400 Westlake - DRB Booklet

Page 1

MARTIN SELIG REAL ESTATE

400 WESTLAKE

400 WESTLAKE AVENUE NORTH | PROJECT 3022779 | WEST DESIGN REVIEW BOARD | DESIGN RECOMMENDATION APRIL 18, 2018



CONTENTS /

SECTION 01 : PROPOSAL Program Site Photos

2

SECTION 02 : PROJECT PROGRESSION Massing in Context ARC Meeting Timeline Landmark Facade Restoration & Preservation

12

SECTION 03 : DEVELOPMENT STANDARDS & ZONING

16

SECTION 04 : LIVING BUILDING PILOT DETAILS

18

SECTION 05 : SELECTED DESIGN REVIEW GUIDELINES

20

SECTION 06 : ITEMIZED RESPONSE TO EDG (1) Massing and Relationship to Context (2) Architectural Concept & Materiality (3) Streetscape & Entries (4) Signage & Lighting

22

SECTION 07 : FLOOR PLANS

28

SECTION 08 : LANDSCAPE DESIGN Landscape Plan Plants, Materials, Features

38

SECTION 09 : ELEVATIONS

40

SECTION 10 : MATERIAL & COLOR Material & Color Palette Typical Ground Floor Entry Bike Room Entry Tower Gasket at Level 03 Typical Slots & Extrusions

48

SECTION 11 : RENDERINGS

60

SECTION 12 : EXTERIOR LIGHTING DESIGN

68

SECTION 13 : SIGNAGE CONCEPT & DESIGN

70

SECTION 14 : SECTIONS

72

SECTION 15 : DEPARTURES Rooftop Features Parking Space Standards Pedestrian Street Facade Setback Overhead Weather Protection

74

APPENDIX A : MHA DESIGN OPTION

82

APPENDIX B : BOARD GUIDANCE FROM EDG

86

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

1 


PROPOSAL / 400 WESTLAKE

2

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018


PROGRAM /

Development Program:

Existing Landmark Building:

220,000 SF of Office

Constructed in 1929, the building at 400 Westlake was designed by the Austin Company for Firestone Tire and Rubber Company. The building has been in continuous use by Firestone since it was built and is a designated Seattle Landmark.

7,500 SF of Retail 67 Car Stalls 195 Bike Stalls

The terra cotta ornament on the exterior is characteristic of the Art Deco style: fluted piers and window surrounds capped by cartouche treatments, scalloped spandrel decoration, and embossed Firestone crests.

Design Objectives:

To preserve and enhance the existing landmarked building. To design an engaging retail and pedestrian experience. To design an addition to the landmark that is compatible yet differentiated.

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

3 


NINE-BLOCK AXONOMETRIC /

2

1

8

3

7

4

AKE

STL

WE 9

AVE

6

T.

S SON

RI

HAR

5

4

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018


NINE-BLOCK VICINITY MAP /

1

7

2

1

2

3

4

5

6

7

8

9

8 3

6

9

4

5

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

5 


SOUTH LAKE UNION ZONING OVERLAY /

SM-SLU 145

SM-85

SM-SLU 85/65-160

SM-SLU/R 65/95

Site

SM-85

SM-SLU/R 65/95

SM-SLU 160/85-280

SM-SLU 240/125-400

6

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018


NINE-BLOCK ZONING OVERLAY /

Republican St

Terrry Ave N

Westlake Ave N Harrison St. Site Commercial / Office Retail

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

7 


COMPOSITE SITE PLAN /

401-415 Westlake Retail Buildings 1-Story

325 Westlake Retail Building 1-Story

435 Westlake Tesla Motors Office and Showroom 2-Stories

Westlake Ave N

428 Westlake Office Building 6-Stories

Terry Ave N

Harrison St

Westlake Terry West Office Building 5-Stories

Lobby Retail Parking + Loading

Westlake Terry East Office Building 4-Stories

401 Terry Ave N Institute for Systems Biology 4-Stories

Bike Storage Pedestrian Entry Vehicle Entry

Republican St

8

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018


COMPOSITE GROUND FLOOR PLAN /

Westlake Ave N

180’ 45’ 6” 20’

26’

49’ 6”

4’ 1” SETBACK

108’

Harrison St

20’

50’

15’

45’ 11”

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

9


MASSING CONCEPT IN CONTEXT /

The addition is smaller than

The horizontal bands establish

what is allowed by zoning.

a proportional relationship to the historic building.

A setback above the podium separates the addition from the landmark building.

10

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018


MASSING CONCEPT IN CONTEXT /

Slots, proportionate to the bays on the historic building, reduce the scale of the addition and make the facade more dynamic.

