Nicholas Wong - CV + Portfolio

Page 1


Curriculum Vitae I’m a tenacious young interior designer with just under five years experience in commercial Interior Design. I’ve worked on large and small projects from initial concept briefing through to documentation and final project delivery. I have experience in workplace, hospitality, residential, retail and maritime design. A key skill of mine is the ability to quickly learn and adapt to different software and technologies, then efficiently teach them to other team members. I’m looking to extend my knowledge of design, software and project management through team work and leadership roles.

Flat 7 Pegasus House Beaumont Square Stepney Green E1 4NB London nicholasjameswong@gmail.com +44 7826 446855 Nationalities: New Zealand & British Qualifications: Bachelor of Design with Honours in Spatial Design Massey University, NZ 2004 – 2008

2012–2008 Planet Design Consultants Ltd 4 Years, 8 Months Role: Interior Designer/CAD Manager Starting as a Graduate Designer, I was involved in high security (top secret clearance) work including initial hard and soft fit out planning, developed design, construction, project delivery and remedial work. My main roll has been split between two areas; firstly, as a designer, my main responsibility was for all 3D modeling and presentation drawings, from quick SketchUp concept models to full presentation renders and graphic design responsibilities. I worked closely with the managing director on the concept design stage, particularly on workplace planning and redefining the notion of the modern office. Upon taking a project from its approved concept I worked as part of project teams in roles from junior designer to project designer, reporting to the design director. From FF&E selection to hard and soft finishes, I focused on finding affordable, effective and environmentally conscious solutions. I’ve been involved in furniture selection and tendering and have an understanding of ergonomics and modern workplace furniture.

To effectively communicate our intent, documentation was a big focus of all work. To streamline this I customised our CAD system and trained everyone to use time saving shortcuts, scripts and automations. I also assumed ownership of file management and reinforced documentation standards. My secondary role was in CAD and technology management, I oversaw maintenance of CAD systems, block libraries, software implementation and technical assistance to designers and directors. Besides architectural technology, I provided advice on all technological matters, from new purchases of hardware and software to smartphone and tablet training. 2012 Cadre Productions 5 Months Role: Digital Asset Manager for documentary ‘Trail Notes’ http://trailnotesfilm.com I assisted the director/editor with software knowledge and advice (Adobe Creative Suite & Final Cut Pro). Additional to technical advice, I participated in critiques of narrative and mood of the edits.


2008 Aesthetics Lighting 1 Month Role: Project Administrator This position began as a relief role on the front desk and coffee machine. I provided project assistance to the lighting consultants with scheduling and product specifications. In the final week I assisted the operations manager with logistics in the warehouse as well as stock taking and providing technical assistance. 2006–2007 Dixon Street Deli 11 Months Role: Front of House Staff This position allowed me hone my hospitality and customer service skills and master the art of making amazing smoothies. 2005 Massey University 1 Month Role: Studio Technician/Designer During the semester break I performed maintenance on studio equipment and designed and fabricated a 3m x 8m hanging divider screen.

Technical Proficiency

References

Highly Proficient:

Proficient:

• • • • • • • • • • • • • •

• • • • • • •

AutoCAD/AutoCAD LT Archicad Vectorworks Sketchup Adobe Photoshop Adobe Illustrator Adobe InDesign Adobe Acrobat Dreamweaver MS Office Suite MS Visio Mac OSX Apple iOS Windows XP & 7

Revit 3DsMax Maxwell V-Ray MS Project Final Cut Pro Wordpress

Paul Belchambers Director Planet Design Consultants paul@planetdesign.co.nz +64 27 249 8008 +64 4 384 7626

Antony Pelosi Spatial Design Programme Director Massey University a.pelosi@massey.ac.nz +64 4 801 2794 ext 63223

Nick Stevenson Founder Cadre Films nick@cadreproductions.com +64 27 696 0236


Exxon Mobil Headquarters Office Building 5

6

HUDDLE

COPY PRINT FAX

COLLABORATION POINT WITH REFRESHMENTS

Port OFFICE

OFFICE

HUDDLE

OFFICE

HUDDLE

Moresby, Papua New Guinea

COPY PRINT FAX

HUDDLE

2012 – Ongoing OFFICE

OFFICE With Planet Design

OFFICE

HUDDLE

Woodhead (base build consultant) KBR (base build consultant) Role: Designer, CAD Management, Document Delivery Control

HUDDLE

7

LARGE CONFERENCE

8

LARGE CONFERENCE

VISITOR OFFICE

In 2011, Exxon Mobil invited Planet Design to bid for a spot on the design team for a new outpost in Port Moresby, Papua New Guinea. After a brief tender period, we were invited to join an internationally based consulting team, leading the workplace design of the main headquarters building. I assumed responsibility for all document management, using my knowledge of AutoCad VISITOR VISITOR VISITOR OFFICE OFFICE to audit andOFFICE automate all incoming CAD files to a format that was specific to the project. As part of my ownership of the drawings, I liaised with CAD managers, designers and other consultants that were part of the Design Team. I concurrently assisted with interiorMEDIUM planning MEDIUM CONFERENCE CONFERENCE with base build under and coordination supervision from the managing director. As I had a high familiarity with the drawings and base building, I could provide insight to the high level briefing from the client.

COPY PRINT FAX

4

As a global company, Exxon Mobil has internationally prescribed workplace standards known as ‘The Metrics’. Using these OFFICE as a guideline, we developed a structured and efficient workplace environment and communicated frequently with the client using HUDDLE clear and accessible block plans. As the individual responsible for the drawing files, I established a 3D model of the OFFICE O&M O&M VISITOR OFFICE HUDDLE OFFICE OFFICE OFFICE building, which I updated throughout the base building process. This allowed me to quickly export wireframe models of the interior as the planning progressed and aided in clarifying the story we were telling. COPY PRINT FAX

3



Initial Block Plans

After Client Feedback

Final Block Plans

Final Concept Plans


With the critical areas already modeled I worked directly with the senior designers and directors to articulate the design in a simple and effective way for the client. By keeping a constantly updated base building model and a library of custom built objects, styles and camera angles, I could efficiently make changes and produce refined visuals with a very quick turn around.

LEFT: THE PLANNING PROCESS An abridged version of the metrics based block planning based on a standardised grid set by egress and day light penetration. We overlaid hard fitout and soft fitout, egress paths and work groups. These plans were simple, concise and colourful, which provided a useful tool for discussions with the client. Gradually more detail was added to plans including glazing, specialist furniture, joinery, doors and glazing. By the final block plans, we had produced full contract drawings. RIGHT: SCHEDULING Exxon Mobil marked a departure from the documentation standards that were utilised by Planet Design. Schedules were to be consolidated in a single key sheet, which referenced all drawings as per the project standard set by the lead consultant. I took responsibility for implementing these new standards and enforcing their use. By linking together the AutoCAD file to a MS Excel file that was accessible by all team members, thus keeping the CAD file clean.

The process of taking drawings from the developed design stage to construction was streamlined through the systems I established, for example, automating formatting of consultant supplied files into our system as we received them, thus ensuring that we were always working on the correct drawing files. With a fully detailed 3D model I assisted the rest of the design team in developing construction details and exploring finishes in three dimensions, and then translating them back to a traditional 2D AutoCad format.


2

3

HUDDLE

COPY PRINT FAX

1

OFFICE

OFFICE

OFFICE

OFFICE

HUDDLE

OFFICE

OFFICE

COPY PRINT FAX

With both clients and consultants based internationally, effective communication between all parties was an integral part of the project. In addition my role as a designer and CAD manager, I was responsible for document control. By establishing clear document transfer register in Microsoft Excel and referencing this against the ‘document deliverables’ list from the project managers, we could efficiently track revisions and drawing issues.

HUDDLE

OFFICE

OFFICE


E

5

6

7

8

9

10

A

OFFICE

MEDIUM CONFERENCE

VISITOR OFFICE

HUDDLE

VISITOR OFFICE

HUDDLE

COPY PRINT FAX

MEDIUM CONFERENCE

OFFICE

B COPY PRINT

C

OFFICE

HUDDLE

D

HUDDLE

VISITOR OFFICE

VISITOR OFFICE

HUDDLE

HUDDLE

OFFICE

OFFICE ' LARGE CONFERENCE EMERGENCY MANAGEMENT ROOM

LARGE CONFERENCE

COPY PRINT FAX

E

4

E OFFICE

F

COLLABORATION POINT WITH REFRESHMENTS

G

Headquarters Office Building LEVEL 3 1:250 @ A3 N 0 1000

Kellogg Brown & Root Pty Ltd

Planet Design

4000

8000

10000


Pipitea House on Pipitea 1

1a A

2

3

A5

01-17

01-16

01-18

B 01-14

B1

A5

Wellington

2007 – 2011

C

With Planet Design in association with Athfield Architects (base build)

Pipitea House on Pipitea was a 9 floor, new build office fit out that I worked on whilst at Planet Design Consultants, in association with Athfield Architects. It was purpose built for a senior New Zealand Government agency and it is designed as one of the highest security fit outs01-13 in New Zealand. Due to highly secure nature of this project only limited drawings can be shown. I joined the project in the developed design stage, my initial responsibility was working with the design director and senior designers to visualise key areas. The interiors were run in two sequential construction phases; beginning with the 01-11 Main Contract Hard Fitout (MCHF) stage, we coordinated the client needs with the

Pipitea Plaza on Pipitea (PART PLAN) LEVEL 1 1:200 @ A3 building owners, base building architects and contractors through their construction phase. My main responsibility through this phase was to coordinate power, data and plumbing needs. The second phase was interior fitout. I 01-12 worked closely with Planet Design director Paul Belchambers in developing customised workplace furniture and specialised power and data solutions. I also assumed responsibility for document transfer and delivery, this ensured that the correct information was distributed to all relevant consultants and contractors. UP

Role: Designer, CAD Management, Document Control

01-15




1 -

OPEN

A -

BEHIND

Dotted line denotes light fitting above

Dashed line denotes benching system

CL

Light fitting centred on extrusion

Dashed line denotes PSL 830 divider

LIGHT FITTING

PLAN

A -

N

O

T

E

S

Scale: 1:5

:

PSL refers to PARTITIONING SUPPLIES (NZ) LTD on free phone: 0800 82 80 80 or email: shaun.jones@innovativealuminium.co.nz Trunking & Transom: PSL 820 Section and PSL 825 trunking lid with PSL 830 divider Allow to anodise to match adjacent aluminium suite - Matt Natural finish Angled Fascia Plate, Power Distribution Plate & Kick Plate: Allow to powder coat to match benching system. Light Fitting: Lumbency 244-VSPL255T 600 x 220 x 50 Uplighter only. Finish: TBA

OPEN

BEHIND

2000.00

SUSPENDED CEILING - 2700 nom.

325.00 nom. 175.00 nom. 25.00

Fascia Plate - angled return

Copper 175.00

30째

C B A TRAY 1

42.00

35.00 76.00

TR A Y 2

84.00 Ctrs

84.00 Ctrs

During the interior fitout stage I worked with A.V., data and furniture consultants to develop a cable dropper solutions that provided separated feeds of copper, fibre and power to feed up to 16 workstations. This also included an uplight to provide extra wash over the ceiling and information for team groupings . An executive version was also developed including acoustically rated dividing screens that gave an added sense of privacy. Part of the fitout included a childcare facility with an outdoor play area. I worked as project designer on this space; building a deck, play area and a colourful border fence. c

PLANET DESIGN CONSULTANTS LTD

10

50

Scale: 1:5 100 mm

CESPO

5.00

TRAY 3 Drawn

150.00

75.00 0

ELEVATION

Project

Segregated Data & P Distribution System TRAY 3

Fibre Kick plate

1

Rev Description

Sheet Title

175.00

Copper

175.00

84.00 Ctrs

T R AY 2

475.00

84.00 Ctrs

Issue for Review

issue f or rev

2 -

25.00

76.00

301.94

42.00 76.00

710.00

42.00 76.00

Vidak benching heights revised

B E A M

22.00

52.00

35.00

Issue for Prototyping

Rev No.

TRAY 1

Drawing Status

Fibre

Power distribution panel. Allow to fit PDL 695 - Finish: Black NOTE: Allow to leave insert panel with tabs if power point is not needed.

TRAY 1

Nick

Northpoint

Scale

1:5 @ A1

5.00

A

SECTION Scale: 1:5

2

ELEVATION Scale: 1:5

Original Paper Size

A1[840x594]

Proj No.

0751

Sheet No.

10.

1. Do not scale 2. Contractor shall verify and be responsible for all dimensions on site. 3. All work to be carried out in accordance with Local Body Regulations. 4.These drawings remain the property of Planet Design and shall not be copied without prior consent. 5.Contractor to confirm access to site prior to commencing work. 6. Any alternative fittings or materials to those specified to be approved prior to com


PLANET DESIGN CONSULTANTS LTD c

Momentum Consulting Group Auckland 1. Do not scale

2. Contractor shall verify and be responsible for all dimensions on site.

3. All work to be carried out in accordance with Local Body Regulations.

4. These drawings remain the property of Planet Design and shall not be copied without prior consent.

5. Contractor to confirm access to site prior to commencing work.

6. Any alternative fittin

Auckland 2011 With Planet Design s e a t i n g

12-08

Role: Project Designer O P E N

P L A N

( 5 0 )

storag e

B O A R D R O O M

12-02 sto rage

MEETI NG

storag e

MEETING T E S T

12-05

glass

MEETI NG

T E S T

12-05

12-10

12-06 ME ETING MEETING

12-03

12-11 R E C E P T I O N

12-04 U T I L I T Y

s e a t i n g MEETING

12-12

S T A F F

A R E A

Se r v e r & Phones

K ITC H EN E TTE

coats

12-01 lift 1

lift 2

lift 3

12-13

lift 4

MEETING

12-14

MEETING

V I C T O R I A

S T R E E T

GENERAL ARRANGEMENT LEVEL 8 1:200 @ A3

S T R E E T

100

12-09

12-07 U T I L I T Y

Q U E E N

200 mm

MEETING

Momentum Consulting Group was looking to consolidate all four of their recruitment groups in to one workspace. I planned the front end areas so each meeting/interview space had a view of the luscious, green Auckland Domain, providing an impressive backdrop to each room. The back office area also benefited from panoramic views over the urban landscape, creating a light and airy office environment. I explored ideas of assigning different materials and finishes to each of these groups. Using brightly coloured carpet tiles inlaid into a tidy linear pattern, the laser jet printed tiles provided a visual guide to the meeting and interview rooms. To avoid a cloistered feeling in the reception, I framed a paint-backed glass signage panel with opaque glass and a frameless glass door, which provided borrowed light into the space.



Dashed line denotes extent of GIB Noisleline as described in deatil 2, sheet 07.01.

83mm Steel Stud to this wall to accept cavity slider

700

UNIT 6 08.04

1385 840

D12-01

D12-02

D12-03

3905

12-04

D12-05

290

990

12-07

12-06

12-03

12-12 D12-15

05

05.01

12-12 12-04

D12-16

04

05.01

Partition from centre of column. UNIT 3 08.02

Partition from cnr.

12-13

12-13

1250 D12-17

Partition from mullion.

1520

12-01 lift 2

lift 3

12-01

12-14

lift 4

lift 1

D12-18

lift 1

UNIT 1 08.01

820

3000 3400

Partition from mullion.

06

05.01

2695

Line denotes extent of chasing to floor slab. Allow for floorbox

12-11 12-05

D12-14

440

1200

EQ 3400

UNIT 8 08.03

990

12-11

12-07

440

EQ

12-03 Partition from cnr.

2425

12-06

D12-09

D12-07

12-05

D12-08

795

200

3155 # 2200 #

D12-04

EQ

EQ Partition from mullion

Partition from mullion.

EQ

D12-19 D12-20 D12-21 D12-06

12-02

D12-13

D12-11

12-10

12-08

UNIT 2 08.01

lift 2

lift 3

12-14

lift 4

1430

02

05.01

2400 opening

5785 3000

EQ

C L

12-10

660

01

05.01

1375

UNIT 4 08.03

Dashed line denotes extent of GIB Noisleline as described in deatil 2, sheet 07.01.

UNIT 7 08.03

2740

Allow for additional in wall block for server rack if required.

Dashed line denotes extent of GIB Noisleline as described in deatil 2, sheet 07.01.

3200

12-08

UNIT 5 08.03

D12-10

12-02

Partition from cnr.

Partition from cnr.

This section of glazing is to be 10.38mm Metro Glass Soft White

03

83mm Steel Stud to this wall to accept cavity slider 2370 D12-12

Partition from cnr.

05.01

12-09

12-09

Partition from cnr.

12-15

12-15

1

Issue for Pricing and Consent

Rev No.

D3-01

New or door. Refer to door schedule (dwgs. 6.01) for details.

Standard partitioning generally built to underside of suspended ceiling (nom. 2600mm) unless otherwise stated. Partition suite is to be Partitioning Supplies (NZ) Limited. Free phone 0800 82 80 80, www.innovativealuminium.co.nz

3.

All aluminium finishes unless otherwise specified to be Anodise 'matt natural' finish

4.

The al. posts and door frames in the glass partitions shall be tied back to the overhead ceiling slab both sides with galv. metal straps, to prevent movement and rotation from doors closing or impacts.

P A R T I T I O N T Y P E S: TYPICAL FULL HEIGHT PARTITION (floor to ceiling): 65mm standard steel stud lined both sides with one layer of 13mm Gib. board. PARTITION WITH GLAZED PANEL OVER (glazing heights vary): 65mm standard steel stud lined both sides with one layer of 13mm Gib. board. 10.38mm Metro Glass, 'Soft White' window panel from specified height above floor level to underside of suspended ceiling. Refer wall elevations for examples

100

500 # varies #

FULL HEIGHT GLAZED PARTITION: (floor to suspended ceiling): 10.38mm clear unless specified otherwise laminated safety glass and glazing film as indicated on Elevations and Window Treatments dwgs.

A C O U S T I C P A R T I T I O N T Y P E S: FULL HEIGHT ACOUSTIC PARTITION (floor to ceiling): 65mm standard steel stud lined both sides with one layer of 13mm Gib. board and AUTEX 'Quietstuf' ASB5 in cavity. In ceiling allow for Autex 'Baffleblock' laid over the effected room enclosed by the acoustic partitions. The Autex 'Baffle block' should extend past the extents of the effected room by 600mm. Allow to seal ceiling tiles airtight to partitions below with acoustic sealant. NB: To accommodate the return air supply, allow to remove a small section of the baffle over the door way into the effected room.

3. All work to be carried out in accordance with Local Body Regulations.

4. These drawings remain the property of Planet Design and shall not be copied without prior consent.

5. Contractor to confirm access to site prior to commencing work.

Contacts for Godfrey Hirst:

Tony Walsh: CELL: 027 345 505 or OFFICE: 04 471 & 50 2650 ONSEN T verify and be responsible for all dimensions on site. 2. CContractor shall 3. All work to be carried out in accordance with Local B

1. Do not scale

WET AREA FLOORING:

GENERAL: Client

2)

Wet Area Flooring :

MEETING ROOM Feature Carpets

Qantas House Feature LevelCarpet 12 Tile 1: Godfrey Hirst Modular Designer Jet Range: Candy Shop 191 Queen Street Colour: 9600 Arrow denotes direction, Quarter Turned Auckland

N O T E S:

Feature Carpet Tile 2: Godfrey Hirst Modular Designer Jet Range: Candy Shop Colour: 8900 Sheet ArrowTitle denotes direction, Quarter Turned

Momentum Consulting Group Feature Carpet Tile 4: Godfrey Hirst Modular Designer Jet FCL 2600nom. Range: Candy Shop Partition Plan

line of joinery toe recess There shall be no substituting of materials or products without the approval of the designer.

2.

Preparation of Floor surfaces: All surfaces requiring new flooring are to be cleaned of all foreign material which may be detrimental to the adhesion of flooring. If patching or levelling is required a cementitious patch must be used. Throughly sweep or vacuum surface before floor installation.

3.

Checked Denotes Setout Tile

All Vinyl is to be welded with matching rod.

SLIDING DOORS

1:100@A1

All carpet to be installed in accordance with AS/NZS 2455.1 :1995

6.

Before work commences, Flooring Contractor to inspect the substrate to ensure that it will allow the work of the required standard and that all fixtures and fittings around which the carpet is to be scribed, are in place.

A1 (840x594)

STA

37

D12-02

E L E V A T I O N

E L E V A T I

2

1 : 5 0

Glass FLO LEVEL

Glass D12-01

550

D12-03

1050

02.01 1

s c a l e

wet floor

Work excluded /

Rev.

Sheet No.

carpet tile

SLIDING DOORS

5.

Original Paper Size

10

floor

Carpet Installation

Nick

1

Gilt Edge 4547 alloy finishing trim, silver

Allow for polythene floor protection over the entire floor.

4.

Feature Carpet Tile 4: Godfrey Hirst Modular Designer Jet Range: Candy Shop Colour: 8800 Northpoint Arrow denotes direction, Quarter Turned

PARTITION PLAN LEVEL 8 1:200 @ A3

E: justine.white@forbo.com

1.

Drawn

1031

Contacts for FORBO Floor coverings Pty Ltd - NZ: Justine White Architectural Consultant - Wellington M: 021 455 348 T: 0800 000 563 F: 0800 000 634

FCL 2600nom.

Colour: 9400 Arrow denotes direction, Quarter Turned

Proj No.

Floor level

Install to manufacturers specifications. Refer to details below.

Project

Scale

Denotes nominated floor finish returned up cupboard toe recess 100mm c/w proprietary coving

Forbo Project Vinyl, Design: 'Smaragd' range Colour: 6299

Carpet is to be quarter turned.

6. Any alternative fittings or materials to those specified to be approved prior to commencing work.

Proprietry aluminium capping fillet silver finish

NOTES : Carpet to Vinyl Bead: to be Gilt Edge, Alumn. Carpet to vinyl bead #3775 Proprietary Coving required information availiable from Justine White (Forbo Rep)

1)

Generally over the perimeter of the tenancy area, the body carpet is to be: Range: Godrey Hirst BASELINE Colour: Striation Code: 37860.790

c

Work excluded / outside from this contract

50

2. Contractor shall verify and be responsible for all dimensions on site.

Rev Date

1220 15

1. 2.

PLANET DESIGN CONSULTANTS LTD

N O T E S:

Existing core walls, columns and tenancy partitioning to remain intact.

10.12.10

Rev Description

Drawing Status

200 mm

P A R T I T I O N P L A N L E G E N D:

855

F L O O R F IPN R I S IH C E SI N P LGA N L E G E N D:

0

s c a l e

1 : 5 0

12-09

Metro Glass Soft white laminated glass Silicone Joint

viewing panel

10a

FCL 2600nom.

