


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.