Setbacks on Westlake and

The proposal is scaled and

Harrison make the historic

modulated in a way that is

building more prominent.

responsive to the history of the site and contextual cues.

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

11 


ARCHITECTURE REVIEW COMMITTEE TIMELINE /

EDG

08/16

10/16

LPB

12/16

01/17

07/17

12/17

12/16

TOWER MASSING HISTORIC FACADE SOIL

02/16

04/18

01/03

P P P

RETAIL GLAZING TOWER SETBACKS HISTORIC WINDOWS ALLEY FACADE EXTERIOR LIGHTING BANDING & BALCONIES 12

DRB

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

P

P

P

P P

P


MASSING PROGRESSION /

ARC 1

ARC 2

EDG 1

ARC 3

ARC 4

ARC 5

ARC 6

ARC 7 & DRB 1

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

13 


LANDMARK FACADE RESTORATION & PRESERVATION /

1

Preserve Facade Scale

2

Replacement In Kind Metal Sash Windows

3

Restore Firestone Emblems

4

Restore And Weatherproof Terra Cotta Ornament And Facade

5

Restore Fluted Columns

6

Preserve Bay Height

7

Preserve Corner Presence

8

Preserve Cornice Line

8

4 3 1

5

14

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

7

6

2


LANDMARK FACADE DETAILS /

2

3

4

4

5 Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

15 


DEVELOPMENT STANDARDS & ZONING DATA /

MASSING, CURRENT PERMISSIBLE BY CODE ZONE SM-SLU 175/ 85-280 | SOUTH LAKE UNION URBAN CENTER OVERLAY BASE HEIGHT FOR OFFICE / LIVING BUILDING CHALLENGE 175’ / 195’ BASE FAR / LIVING BUILDING CHALLENGE 8 / 9.2 BASE HEIGHT FOR RESIDENTIAL / LIVING BUILDING CHALLENGE 280’ / 310’ LIVING BUILDING CHALLENGE BONUS

SMC 23.48.245.D + 280’ / 310’

15% EXTRA FAR

UPPER LEVEL FACADE MODULATION REQUIRED

20’ EXTRA HEIGHT STREET LEVEL USES REQUIRED SMC 23.48.245.A

+ 175’ / 195’

FACADE MODULATION REQUIRED ABOVE PODIUM HEIGHT OF 65’ 65’ TO 145’ HEIGHT

= UP TO 150’ WITHOUT MODULATION

ABOVE 145’ HEIGHT

= UP TO 120’ WITHOUT MODULATION

RESIDENTIAL FLOOR PLATE AREA LIMITED TO 50% OF SITE AREA = 9,720 SF

15

+ 145’

RESIDENTIAL AREA IN A MIXED USE PROJECT IS CHARGEABLE PER 23.48.009

PARKING

12

0’

+ 65’

NONE REQUIRED 1 STALL PER 1000 SF OFFICE MAXIMUM PER CODE

15

+ 0’

0’

S I WEST PE LA DE KE ST AV RIA E NS N TR EE

AREA IN LANDMARK STRUCTURE IS FAR EXEMPT

T

CL

PAYMENT MAY BE MADE IN LIEU OF PROVISION OF OPEN SPACE

AS

EE T

20 SF PER 1000 SF OF OFFICE SPACE

CL

AS S H II AR PE R DE ISO ST N RI ST AN ST R

OPEN SPACE

SMC 23.48.220.b

* With Living Building Challenge 16

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018


DEVELOPMENT STANDARDS & ZONING DATA /

REQUIRED STREET-LEVEL USE

BUILDING HEIGHT

WESTLAKE AVENUE NORTH

205’

CLASS I PEDESTRIAN STREET

BUILDING FAR

75% MINIMUM REQUIRED USES

10

HARRISON STREET

BUILDING HEIGHT FOR RESIDENTIAL

CLASS II PEDESTRIAN STREET

320’

75% MINIMUM REQUIRED USES

37’ 5”

18’ 1”

MASSING, PENDING CURRENT LEGISLATION

Westlake Avenue

+25% EXTRA FAR

180’ - 00”

100.0%

Bike Room

18’ - 01”

10.0%

Office Lobby

22’ - 07”

12.5%

+ 320’

+30’ EXTRA HEIGHT

Total

+ 205’

22’ 7”

PENDING LEGISLATION BONUS

22.5%

Retail 1

37’ - 05”

20.8%

Retail 2

97’ - 11”

54.4% 75.2%

+ 145’

100.0%

Retail 2

104’ - 00”

96.3%

0’

15

+ 0’

0’