7.01

PB

PB

12-07

12-03

2200

12-06

12-12

10

B

R

A

N

A

N

D

I

D

I

N

B

R

A

N

A

N

D

I

D

I

N

G

G

300 x 300mm G Half Thordon Cr

7.01 B B

R

N

R

N

G

G

600x 300mm Gr Eigtht Thordon C

1000

12-04

Eq. Eq. Eq. Eq.

12-11 12-05

900 x 300mm G Quarter Thordon

12-10

12-08 12-02

B

Partition

12-01 lift 1

lift 2

lift 3

A

N

D

I

N

G

1200 x 300mm b as supplied by c

E L E V A T I O N

4

12-14

lift 4

R

D12-07

12-13

s c a l e

1 : 5 0

12-15

1

Issue for Pricing and Consent

Rev No.

Rev Description

10.12.10 Rev Date

Drawing Status

P R I C I N G & CONSENT 500 FCL 2600nom.

PINBOARDS: PB

Supply and adhesive fix Woven Image 'Echo Panel' 542 (Charcoal colour) c/w natural anodise finish equal angle to exposed edges. Refer to all Utility joinery drawing 08.03. Allow to co-ordinate with the joiner.

Painted walls to be plastered, sanded, gib board to be sealed and finished with two coats from the DULUX master palette [DUSPEC NZSD0088]. VOC free when available. Colours to be:

1.

There shall be no substituting of materials or products without the approval of the designer.

Contact: Bryan Perkins/Dulux 04 384 4445 / 021 926 218 / bryan.perkins@dulux.co.nz

2.

The suspended ceiling height above floor level is nominally 2600mm for pricing purposes.

3.

Allow for polythene floor protection over the entire floor.

4.

All aluminium partition sections to be masked with tape prior to painting

5.

Generally all new partitions are to be plastered to a level 4 finish.\

6.

Whiteboard paint wall TBC

WALL FINISHES LEVEL 8 1:200 @ A3

m e e t in g

Sheet Title

Momentum Consulting Group Glass D12-13 Wall Finishes

6

Drawn

Nick Checked

Glass

Glass

D12-15

seven

six

1220 15

D12-14

Partition

Refer to Door Schedule sheet 06 under "finish".

Partition

500

N O T E S:

Qantas House Level 12 191 Queen Street Auckland

five

Refer Sheet 05.01 for glazing film types

Work excluded / outside from this contract

m ee ti ng

Project

D12-16

1220

m e e t in g

GLAZING FILM: D O O R S: All painted doors (and frames if appropriate) to be painted in semigloss finish as per DUSPEC NZSD0300 in Dulux Whakarewarewa - Colours of NZ range, palette 70 Cupboard/access doors and frames contained within new rooms are to be painted to match new adjacent wall colour.

m e e t in g

echo panel

Allow to supply & install 12mm Woven Image Echo Panel with mitred aluminium trim on four sides and through central join. Trim: Tile Warehouse 12mm Tilers Mate 12mm 'L' Trim, matt silver.

495

Dulux Whakarewarewa - Colours of NZ range, palette 70

12mm alum edge

CONTACT: Suzi Blackledge/Window Treatments - 0800 363639 / 027 245 4410

1220 15

P5

B1

Partition

Dulux Water Raceway P35.H.5

Glass

E L E V A T I O N Northpoint

s c a l e

1 : 5 0

Scale

1:100@A1 Original Paper Size

A1 (840x594)

Proj No.

1031

Rev.

Sheet No.

03.01 1 15

500

FCL 2600nom. 15

Dulux Kinleith Half - Colours of NZ range, palette 26

P4

Allow for blinds to all perimeter windows: Mermet M Screen 8505, finish Grey Lotus

four

P3

PINBOARD EDGE AND SEPERATION DETAIL nts

WINDOW TREATMENTS:

15

Dulux Kandallah - Colours of NZ range, palette 41

500

750

Dulux Sandfly Point Half - Colours of NZ range, palette 24

P2

1000 250

P1

500

Client

1220

W A L L F I N I S H E S P L A N L E G E N D: P A I N T F I N I S H E S:

200 mm

Do not scale

Partition from mullion

Mee

Room


1

Issue for Pricing and Consent

Rev No.

Rev Description

10.12.10 Rev Date

Drawing Status

Body Regulations.

P R I C I N G & CONSENT

4. These drawings remain the property of Planet Design and shall not be copied without prior consent.

5. Contractor to confirm access to site prior to commencing work.

6. Any alternative fittings or materials to those specified to be approved prior to commencing work.

100

Client

FLOOR VINYL COVED TO JOINERY (NTS)

Project

FLOOR VINYL TO CARPET DETAIL (NTS) 100

Glazing film "V1" laser cut signage; The word "STAFF" in Capitals cut out, sized to fit dimensions below. Text is Arial Black, to be centred on Glazing film. Film to be 3M dusted crystal, to room side of glazing.

Qantas House Level 12 191 Queen Street Auckland

100

Nick

FCL 2600nom.

Northpoint

2800

Checked

/ outside from this contract

Scale

1:100@A1 Original Paper Size

A1 (840x594)

750

Proj No.

OOR FINISHES Glass L 8 1:200 @ A3

1031

Sheet No.

Rev.

04.01 1 Partition

I O N

3

D12-07

Partition

D12-21

E L E V A T I O N s c a l e

1 : 5 0

Glazing film " V3" laser cut signage; The word "TEST" in Capitals cut-out, sized to fit dimensions shown. Text is Arial Black, to be centred on Glazing film. Film to be 3M dusted crystal, to room side of glazing. 500

FCL 2600nom.

Graphic Glass - colour match to Resene n Cream

550

backpaint glass with vinyl cut branding client

D12-08

5

350

350

Glass

Glass

D12-09

E L E V A T I O N s c a l e

1 : 5 0

Glass

two

raphic Glass - colour match to Resene Cream

m e e t in g

15

1410

Graphic Glass - colour match to Resene ream

TEST TEST

350

1220

740

Silicone Joint

Moment Consulting Group Floor Finishes

Drawn

AFF

Metro Glass Soft white laminated glass

Sheet Title

D12-10 Glazing film laser cut signage; The word "two" in lowercase cut-out, sized to fit dimensions shown. Text is Arial, to be centred on Glazing film. Film to be 3M Diffuser film White (60% light transmission) 3635-70, to room side of glazing.

500

eight

Partition

15

m e eti ng

D12-17

Glass

1 Rev No.

Rev Description

Drawing Status

P R I C I N G & CONSENT

500

FCL 2600nom.

eting room Names:

m Number:

Issue for Pricing and Consent

Client

Room Name:

10.12.10 Rev Date


Glazing film "V1" laser cut signage; The word "STAFF" in Capitals cut out, sized to fit dimensions below. Text is Arial Black, to be centred on Glazing film. Film to be 3M dusted crystal, to room side of glazing.

c

100

18mm MDF fairend

2

Line of partition. Allow to paint finish this partition

750

align 1 : 2 0

B

12-03

1

Issue for Pricing and Consent D 2800 eq.

overlay self closing door hinge

t

PSL PSL315 315Door Doorpost postpillar pillar 32mm hollow core doors laminate finished

10 1aa

Check all built dimensions on site prior to fabrication.

"six" Dims: TBC

Check site access and dimensions prior to construction. Level joinery/furniture items on installation

50

12-13

910

adj shelf

Ensure all products and equipment areDims: fabricated/installed "five" TBC a per manufacturers instructions. 200

12-11 12-12

adj shelf

All fixings to be concealed.

0

10

15

1000

P R I C I N G

Colonial style turned table leg NOGS. NOGS.

S

E

C

T

R E C E P T I O N

12 12

alum. frame

1000

Strip of 3M Film to be 3M dusted crystal, to room side of glazing.

I

D E S K

Toe Space

"nine" Dims: TBC

600

1500 K I T C H E N E T T E

Aluminium Aluminiumframed framedglass glassdoor. door. Sliding Slidinggear geartotosuit suitdoor doortype. type.

O

N

s c a l e

10 10

1 : 2 0

s c a l e

1

Recept Recept v ve er rt ti ic ca al

CC aa vv i i tt yy SS l l i i dd ee rr ww i i tt hh AA l l uu m m i i nn i i uu m m JJ aa m mAlum. bbframe ss 15

h ho o700 r ri zi zo on nt at al l s se ec ct it oi on n 400

FINISHES - UTILITY UNITS x2 c/lc/l

Existing Existingtenancy tenancy adj. shelf Top: suspended ceiling HPL 'Warm White', 30 mm MDF clad suspended both sides withceiling Formica velour Finish with matching ABS clashing.

FINISHES

15

s sc ca al e l e 1 1: :5 5

FINISHES FOR THE RECEPTION DESK REFER TO DRAWING

Strip of 3M Film to be 3M dusted Pinboards: crystal, to room side of glazing. Sides: Allow to supply & install 12mm Woven Image Echo Panel with 30 mm MDF clad both sides with Melteca LPL 'Warm White', mitred aluminium trim on four sidespartition and through central join. Note: Note: 89mm 89mm steel steel stud stud partition wall wall LED strip lighting colour: NZ02 542 (charcoal) velour Finish with matching ABS clashing. 9090 where wherecavity cavitysliding slidingdoors doorsare arenoted noted Trim: Tile Warehouse 12mm Tilers Mate 12mm 'L' Trim, matt power point Uprights & Shelves: 25mm LP Melteca laminate, colour: glass splashback silver. Warm White, natural finish. Matching 2mm ABS clashing

Back Panel: 12mm LPL Melteca laminate, colour: Warm White, natural finish.

2800

10

2200mm 2200mmFFL. FFL. Aluminium Aluminiumframed framedglass glassdoor. door.Sliding Sliding gear geartotosuit suitdoor doortype. type.

adj. shelf

"eight" Dims: TBC 5

NOTE: NOTE: Floor Level 1.1.PSL PSLrefers referstotoPartitioning PartitioningSupplies Supplies(NZ) (NZ)Ltd Ltdwho whomanufacture manufactureEthe the aluminium partitioning ph0800 080082 8280 8080 80 Laluminium E V Apartitioning T I O suite, Nsuite,ph V2 GLAZING FILM 2.2.The Thealuminium aluminiumsuite suiteisistotobe bepowdercoated powdercoatedtotoOrica OricaSilver SilverPearl Pearl915-56960 915-56960 09/00 09/00 Sheet Title Not to scale K I T C H E N E T T E s c a l e 1 : 2 0 Consulting Group 1 Issue for Pricing and Consent Momentum 10.12.10 Rev No. Rev Description Rev Date Construction Details

A

FCL 2600nom.

"seven" Dims: TBC

adj shelf

12-14 Qantas House Level 12 191 Queen Street 12-15 D Auckland

Toe Space

"two" Dims: 205mm x 550mm

GENERAL NOTES

adj shelf

1 : 5

"one" Dims: 150mm x 540mm 20

1: 5

partition partitionbeh be

500

B

60x60mm cut out for power

eq.

1: 5 Adhesive Adhesi panel panelexe 7720. 7720.Co C elevation elevatio

t

have areas of lowered flush ceiling. refer to the ceiling plan sheet 03 for extent.

50 x 50 equal angle descretely fixed to table leg and side rail

1 : 2 0

paper. Fixings to be concealed.

1

Floor Level

Room Name: s c a l e

eq.

s ca l e

jamb jamb- -powdercoat powdercoatfinish finishtotomatch match where wherecavity cavitysliding slidingdoors doorsare arenoted noted before manufacture. 3. Suspended ceiling level is nominally 2600mm, allow to site check partitioning partitioning suite suite The lift frontage and perimeter

glazing setion similar to detail 3, 07.01

"three" Dims: TBC P12-08 R I C I N G Allow to co-ordinate with electrician concerning installation of all electrical fittings. & 12-10 "four" Dims: TBC for any fixture & fittings or C O N S E NAllow T for adequate in-wall support wall mounted unit, loaded to full capacity i.e. rheems of

Client

200

99

4

al e 1 : 5 horizo ntal s ec tion GGls lcaa zzeedd CCoorrnneerr SSee cctti ioonn

sec tion

aluminium suite is to be anodise finished to matt natural. Vertical door frame sections are to be plastic bubble 2. The One Onepiece piecealuminium aluminiumextrusion extrusionclosing closing Note: Note:89mm 89mmsteel steelstud stud partition partitionwall wall wrapped once erected on site to protect the finish from scratching.

ROOM SIDE

Glass to code.

Rev Date

adj shelf

s sc ca al e l e 1 1: :5 5

550

to suit

1 2

have areas of lowered flush ceiling. refer to the ceiling plan sheet 03 for extent. hamish.donnithorne@innovativealuminium.co.nz

Glass to code.

eq.

Drawing Status

Drawing Status

partition behind

10.38mmclear clearlaminated laminated 10.38mm safetyglass glasstotocode code safety completewith withvisibilty visibiltystrip. strip. complete laminate finished MDF shelf Refertotoelevations elevationsfor for Refer visibiltystrip stripdetails. details. visibilty

laminate finished MDF shelf

13mm Stdgib gibboard boardwith withplaster plasterfinish finish 13mm Std Suspended ceiling level is nominally 2600mm, allow to site check before manufacture. The lift frontage and perimeter 3. 1. PSL refers to PARTITIONING SUPPLIES (NZ) LTD on free phone: 0800 82 80 80 or email: (Level4)4)for forpaint paintfinish. finish. (Level

glazing setion similar to detail 3, 07.01 PSL 625 and PSL13mm wool pile

10.12.10

12-07

Rev Description

adj shelf

50 50 100 10 10 0 0

typical trim

ROOM SIDE

Door 6 - LEAF 2

sc al e

Project

Adhesive fixed 6mm back painted glass panel ex Graphic Glass ph (04) 569 7720. Colours vary along panel as per elevations.

PSL 625 and PSL13mm wool pile

R E C E P T I O N

h oriz onta l se ction

CC l l oo ss ee rrBack painted Glass

200 mm

sc al e

1 :5

Line Lineofofpartit par Allow Allowtotopain pa above aboveand andb

The word "two" in lowercase cut-out, sized to fit dimensions shown. Text is Arial, to be centred on Glazing film. Film to be 3M Diffuser film White (60% light transmission) laminate finished MDF shelf 3635-70, to room side of glazing.

Appropirate timber dowels to fix table s sc ca al e l e 1 1: :5 5 h ho or ri zi zt o t on na al l s se ec ct it oi on n s sc ca al e l e 1 1: :5 5 1. PSL refers to PARTITIONING SUPPLIES (NZ) LTD on free phone: 0800 82 80 80 or email: Allow for additional blocking to be discretely hamish.donnithorne@innovativealuminium.co.nz fixed to underside of table and through acrylic suiteto is front to berail anodise finished to matt natural. Vertical door frame sections are to be plastic bubble 2. The aluminium NOTES: wrapped once erected on site to protect the finish from scratching.

T yp e B S li di ng G la s s Do or s

eq.

450 200 mm

horizton al sec tion

15

Reception50 Glass Wall panels 50

10 a

s ca l e

1: 5

32mm hollow core doors PSL PSL305 305Door Doorjamb jamb laminate finished

3

Glass

D12-17

Glass to code.

A

2

450

glass finished panel

s ca l e

SS ee cc tt i i ooNOTES: nn h o r i z o n t a l

v ve er rt ti c i ca al l s se ec ct ti o i on n

B -

Door 6 - LEAF 2

N

1810

11 11

Glazing film laser vcute signage; r t i c a l s e c t i o n The words as per table this page, in lowercase.Allow to polish edge of glass Text is Arial Black, to be centred on Glazing film. Film to be 3M Diffuser film White (60% light transmission) 3635-70, to room side of glazing.

DD oo oo rr

Continuous PSL 1005 'J' mould to each leaf to Glass to code. enable door to catch each other when sliding shut.

Room Number:

1000

packer MM uu l l l l i i oo nn Reception Glass Wall h ho or ri zi panels zo on nt at al l s se ec ct it oi on n

overlay self closing door hinge

4

T yp e B S li di ng G la s s Do or s E L E align V A T I O N

15

200 mm

200 mm

seven

10

A

Snow WH10DC or similar

s c a l e 1800 1: 5

Meeting Names: Continuous section of Ullrichroom Aluminium 'Kableduct' KMP20 ducting lid section KMP20/5930 powdercoated match the partitioning suite. Mount PARTITION on 6mm black paint finish MDF. h oCeiling r i z o nHeight tal section sc al e 1: 5

1000

meeting

lowercase, cut-out sized to fit partition backing dimensions 2200 below. Text is Arial, to be centred on Glazing film. Film topartition be 3M behind dusted crystal, to room side of glazing.

typical trim

15

L

Rev No.

460

15

on closing above and below the Glazing glass panel film laser cut signage; The word "meeting" as shown, in match

1

Alum. frame

typical trim

88

Continuous section of Ullrich Aluminium 'Kableduct' Door 6 - LEAF 1 KMP20 ducting lid section KMP20/5930 3 - suite. Mount powdercoated match the partitioning Existing perimeter perimeter on 6mm blackExisting paint finish MDF. Kglazing I T C H E N E T T E s c a l e glazing line line PSL 625 and PSL13mm wool pile

P

3

m e eti ng

Glass to code. PSL 625 and PSL13mm wool pile

MDF MDFFairend FairendDetail Detailasasdescribed describedonondetail detail5,5, this thispage. page.

15

alum. frame

500

D12-10

1 2

c/w cover infill and

S t stakes o r ato corners. ge Cupboard Doors

horizo ntal s ec tion Generally: use Gib Goldline G1-W 90째 on right angle Door Doorasasdescribed describedinindoor doorschedule schedule outside 150corners

NOTES:

PSL 620 + 640 and PSL13mm wool pile Door 6 - LEAF 1

3 -

205

crystal, to room side of glazing.

15

1: 5

to suit

panel ex Graphic Glass ph (04) 569 7720. Colours vary along panel as per elevations. Strip of 3M Film to be 3M dusted

4

2x 25mm, floor to suspended ceiling, laminate finished MDF central divisions, drilled for MitredSilicon Siliconjoint jointtoadjustable to Mitred height shelves Glazing film laser cut signage; glazedcorner cornerdetail detail glazed

Glass

5

PSL 601 Generally: PSL PSL 305 305 use Gib GoldlineDOOR STANDARD STANDARD DOOR100mmm JAMB JAMB skirting G1-W 90째 on right angle outside corners

PSL PSL205 205 GLAZING GLAZINGBAR BAR

D12-09 18mm, floor to suspended ceiling,

E L E V A T I laminate O PSL N finished 32mm hollow core doors PSL 215 215 MDF shelfGLAZING 1 : 5CUPBOARD 0 laminate finished s c a l e COAT GLAZINGBEAD BEAD

GLAZING GLAZINGBEAD BEAD

Floor level

PSL13mm wool pile

Glass to code.

FCL 2600nom.

s12mm c a gib l gib e board 1 : 5plasterboard 12mm board plasterboardlining liningwith with compressed compressedfoam foamtape tapetotothe theglass glassface. face. 15 Glue Gluefixfixa acontinuous continuous3mm 3mmthick thickacrylic acrylic mirror, mirror,between betweenthe thesillsilllevel leveland andceiling ceiling pelmet level, level, over overthe the plaster plasterboard boardlining. lining. Adhesive fixedpelmet 6mm back painted glass 15

on

100 100

1

T yp e B S li di ng G la s s Do or s Glass panels h o r i z o n t a l sReception ection s c a l eWall 1: 5 sc al e 1 : 5 A c o u s t i c P a r t i t i o n h ot roi z t o n a l s e c t i o n 250 250nom nom C o l u m n / C o rae w 500 a l l PARTITION horizon ta l s ection

350

Glass

laminate finished MDF end panel, to Fairend Fairenddetail, detail,asasper perdetail detail5 5 accommodate coat rail and drilled for adjustable height shelves

PSL 601 100mmm skirting s c ac/w l cover e 1infill : 2and 0 PSL PSL215 215 stakes to corners.

laminate finished

350

Glass

h ho or

900

2 10

N

PSL PSL205 205 32mm hollow core doors GLAZING GLAZINGBAR BAR

PSL 625 and detail 3, 07.01 v e r t i c a l s e c t i o n PSL13mm wool pile IMPORTANT IMPORTANTNOTE: NOTE: Continuous PSL 1005 'J' PSL 620 + 640 and TYPICALLY TYPICALLY ALLOW ALLOW100mm 100mmBEFORE BEFORE mould to each leaf to B PSL13mm pile Glass to code.wool BEGINNING BEGINNING THE THERETURN RETURNWALL WALL enable door to catch each Glass D12-15 D12-16 other when sliding shut. PSL 625 and

Allow to polish edge of glass

T I O N

A

D12-08 COAT CUPBOARD

66

continuous 50x50mm aluminium 'T' section spine fixed to wall and 2x 25mm, floor to suspended MDF divisions ceiling, laminate finished MDF central divisions, drilled for adjustable height shelves Allow Allow totomitre mitre aluminum aluminumpartition partitionsuite suite

1050

E L 64mm E VsteelA 13 gib board on standard s c4 a e 1 finish. : 5 0 stud. Plaster to level forl paint

495

Glass

L

F.C.L. F.C.L.

K I T C H E N E T T E

m e e t in g

Partition

five

1220 15

SS ee cc tt i iDoor oo6 - LEAF nn 2 Partition

four

Glass to code.

PSL 625 and PSL13mm pile IF INDICATED ON THEwool PARTITION PLAN: h ho or ri zi zo on nt a t al l s se ec ct it oi on n s sc ca al e l e 1 1: :5 5 Continuous section of Ullrich Aluminium 'Kableduct' Denotes Autex 'Quietstuf ASB5' infill to packer KMP20 ductingD12-13 Glass Glass D12-14 partition cavitylid section KMP20/5930 powdercoated match the partitioning suite. Mount align on 6mm black typicalpaint trim finish MDF. glass finished panel

PARTITION

6

backing partition

overlay self closing door hinge

AAcc CC o

T yp e B Sli di ng G l as srefers Do or s Sort email: orage Cu pboard Doors oo r score doors 1. PSL to PARTITIONING SUPPLIES (NZ) LTD on free phone: 0800 82 80 80 32mm hollow 32mm hollow core doorsS t o r a g e C u p b o a r d D Floor level hamish.donnithorne@innovativealuminium.co.nz laminate finished laminate finished 150 s e c t i o n s ca le 1: 5 ho rizontal sec tion C sc al e 1 : 5 horizo ntal s ec tion s ca l e 1: 5 2. The aluminium suite is to be anodise finished to matt natural. Vertical door frame sections are to be plastic bubble wrapped once erected on site to protect the finish from scratching. ROOM SIDE Floor Floorlevel level T yp e B di ng Glevel linas sblack.Do or sallow to 20mm ceiling is nominally 2600mm, site check manufacture. The lift frontage and 3. Suspended PSPbefore Satinice Acrylic Panel finish: TableSli top and legs to finished gloss Sperimeter torage Cu pboard Doors Storage Cupboard Doors glazing setion similar to have areas of lowered flush ceiling. refer to the ceiling plan sheet 03 for extent.

PSL 625 andv e r t i c a l wool pile m e e t i PSL13mm ng

m e e t in g

15

1220

1000 250 500

77

DD oo oo rr

1

six

750

Line of partition.

1 2

Storage Cu pboard Doors A Glazing ho rizontal sec tion s c abehind l e 1as: 5 - per detail 2 sheet 07

Rollers by PSL code TBA, and PSL 1001 roller guide

Hinge Hinge

P

Glazing behind as per detail 2 sheet 07

PSL 605 and 610 sliding door rail

500

Continuous PSL 1005 'J' mould to each leaf to enable door to catch each other when sliding shut.

PSL 305 305 two continuous beadsAllow of acoustical to paint finishPSL this partition Glass to m e ebelow tDOOR inDOOR g code. STANDARD STANDARD JAMB above the JAMB glass panel sealant on each side of portion toand ensure an air tight seal to column face. Foam sealant strips are not acceptable. Door 6 - LEAF 1 2200 3 -

200 mm 200 mm

500

1: 5

PSL PSL215 215 PSL 620 + 640 and PSL13mm wool pile BEAD GLAZING GLAZING BEAD

ed Silicon joint to Apply ed corner detail

6

PSL 625 and PSL13mm wool piles c a l e

Rollers by PSL code TBA, and PSL 1001 roller guide

1220 15

FCL 2600nom.

horizon ta l s ection

3

PSL 605 and 610 slidingGlass panel to code

200 mm

T y p i c a l M D F 500f a i r e n d w to mitre aluminum partition suite

315 Door post pillar

1: 5

c/w glazing film PSL PSL400 400 door rail 13mm 13mmHEADSECTION HEADSECTION

cover infill and corner stakes to s e c t i o seen n end adjacent to thesPSL ca le 740 section.

Partition

v e r t i c a l

13mm Gib board on steel stud.

8mm clear laminated y glass to code plete with visibilty strip. r to elevations for ilty strip details.

1: 5

T yp e B Sli di ng G100mmm l as skirting s Do c/w or s

seven

s ca l e

150

PSL PSL305 305 STANDARD STANDARDDOOR DOORJAMB JAMB

100

6 1

ROOM SIDE

s c a l e

DOOR DOOR PILLAR PILLARPOST POST horizon ta l s ection Acoustic treatment to PSL 601 cavity where applicable

1

1 13 s stu

1000

A c o u Ts tI i Oc NP18mm a rMDF t ifairend t i oFloor n level to 1 : 5 0 C o l uPSL m315 n / C o r e w a l l PSL 315

4

1 : 5

Glass panel to code c/w glazing film

1220 15

Rollers by PSL code TBA, and PSL 1001 roller guide Apply a layer of BosticE glue L to join Ewhere V ever A MDF fairend is used

18mm, floor to suspended ceiling, laminate finished MDF MDF shelf end panel, to laminate finished accommodate coat rail and drilled for adjustable height shelves

m e e t in g

13 13 D

CC aa vv i i tt yy SS l l i i dd ee rr ww i i tt hh AA l l uu m m i i nn i i uu m m JJ aa m m bb ss 550

board on standard stud. Plaster to level 4 for paint finish.

lternative fittings or materials to those specified to be approved prior to commencing work.

ion

A -

c

PSL 605 and 610 sliding Partition door rail 13 gib

laminate finished MDF shelf

15

D

1220

N

MDF s sc cadivisions al e l e 1 1: :5 5

v ve er rt ti ic ca al l s se ec ct ti io on n

TEST TEST

A

1410

R

G

500

44

550

B N

90 90

7.01

Glass panel to code c/w glazing filmB R A

5. Contractor

5. Contractor to confirm acc

PPaarrtti itti iaal l lyy GGl laazzeedd PPaacontinuous rrtti itti io50x50mm onn aluminium 'T' section spine fixed to wall and

350

s sc ca al e l e 1 1: :5 5

20

G

FCL 2600nom.

450

I

N

ceiling, laminate finished MDF central divisions, drilled for

TTyyppi iccaal l GGl laazzeedd PPaarrtti itadjustable ti ioonnheight shelves

450

D

I

Glazing film " V3" laser cut signage; The word "TEST" in Capitals cut-out, sized to fit dimensions shown. Text is Arial Black, to be centred on Glazing film.

910

N

D

PSL PSL400 40013mm 13mmlining lining standard standardheadtrack. headtrack.

4. These drawings remain the property of Planet Design and shall not be copied without prior consent.

100

N

33

Quarter Thordon Cream

finish. finish.

ana an Foa Foam

Floor Floor level level of Planet Design and shall not be copied without prior consent. 3. All work to be carried out in accordance with Local Body Regulations. 4. These drawings the property 2x 25mm, floor to suspended Film to be 3M dusted crystal, to room remain side of glazing.

990

A

Floor Floorlevel level

2. Contractor shall verify and be responsible for all dimensions on site.

TTyyppi iccaal l AAccoouusstti icc PPaarrtti itti ioonn

Plaster Plastercompound compound NOTE: NOTE:PLASTERER PLASTERERSHOULD SHOULDALLOW ALLOWFOR FOR ADDITIONAL ADDITIONALMATERIAL MATERIALFOR FORTHIS THISSECTION. SECTION.

1 : 5 0

App Appl

Partition

Plaster Plasterto level 4 4forforpaint paint 3. All work to be carried out in accordance with LocalMDF Body Regulations. 4.tolevel These drawings remain the property of Planet Design and shall not be copied without prior consent. divisions

PSL PSL215 215 PSL PSL205 205 GLAZING GLAZINGBEAD BEAD GLAZING GLAZING BAR BAR All work to be carried out in accordance with Local Body Regulations.

3.

Ceiling Slab

Floor Floorlevel level

1. Do not scale

s c a l e

h ho or

6. Any alternative fittings or sea seala

PSL PSL215 215D12-21 GLAZING GLAZINGBEAD BEAD

D12-07

heightabove floorlevel. E height L Eabove Vfloor A level. T I O N

3

eight

R

5. Contractor to confirm access to site prior to commencing work.

PSL PSL205 205 GLAZING GLAZINGBAR BAR

13mm 13mmGib. Gib.board boardplasterboard plasterboard continuous 50x50mm aluminium ononstandard standard65mm 65mmsteel steelstud. stud. 'T' section spine fixed to wall and

GLASS GLASS

30% compressed Autex Baffle Block between Suspended ceiling COAT CUPBOARD tiles and ceiling slab, centred over the PSL 1000 'C'ceiling channel 601 - gap 300 x 300mm Provide PSL a 1000mm in the baffle Graphic Glass - colour match to Resene guide + woolpartition. pile. 100mmm skirting I N G block over the section of wall(centred over the Cream Half Thordon c/w cover infill andair circulation. accommodate mechanical PSL 605 anddoor 610to sliding IF INDICATED ON THE PARTITION PLAN: stakes to corners. door rail Denotes Autex 'Quietstuf ASB5' infill to 600x 300mm Graphic Glass - colour match to Resene Suspended ceiling partition cavity Eigtht Thordon Cream Glazing behind as PSL 1000 'C' channel Generally: use guide + wool pile. per detail 2 sheet 07 Gib Goldline 1200 x 300mm backpaint glass with vinyl cut branding B R A N D G1-W I N G 90째 on PSL 605 and 610 as sliding supplied by client ROOM SIDE door railright angle D12-07 64mm steel outside corners

c

B

c a l e 1 ON : ON 5 0 IFIFsINDICATED INDICATED THE THEPARTITION PARTITIONPLAN: PLAN: Denotes DenotesAutex Autex'Quietstuf 'QuietstufASB5' ASB5'infil infiltoto partition partitioncavity cavity

2. Contractor shall verify and be responsible for all dimensions on site.

22

1 1: :5 5

c

Eq. Eq. Eq. Eq.

1000

Denotes service core, column, or existing wall.

2200

sealant on each side of portion to ensure v ve er rt tian c i caair al ltight s se ecseal ct ti o ito oncolumn n s sc ca al e l e face. ROOM SIDE Foam sealant strips are B R A N D I N G not acceptable. 10

PSL PSL215 215 GLAZING GLAZINGBEAD BEAD

panel 30%viewing compressed Autex Baffle Block between 18mm, floor to suspended ceiling, ceiling tiles and ceiling slab, centred over the laminate finished MDF end panel, to partition. Provide a 1000mm gap in the baffle accommodate coat rail and drilled for Ceiling Slab block over the section of wall(centred over the adjustable height shelves Cable Outlet door to accommodate mechanical air circulation. 900 x 300mm Graphic Glass colour v ve er rt ti ic ca al l s se ec ct ti io on n s sc ca al e l e 1 1: :5 5 match to Resene v ve er rt ti c i ca al l s se ec ct ti o i on n

Apply beads TT yy p p i i two cc continuous aa l l PP aa rofracoustical tt i i tt i i oo nn 7.01

Partition

1800

2. Contractor shall verify and be responsible for all dimensions on site.

laminated glass

PLANET DESIGN CONSULTANTS LTD

c

10a

1. Do not scale

Soft white s c a Metro l e 1 Glass : 5

PLANET DESIGN CONSULTANTS LTD

Floor Floorlevel level

PSL 605 and 610 sliding Silicone Joint door rail

LD ALLOW FOR OR THIS SECTION.

PLANET DESIGN CONSULTANTS LTD

PSL PSL400 40013mm 13mmlining liningstandard standardheadtrack. headtrack.

FCL 2600nom.

11

1. Do not scale

Typical MDF fairend

E L E V A T I O N

2

PSL 601 - 100mmm skirting c/w cover infill and corner stakes to seen end adjacent to the PSL 740 section.

30% compressed Autex s cBaffle a l eBlock 1 between : 5 0 cavity where applicable ceiling tiles and ceiling slab, centred over the partition. Provide a 1000mm gap in the baffle block over the section of wall(centred over the 13mm Gib board on steel stud. door to accommodate mechanical air circulation.

5

PSL PSL205 205 GLAZING GLAZINGBAR BAR

Glass

nominated nominated

E L E V A T IAcoustic O Ntreatment to

Suspended ceiling PSL 1000 'C' channel guide + wool pile. h o r i z o n t a l s e c t i o n

Tenancy Tenancysuspended suspendedceiling ceiling

4. These drawings remain the property of Planet Design and shall not be copied without prior consent.

Allow Allowfor forGIB GIBNoiseline Noiselinetotoopen openplan planside, side,asas shown shownon onpartition partitionplan plan02.01 02.01

Ceiling Slab

Clear Clearlaminated laminatedsafety safety glass glasstotocode. code.Allow Allowforfor vertical verticalsilicon siliconjoints jointstoto abutted abuttedglass glasspanels panels

TTyy

205

stud. tolevel level 4 4where for forpaint paint finish. Apply astud. layer Plaster ofPlaster Bostic to glue to join ever finish. D12-02 MDF fairend is used

D12-03

Glass

Partition

PLANET DESIGN CONSULTANTS LTD

STAFF

D12-01

55

2800

Tenancy Tenancysuspended suspendedceiling ceiling

Glass 3. All work to be carried out in accordance with Local Body Regulations.

550

13mm 13mmgib gib board board on on standard standard 64mm 64mmsteel steel 2. Contractor shall verify and be responsible for all dimensions on site.

1050

6. Any alternative fittings or materials to those specified to be approved prior to commencing work. 1. Do not scale

Allow Allowtotoscrew screwdown downthe theceiling ceilingtiles tilestotothe the top topplate plateofofthe thepartition partitionc/w c/wtwo two 3740 sealant continuous continuousbeads beadsofofacoustical acoustical sealanton on each eachside sidetotoensure ensurean anairtight airtightfit.fit.(Foam (Foam strips stripsare arenot notacceptable!) acceptable!)

1220 15

c c

PSL PSL400 40013mm 13mmlining liningstandard standardheadtrack. headtrack.

Silicone Joint

Continuous ContinuousMDF MDFsupport supportpanel panelover overceiling ceilingtile. tile.

Tenancy Tenancysuspended suspendedceiling ceiling

SLIDING DOORS

6.6. Any Anyalternative alternativefittings fittingso

Metro Glass Soft white laminated glass

IFIFINDICATED INDICATEDAS ASAN ANACOUSTIC ACOUSTICPARTITION: PARTITION: allow allowforfor30% 30%compressed compressedAutex AutexBaffle Baffle Block Block FCL 2600nom. between betweenceiling ceilingtiles tilesand andceiling ceilingslab, slab,centred centredover over the thepartition partition

SLIDING DOORS

Tenancy Tenancysuspended suspendedceiling ceiling

5.5. Contractor Contractortotoconfirm confirmaccess accesstotosite siteprior priortotocommencing commencingwork. work.

Ceiling CeilingSlab Slab

FCL 2600nom. 30% 30%compressed compressedAutex AutexBaffle BaffleBlock Block between betweenceiling ceilingtiles tilesand andceiling ceilingslab, slab, centred centredover overthe thepartition partition

4. These drawings remain the property of Planet Design and shall not

Denotes service core, column, or existing wall. Denotes service core, column, or existing wall.

FCL 2600nom.

1

3. All work to be carried out in accordance with Local Body Regulations.

3.3. AllAllwork worktotobebecarried carriedout outininaccordance accordancewith withLocal LocalBody BodyRegulations. Regulations. 4.4. These Thesedrawings drawingsremain remainthe theproperty propertyofofPlanet PlanetDesign Designand andshall shallnot notbebecopied copiedwithout withoutprior priorconsent. consent.

Ceiling CeilingSlab Slab

o commencing work.

5

2. Contractor shall verify and be responsible for all dimensions on site.

two

2.2. Contractor Contractorshall shallverify verifyand andbeberesponsible responsiblefor forallalldimensions dimensionsononsite. site.

PLANET DESIGN CONSULTANTS LTD

PLANET DESIGN CONSULTANTS LTD PLANET DESIGN CONSULTANTS LTD

1.1. Do Donot notscale scale

1. Do not scale

v ve er rt ti ic ca al l s se ec ct ti io on n

V4 GLAZING FILM Not to scale

s sc ca al e l e 1 1: :5 5

IMPORTANT NOTE: these files are not av If such a file is requir include for the cost o file as part of their pr

Floor Level

B

E L E V A T I O



Strait Shipping

SEATING FOR 195 PASSENGERS IN THIS AREA

B

B

B

P

P

B

B

B

P

B

B

B

B

B

P

P

P

B

B

B

B

B

B

P

P

P

B

B

B

Mag

L

Mag V

V

V

V

LIFT

V

WAITING UP UP

P

P

P

P

J

F

F

P

F

F

T

V

R

B

B

BANQUETTE SEATING M

P

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

M

F

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

M

F

V T

Q

G

M

M

MALE

P

M

A

A

A

A

A

A

A

A

A

A

A

A

A

A

P

G M

P S

M

M

Glazed screen

B

TEL

G

G

ACCESSIBLE WC

Q

Q

V

J M

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

A

ACCESSIBLE WC

G

FEMALE

Q

M

P

LOW SEATING

UP

F

M

M

P

F

J

A A

RECEPTION

N

QUIET ROOM P

KIOSK

AIRLINE-STYLE SEATING

TV

S

MOTHERS ROOM

Study

P

M J

A

A0 Door 975mm clear

RECEPTION

LOW SEATING

B

B

B

B

P

P

B

B

TV

J

R

K

M M

M R

M

BANQUETTE SEATING

J

P

VIDEO GAMES

DRIVERS LOUNGE

STORE

J

V

A0 Door 975mm clear

UP A60 Door 975mm clear

UP V

V

UP LIFT

A0 Door 975mm clear UP

V

HATCHED AREA DENOTES AREA OUT OF CONTRACT 20

30

40

50

60

70

80

90

100

N T

Wellington - Cook Strait - Picton

2010-2012 With Planet Design Role: Project Designer

120

130

S

Strait Shipping requested a new crew lounge for their interisland ferry ‘MV Santa Regina’. I was assigned the project in the role of Project Designer, taking responsibility for design and client liason. The project involved surveying the existing crew lounge and presenting a fresh new lounge including dining and lounge area. Consideration had to be taking during the planning process to accommodate the dynamic environment of New Zealand’s Cook Strait. Joinery and furniture were customised to compensate for the rough swells.

N T

110

Interior finishes were all specifically chosen to meet IMO (Internation Maritime Organisation) standards. I produced 3D SketchUp drawings weekly to help articulate ideas with the client and provide simplified details for the contractors refitting the job.

S


4. These drawings remain the property of Planet Design and shall not be copied without prior consent.

5. Contractor to confirm access to site prior to commencing work.

6. Any alternative fittings or materials to those specified to be approved prior to commencing work.

REV 2

Allow to remove existing joinery

Allow to demolish existing glazing and associated trim, below glazing remains Allow to remove existing wall mounted light fitting

495

DEMOLITION

Allow to remove existing low table Allow to demolish section of existing partition

1. Do not scale

PLANET DESIGN CONSULTANTS LTD

3. All work to be carried out in accordance with Local Body Regulations.

Allow to demolish existing joinery

3. All work to be carried out in accordance with Local Body Regulations.

4. These drawings remain the property of Planet Design and shall not be copied without prior consent.

5. Contractor to confirm access to site prior to commencing work.

6. Any alternative fittings or materials to those specified to be approved prior to commencing work.

FLOORING

NOTES

Demolition works are confined to the areas shown hatched on plan only. Areas not shown hatched on plan shall remain as-is unless otherwise noted below . Remove with care all items destined for Shipowner store.

S E C O N D

F L O O R

P LA NET DES IG N BU ILDI N G

Read this drawing in association with general arrangement and partition layout drawings 01.01 and 02.01.

22m²

23 3 W ILL IS S T RE ET P . O .

Contractor to isolate all electrical, comms and plumbing services prior to disconnection and removal of demolition items.

Allow to demolish existing wall

2. Contractor shall verify and be responsible for all dimensions on site.

c

PLANET DESIGN CONSULTANTS LTD

2. Contractor shall verify and be responsible for all dimensions on site.

c

1. Do not scale

B O X

1 1 4 1 4

N E W

233 WILL P . O .

Z

TEL. +64

50m²

TEL. +64 4 384 7626

B O

W E L L I N E W

Z E A L A N D

FLOORING

FAX. +64 4 3847625

Denotes Existing Bulkhead(Wall) to be removed

S E C O N

PLANET DES

New Carpet Tile: Contractor to supply and install new Irvine International express stock LINEOUT, colour: EBONY LO. 500x500mm Lay direct stick. Tiles are to be quarter turned.

W E L L I N G T O N

Denotes Existing Curtain and associated pelmet to be removed

NOTES

New Floor Vinyl: Contractor to supply and install new Amtico Marine Collection Wood floor vinyl planks Golden Oak AMTW751, 2.5mm bevelled edges, ex Irvine International Floors. Supply and install satin chrome naplock bar to all vinyl and carpet junctions. NOTE - INDENT PRODUCT

FAX. +64

NOTES

www.plane

Install all products as per manufacturers instructions.

w w w.pla net design.co.nz

Order all indent and special products early. Refer to Specification and Programme for installation dates and times.

Denotes Existing Joinery/Furniture to be removed

Contractor to inspect flooring surfaces and fill all imperfections with non-combustible FLC, prior to installing carpet, vinyl and tiles.

Denotes Existing Door and associated trim to be removed

Allow to remove existing tables

All flooring from IRVINE INTERNATIONAL John Saunders M. 021 430 728 / E. john.saunders@irvineinternational.com

Allow to demolish existing wall

1. Remove all existing carpet, vinyl and tile floorcoverings from hatched area. Any existing fire-retardent material under floorcoverings shall remain as-is.

DENOTES SETOUT TILE

2. Existing suspended ceiling panels and ceiling grid shall remain. Existing ceiling-mounted smoke and heat detectors to remain connected and be reconfigured to suit new layout. All existing warning and exit signs to be reconfigured to suit new layout.

UP

Allow to demolish existing joinery

3. Remove redundant plumbing pipework all the way back to nearest stack and terminate. Seal all penetrations in deck to A60 rating.

UP

4. Perimeter windows, window reveals to remain as-is. 5. IMPORTANT - Selected existing elements shall remain as-is - refer to Designer or Ship Owner for more details. 6. Allow to remove all demolition materials from site.

Allow to demolish existing wall

3 2 1 200 mm

200 mm

1

Issue for Review

Rev No.

Setout revised Revised Pricing Issue for Pricing

Rev No.

23.07.11

Rev Description

Rev Date

Rev Description

Drawing Status

Drawing Status

Allow to demolish existing operable wall, alcove and associated track and trim Client

Allow to remove existing door

Client

Allow to demolish existing joinery Project

MV Santa Regina Level 4 Cook Strait

Project

Allow to demolish existing part height wall

100

100

MV Santa Regina Level 4 Cook Strait

Sheet Title

New Crew Lou

Sheet Title

Demolition Plan

50

Drawn

50

Drawn

NW

NW

Northpoint

CENTRED

0

Original Paper Size

A1 (840x594)

A1 (840x594)

1113

1:50@A3 1:25@A1

1:25@A1

Proj No.

Nor

Scale

Original Paper Size Scale

Original Paper Size 10

WORKS UNDER SEPERATE CONTRACT

1:50@A3 Original Paper Size Scale

0

10

Scale

Proj No. Sheet No.

Rev.