T

AS S H II AR PE R DE ISO ST N RI ST AN ST R

EE T

S I WEST PE LA DE KE ST AV RIA E NS N TR EE

104’ 0”

CL

AS

108’ - 00”

12

+ 65’

CL

Harrison Street

97’ 11”

15

Total

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

17


LIVING BUILDING PILOT PROJECT DETAILS /

REQUIRED AMOUNT OF RENEWABLE ENERGY PRODUCTION

ILFI REQUIREMENTS

ENERGY PRODUCTION (ON-SITE/OFF-SITE) MUST OFFSET AN EUI OF 31 (110% X 28 EUI = 31 EUI). THE 400 WESTLAKE RENEWABLE ENERGY PRODUCTION PRODUCES 105% OF THE PROJECT ENERGY REQUIREMENTS. ENERGY IMPERATIVE 06 - NET POSITIVE ENERGY *OFF-SITE RENEWABLE EXCEPTION PLACE IMPERATIVE IMPERATIVE IMPERATIVE IMPERATIVE

01 - LIMITS TO GROWTH 02 - URBAN AGRICULTURE 03 - HABITAT EXCHANGE 04 - HUMAN POWERED LIVING

BEAUTY IMPERATIVE 19 - BEAUTY + SPIRIT IMPERATIVE 20 - INSPIRATION + EDUCATION

CITY OF SEATTLE REQUIREMENTS • TOTAL BUILDING ENERGY USE IS 75% OR LESS OF 2012 SEATTLE ENERGY CODE 400 WESTLAKE PETAL MATRIX TARGETS • PROJECT USES ONLY NON-POTABLE WATER FOR NON-POTABLE USES

ON-SITE PV AT OPTIMAL SOLAR EXPOSURE

EQ

AC

E

CARVE PL

TY

BEAU

SETBACK UIT

PURCHASED PV PANELS:

Y

HEAL TH +

GY ER

18

EN

T MA

HAPP

LS

IA ER

INES S

WATER

• • • •

75% OR LESS ENERGY USES ONLY NONPOTABLE WATER 15% MORE FLOOR AREA 20’ ADDITIONAL BUILDING HEIGHT

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

CONTEXT

OFF-SITE PV IN WASHINGTON STATE EQUAL TO THE AREA OF 5 1/2 ROOFTOP ARRAYS


LIVING BUILDING PILOT PROJECT DETAILS /

URBAN AGRICULTURE, CASCADE PEOPLE’S CENTER P-PATCH

ILFI REQUIREMENTS

• • • • • •

200 SF MINIMUM WITHIN PROJECT’S COMMUNITY MATERIALS COMPLY WITH MATERIAL PETAL BUILT AND MAINTAINED BY VOLUNTEERS FOR CASCADE PEOPLE’S CENTER P-PATCH WILL BE OPERATION AT THE TIME OF ILFI PERFORMANCE AUDIT TEAM TO PROVIDE DESIGN SERVICES AND CONSTRUCTION MATERIALS

Site Walking Path to P-Patch Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

19


APPLICANT-SELECTED DESIGN REVIEW GUIDELINES /

ARCHITECTURAL CONTEXT AND CHARACTER CS3-I HEIGHT, BULK, AND SCALE: Articulate the building facades vertically or horizontally in intervals that relate to the existing structures or existing pattern of development in the vicinity. CS3-II ARCHITECTURAL CONTEXT: Re-use and preserve important buildings and landmarks when possible. Respond to the history and character in the adjacent vicinity in terms of patterns, style, and scale. Encourage historic character to be revealed and reclaimed, for example: through use of community artifacts, and historic materials, forms and textures. DESIGN RESPONSE: The proposal will breath new life into the prominent quarter block corner site through an extensive restoration and rehabilitation of the historic Firestone building facade, pedestrian-focused retail spaces, and landscape improvements. The materials and details in the new addition are consistent with the character and distinct quality of the neighborhood. Left: View from Harrison Street facing west

URBAN PATTERN AND FORM CS2-II HEIGHT, BULK, AND SCALE: Address both the pedestrian and auto experience through building placement, scale and details with specific attention to regional transportation corridors such as Mercer, Aurora, Fairview and Westlake. These locations, pending changes in traffic patterns, may evolve with transportation improvements. Encourage stepping back an elevation at upper levels for development taller than 55 feet to take advantage of views and increase sunlight at street level. Where stepping back upper floors is not practical or appropriate other design considerations may be considered, such as modulations or separations between structures. DESIGN RESPONSE: The proposal uses a combination of strategies to achieve a massing and form that is responsive and appropriate for the site and context. A notable setback at the first level above the landmark building separates the addition from landmark building. The proposal’s facade design is articulated with relief and modulation to create rhythm and establish proportional relationships to the landmark building.