00.01 1

1113

She


PLANET DESIGN CONSULTANTS LTD

2. Contractor shall verify and be responsible for all dimensions on site.

3. All work to be carried out in accordance with Local Body Regulations.

4. These drawings remain the property of Planet Design and shall not be copied without prior consent.

Deck Crew

Fridge Under

5. Contractor to confirm access to site prior to commencing work.

Uniform Crew

Tea & Coffee

c

1. Do not scale

Internet Kiosk

Wall mounted TV

200 mm

Tea & Coffee

UP

50

Book & DVD Storage

100

Fridge Under

al

W nt

ou

lm TV

10

ed

0

6. Any alternative fitting


D4-01

DOOR

DETAILS

REV 2

scale 1:20

1800

200 mm

1400

JO IN ER Y NO TES A ND F IN IS HE S

900

900mm deep x 1400mm wide table; std height; heavy pedestal base, powdercoat finish Orica Silver star. Tabletop to be 30mm MDF with Formica Icelandic Blue Velour laminate finish over with matching ABS clashing. 2x off

R1

S 720

100

N T

900mm deep x 1800mm wide table; std height; heavy pedestal base, powdercoat finish Orica Silver star. Tabletop to be 25mm MDF with Formica Icelandic Blue Velour laminate finish over with matching ABS clashing. 2x off

00

200

THE SANTA REGINA LEVEL 4 CREW MESS AND LOUNGE COOK STRAIT 50

T A B L E S

3. All work to be carried out in accordance with Local Body Regulations.

4. These drawings remain the property of Planet Design and shall not be copied without prior consent.

2410

DET-1 06.01

5. Contractor to confirm access to site prior to commencing work.

6. Any alternative fittings or materials to those specified to be approved prior to commencing work. PLANET DESIGN CONSULTANTS LTD

2. Contractor shall verify and be responsible for all dimensions on site.

1690 850

1. Do not scale

1. Do not scale

2. Contractor shall verify and be responsible for all dimensions on site.

3. All work to be carried out in accordance with Local Body Regulations.

4. These drawings remain the property of Planet Design and shall not be copied without prior consent.

5. Contractor to confirm access to site prior to commencing work.

6. Any alternative fittings or materials to those specified to be approved prior to commencing work.

c

ALIGN

UNIT 01 06.01

1400

ALIGN

c

PLANET DESIGN CONSULTANTS LTD

0

10

scale 1:20

PARTITION

FINISHES

NOTES

NOTES

ALIGN Existing partitions, bulkheads

940

WORKING DRAWINGS

S E C O N D F L O O R P LA N ET DE SI G N BU I LDI N G 233 WILLIS STREET P . O . B O X 1 1 4 1 4 W E L L I N G T O N N E W Z E A L A N D TEL. +64 4 384 7626 FAX. +64 4 3847625 w w w. p l a ne td e s ig n . co .n z

1000

ALIGN

JULY 2011 ALIGN

Allow for additional in-wall blocking to support new flatscreen TV

1

06.01

1000

1250

Heights to suspended ceiling to be confirmed onsite. S E C O N D

New full height B15 solid partitions

F L O O R

P LA NET DES IG N BU ILDI N G

Existing porthole

23 3 W ILL IS S T RE ET P . O .

B O X

Z1

1 1 4 1 4

W E L L I N G T O N

Partitioning Contractor to supply and install new full height B15 partitioning as indicated on plan. Partitioning Contractor to supply and install new full height B15 wall panelling to selected perimeter walls as indicated on plan. The remaining areas of existing wall panelling shall remain and be made good and finished by Decoration Contractor.

N E W

Z E A L A N D

TEL. +64 4 384 7626 L-1

FAX. +64 4 3847625

All new B15 partitions shall be constructed from steel stud framing with Promarine-450 B15 20mm board panels over; ex Forman Building Systems. Promarine-450 board shall be installed as per Manufacturers specifications with proprietary standard trims, joints, mouldings, matching cover strips, and skirtings. Steel stud framing shall extend from floor upwards to underside of deck overhead. Framing shall be very securely fixed to ship structure - confirm fixing system with Designer prior to construction. Promarine-450 partition lining panels to finish at suspended ceiling. Exposed partition fair ends shall be finished with 100mm wide aluminium channel, powdercoat finish Orica Silver Star. Partition lining panels shall be butt-joined with concealed jointers to vertical edges wherever possible.

To Align with edge of existing window

1

00.00

Z E A L A

TEL. +64 4 384 7

L1. General new walls: Selected new partitions and wall panels shall be finished in Laminate 1: Formica 'New Stainless Steel' velour finish where indicated on plan.

FAX. +64 4 3847

L2. General new walls: Selected new partitions and wall panels shall be finished in Laminate 1: Formica 'Refined Oak' velour finish where indicated on plan.

Refer to Specification and Programme for installation dates and times.

UP B-1

Perimeter Blinds: Mermet Rollerblind M Screen 8505 - Linen Ultra contact: Suzie Blackledge / Window Treatments - 027245 4410

Denotes Joinery Marker.

Denotes Elevation Marker.

2 1

Joinery items Deleted

200 mm

27.07.11

Issue for Review

Rev No.

200 mm

1 1 4

W E L L I N G T N E W

Doors: Doors, metal door frames and hardware shall be existing and re-used from demolition wherever possible. Partitioning Contractor to determine junction details between existing door frames and new partitioning in association with Designer. For further details refer to door schedule on drawing 7.02. Door leafs shall be made good and spray finished onsite with new high-build paint finish - Zolatone PLX 01060. Low flame spread index required. Alternate flat colour shall be Resene Barely There , satin finish high wear spray-applied paint system to suit substrate as advised by Resene.

All new Promarine-450 board shall be finished in Formica high pressure laminate from Formica. Unless specified on plan. UNIT XX 00.00

B O X

WINDOW SILLS: Windows will be scaled and primed by client and sills are to be refinished with client supplied white paint.

Heights to suspended ceiling to be confirmed onsite.

Hatch denotes area where existing door track is to be removed and replaced with metal ceiling to match existing

23 3 W ILL IS S T RE P . O .

w w w.pla net design.co L-2

No timber framing or wood-based wallpanelling shall be used on ship.

UP

F L O

P LA NET DES IG N BU ILD

EXISTING PARTITIONS: Selected existing perimeter and internal partitions and panelling to remain shall be made good and spray finished onsite with new high-build Z1 paint finish - Zolatone PLX 01060. Low flame spread index required. Alternate flat colour shall be Resene Barely There , satin finish high wear spray-applied paint system to suit substrate as advised by Resene.

w w w.pla net design.co.nz

All new B15 wall panel cladding shall be constructed from Promarine-450 B15 20mm board fixed directly to existing panelling with proprietry jointers and concealed fixings OR be screwfixed to 50x75mm galv. RHS sections attached to existing perimeter linings, and terminate 150mm short of the ceiling to provide niche for pelmet fluorescent lighting - see plans. Panels and sections all ex Forman Building Systems. Promarine-450 board shall be installed as per Manufacturers specifications. In general Promarine-450 partition lining panels shall finish at suspended ceiling, unless fixed to RHS sections as decribed above. Cladding panels shall be joined with proprietry metal jointers, powdercoat finish Orica Silver Star.

D4-01

S E C O N D

All new Promarine-450 board shall be finished in Formica high pressure laminate from Formica. Colours are listed below and indicated on plan:

23.07.11

Rev Description

Rev Date

2 1

Window Sills finishes Issue for Review

Rev No.

Rev Description

Drawing Status

Drawing Status

Client

Client

Project

Project

DET-1 06.01 Allow to infill wall over existing door

MV Santa Regina Level 4 Cook Strait

100

100

MV Santa Regina Level 4 Cook Strait

Sheet Title

Sheet Title

50

50

New Crew Lounge and Dining

Drawn

NW

Drawn

Northpoint

NW 1:50@A3

1:50@A3

Original Paper Size Scale

Original Paper Size Scale

1:25@A1

1:25@A1

Original Paper Size

Original Paper Size

A1 (840x594)

10 0

0

10

A1 (840x594)

1113

Northpoint

Scale

Scale

Proj No.

New Crew Lounge an

Sheet No.

Rev.

02.01 2

Proj No.

1113

Sheet No.

03


1. Do not scale

2. Contractor shall verify and be responsible for all dimensions on site.

3. All work to be carried out in accordance with Local Body Regulations.

4. These drawings remain the property of Planet Design and shall not be copied without prior consent.

5. Contractor to confirm access to site prior to commencing work.

6. Any alternative fittings or materials to those specified to be approved prior to commencing work.

1. Do not scale

2. Contractor shall verify and be responsible for all dimensions on site.

3. All work to be carried out in accordance with Local Body Regulations.

4. These drawings remain the property of Planet Design and shall not be copied without prior consent.

5. Contractor to confirm access to site prior to commencing work.

6. Any alternative fittings or materials to those specified to be approved prior to commencing work.

c

PLANET DESIGN CONSULTANTS LTD

Momentum Consulting Group Wellington Wellington 2010-2012 With Planet Design

c

100 50 10 0 200 mm

After a successful fitout of their Auckland office, MCG asked us to provide a design for their new Wellington premises. I was asked to provide a functional workplace that included a reception, public facilities including interview/meeting rooms, testing facilities and a conference suite, and a private open plan workspace including storage and kitchenette. This became an evolution of the design and details that I had used in the previous job, which provided opportunities to explore and expand on design concepts that were implemented in Auckland. I began with a full site survey to gain an accurate drawing of the floor plate, and planned the facilities to give ample light and views to the interview rooms, where prospective clients could gaze of harbour views. The open plan office was positioned

PLANET DESIGN CONSULTANTS LTD

200 mm

Role: Project Designer


S E C O N D

F L O O R

P LA NET DESIGN BUILDING 2 3 3 W I LL IS ST R E ET P . O .

B O X

1 1 4 1 4

W E L L I N G T O N N E W

Z E A L A N D

TEL. +64 4 384 7626 FAX. +64 4 3847625 w ww .plan etd esign .co .n z

1 Rev No.

Issue for Pricing & Consent Rev Description

09.09.11 Rev Date

Drawing Status

P R IC IN G & C O N S E N T

Client

Project


Overbench storage

GENERAL NOTES

FINISHES - KITCHENETTE

FINISHES

Overhead Read this dwg in association with GA, Partition and Microwave unit Finishes plans.

Benchtop & Sides: 30mm Wilsonart HP laminate 13027-60, colour: Luxor. Ensure bottom side of benchtop substrate is moisture sealed.

Toespace: Wilsonart HP laminate 13027-60, colour: Luxor

& FITTINGS

cont.

FITTINGS & APPLIANCES

FINISHES - LEANER

A -

2

L

A

N

GENERAL NOTES

FINISHES - UTILITY UNITS

A -

HydroTap unit

In-wall blocking required for all wall hung joinery D

1810 500

370

: 2

adj. shelf

FINISHES - UTILITY UNITS

30

L

A

N

C R E D E N Z A

P

Fixed Shelf

A 150

Adjust Shelf

600

Adjust Shelf

A

N

J O I N E R Y

s c a l e

500

1 : 2 0 A3 box

RECEPTION SIDE

UTILITY BENCH SIDE

RECEPTION SIDE

Credenza Top - Finish to match sides & front of unit

UTILITY BENCH SIDE

Routed out handle, matching 25mm lowered infill panel behind - finish to match top of carcase finish Routed out handle, matching 25mm lowered infill panel behind - finish to match top of carcase finish

350

Continous Timber Lintel adj shelf

Pin board to rear of joinery bench

Fixed Shelf

1 : 2 0 A3 box 500

Drawer 2 Fixed Shelf

A3 box 500

Fixed - Shelf

500 adj shelf

3

175

700

2

adj shelf adj shelf

2

700

450

adj shelf adj shelf

Top finish to match sides and front of unit

500 Shelf Fixed

Drawer 4

2 3

450

Push to open doors -

450

945 450

painted1800 out to match surrounding wall colour

30 450

450 1810 c.o.s

adj shelf Extent of dual access cupboards (refer to wall finishes dwg).

3715 c.o.s

200

900

adj shelf

450

200

E L E V40 A T I O EN L E V A 40 T I O N 1 U T I L I T Y

50 J O I N E R Y 40 50

C

A

s c a l e U1 T: I2 L0 I T Y

50 J O I N E R Y

1

E L E V A T I O N C R E D E N Z A

s c a l e

1 : 2 0

700

benchtop

s c a l e

50

1 : 2 0

40 50

Top finish to match adj. shelf frontpaint of unit Highsides glossand spray finished exterior carcase adj. shelf adj. shelf High gloss spray paint finished exterior Spray paint finish doors off 450 carcase site prior to install 40x40mm brushed stainless adj. shelf

steel welded frame with adjustable feet 40x40mm brushed stainless steel welded frame with adjustable feet

B

S I D E

E L E V A T I O N

s c a l e

1 : 2 0

Standard white melamine to adjustable shelves and interior carcase Standard white melamine to adjustable shelves and interior carcase

1

50

E L E V A T I O N

High gloss spray paint finished exterior carcase High gloss spray paint finished exterior carcase

1

3 3

Dashed line denotes additional continuous support around double sided joinery unit

550

Open shelving unit with cavity behind

A3 box

Fixed Shelf

500

Drawer 3

2000

500

adj shelf

2 2

Drawer 1

toe recess 450

1050

Credenza Top - Finish to match sides & front of unit

1 : 2 0

25

Router out carcase to form handle ensure to use matching clashing to inside edge Router out carcase to form handle ensure to use matching clashing to inside edge

450

Fixed Shelf

1

675

Fixed Shelf

L

s c a l e

E

30 1380 Line of brushed stainless steel welded frame with 30 joinery unit adjustable feet, below

C -

U N I T

Spray paint finish doors off site prior to install

450

25

U T I L I T Y

150

Line of brushed stainless steel welded frame with adjustable feet, below joinery unit

1 C R E D E N Z A 2000 U N I T s c a l e 500 500

500

900

3

450 1810 c.o.s

GENERAL NOTES

FINISHES Fixed shelf

GENERAL NOTES

fabricated/installed as per manufacturers instructions.

Check all built dimensions site prior are to fabrication. Ensure all products andon equipment fabricated/installed as per manufacturers instructions. Check site access and dimensions prior to construction. Check all built dimensions on site prior to fabrication. Level joinery/furniture on installation Check site access items and dimensions prior to construction. All fixings to be concealed. Level joinery/furniture items on installation All1fixings to for be Consent concealed. Issue & Pricing Rev No.

Rev Description

Drawing Status

benchtop

Fixed shelf

Push to open doors painted out to match A3 box surrounding wall colour (access point to utility bench joinery unit). A3 boxEnsure all products and equipment are

4 4

700

30

P

A3 box

B

C

4 E L E V A T I O N 4

900

900

C -

1

A3 box

1

3

150

30

A3 box

450

B

450

1

Dashed line of utility joinery unit behind wall (office side)

30

450

500

B -

Silicon sheet joint detail

150

33

Adjust Shelf

Fixed Shelf

Push to open doors -

150mm wide x 30mm high new recessed handle

25

2000

Adjust Shelf

Paint back glass Panels to rear wall of reception area

1

1

Fixed Shelf

(refer to wall finishes dwg).

Magnetic Push / Open Reception side door leafs - Magnetic touch catch: Hettich P2O (push to open) Magnet catch to suit with Intermat 9943 P2O 110 degree hinges Laminex Group high 0800new 303 recessed 606 150mm wide x 30mm handle

500

B -

2

20

Fixed Shelf

E L E V painted A out T to match I Osurrounding N wall colour

2785 c.o.s

2000 1405

Fixed Shelf

30

Level 8 Reception Credenza Joinery Level 8 1

Refer to Elevations for feature wall details

Central support panel

30

JOINERY ITEM JOINERY Reception CredenzaITEM Joinery 25

Drawer Handles: Heritage Hardware 'TIRANE' handle 608mm, brushed nickel, code: 1093 BN

D

All fixings to be concealed. 0

175

175

Level joinery/furniture items on installation

: 2

E

Handles: Heritage Hardware 'TIRANE' handle 128mm, brushed nickel, code: 1087 BN

Dishwasher

1

350

700

Back Panel: 12mm LPL Melteca laminate, colour: Warm White, natural finish.

30 dimensions prior to Check site access and 600 construction.

O N

175

Silicon sheet joint detail

Uprights & Shelves: 25mm LP Melteca laminate, colour: Warm White, natural finish. Matching 2mm ABS clashing

Check all built dimensions on site prior to fabrication. 370

E

1050

900

870

10

Ensure all products and equipment are fabricated/installed a per manufacturers instructions.

370

C

700

Sides: 30 mm MDF clad both sides with Melteca LPL 'Warm White', velour Finish with matching ABS clashing. HydroTap unit

Cavity

0

370

2400

10

fittings or wall mounted unit, loaded to full capacity i.e. 100mm Plumbing rheems of paper. Fixings to be concealed.

500

R

Sink Central support panel Top: 70 Dashed line of utility joinery unit 30 mm MDF clad both sides with Formica HPL 'Warm White', velour Finish with matching behind wall (office side) ABS clashing.

Dishwasher installation of all electrical fittings. Allow to under cut back of unit ventilation Allow for adequate in-wall support for anyforfixture &

D

E

350 40

GENERALBNOTES min clearance to rear of unit Allow to co-ordinate-with electrician concerning

HydroTap unit

N

450

Power point

1 : 2 0 Sink

A

30

Glass splashback 3715 C.O.S.

Hydro tap

E

E L E V A T I O N

B

Paint back glass Panels to rear wall of reception area

2780 C.O.S. LED strip lighting 450

50

a l e

1050

L

Utility Bench top Dashed line of joinery under bench

D

0

900

Microwave

adj shelf

1

Refer to Elevations for feature wall details

6. Any alternative fittings or materials to those specified to be approved prior to commencing work. 400

25

K I T C H E Overhead N sStorage c a l e

600 Dishwasher

09.09.11 Rev Date

FINISHES FOR CREDENZA UNIT

FINISHES

150

adj shelf

E L E V A T I O N

5. 545 Contractor to confirm access to site prior to commencing work.

25

370

700

450

25

700

25

350

A

545 sign and shall not be545 copied without prior consent. 100

545

370

40

600

Extent of dual access cupboards

E 30

30

30

D

2875 c.o.s

HydroTap unit

Toe kick

40 350

Push to open doors ed out to match surrounding wall colour ccess point to utility bench joinery unit).

Magnetic Push / Open Reception side door leafs - Magnetic touch catch: Hettich P2O (push to open) Magnet catch to suit with Intermat 9943 P2O 110 degree hinges Laminex Group 0800 303 606

100mm Plumbing Cavity

1050

1 : 2 0

675

s c a l e

Allow to under cut back of unit for ventilation

450

H E N

870

Oven

N

900

30

40

40 350

30

450

450

c

200 mm

450

oinery evel 8

P

450

EM

1

2875 c.o.s

PLANET DESIGN CONSULTANTS LTD PLANET DESIGN CONSULTANTS LTD

(5). Heated/Chilled Water Unit: Leaner Top & Sides: HydroTap 430381 c/w dispenser tap for 40mm MDF clad both sides with Formica HPL chilled/boiling water. 'Warm White', velour Finish Allow to co-ordinate with plumber &700 electrician Exposed edges (exaggerated dove tail) clashed with Handles: Additional HydroTap extension shaft (commercial 4 concerning installation all plumbing andremain electrical Hardware 'TIRANE' handle 128mm, in 1). Hutchco Enterprises Tekton, Multiplex Birch solid d be responsible for all dimensions on site. 3. All work to be carried out in accordance with Local Body Regulations. 4. ofThese drawings the property of Planet Design and shall not be copied without prior consent. Heritage 5. Contractor to confirm access to site prior to commencing work. 6. Any alternative fittings or materials to those specified to be approved prior to commencing work. fittings. brushed nickel, code: 1087 BN Cupboard & Drawers Fronts: clashing, clear satin lacquer finished. Grain to run Dims: 500w x 465d x 395h (allow 50mm clearance Oven 18mm LPL Melteca, colour: Warm white horizontally around narrow edge and butt-join on each side and 70mm at rear). Underbench 1. Do not scale 2. Contractor shall verify and be responsible for all dimensions Allow on site. 3. All work to be carried out in accordance with Local Body Regulations. 4. These drawings remain the property of Planet Design and shall not be copied without prior consent. 5. Contractor to confirm access to site prior to commencing work. 6. Any alternative fittings or materials to for adequate in-wall support for any fixture & corners. Refer to elevations. Minimal radius, if any Splashback: Requires power & plumbing. fittings or 6mm Back painted glass with neutral cure clear Over bench open shelving: on edges. Ensure that dispenser tap clearly flows into sink S T A F F K I T C H E N s wall c a mounted l e 1 : unit, 2 0 loaded to full capacity i.e. silicon seal to bench. Colour: Dulux Sandfly Point rheems of paper. Fixings to be concealed. Carcass & adjustable shelves: 25mm LP Melteca below. 1. Do not scale 2. Contractor shall verify and be responsible for all dimensions on site. 3. All work to be carried out in accordance with Local colour: Body Regulations. 4. These property of Planet shall notMate' be copied without prior consent. 5. Contractor to confirm access to site prior to commencing 6. corner Any alternative laminate, Warm White, natural finish.drawings remain theHalf. Adjustable glide work. fixed to each to allow for fittings or materials Exposed edgesDesign to haveand 8mm 'Tilers Allow to under cut Use Grass and/or Salice brand hardward or similar. uneven floor level, minimum 15mm adjustment. L-trim, matt silver finish. Supplier: Tile Warehouse Edge clashed with Hutchco Enterprises Tekton, (1). Fridge: bottom back of unit for 04-473 9659 Multiplex Birch solid clashing, clear satin lacquer Hafele M10 Adjusting Screw & screw in sleeve. Cat. Client supplied ventilation Ensure all products and equipment are finished. Grain to run horizontally around narrow no. 651.02.909 fabricated/installed a per manufacturers instructions. edge and butt-join on corners, etc. Minimal radius, if Sink Insert: (2). Dishwasher: Mercer 'Mystique' single bowl and drainer, any on edges. Central Support: Client supplied Product code: MMS950-1 Check all built dimensions on site prior to fabrication. 40mm (approx) LPL Melteca, colour: Warm white Back Panel: 12mm MDF painted Dulux Aquanamel Hidden fixings (3). Oven: Check site access and dimensions prior to Low Sheen, colour: Sunshine Surprise P13.H9 Faucet: Client supplied 700 2875 c.o.s D Sink construction. D Methven 'Minimalist' sink mixer 545 545 545 545 545 Product code: MMKCP LED Lighting : (4). Microwave: Client supplied 400 25 25 25 25 25 Ensure adequate clearance between tapware and Level joinery/furniture items on installation Install LED25ribbon to underside of Unit above. Allow to co-ordinate with electrician concerning Top: splashback Hettich Versa 14V surface mounted LED with Above bench Electrical: 2 x PDL 695X (with installation of all electrical fittings. 30 mm MDF clad both sides with Formica HPL 'Warm White', velour Finish with matching All fixings to be concealed. ballast, lead & 2-pin plug, colour: 'Cool Light', white middle switch to beLisolating switch E A N for E R ABS clashing. Cutlery Drawer Inserts tape. dishwasher/oven) 170mm above bench level Allow for adequate in-wall support for any fixture & 'Blum' supplied 500mm wide cutlery drawer insert Any substrates that are exposed to moisture ie 4.8m long. Cut to length as per manufacturers adj. shelf adj shelf adj shelf fittings or wall mounted unit, loaded to full capacity i.e. Sides: Microwave adj shelf 500mm deep, Code: Z5KC50X50. Supplier: Sanco benchtop - have either LPL (warm white or similar) or instructions. 400 adj shelf rheems of paper. Fixings to be concealed. 30 mm MDF clad both sides with Melteca LPL 'Warm White', velour Finish with matching appropriate moisture sealing to prevent bowing. 09 820 5051 POWER SUPPLY REQUIRED. ABS clashing. Fridge 2400 Ensure all products and equipment are Dishwasher Back painted Glass fabricated/installed a per manufacturers instructions. Uprights & Shelves: 25mm LP Melteca laminate, colour: Warm White, natural finish. Underbench LED strip lighting 450 Matching 2mm ABS clashing E 1 Check all built dimensions on site prior to fabrication. Glass splashback Back Panel: 12mm LPL Melteca laminate, colour: Warm White, natural finish. Hydro tap Check site access and dimensions prior to Isolation Switch Power point Overhead construction. Handles: Microwave unit Heritage Hardware 'TIRANE' handle 128mm, brushed nickel, code: 1087 BN min clearance to 10 New Reception Counter Joinery SinkLevel joinery/furniture items on installation Central support panel Sink rear of unit refer sheet 08.01 Drawer Handles: 70 700 Dishwasher All fixings to be concealed. Heritage Hardware 'TIRANE' handle 608mm, brushed nickel, code: 1093 BN

40x40mm brushed stainless welded frame with toesteel recess adjustable feetFOR to base of joinery UNIT unit. FINISHES CREDENZA 825 c.o.s

Credenza Unit: 40x40mm brushed stainless steel welded frame with All exposed edges and faces of Credenza adjustable feet to base of joinery unit. unit to be spray paint finished off site in high gloss black (to match reception counter). Credenza Unit: Ensure to apply edges a 'Mirotone' 2-pacofclear coat hardener. All exposed and faces Credenza unit to be Unitspray to overhang stainless front &black sides(to match paint finished off steel site inframe high gloss 50mm. reception counter). Joiner to ensure to router out joinery to form handle Ensure to apply a 'Mirotone' 2-pac clear coat hardener. detail. Unit to overhang stainless steel frame front & sides 50mm. Interior unseen carcase: Joiner to ensure to router out joinery to form handle Adjustable detail. shelves and interior carcase to be Melamine LPL. Interior unseen carcase: Adjustable shelves and interior carcase to be Melamine LPL.

2


PSL 400 13mm lining standard headtrack.

Tenancy suspended Tenancy ceilingsuspended ceiling 30% compressed Autex Baffle Block between ceiling tiles and ceiling slab, 13mm lining PSL standard 400 13mm headtrack. lining standard headtrack. centred PSL over 400 the partition

1

T y p i c a l

ACOUSTIC PARTITION: ssed Autex Baffle Block Tenancy suspended ceiling nd ceiling slab, centred over

PSL 215 GLAZING BEAD

PSL 305 STANDARD DOOR JAMB

v e r t i c a l

1 : 5

B

s e c t i o n

sc

D o o r S e c t i o n i c P a r t si cta il eo 1n: 5 t o h o r iA z o nct ao l sue cst i to n C o l u m n / C o r e w a l l horizon ta l s ection

s ca l e 1: 5 To Suit

schedule

13mm Std gib board with plaster finish MDF Fairend Detail as described on detail 5, (Level 4) for paint finish. Note: 89mm steel stud partition wall where cavity sliding doors are noted

100

NOGS.

M u l l i o n ho riz ontal se ctio n

Silicone Joint

PSL 205 GLAZING BAR

7

sc al e

sc al e

P . O . B O X IMPORTANT NOTE: TYPICALLY ALLOW 100mm BEFORE BEGINNING THE RETURN WALL W E L L I N

7

D o o r

v e r t i c a l

3

s e c t i o n

G l a z e d P a r t it i o n t o C o l u m n v e r t i c a l

s e c t i o n

v e r t i c a l

s ca l e

1: 5

s e c t i o n

10

sc al e

1 : 5

6 4

F.C.L.

PSL 215 PSL 215 GLAZING BEAD GLAZING BEAD

PSL 215 GLAZING BEAD

PSL 305 S E CP .O ON . D B FO XL O 1 O 1 R4 1 4 STANDARD DOOR JAMB P L A NWE T ED E LS I GL N I B UNI L GD I NT G O N

1: 5

To Suit

305 Door Door asPSL described in door as described schedule in door schedule STANDARD DOOR JAMB MDF Fairend Detail as described on detail 5, this page.

P . OT .E L B. O+ 6X 4 14 13 48 41 47 6 2 6

Door as described in door schedule Floor level Floor level

W E F LA X L. I+ 6N 4 G 4 T 3 8O 4 N7 6 2 5

1: 5

sc al e

8

T E L IMPORTANT . + 6 4 4 3NOTE: 84 7626 IMPORTANT NOTE:

v e r t i c a l

8

8

D o o rD o S o e r c tS i eo cn t i o n

TYPICALLY TYPICALLY BEFORE ALLOW 100mm BEFORE Floor level ALLOW 100mm

1: 5

v e r t i c a l

F ARETURN X BEGINNING . + 6 WALL 4 4 THE 3 8 4RETURN 7 6 2 5 WALL BEGINNING THE

D o o r

1 1 4 1 4 G T O N

N E wWw w . Zp l Ea n Ae t dL e sA i gNn . Dc o . n z

Hinge

S e c t i o n

w ww .plan etd esign .c o.n z

s e c t i o n

sc al e

1 : 5

8

IMPORTANT NOTE: TYPICALLY ALLOW 100mm BEFORE BEGINNING THE RETURN WALL

Z E A L A sN c Da l e 1 : 5

D

s e vc et ri to i nc a l

1 : 5

sc al e

M u l l i o n

o9 o

v e r t i c a l

s e c t i o ns c a l e

r

ho riz ontal se ctio n

S e c t i o n

s e c t i o n

sc al e

PSL 21 GLAZIN

Silicone

Glass to

PSL 20 GLAZIN

1 : 5

C l o s e r

Floor level

c/l Existing tenancy Existing tenancy suspended ceilingsuspended ceiling

sc al e

1 : 5

1 : 5

c/l One extrusion piece aluminium One piece aluminium closing extrusion closing jamb - powdercoat jamb - powdercoat finish to match finish to match partitioning suite partitioning suite

tenancy Note: 89mm steel Note: stud89mm partition steel wall studExisting partition wall suspended ceiling where cavity sliding where doors cavity aresliding noted doors are noted

NOGS.

25mm MDF adhesive fixed contin adh

25mm MDF packer paint finished to black, c/w Note: 89mm steel Note: stud89mm partition steel wall stud partition wall adhesive fixed continuous 2590 x 3mm aluminium flat bar 90 where cavity sliding where doors cavity aresliding noted doors are noted finished to match partition suite PSL 546 and PSL 537 flush start c/l 25mm Existing tenancy If part of an acousticadhesive partition fixe - Ap suspended ceiling acoustic sealant at the junction o glazing bead to seal the glazing b 2200mm FFL. 2200mm FFL. column. Note: 89mm steel stud partition wall 90 Aluminiumwhere framed Aluminium glasssliding door. framed Sliding glass Sliding cavity doors aredoor. noted gear to suit door type. gear to suit door type. Glass to code.

Note: 89mm steel stud partition wall where cavity sliding doors are noted

90

c/l

Aluminium framedAluminium glass framed glass door. Onedoor. piece aluminium extrusion closing Sliding gear to suit Sliding door type. gear to suit doorfinish type.to match jamb - powdercoat partitioning suite 2200mm FFL. Aluminium framed glass door. Sliding gear to suit door type. Aluminium framed glass door. Sliding gear to suit door type.

C a v i t y C aSv l i i tdy e rS l wi di tehr w i t h A l u m iAnl iuummNOGS. i nJ i au m mb s J a m b s h o r iz o n t a l sh eo c tr i o zo nntal sectionsc al e

1: 5

sc al e

1

1: 5

11 11

11

sc al e

1: 5

Rev No.

v e r t i c a l 09.09.11

Issue for Consent and Pricing

C a v i t y S l i d e r Rev wNo.i tRevhDescription A l u m i n i u m J a Drawing m Status b s C a v i t y S l i d e r wv ei r tt i hc a l s e c t i o n s ca le 1: 5 A l u m i n i u m J a m b s 1 Issue for Consent and Pricing h oriz ontal se ction

wall 2200mm FFL. C a v i t y C aSv l i i tdcolumn y e orrSperimeter l wi d i tehr w i t h A l u m iAnl iuum mi nJframed i au m m bdoor. s J Sliding a m b s Aluminium glass

Rev Description

Drawing Status

Rev Date

11

09.09.11

Rev Date

gear to suit door type.

s e vc et ri to i nc a l

s e c t i o ns ca le

1: 5

12

v e r t i c a l

s e c t i o n

s ca le

Client

Client

Wellington Momentum

Simpl House Sheet Title Level 8 Construction Mercer Street Wellington

Details

s ca le

1: 5

G l a z e d P a r t it i o n t o C o l u m n C a v i t y S l vi e dr t iec arl s ewc t ii otn h s ca l e 1: 5 A l u m i n i u m J a m b s

NOTE: NOTE: 1 Issue for Consent and Pricing 09.09.11 Rev No. Rev Description Rev Date Client 1. PSL refers 1. PSL to Partitioning refers to Partitioning Supplies (NZ) Supplies Ltd who (NZ) manufacture Ltd who manufacture the aluminium the aluminium partitioningpartitioning suite, ph 0800 suite,82ph800800 80 82 80 80 Status 2. The aluminium 2. TheDrawing aluminium suite is to be suite powdercoated is to be powdercoated to Orica Silver to Orica PearlSilver 915-56960 Pearl 915-56960 09/00 09/00

0

1: 5

1 : 5

FAX. + 64 4 3847625

10

50

12

s ca l e

sc al e

1 : 5

F.C.L.

10 0

Glass to code.

s e c t i o n

4

Typical Glazed Partition

NOTE:column or perimeter wall Project 1. PSL refers to Partitioning Supplies (NZ) Ltd who manufacture the aluminium partitioning suite, ph 0800 82 80 80 Momentum Glass to code. NOTE: Simpl House 2. The aluminium suite is to be powdercoated to Orica Silver Pearl 915-56960 09/00 1. PSL refers to Partitioning Supplies (NZ) Ltd who manufacture the8aluminium partitioning suite, ph 0800 82 80 80 Level PSL 546 and PSL 537 flush starter cap pocket section column or perimeter wall Mercer Street 2. The aluminium suite is to be powdercoated to Orica Silver Pearl 915-56960 09/00 G lbead a z ofe d P a r t it i o n t o C o l u m n Project If part of an acoustic partition - Apply a continuous

12

sc al e

Pa rtitia lly Gla ze d Pa rtition

PSL 205 GLAZING BAR

If part Glass of an toacoustic partition - Apply a continuous bead of code. acoustic sealant at the junction of the column and the glazing bead to seal the glazing bead to the underside of the column.

acoustic sealant at the junction of the column and the v e r t iofc the a l glazing bead to seal the glazing bead to the underside column.

1 : 5

PSL 305 PSL 305 STANDARD DOOR STANDARD JAMB DOOR JAMB

TEL. +64 4 384 7626

10 10

1: 5

Floor level GLAZING BEAD s e vc et ri to i nc a l s e c t i o n s c a l e

Floor level

1: 5

PSL 305 PSL 305 STANDARD DOOR STANDARD JAMB DOOR JAMB S E C O N D F L O O R PSL 215 GLAZING PSL 400 PSL 400 BEAD P LA NET DES IGN BUI LDI NG 13mm HEADSECTION 13mm HEADSECTION PSL 305 23 3 W I LL IS S TR E ET STANDARD DOOR JAMB

1 : 5

50

50

s cal e

3

T y p i c a l TG y lpai zcPSLea215 d l G P laarzt ei tdi oPna r t i t i o n

PSL 205 v e r tBAR i c a l GLAZING

1: 5

PSL 400 Hinge Hinge 13mm HEADSECTION 2 3 3 N WE I LW L I SZ SE T AR EL E AT N D Door as described in door schedule

S e c t i o n

h o r i z o n t a l s e c t Ni o En W

If part of an acoustic partition - Apply a continuous bead of acoustic sealant at the junction of the column and the glazing bead to seal the glazing bead to the underside of the column. PSL 546 and PSL 537 flush starter cap pocket section

25mm MDF packer paint finished to black, c/w adhesive fixed continuous 25 x 3mm aluminium flat bar finished to match partition suite

s e c t i o n

PSL 205

1 : 5

1 : 5

13mm Gi on stand Plaster to finish.

PSL 400 13mm lining standard headtrack.

PSL 205 PSL 205 GLAZING BAR GLAZING BAR

P LA NET DES IGN BUI LDI NG

PSL 546 and PSL 537 flush starter cap pocket section

1 : 5

s ca l e

STANDARD DOOR JAMB 23 3 W I LL IS S TR E ET

Aluminium framed glass door. Sliding gear to suit door type.

25mm MDF packer paint finished to black, c/w

sc al e

F.C.L.

PSL 205 GLAZING BAR

h o r iz o n t a l sh eo c tr i o z PSL o n n t a305 l sectionsc al e

205 C l o s ePSL r GLAZING BAR

C a v i t y S l i d e r w i t h A l u m i n i u m J a m b s h oriz ontal se ction

v e r t i c a l

D o o rD o S o e r c tS i eo cn t i o n

13mm Std gib board with plaster finish GLAZING BAR One piece aluminium extrusion closing (Level 4) for paint finish. jamb - powdercoat finish to match Silicone Joint suite partitioning Note: 89mm steel stud partition wall Glass to have single layer of 3M glazing film NOGS. where cavity sliding doors are noted

C l o s e r

s cal e

Clear nominated glassf height above vertic abutte

1: 5

Glass to have single layer of 3M glazing film

sc al e

sc al e

w ww .plan etd esign .c o.n z

Glass to have single layer of 3M glazing film

25 x 3mm aluminium flat bar Cadhesive l o fixed s continuous e r finished to match partition suite

al se ctio n

ll ed

ho riz ontal se ctio n

s e c t i o n

13mm Std gib board 13mm withStd plaster gib board finishwith plaster finish (Level 4) for paint(Level finish.4) for paint finish.

PSL 215 GLAZING BEAD

10

l i o n

9 10

Silicone Joint

M u l l i o n

1: 5

Floor level

Acoustic Partition to C o l u m n / C o r e w a l l

PSL 215 GLAZING BEAD

0

: 5

Window Sill

n

9

horizon ta l s ection

50

1 : 5

6

10

e

d Detail as described on detail 5,

PSL 215 GLAZING BEAD

a l e

Acoustic Partition to C o l u m n / C o r e w a l l

13 gib board on standard 64mm steel PSL 215 PSL 215 stud. Plaster to levelBEAD 4 for paint finish. BEAD GLAZING GLAZING

6 7

100

o n

90

Existing perimeter glazing line

To Suit

Window Sill

this page.

edule

sealant on each side of portion to ensure horizon ta l s ection s c an air tight seal to column face. Foam sealant strips are not acceptable.

90

200 mm

MDF Fairend Detail as described on detail 5, To Suit this page.

s e c t i o ns cal e

T ypi cal A cou st ic Par ti ti on

PSL 305 PSL 305 STANDARD JAMB DOOR JAMB IF INDICATED ON THE PARTITION PLAN: Hinge STANDARD DOOR Denotes Autex 'Quietstuf ASB5' infill to partition cavity PSL 215 al e 1 : 5 horizon ta l s ection S E C O Ns cD a l Fe L 1O: 5O R GLAZING BEAD

13 gib board on standard 64mm steel stud. Plaster to level 4 for paint finish.

6

T y Apply p i two c acontinuous l M beads D F of acoustical fairend

1: 5

PSL 305 IF INDICATED 13 gib board on standard 64mm steel ON THE PARTITION PLAN: STANDARD DOOR JAMB stud. Plaster to level 4Denotes for paintAutex finish.'Quietstuf ASB5' infill to partition cavity PSL 315 PSL 400 DOOR PILLAR POST 13mm HEADSECTION

200 mm

Floor level

1 : 5

200 mm

sc al e

sc al e

Existing perimeter glazing line

ze d Pa rtition

s e c t i o n

Pa rtitia lly Gla ze d Pa rtition

7

oor level

Foam sealant strips are not acceptable.

Window Sill

SL 400 13mm lining andard headtrack.

Apply two continuous beads of acoustical sealant on each side of portion PSL 400 13mm lining to ensure

v e r t i c a l

sc al e

v e r t i c a l

2

P a r t i t i o n

13mm Gib board on steel stud. v e r t i c a l s e c t i o n

PSL 315 PSL 315 partition Foam sealant strips are not acceptable. DOOR PILLAR POST DOOR PILLARcavity POST

100

4

1 : 5

1: 5

s e vc et ri to i nc a l

suspended ceiling

Floor level

GLASS

F.C.L.

0

sc al e

l e

P a r t i t i aanl lair y tight Gstandard lseal a ztoecolumn d Pface. artition headtrack.

ster compound TE: PLASTERER SHOULD ALLOW FOR DITIONAL MATERIAL FOR THIS SECTION.

artition

Plaster compound lining h o r i z o nNOTE: t a lPSL s e 400 c t i o13mm n SHOULD s ca PLASTERER ALLOW FOR PSL 315 headtrack. standard ADDITIONAL MATERIAL FOR THIS SECTION. DOOR PILLAR POST

Existing perimeter glazing line

1 : 5

Typical MDF fairend

100

sc al e

Denotes service core, column, or existing wall.

4

Partition

1

T y p i c a l

infill and corner stakes to s c a lsec a1 l: e5 cover 1: 5 seen end adjacent to the PSL 740 section.

PSL 601 - 100mmm skirting c/w Apply cover infill and corner stakes to two continuous beads of acoustical INDICATED ON THE PARTITION PLAN: seen end adjacent to the PSL sealant on each side of portion toIF ensure 740 section. an air tight seal to column face. Denotes Autex 'Quietstuf ASB5' infill to

Floor level

Denotes service core, column, or existing wall.

13mm Gib. board plasterboard on standard 65mm steel stud. Plaster to level 4 for paint finish.

5

Denotes service core, column, or existing wall.

Acoustic treatment to

cavity where applicable

v e r thiocr ai zl o sn et ac l t s i oe c nt i o n

5

cavity where applicable Plaster compound NOTE: PLASTERER SHOULD ALLOW FOR ADDITIONAL MATERIAL FOR THIS SECTION. PSL 215 13mm Gib board on steel stud. GLAZING BEAD

3 4

T y p i c a l TAycpoiuc sa tl i c A cPoaur s t ittiico nP a r t i t i o n

Typ caol utreatment s t iit ri oenn d Typical Glazed Partition toP af ra T iyc apl i A cAcoustic Mt iDc F PSL 601 - 100mmm skirting c/w

18mm MDF fairend

PSL 215 GLAZING BEAD

PSL 205 13mm Gib. board plasterboard GLAZING BAR on standard 65mm steel stud. Plaster to level 4 for paint nominated finish. height above floor level.

15 NG BEAD

1: 5

Apply a layer of Bostic glue to join where ever MDF fairend is used

PSL 205 GLAZING BAR Clear laminated safety glass to code. Allow for verticalnominated silicon joints to abuttedheight glass above panelsfloor level.

uspended ceiling

sc al e

6. Any alternative fittings or materials to those specified to be approved prior to commencing work.

Clear laminated safety glass to code. Allow for vertical silicon joints to ceiling abutted glass panels Tenancy suspended ceiling

ort panel over ceiling tile.

ncy suspended

P a r t i t i o n

s e c t i o n

200 mm

access to site prior to commencing work.

v e r t i c a l

2

Floor Floor level FloorON level Plaster to level 4 for paintlevel IF INDICATED THE PARTITION PLAN: Denotes Autex 'Quietstuf ASB5' infil to finish. PSL 215 partition GLAZING BEADcavity

PSL 215 Tenancy GLAZING BEAD

13mm Gib. board p on standard 65mm PSL 215 Plaster to level 4 fo Plaster compound GLAZING BEAD NOTE: PLASTERER SHOULD ALLOW FOR finish. PSL 215 ADDITIONAL PSL 215 MATERIAL FOR THIS SECTION. nom PSL 205 GLAZING BEAD GLAZING BEAD heig GLAZING BAR

PSL 205 13mm Gib. boardGLAZING plasterboard BAR on standard 65mm steel stud.

T y p i c Ta yl p Pi ca ar tl i P t iaor nt i t i o n Floor level

5

Tenancy suspen GLAZ

PSL 215 GLAZING BEAD

abutted glass panels

GLASS

2 3

PSL 205 GLAZING BAR PSL 215 GLAZING BEAD

continuous beads of acoustical sealant on each side to ensure an airtight fit. (Foam PSL 205 PSL 215 IF INDICATED ON IF THE INDICATED PARTITION ON THE PLAN: PARTITION PLAN:GLAZING BAR strips are not acceptable!) GLAZING BEAD Denotes Autex 'Quietstuf DenotesASB5' Autex 'Quietstuf infil to ASB5' infil to PSL 205 nominated partition cavity partition cavity Allow for GIB Noiseline to open plan side, as above floor level.GLAZING BAR height GLASS GLASS shown on partition plan 02.01

PSL 205 GLAZING BAR

PSL 205 Acoustic treatment to GLAZING BAR PSL 400 13mm lining standard headtrack. PSL 601 - 100mmm skirting c/w cavityglue where Apply a layer of Bostic to joinapplicable where ever 18mm MDF fairend cover infill and corner Floor stakes level to Floor level MDF fairend is used seen end adjacent to the PSL v e r t i c a l s e vc et ri to i nc a l s e c t i o n s c a l e 1 : 5 740ssection. c al e 1: 5 v e r t i c a l 13mm Gib board on steel stud.

1

Tenancy suspended ceiling Tena IF INDICATED AS AN ACOUSTIC PARTITION: allow for 30% compressed Autex Baffle Block between ceiling tiles and ceiling slab, centred over Clear laminated the partition glass to code. A Continuous MDF support panel over ceiling tile. Tenancy suspended Tenancy ceilingsuspendedvertical ceilingsilicon j abutted glass p

205 Clear laminatedPSL safety

18mm MDF fairend

6. Any alternative fittings or materials to those specified to be approved prior to commencing work.

Continuous MDF support Continuous panel over MDF ceiling support tile.panel over ceiling tile.