Left: View from Westlake Avenue North facing north

20

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018


APPLICANT-SELECTED DESIGN REVIEW GUIDELINES /

PEDESTRIAN-FOCUSED STREET LEVEL PL1-III PEDESTRIAN OPEN SPACES AND ENTRANCES: New developments are encouraged to work with the Design Review Board and interested citizens to provide features that enhance the public realm, i.e. the transition zone between private property and the public right of way. The Board is generally willing to consider a departure in open space requirements if the project proponent provides an acceptable plan for features PL3-II HUMAN ACTIVITY: Create graceful transitions at the streetscape level between the public and private uses. Create businesses and community activity clusters through collocation of retail and pedestrian uses as well as other high pedestrian traffic opportunities. DESIGN RESPONSE: The two primary street frontages of the proposal will be transformed with gracious landscaping, thoughtfully designed hardscaping, and ground floor retail uses that add vitality and energy to the street. The restoration of the landmark building will strengthen the area as a destination and respect the context and history of the neighborhood. Left: View from Westlake Avenue North facing south

PUBLIC LIFE AND SAFETY PL2-I STREETSCAPE COMPATIBILITY: The vision for street level uses in South Lake Union is a completed network of sidewalks that successfully accommodate pedestrians. Streetscape compatibility is a high priority of the neighborhood with redevelopment. Sidewalk-related spaces should appear safe, welcoming and open to the general public. PL2-II PERSONAL SAFETY AND SECURITY: Enhance public safety throughout the neighborhood to foster 18-hour public activity. DC3-I LANDSCAPING TO REINFORCE DESIGN CONTINUITY: Where appropriate, install indigenous trees and plants to improve aesthetics, capture water and create habitat. DESIGN RESPONSE: The design proposal will foster a healthy pedestrian network through the restoration of the landmark building, landscape improvements, and the addition of ground floor retail spaces on Westlake Avenue North and Harrison Street. Multiple curb cuts currently serving automobile oriented uses will be removed to create a generous sidewalk zone with no curbcuts and with access to continuous street level pedestrian oriented uses. The pedestrian realm will be well illuminated at night. Left: View from Westlake Avenue North facing east

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

21 


ITEMIZED RESPONSE TO EDG / (1) MASSING AND RELATIONSHIP TO LANDMARK & CONTEXT /

EDG GUIDANCE:

DESIGN RESPONSE:

The notches and balconies have been developed and enhanced by including an additional horizontal band and additional notch and balcony on each of the primary frontages.

The taller height alternative including Living Building Pilot and HALA bonuses has been developed.

22

The Board discussed the strengths of the different massing options and unanimously supported the notches and balconies shown in the massing Option 3 alternatives as the voids and projections form a playful counterpoint to the rational landmark building. The Board specified their preference for the taller height shown in Alternate 3.B, which incorporates the Living Building Pilot code provisions and anticipated HALA height and FAR bonuses, as the slender proportion has the best potential to create a vertical architectural presence.

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018


ITEMIZED RESPONSE TO EDG / (1) MASSING AND RELATIONSHIP TO LANDMARK & CONTEXT /

A scale and proportional

A modulation and scale

An articulation and

relationship to the historic

relationship to the historic

expression relationship

building is established by

building is established by the

is established by the fine

the horizontal bands of the

vertical slots of the addition,

grained vertical emphasis

addition which relate to the

which relate to the historic

of the addition, within the

historic building height.

bays.

horizontal bands, which relates to the historic fretwork ornamentation.