GLAZING glass to code. Allow for GIB Noiseline Allow for to open GIB Noiseline plan side,toasopen plan side,Allow as for BAR Allow to screw down the ceiling tiles to the vertical silicon joints to shown onTenancy partitionshown plan 02.01 on partition plan 02.01 top plate of the suspended partition c/wceiling two

PSL 400 13mm lining PSL standard 400 13mm headtrack. lining standard headtrack.

1 25

allow for 30% compressed allow Autex for 30% Baffle compressed Block Autex Baffle Block between ceiling tiles and between ceilingceiling slab, centred tiles andover ceiling slab, centred ove the partition the partition

Ceiling Slab

IF INDICATED AS AN ACOUSTIC PARTITION: allow for 30% compressed Autex Baffle Block between ceiling tiles and ceiling slab, centred overceiling Tenancy suspended Tenancy ceiling suspended the partition

Tenancy suspended ceiling

6. An

4. These drawings remain the property Design and not bePARTITION: copied with IF INDICATED ASof ANPlanet IFACOUSTIC INDICATED PARTITION: AS AN shall ACOUSTIC

Allow to screw down Allow thetoceiling screw tiles down tothe thetile. ceiling tiles to the Continuous support panel over ceiling 30% MDF compressed Autex Baffle Block top plate ofbetween the partition topceiling plate c/wof two theand partition c/w two tiles ceiling slab, continuous centred beadscontinuous ofover acoustical beads sealant of acoustical on sealant on the partition each side to ensure each anside airtight to ensure fit. (Foam an airtight fit.suspended (Foam ceiling Tenancy strips are not acceptable!) strips are not acceptable!)

Tenancy suspended ceiling

90

Ceiling Slab

Ceiling Slab

6. Any alternative fittings or materials to those specified to be approved prior to commencing work.

Floor level

F support panel over ceiling tile.

3. All work to be carried out in accordance with Local Body Regulations.

Tenancy suspended ceiling Allow to screw down ceiling tilesgib to board the 13mm gib the board on 13mm standard 64mm onsteel standard 64mm steel top plate ofstud. the partition two Plasterc/w to level stud.4 for Plaster painttofinish. level 4 for paint finish. continuous beads ofPSL acoustical sealant onstandard headtrack. 400 13mm lining each side to ensure an airtight fit. (Foam strips are not acceptable!)

90

AS AN ACOUSTIC PARTITION: ompressed Autex Baffle Block tiles and ceiling slab, centred over

5. Contractor to confirm access to site prior to commencing work.

Ceiling Slab

30% compressed30% Autex compressed Baffle BlockAutex Baffle Block between ceiling tiles between and ceiling ceilingslab, tiles and ceiling slab, centred over the partition centred over the partition

IF INDICATED ON THE PARTITION PLAN: Apply a layer of Bostic glue to join where infil ever to Denotes Autex 'Quietstuf ASB5' MDF fairend is used partition cavity Floor level Floor level

Ceiling Slab access to site prior to commencing work. 5. Contractor to confirm

esign and shall not be copied without prior consent.

2. Contractor shall verify and be responsible for all dimensions on site.

Allow for GIB Noiseline to open plan side, as 13mm gib board on standard 64mm steel shown on partition plan 02.01 stud. Plaster to level 4 for paint finish.

5. Contractor to confirm access to site prior to commencing work.

Ceiling Slab

Ceiling Slab

13mm gib board on standard 64mm steel stud. Plaster to level 4 for paint finish.

net Design and shall not be copied without prior consent.

4. These drawings remain the property of Planet Design and shall not be copied without prior consent.

Existing perimeter glazing line

PLANET DESIGN CONSUL

1. Do not scale

c

c

PSL 400 13mm lining standard headtrack.

3. All work to be carried out in accordance with Local Body Regulations.

Window Sill

Tenancy suspended ceiling

c

PLANET DESIGN CONSULTANTS LTD

PLANET DESIGN CONSUL

2. Contractor shall verify and be responsible for all dimensions on site.

c

PLANET DESIGN CONSULTANTS LTD

1. Do not scale

1: 5


LOBBY WALL PANEL

DOOR SHOWN CLOSED

Vinyl Cut Branding - TBC by client

Scale 1:10

ELEVATION

LO B B Y WA LL P A N Scale 1:10 Horiztonal Se L

ELEVATION

S

Scale 1:50

DOOR SHOWN CLOSED

Scale 1:50

Vertical Section

3. All work to be carried out in accordance with Local Body Regulations. 4. These drawings remain the property of Planet Design and shall not be copied without prior consent. 5. Contractor to confirm access to site prior to commencing work. 6. Any alternative fittings or materials to those specified to be app to give the employees an eagle eye onto the graphics to include bold stripes that included urban landscape below them. large words and numbers. Text to read 'TEST', font to be Helvetica NeueAll LT 65 Medium , to be centred onrooms Glazing film. interview where planned to a This provided both privacy and directional Film to be 3M Diffuser film White (60% light transmission) 363507.0170, to room side of glazing. similar size, ensuring that they a sense of parity signage to the rooms. and a floating interview room was glazed on The placement of the glazing film then 2 BRANDING BRANDING BRANDING both sides. This let light from the perimeter into provided lines to set upBRANDING a lightbox behind 1 tbc tbc tbc tbc BRANDING BRANDING BRANDIN BRANDING the reception area and to provided threshold reception for signage, large enough to give tbc tbc tbc tbc between the reception and interview areas. each brand their own space at a decent scale. An agreement with the building landlord provided new flooring to the base building before the fitout. Instead of discarding the ELEVATIO N L O B B Y W A L L PELEVATION ANEL LO B B Y Scale 1:50 ION ELEVATION carpet to place inlays, I redeveloped the Scale 1:10 Vertical Section Scale 1:10 07.01

Denotes silicone join in glass

2000 RO

1

1

07.02

07.02

07.01

PARTITION

D08-07

Paintback Glass Panel, proud of wall

lighting behind

refer to dwg 08.01

GLASS GLASS

D08-12

D08-11

GLASS D08-01

GLASS

GLASS

2575mm AFL (c.o.s) Refer to Glazing Manefestation for details

1000

tbc

PARTITION

Text to read 'TEST', font to be Denotes silicone Supsended +2575 Helvetica Neue LT 65Ceiling Medium , join to AFL be centred on Glazing film. in glass Film to be 3M Diffuser film White (60% light transmission) 363507.0170, todenotes roomglazing sidefilmofoverglazing. Shading

BRANDING +1000 AFL  tbc

1000 BRANDING tbc

void

Door stop

2800 RO Line of Partition 100

2000 7

07.01

1

8

07.01

1

Door and frame to match partitioning suite

07.01

OFFICE SIDE

3

4 D08-13

2

Adequate blocking to support glass infill panel +0 FFL and substrate T5 Fluoro

PARTITION

GLAS

D08-06

GLASS

Section of wall to be constructed out of 83mm Steel stud to accommodate cavityRefer slider to Glazing Manefestation

for details

LOBBY WALL PANEL Scale 1:10 Vertical Section ELEVATION ELEVATION Scale 1:50 GLASS

Glazing film laser cut signage; Text is Helvetica Neue LT 65 Medium , to be vertically centred on Glazing film. Film to be 3M Diffuser film White (60% light transmission) 363507.0170, to room side of glazing.

Scale 1:50

0

Glass to stop 10mm +1000 AFL from partition to form negative detail. Allow to paint out negative to match wall colour +550 AFL Discrete silicone butt join

1

Frameless Glass Door

Vinyl Cut Branding - TBC by client

07.01

+2000 AFL

glazing film as per sheet 05.01 Raven acoustic threshold seals as noted

ALL ALUMINIUM DOORS HAVE 125mm STILES LOBBY SIDE WITH 100mm TOP AND BOTTOM RAILS D08-07 D08-07 900

D08-03

8

07.01

Raven door seals 07.01 as noted

07.01



Furniture Store Sliding Door Solid Core Timber Door

Cupboards from utility 07.01 refer to dwg 08.01

Supsended Ceiling +2575 AFL

11

07.01

18mm MDFpanel finished in Laminex LPL "Moleskin" laminate. Adhesive fixed 6mm back painted glass panel ex Graphic Glass ph (04) 569 7720 colour Cradle 5LIP07.0120351307.01M Aluminium Glazed Double Cavity Sliding Doors



Refer to Glazing Manefestation for details

+0 FFL

Dashed line denotes conceal lighting behind

Recessed flush pull to both sides of door

framing to wall behind adequate to support weight of panel

frameless glass doorGLASS D08-06 +550 AFL

GLASSSection of wall to be constructed GLASS out D08-04 of 83mm Steel stud to accommodate cavity slider

10

10

Head track to finish against column and door hanger positioned to allow door to close fully

fluorescent tube lighting over lapped to create a seamless wash of lighting.

door generally. Refer sheet 05.01 +2000 AFL

15

5

equal

150

1450

07.01

equal

6. Any alternative fittings or materials to tho

2800 400

15

120

950 leaf

Door to stack here

2

TEST BRANDING

Paintback Glass Panel, proud of wall

200 mm

Paint Quality finish - refer to notes below

D08-05 D08-16 PARTITION

07.01

and

Floor spring to door scabbled into slab. Supplied by door manufacturer and installed in conjunction with main contractor

D08-07

5. Contractor to confirm access to site prior to commencing work.

Strips of 3M Film to be 3M dusted crystal, to room side of glazing.

3

ELEVATIO N Scale 1:50 ELEVATION ELEVATION ELEVATION Scale 1:50 Scale 1:50

DOOR SHOWN CLOSED

Line of MDF cupboard dividers behind. Doors to overlay.

2200

Scale 1:50

PARTITION

Refer to Glazing Manefestation for details

Dashed line denotes Sliding door leaf, 460 460 stacked behind

ATION ELEVATION

TEST BRANDING tbc

LEAF 1

2000

ALL ALUMINIUM DOORS HAVE 125mm STILES WITH 100mm TOP AND BOTTOM RAILS PARTITION

D08-09

PARTITION

Glue RP79

equal

75mm strip of 50 x 50 x 3mm aluminium equal angle riveted to door to prevent finger jamb when opening this door leaf. 20mm radius corners of al. section.

Double sliding Aluminium framed Glass doors Aluminum framed to match partitionD08-07 suite

Suspended Ceiling Level

ION

-

8 8470 C.O.S.

07.01

equal

ELEVATION

5

Solid Core Timber Door Aluminum framed to match partition suite

ASS D08-04

B

LEAF 2



Cupboards from utility 07.01 refer to dwg 08.01

5

STAFF



Dashed line denotes conceal lighting behind

Scale 1:50 TO to SUIT 6. Any alternative fittings or materials to those specified be approved prior to commencing work.

900 Opening

1

Handle: Wilson & "o" Macindoe Momentum vinyl applied to door code 11904 - 900 x A Guardsman wall.(1260OA) Final art work TBC by client. 19mm Satin Stainless - finish. Back to back

Glass

3

Refer to Glazing Manefestation for details

1000

Acoustic seals where applicable

PARTITION

Equal

4

1

07.01

Adequate blocking to +550 AFL support glass infill panel +0 FFL and substrate T5 Fluoro +0 FFL

350

5

07.01

Glass to stop 10mm from partition to form +1000 AFL negative detail. Allow to paint out negative to match wall colour +1000 AFL +550silicone AFL butt join Discrete

GLASS

150

1000

275

07.01

900

Denotes silicone join in glass

Scale 1:50

275

c

ST

07.01

+2000 AFL

860

1000

07.01

07.01

8 film laser 7 cut signage; 1 Glazing 07.01 07.01 07.01 2 is Font Helvetica Neue LT 65 Medium , to be centred. 07.02 3M Dusted Crystal

1450

1 standard details 07.01 this page. Paint Quality finish - refer to 07.02 notes below NO FEATURE WHITE STRIPE.

07.01

11

1100

1

07.02

Glazing film as described on sheet 05.01

07.01

3

D08-13 LOBBY SIDE

5. Contractor to confirm access to site prior to commencing work.

Supplied by door manufacturer and installed in conjunction with main contractor

2800 RO

10

Text to read 'TEST', font to be Helvetica Neue LT 65 Medium , to be centred on Glazing film. Frame to match partitioning 2000 RO Film to be 3M Diffuser film White (60% suite light transmission) 8 7 8 3 similar as per 363507.0170,Glazing to roomManefestation side of glazing. 1200

-

3. All work to be carried out in accordance with Local Body Regulations. 4. These drawings remain the property of Planet Design and shall not be copied without prior consent. Door head pivot only

'C' channels (door head guides) to extend over the full lenght of this wall

900

07.01

810

A

-

equal

Supsended Ceiling +2575 AFL

Paintback Glass Panel, proud of wall

4. These drawings remain the property of Planet Design and shall not be copied without prior consent.

Scale 1:50

2. Contractor shall verify and be responsible for all dimensions on site.

Suspended Ceiling Level 2575mm AFL (c.o.s)

B

Vinyl Cut Branding - TBC Dashed line denotes Sliding door leaf, by client stacked behind

ELEVATION

3. All work to be carried out in accordance with Local Body Regulations.

700

3

DOOR SHOWN CLOSED

PLANET DESIGN CONSULTANTS LTD

1. Do not scale

equal

+2000 AFL

Vinyl Cut Branding - TBC by client

Scale 1:50

2. Contractor shall verify and be responsible for all dimensions on site.

D08-03 OFFICE SIDE Refer to Glazing Manefestation for details PARTITION Frameless Glass Door

Section of wall to be constructed out of 83mm Steel stud to accommodate cavity slider Dashed line denotes conceal Cupboards from utility 07.01 GLASS D08-01

Refer to Glazing Manefestation for details

1. Do not scale

GLASS

D08-06

Supsended Ceiling +2575 AFL

equal

07.01

18mm MDFpanel finished in Laminex LPL "Moleskin" laminate. Adhesive fixed 6mm back painted glass panel ex Graphic Glass ph (04) 569 7720 colour Cradle 5LIP07.0120351307.01M

2200

PARTITION

Dashed line denotes Sliding door leaf, stacked behind

3

equal

07.01

1100

1100 900

PARTITION

D08-07

2200

GLASS

void

8470 C.O.S.

Line of Partition

20008

07.01

07.02

framing to wall behind adequate to support weight of panel

PARTITION

D08-01

1

07.01

700

STAFF

7

fluorescent tube lighting over lapped to create a seamless wash of lighting. 1 2

275

1200

07.01

Equal

Glazing film laser cut signage; Font is Helvetica Neue LT 65 Medium , to be centred. 3M Dusted Crystal

07.01

Equal

-

Equal

A

-

120

3

900

Glazing Manefestation similar as per standard details 07.01 this page. NO FEATURE WHITE STRIPE.

07.01

B

8

550

2

07.02

equal

1

150

1

07.01

equal

11

07.01

1

07.02

equal

150

10

2000 RO

8470 C.O.S.

2800 RO

equal

10

2. Contractor shall verify and be responsible for all dimensions on site.

1000

Do not scale

TO SUIT

Scale 1:50

AL Frame 15

400

15

GLAZING M ANEFESTATION

Strips of 3M Film to be 3M dusted crystal, to room side of glazing.

07.01

1

07.02

07.01

B -

363507.0170, to room side of glazing.

4

GLASS GLASS

GLASS D08-04 D08-12

D08-11

GLASS

GLASS

GLASS

8

07.01

07.01

07.01

07.01

07.01

07.01

7 D08-16

Refer to Glazing Manefestation for details Dashed line denotes Sliding door leaf,

BRANDING tbc D08-07

5

D08-07

D08-14

7

07.01

7

8

3

3

8

7

1

07.01

07.01

07.01

07.01

07.01

07.01

07.01

+2000 AFL

BRANDING +1000 AFL tbc

PARTITION

2

4

+550 AFL

Section of wall to be constructed out of 83mm Steel stud GLASS D08-12 D08-11 to accommodate cavity slider

Paintback Glass Panel, proud of wall

Dashed line denotes conceal lighting behind

GLASS

Refer to Glazing Manefestation for details GLASS

200 mm

07.01

07.01

07.01

Solid Core Timber Door with viewing panel

B

2 x Sliding aluminium doors with clear laminated glass panels to code. Matching aluminium frame. Anodised to matt natural

D8-06 D8-07 D8-08

100

D8-09 D08-05

50

Al. frame to match partition suite, Paint Quality Leaf

TEST TEST

6

1

07.01

07.01

PARTITION

D08-13

GLASS

D08-16

 DOOR STOP SEALS:

Frameless Glass Door

Refer to G for details

ALL DOORS TO USE TYPE 1 SEALS UNLESS NOTED.

TYPE 1 - PSL547 Door stop filler fitted to al. partitioning door jamb, with standard felt seal (NO Raven seals)

ELEVATION Scale 1:50 ELEVATION

Refer also to details 10, 11, 12, 14 and 15 on dwg 7.01

GLASS

TO SUIT

11

1

07.01

8

07.01

Door Locking OR Latch

Door Stop

Momentum "o" vinyl applied to door and wall. Final art work TBC by client.

L8000/BS Bergen furniture

LEAF 1 = Wilson & Macindoe Guardsman code 11904 (back to back)

Proprietary PSL doors stops

LG990 C57 60mm Latchset

INTERIOR DOORS: Doors to be rolled painted on site with Resene paint system, 40003 for 15on dwg series Colour to be Resene 'Triple Concrete' Refer legend paint system details. Strips of 3M Film to be 3M dusted crystal, to room side of glazing.

DAX12801CA door stop

3

07.01

Closer

07.01

Supsended Ceiling +2575 AFL -

-

-

-

2

12mm Laminated Glass with Glazing Film

860w x 2200 high

Wilson & Macindoe Guardsman code 11904 (back to back)

DAX12801CA door stop

Supplied by Door manufacturer

Solid Core Timber Door

Al. frame to match partition suite, Paint Quality Leaf

810w x 2575h

L8000/BS Bergen furniture

LG990 C57 60mm Latchset

DAX12801CA door stop

-

-

A

Solid Core Timber Door

Al. frame to match partition suite, Paint Quality Leaf

810w x 2575h

L8000/BS Bergen furniture

DAX12801CA door stop

-

-

-

A

Solid Core Timber Door

Al. frame to match partition suite, Paint Quality Leaf

810w x 2575h

L8000/BS Bergen furniture

LG990 C57 60mm Latchset

DAX12801CA door stop

-

-

-

E

Double Cavity Slider, Aluminium framed Glass Doors

Al. frame to match partition suite, Clear laminated glass to code.

2780w opening x 2575h

3

LG990 C57 60mm Latchset

CL200D1010 passage set SCP

-

Propietary CS Stop

Propietary CS closer

-

Cavity Slider track and gear supplied by door manufacturer - CS Cavity Sliders ph (09) 2760800

D

Top Hung Solid core Sliding Door

Paint Quality Solid Core Door

Leaf - 950w x 2200 high

CL200D1010 passage set SCP

-

by Door supplier

-

-

Door is top hung but also allow floor guide, Door is to be painted out to match colour of wall

PARTITION DAX12801CA door stop

-

-

-

DAX12801CA door stop

-

DAX12801CA door stop

-

Al. frame to match partition suite, Paint Quality Leaf

810w x 2575h

L8000/BS Bergen furniture

LG990 C57 60mm Latchset

A

Solid Core Timber Door

Al. frame to match partition suite, Paint Quality Leaf

810w x 2575h

L8000/BS Bergen furniture

LG990 C57 60mm Latchset

D8-11

A Solid Core Timber Door GLASS

A

Solid Core Timber Door

Al. frame to match partition suite, Paint Quality Leaf

810w x 2575h

L8000/BS Bergen furniture

LG990 C57 60mm Latchset

GLASS 810w x 2575h

L8000/BSD08-09 Bergen furniture

GLASS D08-04

D8-12GLASSA

Solid Core Timber DoorGLASS

D08-12 D08-11 GLASS Al. frame to match partition suite, Paint Quality Leaf

D8-13

A

Solid Core Timber Door

Al. frame to match partition suite, Paint Quality Leaf

810w x 2575h

L8000/BS Bergen furniture

D8-14

A

Solid Core Timber Door

Al. frame to match partition suite, Paint Quality Leaf

810w x 2575h

L8000/BS Bergen furniture Refer to Glazing

PARTITION

D08-07

LG990 C57 60mm Latchset D08-16 LG990 C57 60mm Latchset

Manefestation

LG990 C57 60mm Latchset

D08-07

Glazing film required

4

Frameless glass Door, 12mm Laminated Glass

D8-10

+2000 AFL

-

+1000 AFL GLASS +550 AFL

D08-06

Section of wall todoor be constructed out- of 83mm Steel stud DAX12801CA stop to accommodate cavity slider

-

+0 FFL-

-

Sheet Tit

DAX12801CA door stop

-

-

-

Do

D8-15

A

Solid Core Timber Door

Al. frame to match partition suite, Paint Quality Leaf

810w x 2575h

DAX12801CA door stop

-

-

-

D

Top Hung Solid core Sliding Door

Paint Quality Solid Core Door

Leaf - 950w x 2200 high

CL200D1010 passage set SCP

-

by Door supplier

-

-

Door is top hung but also allow floor guide, Door is to be painted out to match colour of wall

D8-17

H

Hollow Core Cupboard Doors

Paintfinish as described by Sheet 03.08 Wall Finishes

2 eq doors x 2200h x 32mm

2 x L8001 Lever half set + L8003 Blank Rose

SDC 18503 magnetic door Catches - one at top of each leaf

DAX12801CA door stop x 2

-

-

D8-18

H

Hollow Core Cupboard Doors

Paintfinish as described by Sheet 03.08 Wall Finishes

2 eq doors x 2200h x 32mm

2 x L8001 Lever half set + L8003 Blank Rose

SDC 18503 magnetic door Catches - one at top of each leaf

DAX12801CA door stop x 2

-

-

Scale 1:50

Scale 1:50

Sim Leve Mer Wel

-

-

ELEVATIO N Scale 1:50 ELEVATION

Mo

-

DAX12801CA door stop

D8-16

LG990 C57 60mm Latchset

Project

-

Refer to Glazing Manefestation for details

for details L8000/BS Bergen furniture

ELEVATION Scale 1:50 ELEVATION

Client

Remarks

A

4

PR

100

Other Hardware

C

5

1 Rev No.

ALDrawing Fram

Scale 1:20

2400 open x 2575 H

810w x 2575h

D08-09

 Paint quality finish - refer to notes below -

07.01

7

(7.01) so that you are familiar with the door jamb sections and allow for the appropriate strike plate to suit each door.

 Master keying by others.

GLAZING M ANEFESTATION

10

10

F

D8-05

D08-14

07.01

D8-02

D8-04

D08-15

07.01

Text to read 'TEST', font to be Helvetica Neue LT 65 Medium , to be centred on Glazing film. Leaf Size Door Furniture Film 7to be 3M8Diffuser film White 3 (60% light transmission) 3 8 363507.0170, to room side of 07.01 glazing. 07.01 07.01 07.01 07.01

D8-01

D8-03

7

Finish 8

3

be satin chrome.

Scale 1:50

0

07.01

Description 3

275

8

 All door hardware (eg. hinges, latches) unless otherwise specified to

Refer to Glazing Manefestation Glazing film laser cut signage; for details Text is Helvetica Neue LT 65 Medium , to be vertically centred on Glazing film. Film to be 3M Diffuser film White (60% light transmission) 363507.0170, to room side of glazing.

Vinyl Cut Branding - TBC by client

Scale 1:50

 7

1

Selected doors are required to lock, as listed in Door Schedule.

3

2800 RO

8

4

125mm WIDE STILES AND 100mm TOP AND BOTTOM RAILS

 Read these drawings in conjunction with the Construction Details sheets

Cupboards from utility 07.01 refer to dwg 08.01

ELEVATIO N ELEVATION Scale 1:50 Scale 1:50 ELEVATION Scale 1:50 ELEVATION

3

07.01

 General office and meeting room doors are to be non-locking as standard.

D08-03

GLASS

8

07.01

 ALL STILES ON ALUMINIUM FRAMED GLASS DOORS AT TO BE

BRANDING tbc

GLASS

D08-06

1

07.01

Momentum "o" vinyl applied to door and  wall. Final art work TBC by client.

+0 FFL

PARTITION

D08-15

50

Scale 1:50

BRANDING tbc

6

stacked behind

ELEVATION EVATION Scale 1:50 ELEVATION

e 1:50

3

PARTITION

D08-09 PARTITION

D08-01

Refer to Glazing Manefestation for details

3

350

D08-05

8

3 100

275

5

7

100

Denotes silicone join in glass

Supsended Ceiling +2575 AFL

-

8

1100

TEST TEST

Scale 1:20

equal

3

07.01

Equal

07.01

Momentum "o" vinyl applied to door and wall. FinalAart work TBC by client.

8

07.01

Equal

07.01

1

equal

07.01

Equal

07.01

8 Text to read 'TEST', 3 3 8 7 font to be Hollow core Timber Doors 07.01 07.01 07.01 Helvetica Neue LT 65below Medium , to film. 207.01 Paint07.01 quality finish - refer to notes 1 be centred on Glazing 1 CupboardFilm Doors to be 3M Diffuser film White (60% light transmission) 07.02 07.01 07.02

07.01

Equal

7

07.01

1

550

8

equal

11

350

3

2000 RO

8470 C.O.S.

2800 RO equal

10

900

3



Glazing film laser cut signage; Text is Helvetica Neue LT 65 Medium , to be vertically centred on Glazing film. Film to be 3M Diffuser film White (60% light transmission) 363507.0170, to room side of glazing.

Drawn

JLE

GLASS

Scale

1:1

Original P

1:5

Original P

A1 GLAZING M ANEFESTA 15

Strips of 3M Film to be 3M dusted crystal, to room side of glazing.

0

10

Scale 1:20

8

7

8

3

3

8

7

8

3

3

8

7

1

400

Proj No.

100


1

Issue for Review

Rev No.

09.09.11

Rev Description

Rev Date

Drawing Status

Client

Project

Momentum Simpl House Level 8 Mercer Street Wellington

Sheet Title

ELEVATIONS

& GLAZING MANEFESATION

Drawn

NW

Northpoint

Scale

Original Paper Size Scale

As Shown Original Paper Size

A1 (840x594)

Proj No.

1123

Sheet No.

Rev.

05.01 1


c

3. All work to be carried out in accordance with Local Body Regulations.

2

4. These drawings remain the property of Planet Design and shall not be copied without prior consent.

4

3

5

7

6

5. Contractor to confirm access to site prior to commencing work.

8

9

10

N

ENTRY

Z G-02

G-01

MEETING

Z1

G-03

R

A

1. Do not scale

2. Contractor shall verify and be responsible for all dimensions on site.

3. All work to be carried out in accordance with Local Body Regulations.

4. These drawings remain the property of Planet Design and shall not be copied without prior consent.

1

2

Z

3

04-02

04-01

04-04

04-03

A

4 04-07

04-06

5 04-09

04-08

PROCEDURES & SUPPORT (6)

6 04-11

ACCOUNTANTS (2)

SPECIAL PROJECTS (1)

monitor

G-04

CLIENT SERVICES

6. Any alternative fittings or materials to those specified to be approved prior to commencing work.

10

S S S

04-10

04-59 04-58

G-08

AV cabinet

04-21

04-22

OFFICE

04-23

04-24

05-02

Carving

42" monitor

WAITING

KITCHEN

UP stair 1

05-31

CD

E.A.

E.A.'s

COATS

E

E

04

Female

SCIF

6

04

2 -3 04

-2

-2

30.03.10

Issued for Information Issue For Information

8

Rev No.

6

COMMS

22.06.09

04-53

04

06.05.09

Rev Description

Rev Date

MEETING

INFORMATION ONLY 04-50

GAS & WATER

04-48

Client

04

service riser

5 -3

04 OFFICE

42U

04.09.09

Drawing Status

7

water

UTILITY

05.02.10

Issued for Information

04

OPERATIONS STRATEGY (4)

7 -3

04

F1

OFFICE

04

BREAKOUT E.A.

04-36

04-51

04

-3

-3

-2

04-49

05-29

E

Issue for review (3) AUDIT

30.04.10

Issue for Review

OFFICE

Issued for information

STORE

22.06.09

05

06.05.09

Rev Description

G

Drawing Status05-26

STORE 05-25

05-24

OFFICE

05-23

-4 2

-4 3

COATS

UP

05

05

05-22 Project

New Zealand Customs Service D4 at CentrePort COMMS (6) Waterloo Quay Wellington

Ground Floor

50

GENERAL ARRANGEMENT 04-45 Ground Floor

JLE

New Zealand Customs Service - D4 at Centreport

Fourth Floor

K Drawn

Northpoint

Checked

PC

05

-19 05

-17

05

CD

2 -1

-14

-15

-16

-18 05

1:100

2008-2011 With Planet Design in association with Studio Pacific Architecture (base build)

JLE

New Zealand Customs Service - D4 at Centreport

Fifth Floor

Northpoint

Checked

PC Scale

A1[840x594]

Proj No. Sheet No.

Rev.

01.00 6

New Zealand Customs Service was a new build in the newly developed D4 @ Centreport district on Wellington’s water front. This was one of the first 5 star rated buildings by the New Zealand Green Building Council. The new Customhouse was a coordinated new building, with Studio Pacific Architecture and Planet Design. As part of Planet Design I worked on fitout interior design which was completed alongside the base building. I joined the project at the developed design stage and shared the job of producing the development and presentation renders with another junior designer.

10

10 10

Wellington

Drawn

Original Paper Size

A1[840x594]

0806

H

K

0

GENERAL ARRANGEMENT 1 05 -2 Fourth Floor

1:100

Scale

Original Paper Size

Proj No.

05 -2

Sheet Title

Sheet Title

50

New Zealand Customs Service - D4 at Centreport

Role: Designer

07

8

OFFICE

STRATEGY & PLANNING (5)

G G1

04-44

H

H

-0

100

100

04

05

BREAKOUT

05 -38 04 -40 04

04

COATS E.A.

F1

0 -1 05

INFORMATION ONLY

Project

New04-47 Zealand Customs Service OPERATIONS COORDINATION (11) D4 at CentrePort 04-46 Waterloo Quay Wellington

4 -0 05

5

OFFICE

3 -1

Rev Date

Client

INTEL (6)

1

-0

6 -0 05

OFFICE

1 -1

05-

04.09.09

Issue For Information

F

4 -3

GYMNASIUM

K

stair 2

05

UTILITY

01.04.10 05-27

Issued for Information

Rev No.

3 -3

05

service riser

5 4 3 2 1

1

9 -0

05-28

9

0

05

Female

-4 1

G

G1

100

Comms

MEETING

-39 04

04

SPRINKLERS

42" Monitor

EXECUTIVE SECRETARIAT (5)

STORE

7

8

200 mm

200 mm

F

23.04.10

Furniture Layouts Altered

04-52 Speed gate location altered

9

1

mirror

10

5

FEMALE'S CHANGE

11

BIKE PARK

Accessible wc

4

DRY ROOM

F1

Furniture Layouts Altered 04-54

3

iron

iron

#31 lockers

2

F

12 13 14 15 16 17 18 19 20

21 22 23 24 25

COATS

6 5 4 3 2 1

MEN'S CHANGE

UTILITY

BREAKOUT

cl service riser

OFFICE 04-55

TRANSFORMER

#49 lockers

200 mm

-2

STORE

G-12

50

04

comms

42U

ups

G

COATS

UP

R COMMS

GENERAL STORE

Male

05-31 05-30

MEETING

BREAKOUT

COATS

pl riser

accessible wc

service riser

50" monitor

UP

UP

04-57 04-56

D

OPERATIONS DEVELOPMENT (5)

MEETING cl

R MAIL

STORE

05-03

MAORI RESPONSIVENESS (1)

electrical

Male

CD

electrical

COATS

D

G-09

R ELECTRICAL SWITCH ROOM

UP

10

36" monitor

STORE side board

50" monitor

CD

R STAIR 2

UP

LOADING DOCK

9

REFRESHMENT

C

04-25

RECYCLING ZONE

6. Any alternative fittings or materials to those specified to be approved prior to commencing work.

05-01

OPERATIONS ROOM

D

8

OFFICE

ENSUITE

INTERVIEW COATS

05-33

OFFICE

UP

TOILETS

CD

5. Contractor to confirm access to site prior to commencing work.

05-32

UP

LIFT

Carving over door

7

UTILITY

C

REFRESHMENT

STAIR 1

ACCESSIBLE PARK

6

A

04-20

Lockers

safe

5

04-18

UP

G-06 G-07

UTILITY

4. These drawings remain the property of Planet Design and shall not be copied without prior consent.

4

Z

EXHIBIT STORE ROOM

LIFT

UP

3

B

STORE

04-60

UP

3. All work to be carried out in accordance with Local Body Regulations.

2

04-19 04-61

C

1

EXAMINATION

CLIENT SERVICES (10) form filling

UP

2. Contractor shall verify and be responsible for all dimensions on site.

04-16

PERFORMANCE ASSURANCE (8)

INTERVIEW display

1. Do not scale

04-17

B

forms

9

INVESTIGATIONS (10)

04-15

REFRESHMENT

04-05

UTILITY

G-05

speed gates by others

G-11

signage

8

04-14

DDD STORE ROOM

04-62

G-10

card access

B

04-13

OFFICE

OFFICE

04-63

CORPORATE RECEPTION

7

04-12

BREAKOUT MEETING

5. Contractor to confirm access to site prior to commencing work.

6. Any alternative fittings or materials to those specified to be approved prior to commencing work.

PLANET DESIGN CONSULTANTS LTD

1

c

2. Contractor shall verify and be responsible for all dimensions on site.

PLANET DESIGN CONSULTANTS LTD

1. Do not scale

c

PLANET DESIGN CONSULTANTS LTD

New Zealand Customs Service Headquarters

0806

Sheet No.

Rev.

01.04 5

I was assigned key areas including the reception, customer services and lift lobby areas. Accuracy was a big factor for the client who wanted a realistic representation of the proposed design.



PLANET DESIGN CONSULTANTS LTD c

1. Do not scale

2. Contractor shall verify and be responsible for all dimensions on site.

1

3. All work to be carried out in accordance with Local Body Regulations.

2

3

4. These drawings remain the property of Planet Design and shall not be copied without prior consent.

4

5

6

7

5. Contractor to confirm access to site prior to commencing work.

8

6. Any alternativ

9

Z A 50" monitor MEETING AV cabinet CONFERENCE

ROOF TERRACE MEETING

50" monitor

B AV cabinet

CONFERENCE

AV cabinet

CONFERENCE

C

AV cabinet

COATS

UP

STORE

VENDING MACHINES

UP

CAPPUCCINO

SELF HELP

MICROWAVES

CD

stair 1

Existing Carving

FIRST AID

Existing Carving

STORE ROOM

Male

UP

UTILITY

UP

smartboard

PARENTS ROOM

stair 2

secure

electrical

D

COATS

smartboard AV cabinet

CD

AV cabinet

cl

TRAINING ROOM

I.T TRAINING

BREAKOUT Accessible wc

service riser

02-01 02-02

REFRESHMENT

Comms

Female

E

02-24

STORE

02-03 02-04

OFFICE

service riser 02-23

STORE

02-21 02-20

OFFICE

MEETING

TRAINING (7)

02-22

02-05 02-06

200 mm

UTILITY

F1

F

02-07

BREAKOUT

02-08 02-09

E.A. 02-19

ORGANISATION DEVELOPMENT (6)

02-18

ADVISORY SERVICES (8)

G

02-10 02-11

G1 02-17

02-12

02-16 100

02-13

02-14

10

50

H

K

02-15

New Zealand Customs Service - D

Seco


PLANET DESIGN CONSULTANTS LTD

2. Contractor shall verify and be responsible for all dimensions on site.

3. All work to be carried out in accordance with Local Body Regulations.

4. These drawings remain the property of Planet Design and shall not be copied without prior consent.

3. All work to be carried out in accordance with Local Body Regulations.

4. These drawings remain the property of Planet Design and shall not be copied without prior consent.continuous5.fluroContractor to confirm access to site prior to commencing work. strip lighting

exposed wall at rear of recess to be paint finished in a pale metallic TBA

COMMERCIAL KITCHEN

200 wall exposed both sides

1225

270

540

270

scale1:20

c

GENERAL NOTES

A -

Refer to Beca documents for final description of lighting and power specifications.

120mm x 10mm diameter stainless steel disc foot. arrised edges and 3x counter sunk stainless steel screw fixings.

JOINERY ITEM

external veneercarcase work and Generally 12, 18 and 25mm lp laminate/veneer paint finished ply/MDF, ie no unfinished corner,mdf. refer to Ensure joinery securely fixed to floor and wall where applicable. detail 2 All fixtures & fittings to be installed as per manufacturers instructions. Mitre all visible corners and edges. All fixings to be concealed. timber veneer over marine

Footrail

A

1:5

grade ply paneling to wall Check all built dimensions on site prior to fabrication. Check site access prior to construction.

Entry doors to be installed after ply paneled wall and glass panels

-

Suspended ceiling level

Suspended ceiling level

2750mm AFFL (c.o.s.)

timber venered wall paneling

80

3275mm AFFL (c.o.s.)

drawing 8.21A

DETAIL 2

Bar Height Banquette Level 2

scale1:20

LIFTS

5

80

Banquette Booth Seating - Level 2

removable access panel fixed with aluminium angle

10

6. Any alternative fittings or materials to those specified to be approved prior to commencing work.

540 or materials to those specified to be approved prior to commencing work. 6. Any alternative fittings

STEP UP

PLAN 1

continuous fluro strip lighting

Support upstand of 30mm diameter stainless steel tube welded to the foot rail. Brushed finished.

5. Contractor to confirm access to site prior to commencing work.

Continuous length of 40mm diameter stainless steel tube foot rail with domed cap end. All brushed finished.

5. Contractor to confirm access to site prior to commencing work.

PLAN 1

grain C C 8.21A 8.21A 4. These drawings remain the property of Planet Design and shall not be copied without prior consent. ledge

Bar Leaner Banquette - Level 2

timber veneered paneling

FIXTURES & FITTINGS Lighting: Sylvania T5 Slim Lighting. Position fittings continuously and without gaps.

Supply with connector cables as required. Suspended ceiling level

SOCIAL These drawings are intended to be printed in A1 for clarity of CLUB BENCH detail.

seat pad seat base

-

Bar Leaner Banquette - Level 2 FIXTURES & FITTINGS

D E T EAL EI LV A 1T I O1:5 N A

2959

10 0

Banquette Seating - Level 2 Glass Slot WallBooth Inserts external veneer corner, refer to drawing 8.21A detail 2

600

300

300

glass slot recess

doors to be installed after wall300 and glass panels 450

600

600

150

300

450

600

150

300

450

10 10

1230

100

5

SERVERY

scale1:20

300

Banqu

300

450

600

colour 1

colour 2

colour 3

SOCIAL CLUB Lumbar : Backrest BENCH

Upholstered wall-mounted (raked blocking) backrest to be 18mm high resilient foams to 18mm MDF base board. timber veneered paneling To be upholstered in Mokum Hospitality "Yalumna" colour 081 Peppercorn (to be confirmed before order)

200

1. Do not scale

Cafe Entry Wall - Level 2 80

10 0

06.05.09

external veneer corner, refer to drawing 8.21A detail 2

60

timber veneer over marine grade ply paneling to wall

75

30

480 cushioned bench seat

20

seat pad timber veneer over marine grade ply paneling to wall

seat base

recessed show panel

380

Project

equal

100 150

equal

grain

equal

SECTION A BOOTH SEATING

seat base

New Zealand Customs Service D4 at CentrePort Waterloo Quay Wellington

footrail refer Detail 2

150 100

footrail, detail 2

A

Veneer, refer dwg 8.21 finishes note A

60

2680mm AFFL (c.o.s.)

1230

DETAIL 1

platform

timber venered wall paneling

JLE

1:100 Original Paper Size

A1[840x594] Sheet No.

Rev.

75

60

20

seat base

Drawn

recessed show panel

Checked

360

365

90

55

Northpoin

Pip/KD PC Scale

1:20

90

Original Paper Size

425

4 x 2 framing

A

ELEVATION B

PC Scale

scale1:10

360

9

A1[840x594]

90

Checked

Proj No.

90

platform

Northpoint

30

Proj No.

200

Drawn

480

platform

60 155 365

seat pad seat base recessed showpanel

Ven Corn

JOINERY Bar Leaner Banq 2nd Floor

Banquette Booth Seating Section

300

backrest lumbar

timber venered ply wall paneling

30

glass paneling to return to wall end. Clear silicon join at end. refer to drawing 8.21 glass panel detail

Bar Leaner Banquette - Level 2

DE

Sheet Title

SECTION A

1:20

300

fluorescent lighting in recess behind refer notes

1230

ond Floor

ELEVATION B 100

D4 at Centreport

GENERAL ARRANGEMENT Second Floor

50

Bar Leaner Banquette - Level 2

Sheet Title

external veneer corner refer to detail 2

New Zealand Custom D4 at CentrePort Waterloo Quay Wellington

platform

seat pad

timber venered ply wall paneling

10

scale1:20

scale1:2

4 x 2 framing

grain

0

ELEVATION A

-

Project

Glass Panel Light Well - Level 2 Typical Section

90 A

Client

Veneer

recessed show panel

Suspended ceiling level

platform

2 -

scale1:10

Banquette Booth Seating Section

timber venered wall paneling

equal

450

380

equal

4 x 2 framing

seat pad

200 mm

equal

60 100 200

55 grain

CONSTRU

90

90

200

450

backrest lumbar

765

seat pad seat base recessed showpanel

Rev Description

platform

glass 'slots' backrest lumbar

30

seat base

portion of wall exposed to both sides

glass slot recess

Issued For Pricing and Co

Drawing Status

aluminium trim 365

Client

450

Additional Detail

70

raked blocking backrest lumbar

seat pad

1230

timber venered wall paneling

access panel

4mm back painted glass, four sizes, five colours, refer dwg 8.21 glass panel detail

backrest lumbar

100

INFORMATION ONLY

glass panels

Issued for Construction

Rev No.

raked blocking, 20mm

300 backrest lumbar

70

refer dwg 3.02 wall finishes dwg

300

2750mm AFFL (c.o.s.)

3 2 1

REAR WALL - PAINTED

glass panels

Suspended ceiling level

Drawing Status

20

50

fluorescent light

Rev Date

350

Rev Description

aluminium angle screw fixed to framing, UA1091 or similar

200

Issue For Information

Rev No.

1 -

100

22.06.09

JOI

fluorescent light fittings in light well to extend along/around full length of wall behind platform, crossing over in some places as indicated.

1 -

20

04.09.09

Issue For Information

timber veneer over marine grade ply paneling to wall

75

Issued for Information

Footrail

timber veneer over marine grade ply paneling to wall

60

30.03.10

60

A 29.04.10 -

Issue for Review

6. Any alternative fittings or mate

Refer

1:5

20

timber venered wall paneling

Issue for review

scale1:5

5. Contractor to confirm access to site prior to commencing work.

Glass Slot Wall Inserts

Boot

300

5 4 3 2 1

4. These drawings remain the property of Planet Design and shall not be copied without prior consent.

2750mm AFFL (c.o.s.)

c

3275mm AFFL (c.o.s.)

3. All work to be carried out in accordance with Local Body Regulations.

Suspended ceiling level

DETAIL 2

Suspended ceiling level

DETAIL 1

-

scale1:20

2. Contractor shall verify and be responsible for all dimensions on site.

120mm x 10mm diameter stainless steel disc foot. arrised edges and 3x counter sunk stainless steel screw fixings.

Bar Leaner Banquette - Level 2

Platform: Refer Level 2 Floor Finishes Plan, sheet 4.02.

A

ELEVATION A

0

scale1:20

50

PLANET DESIGN CONSULTANTS LTD

PLAN 1

120

10

Continuous length of 40mm diameter stainless steel tube foot rail with domed cap end. All brushed finished.

150

grooves routered for friction-fit

GLASS PANEL DETAIL

Support upstand of 30mm diameter stainless steel tube welded to the foot rail. Brushed finished.

300

Seat: back wall painted Resene Proton Upholstered seat to be 18mm high resilient foams to 18mm MDF base board. groove for glass insert To be upholstered in Mokum Hospitality "Yalumna" colour solid timber tapered shelf, glass 081 Peppercorn (to be confirmed before order)

solid timber end - to match veneer

50

A -

150

SEC

1:20

grain

platform riser

continuous fluro strip lighting

OVERHEAD LIGHTING

150

show panel

5160

ELEVATION B

Bar Height Banquette Seating: Seat Base removable access panel fixed with aluminium angle Bestwood Recon Veneer, colour: 'Barista' over finely sanded marine grain ply. Veneer to be prepared as required to groove for glass insert, receive Mirotone 'Mirocat' PC3244 Sealer and finally friction-fit Mirotone 'Mirocat' PC 3220 Lacquer 30%,exposed spraywallfinished. at rear of recess to be paint finished in a pale ex Carter Holt Harvey Woodproducts. metallic TBA Allow to scribe to suit floor tolerance. 6mm clear glass panels, exposed indicated on plans 300 600Follow grain 300 as 150 600 450 edges 300 polished

100

200 mm

2750mm AFFL (c.o.s.)

4 x 2 framing

seat pad seat base recessed showpanel

Exposed Wall at Rear of Recess : A Pale Metallic paint finish: 8.21A Resene Metalic colour 'Proton' timber veneered paneling 16MA50 spray finished .

-

scale1:20

Suspended ceiling level

Cafe Entry Wall - Level 2

timber veneered wall paneling

Bar Leaner Banquette - Level 2

grain

Lighting: Sylvania T5 Slim Lighting. 8.21A A A Position fittings continuously and without gaps. Supply with connector cables as required. To be connected to room switching.

recessed show panel

1:20 1230

scale1:20

grain

Glass Slots : 90 100 pieces of 6mm glass (TBC), exposed edges polished. A To be friction-fitted into grooves above and below discreetly grain with clear sealant if required. graindistances 'bar code style' as Positioned slots at random shown on Elevation A. Designer to assist with spacings if required. Allow 100mm spacings at approx 600mm intervals for access to removable panel fixing. Refer Detail 1.

dwg 8.21A detail 1

platform

10

ELEVATION A

platform riser

4245 (c.o.s)

540

seat pad

Check site access prior to construction. seat base

grain

50

200

Check all built dimensions on site prior to fabrication.

backrest lumbar

grain

4

seat pad

Exposed Wall at Rear of Recess : fluorescent lighting in 'Proton' Pale Metallic paint finish: Resene Metalic colour 16MA50 spray finished . recess behind. refer

SECTION A

150 100

grain

80

seat base

required. Allow 100mm spacings at approx 600mm intervals for access to removable panel fixing. Refer Detail 1. footrail, detail 2

300

scale1:20

Cafe Entry Wall - Level 2

wall exposed both sides

380

backrest lumbar

4

200 mm

BOOTH SEATING

PLAN 1 Bar Leaner Banquette refer J20/8.21

2 -

Glass Slots : 80 pieces of 6mm glass (TBC), exposed edges polished. To be friction-fitted into grooves above and below discreetly with clear sealant if required.

BOOTHPositioned slots at random distances 'bar code style' as shown on Elevation A. Designer to assist with spacings if SEATING

300

100

groove for glass insert

Veneered Wall Paneling : seat pad 3mm solid Victorian Ash veneer over Marine Ply substrate. timber veneer over marine Timber grain to run verticallly as indicated in elevations. grade ply paneling to wall Veneer joints to be butted neatly to appear seamless. External corner-joints in the veneer to have Plankwall Aluminium extrusion or similar. Shelf of recess to be solid timber to match. seat base timber veneered Timber to be prepared as required before finishing. To receive Mirotone 'Mirocat' PC3244 Sealer and finally wall paneling Mirotone 'Mirocat' PC 3220 Lacquer 30%. Refer Section A & Detail 1.

timber venered wall paneling

20

Generally 12, 18 and 25mm lp laminate/veneer carcase work and backrest lumbar paint finished A ply/MDF, ie no unfinished mdf. SERVERY seat pad seat base Ensure joinery securely fixed to floor and wall wheregrain applicable. recessed showpanel All fixtures &equal fittings to be installed as per manufacturers equal equal equal instructions. Mitre all visible corners and edges. All fixings to be concealed. backrest lumbar 100 150

glass panels

backrest lumbar

Wall Paneling Refer to lettering shown on elevation

Veneered Wall Paneling : portion of wall exposed 3mm solid Victorian Ash veneer over Marine to bothPly sides substrate. Timber grain to run verticallly as indicatedglass in 'slots' elevations. Veneer joints to be butted neatly to appear seamless. backrest lumbar External corner-joints in the veneer to have Plankwall seat pad 4 x 2 framing Aluminium extrusion or similar. Shelf of insert to be solid timber to match. seat base timber venered wall Timber to be prepared as required beforepaneling finishing. To equal equal receive Mirotone 'Mirocat' PC3244 Sealerfootrail and finally refer Detail 2 Mirotone 'Mirocat' PC 3220 Lacquer 30%. platform Refer Section A & Detail 1. 55

glass slot recess

Bar Leaner Banquette Wall refer J20/8.21 recessed lighting

solid timber tapered shelf, glass grooves routered for friction-fit

Wall Paneling glass panels refer detail 1 Refer to lettering shown on elevation

Refer to Beca documents for final description of lighting and power specifications.

access panel

external veneer corner, refer 1 to drawing 8.21A detail 2 -

1230

20

300

clear glass panels, exposed edges polished

FINISHES

60 100 200

timber venered wall paneling

external veneer corner, refer to drawing 8.21A detail 2

To be connected to room switching.

FINISHES

timber veneer over marine grade ply paneling to wall

765

2750mm AFFL (c.o.s.)

2750mm AFFL (c.o.s.)

8.21A

GENERAL NOTES

10

Suspended ceiling level

exposed wall at rear of recess to be paint finished in a pale metallic TBA

A

8.21A

380

A

200 mm

groove for glass insert, friction-fit

B -

external veneer corner, refer to drawing 8.21A detail 2

3. All work to be carried out in accordance with Local Body Regulations.

STEP UP

PLANET DESIGN CONSULTANTS LTD

4. These drawings remain the property of Planet Design and shall not be copied without prior consent.

2. Contractor shall verify and be responsible for all dimensions on site.

ledge

show panel

540

1800

grain

5160

A -

1. Do not scale

Lighting: Sylvania T5 Slim Lighting. Position fittings continuously a Supply with connector cables To be connected to room switc

1:5

seat pad

Glass Slot Wall Inserts

B -

B -

FIXTURES & FI

DETAIL 1

B

8.21A

seat pad

external veneer corner, refer to drawing 8.21A detail 2

Check all built dimensions on site

Check site access prior to construc

BOOTH SEATING

3770

10

B

8.21A

grain

grain

COMMERCIAL KITCHEN

3400 (c.o.s.)

STEP UP

Generally 12, 18 and 25mm lp la paint finished ply/MDF, ie no unfin

Ensure joinery securely fixed to f All fixtures & fittings to be installe instructions. Mitre all visible corners and edges. All fixings to be concealed.

ledge

solid timber tapered shelf, glass grooves routered for friction-fit

4

seat pad

grain

120

c

seat pad

grain

I implemented the use of 3D modeling to help work out some of the details on the project. For example, a key motif of the design was the use of paint back glass, which appears as panels and fins throughout the fitout. Each area was first modeled in detail in SketchUp, by developing these COMMERCIAL KITCHEN features in 3D we were able to pare back the construction giving a cleaner minimal look.

These drawings are intended to b detail.

Refer to Beca documents for fina power specifications.

groove for glass insert

ledge

ledge grain

3. All work to be carried out in accordance with Local Body Regulations.

GENERAL NOT

10

c

groove for glass insert, friction-fit

external veneer corner, refer to drawing 8.21A detail 2

2. Contractor shall verify and be responsible for all dimensions on site.

6. Any alternative fitt

80

removable access panel fixed with aluminium angle

clear glass panels, exposed edges polished

Z1

6. Any alternativ

timber veneered paneling

2. Contractor shall verify and be responsible for all dimensions on site.

270

1. Do not scale

5. Contractor to confirm access to site prior to commencing work.

300

N

10

1. Do not scale

PLANET DESIGN CONSULTANTS LTD

ve fittings or materials to those specified to be approved prior to commencing work.

1. Do not scale

scale1:20

Banquette Booth Seating - Level 2

SECTION B

scale1:10

Banquette Seating Ottoman - L2

0806

Sheet No4

SECTIO

Banquette Seat




KiwiBank

Wellington

2010-2012 With Planet Design Role: Designer

I coordinated demolition of existing fitout and services ensuring what elements could be reused. After returning the floor plates back to blank canvas, I worked with the Director to plan both hard and soft fitout. Playing with the length of the building we worked with the idea planning the shared workspace facilities along the spine, staggering and offsetting the rooms along the way to break up span. More structured spaces like training facilities; stores and large social areas were planned into the corners of the building, ensuring that the social areas faced towards the harbour, and stores towards the adjacent building.

We aimed for parity within the open plan area with no personal offices, including the bank’s CEO, guaranteeing every workstation had a similar distance to shared facilities. The project also involved the relocation and consolidation of KiwiBank from their previous six floor premisis to this new head office with their parent corperation NZPost. KiwiBank insisted on their new fitout being a GreenStar rated office, as part of this, we relocated joinery and furniture. The main reception area inloved modifying and installing the main reception counter into the new fitout. I provided space planning and 3D visuals for this and worked along side the project designer going helping with detailing the area.



3. All work to be carried out in accordance with Local Body Regulations.

4. These drawings remain the property of Planet Design and shall not be copied without prior consent.

5. Contractor to confirm access to site prior to commencing work.

6. Any alternative fittings or materials to those specified to be approved prior to commencing work.

REV 2 Male

Female

LIFT

LIFT

600mm² Suspended ceiling grid and ceiling tile to match the remainder of this project. Setout grid from back wall & 70mm off this corner align to corner of column opposite

Generally, projector, projector support arm & ceiling tile cutouts by others

A -

70

Cleaners Cpd.

C

wet riser

electrical

projector

duct STAIRS

projector

A -

mail room

01-01

LIFT

align

screen NOTE: Slats and panit finished bulkhead face to return on this side

2746 to lens centre

1125 to lens centre

NOTE: On front face of the bulkhead, finish the backing panel in Dulux "Luck" (dark grey colour) before the slats are fitted

850 nominal c.o.s.

suspended ceiling

RECEPTION

LOCATION PLAN 1:100

3. All work to be carried out in accordance with L

ex 50 x 20mm finished size dressed timber slats, 10mm spacings, timber NZ Ash Eucalypt. Timber slats to be finished with Mirothane acrylic satinclear to manufacturer's application recommendations. Pin slats to gib and adhesive fix slats so there are no seen fixings. Wall lining behind timber slats painted - see note below

4372 to lens centre

A -

refreshment

2. Contractor shall verify and be responsible for all dimensions on site.

c

Extent of lowered ceiling as detailed on this sheet

courier

LIFT

2883 nominal c.o.s.

5293 nominal c.o.s.

P L A N scale 1:20

sliding door

Sir Edmund Hillary Room

slats continue to abut the adjacent wall

LIFT duct

D

projector

NOTE: Slats and panit finished bulkhead face to return on this side

1. Do not scale

PLANET DESIGN CONSULTANTS LTD

2. Contractor shall verify and be responsible for all dimensions on site.

750 nominal c.o.s.

PLANET DESIGN CONSULTANTS LTD c

1. Do not scale

projector

projector

projector

Level 1 Southend lift lobby NZ Post House

EXIT A -

1

2150

Trim slats around exit signage

2

A

LEVEL 5 PLASTER TO THIS PARTITION

3

D

LC

ceiling slab

CAFETERIA

denotes standard 100mm high aluminium skirting STAIR DOOR

750 nominal c.o.s.

This section of wall to be plastered to a level 5 finish, then painted to Resene "Alabaster" as noted on sheet 03.01

dimension to suit existing return wall existing suspended ceiling For power, data and fire details refer to the Spenser Holmes documentation ex 50 x 20mm finished size dressed timber slats, 10mm spacings, timber NZ Ash Eucalypt. Timber slats to be finished with Mirothane acrylic satinclear to manufacturer's application recommendations. Pin slats to gib and adhesive fix slats so there are no seen fixings. Wall lining behind timber slats painted - see note below

VOID 800 x 600mm x12mm MDF panel screwed to wall to accommodate projector support arm fixing

NOTE: On front face of the bulkhead, finish the backing panel in Dulux "Luck" (dark grey colour) before the slats are fitted

850 nomimal dimension

200 mm

STAIR DOOR

FLOOR

Timber framing within ceiling plenum to ceiling slab as necessary to support new bulkhead structure

This section of wall (and return wall on the left hand side) to be painted as noted on sheet 03.01 - Dulux "Luck" dark grey

ELEVATION scale 1:20

2 1

Ceiling grid changed to 600mm square Issue for Pricing and Approval

Rev No.

Rev Date

REVIEW + PRICING

Client

Projector and projector support arm by others

bank

Paint finished 12mm MDF backing panel abuts the existing partition NOTE: if the existing partition is not square then allow to continue this panel over the face of the existing wall

projector

Timber framing behind MDF panel

19.05.11 16.05.11

Rev Description

Drawing Status

Foosball

Project

50

100

600mm² Suspended ceiling grid and ceiling tile to match the remainder of this project. Setout grid from back wall Projection image and speaker ceiling tile cut outs by others

SECTION A - A

Existing partition plastered to a level 5 finish and painted

Post House Level 1, 2 and 4 7 Waterloo Quay Wellington

2150mm to floor critical dimension

REV 2

B

Sheet Title

Level 1 Lift Lobby INTERACTIVE WALL

scale 1:10 50

Drawn

patrick

internet kiosks

Northpoint

coats

Checked

Scale

as shown

FEMALE

Original Paper Size

A1 (840x594)

0

10

Proj No.

1001

Sheet No.

LIFT

Rev.

14.01 2

Immersive Room

LIFT

Sergeant Haane Manahi Room

MALE

With a tight schedule to get approval, I produced a 3D visual for client presentation and to help sell the idea to the management.

Swipe Card

CLEANER CD

Swipe Card

C

Rev6 Built-in Screen

LIFT

STAIR

MAIL LIFT

SOUTH LOBBY

COURIER

Pres

Rev6

STORE/UTILITY

Swipe Card

Swipe Card

Built-in Screen screen

200 mm

Ia

Cabinet

Swipe Card

D

Bert Munro Room

Presentation PC

LIFT

Swipe Card

REFRESHMENT

Sir Edmund Hillary Room

RECEPTION

Presentation PC Cabinet

Rev6 Jean Batten Room

Katherine Mansfield Room

Digital Signage

10

50

100

E

0

Prior to the job finishing the project team came to us with an idea; They wanted to showcase their new interactive banking facilities that they were planning to roll out across their retail operations. Utilising some wallspace leading into the reception area we set up an interactive display wall.

Bill Ham Room

L E V E L

1

P O S T


Local Body Regulations.

4. These drawings remain the property of Planet Design and shall not be copied without prior consent.

4

5

5. Contractor to confirm access to site prior to commencing work.

6

7

6. Any alternative fittings or materials to those specified to be approved prior to commencing work.

8

9

10

LCD LCD

POSTLINK LAB

LCD

PRODUCTION SUPPORT

Swipe Card

LCD Swipe Card

milton m

coats Cabinet

Presentation PC

Nancy Wake Room

Presentation PC

Sir Keith Park Room

Built-in Screen

Built-in Screen

Cabinet

Richard Pearce Room

illiam Hudson Room

Immersive Room

Henry Nicholas Room

coats KITCHENETTE

coats

FEMALE

Rev6 KITCHENETTE

Built-in Screen

LIFT

MAIN UTILITY Swipe Card

an McFeeters Room

Swipe Card

STORE

Swipe Card

LIFT

sentation PC Cabinet

CLEANER

Swipe Card

CD

Charles Upham Room

MALE

STORE COMMS

NORTH LOBBY

Bill Gallagher Room coats

Presentation PC

STAIR

LIFT

LCD

coats

coats

6 5 4 3 2 1

Issue for information (Construction)

08.12.10

Issue for Information (consent / tender)

26.10.10

Additional furniture to reception

15.10.10

Layout changes / Furniture updated

14.10.10

Layout changes around Reception Layout changes around Reception

Rev No.

Rev Description

11.10.10 08.10.10 Rev Date

Drawing Status

INFORMATION

Client

bank Project

scale

H O U S E

274 workstations

bank

0

1

2

3

4

5

10 m e t r e s

POST HOUSE LEVEL 1 7 WATERLOO QUAY WELLINGTON

Sheet Title

KIWIBANK LEVEL 1 GENERAL ARRANGEMENT PLAN Drawn

MC

Northpoint

Checked

Scale

1:125 @ A1 Original Paper Size

A1 (840x594)

Proj No.

1001

Sheet No.

Rev.

01.01 6



1

2

3

4

5

6

7

8

9

10

A

TRAINING

Swipe Card

KITCHENETTE Presentation PC

Digital lock

Swipe Card

coats Presentation PC

coats

MEETING

FEMALE

Built-in Screen

STORE

MALE

Immersive Room

Jack Lovelock Room

Training STORE

Presentation PC

Built-in Screen

coats LIFT

LIFT

coats Cabinet

Cabinet

STORE

Murray Halberg Room

Yvette Williams Room

KITCHENETTE

B

BREAKOUT

FEMALE

MALE

internet kiosks

CLEANER

C

STORE

CD Bruce McLaren Room

Swipe Card

STAIR

Built-in Screen

Sir Richard Taylor Room

John Walker Room

internet kiosks

Presentation PC

STORE

Swipe Card

Presentation PC

STORE

Cabinet

Cabinet

Sir Peter Blake Room

Furniture STORE

LIFT

STORE

CLEANER

Swipe Card

LIFT

Swipe Card Cabinet Presentation PC

LIFT

Swipe Card

MAIN UTILITY

Built-in Screen

LIFT

SOUTH LOBBY

Rev3

KITCHENETTE

CD

Swipe Card

LIFT

NORTH LOBBY

STORE

Swipe Card

COMMS

coats

coats

5 4 3 2 1

STAIR

LIFT

Arthur Lydiard Room

Built-in Screen

D

Immersive Room

coats

Issue for Information (Construction)

08.12.10

Issue for Information (Consent / Tender)

26.10.10

Access to South End Cleaners rm altered Furniture updated

Rev No.

15.10.10 14.10.10

Layout Change to Utility

28.09.10

Rev Description

Rev Date

200 mm

Drawing Status

INFORMATION

LC

D

CONFERENCE

Client

bank

CAFETERIA Presentation PC Built-in Screen

E

Project

2

P O S T

2. Contractor shall verify and be responsible for all dimensions on site.

276 workstations

H O U S E

3. All work to be carried out in accordance with Local Body Regulations.

4. These drawings remain the property of Planet Design and shall not be copied without prior consent.

bank

5. Contractor to confirm access to site prior to commencing work.

0

1

2

3

4

5

10 m e t r e s

6. Any alternative fittings or materials to those specified to be approved prior to commencing work.

POST HOUSE LEVEL 2 7 WATERLOO QUAY WELLINGTON

Sheet Title

KIWIBANK LEVEL 2 GENERAL ARRANGEMENT PLAN Drawn

Northpoint

MC Checked

c

50

L E V E L

1. Do not scale

PLANET DESIGN CONSULTANTS LTD

100

scale

Scale

1:125 @ A1 Original Paper Size

A1 (840x594)

10

Proj No.

0

1

2

3

4

5

6

7

8

9

10

1001

Sheet No.

Rev.

01.02 5

A

Swipe Card

coats STORE

Swipe Card

FEMALE

STORE

MALE

LIFT

LIFT

Dame Edith Ngaio Marsh Room

Dame Whina Cooper Room

Beatrice Tinsley Room

Leslie Comrie Room

Cabinet

Presentation PC

Presentation PC

Joseph Nathan Room

Rewi Alley Room

internet kiosks

Roy Kerr Room

Janet Frame Room

BREAKOUT

Alexander Aitken Room

Built-in Screen

Built-in Screen

Cabinet

coats

coats

FEMALE

Rev3

CLEANER STORE

Furniture STORE

Consumables STORE

LIFT

MEETING

LIFT

LIFT

Presentation PC

Sir Harold Gillies Room

CLEANER

Swipe Card

LIFT

Swipe Card

LIFT

NORTH LOBBY

STORE COMMS

Catering Kitchen

MEETING STAIR

LIFT

Presentation PC LCD

Swipe Card

D

MALE

Swipe Card Built-in Screen Cabinet

Sir Peter Buck Room STAIR

CD

BREAKOUT MAIN UTILITY

Swipe Card

SOUTH LOBBY

KITCHENETTE Cabinet

CD

Swipe Card

Presso PC Desktop PC

C

STORE

coats

KITCHENETTE

B

coats

Rev5

coats

coats

5 4 3 2 1

08.12.10

Issue for Information (Consent / Tender)

26.10.10

Boardroom layout altered Catering kitchen layout updated Issue for Information

Rev No.

KITCHEN

Issued for Information (Construction)

15.10.10 14.10.10 08.10.10

Rev Description

Rev Date

200 mm

Drawing Status

Kate Shepherd Room

Earnest Rutherford Room

Built in screen Art work

INFORMATION

Client

bank

CAFETERIA

D

LC Presentation PC Built-in Screen

E

Presentation PC

Project

100

scale

L E V E L

4

P O S T

H O U S E

263 workstations

bank

0

1

2

3

4

5

10 m e t r e s

POST HOUSE LEVEL 4 7 WATERLOO QUAY WELLINGTON

Sheet Title

KIWIBANK LEVEL 4 GENERAL ARRANGEMENT PLAN




Formica Foundations New Zealand

2012 Competition Entry Highly Commended Role: Designer

Formica ran a competition inspired by chairs created by internationally renown designers and architects. My competition entry was inspired by all the old laminate samples that I was in the process of clearing out of my work library. Thinking about how wasteful it was just to throw out these samples I reimagined a process and range of furniture utilising ‘waste material’. Presented as a comic, I was awarded highly commended by the judges.


WHAT HAPPENS TO ALL THE OLD SAMPLES WHEN THEY GET DELETED FROM THE CURRENT RANGE? LETS SHRED ALL THESE OLD SAMPLES ON TO SMALL SHARDS AND MIX THEM TOGETHER!...

AND Then MIX IT WITH THIS... INCLUDING A LIST OF MATERIALS (WHICH ARE DELETED OR PENDING DELETION...) Arezzo Granite Lightning Ridge Plantation Sorrento Marble Capri Marble Moonstone Stipple Aquatic Carrara Dynasty Ruby Ming Stipple Bonsai Oatmeal Russet Granite Chilli Telea Flax Olive Telea Sakarra Mint Giallo Granite Seductive Limba Classic Beige Lava Flux Pinot Integra Indigo Granite Concrete Mountain Haze South West Jarrah Stargaze Autumn Slate Gloss Embertone Natural Beech Baltic Granite

USING INJECTION MOULDING WE CAN CAST...

...this year... NOW WITH THIS innovative PROCESS, each year, formica has the opportunity to license and release a different iconic chair design as a limited edition piece every year...

THE DELETED chair!

INtroducing the 2012 formica and vitra colLaboration...

Turning a waste material into an interesting and bestoke dining chair...


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.