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

23 


ITEMIZED RESPONSE TO EDG / (2) ARCHITECTURAL CONCEPT & MATERIALITY /

EDG COMMENTS: The Board was supportive of an architectural concept that is complimentary to the landmark, but can also stand on its own and gave guidance for further design development. a. The Board found the depth of the proposed insets and balconies critical to the dynamism of the façade. The Board unanimously agreed these insets should remain open to the sky as shown. (CS2‐A‐2, DC2‐A‐2, DC2‐B, DC2‐C‐1) b. Echoing public comment, the Board supported integrating texture into the façade composition to avoid a glass box appearance, similar to the vertical textural elements shown in the rendering on page 69. When further developing the materiality for the upper volume, the Board encouraged studying light, transparency, color and potentially using materials which reference the landmark below. (DC2‐B‐1, DC2‐D, DC4‐A‐1) c. The Board noted the proposal will be very visible on all four elevations and agreed that all facades should be clad with the same quality of materials. The Board also suggested exploring a light and air easement in order to be able to continue glazing over to the north façade. (DC2‐A, DC2‐B, DC4‐A‐1) d. The Board expressed interest in seeing how the Living Building Petals will be integrated into the project and notated their support for integral sustainability rather than gratuitous sustainable strategies. (CS1‐I‐i.) DESIGN RESPONSE: a. The depth of the slots has remained unchanged since EDG. The addition of a middle slot creates a more dynamic and modulated facade. b. The perforated metal fins on each of the four facades adds rhythm and texture to the massing and compliments the terra cotta fluting on the landmark building below. The aluminum profiles that wrap each massing element articulate the massing and create further shadow and light play. c. The vision glass, shadow box glass, perforated metal fins, and aluminum profiles wrap all four sides of the proposal. The opaque wall on the east facade is clad with textured precast concrete panels scaled to compliment the size and rhythm of the curtain wall grid. d. The Living Building Pilot Project Petals for energy, place, and beauty are visually expressed in the design. The photovoltaic array on the roof reduces the building’s energy demand. The ground floor bike storage room off of Westlake encourages sustainable transportation and two graciously lit stairwells promote a healthy alternative to taking the elevator.

EDG Massing shown for comparison. 24

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018


ITEMIZED RESPONSE TO EDG / (2) ARCHITECTURAL CONCEPT & MATERIALITY /

The proposed perforated vertical fins add an ephemeral counterpoint to the historic buildings terra cotta fretwork, and are comparable in scale to the fins at the Allen Institute a few blocks north on Westlake.

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

25 


ITEMIZED RESPONSE TO EDG / (3) STREETSCAPE & ENTRIES /

EDG COMMENTS: The Board was supportive of the design intent to preserve the character of the building with large, recessed glazing and ensuring the visibility the terra cotta detailing. a. The Board strongly supported the scale of the recessed bay glazing as it reinforces the original architecture. While the Board supported the idea of operable glazing, they acknowledged this feature will be dependent on future tenants. In either case, the Board encouraged the glazing to be as open and porous as possible. (PL3‐C‐1, DC2‐B) b. Related to the proposed departure for overhead weather protection, the Board recommended exploring other ways to provide pedestrian amenities along the streetscape, such as seating, public art, selection of tree species, etc. in a way that is celebratory of the South Lake Union neighborhood. (PL1‐B, PL1‐III‐i) c. In order to identify the entries and improve wayfinding, the Board recommended studying limited overhead protection at entries, setting back the glazing further into a recessed type of arcade, differentiating paving, and/or other pedestrian cues. (CS2‐B‐2, PL1‐B, PL1‐III‐I, PL3‐A) d. For the streetscape design, the Board recommended referring to the Market to MOHAI Pedestrian Corridor Plan for desirable sidewalk width and anticipated pedestrian volumes. (CS2‐B‐2, PL1‐B, PL1‐III‐i) DESIGN RESPONSE: a. The setback at the ground floor has been doubled, making the landmark facades even more prominent than the design shown at EDG. b. The landscape design provides public seating in the right of way and uses appropriate tree and plant species to create a welcoming pedestrian experience. c. The increased setback at the ground floor glazing creates more prominence at the retail, office, and bike room entry vestibules. d. The landscape design pursues the shared goals of neighborhood, district, and city design plans.

A

A

Retail Curtain Wall 4’ - 1” setback shown in blue

26

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018


ITEMIZED RESPONSE TO EDG / (4) SIGNAGE & LIGHTING /

EDG COMMENTS: The Board viewed signage as a unique opportunity for an artistic expression to reflect and acknowledge the automotive historical character and requested a developed signage plan for the next meeting. Agreeing with public comment, the Board supported well‐lit streets and recommended adding pedestrian lighting or incorporating the existing pedestrian lighting to increase visibility. (CS3‐B, DC4‐B, DC4‐C‐1) DESIGN RESPONSE: The lighting design creates a safe atmosphere for members of the public and building occupants. The lighting strategy at the ground floor provides ample lighting for pedestrian safety and intuitive wayfinding. Thoughtful placement of lighting on the landmark building emphasizes historic features and creates dynamics shadows along the terra cotta columns and fluting. Each of the six entry portals provides a space for signage that doesn’t distract from the landmark building.

1

In-grade uplight at columns

2

Signage light at Firestone crests

3

Low profile recessed downlights at metal entry portals

4

Linear wall grazer at terra cotta ornament

5

Linear wall grazer at gasket soffit

6

Linear ground recessed lighting at balcony slots

6

4

5

2

3

4

1

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

27


FLOOR PLAN, PARKING LEVEL 01 /

1

Parking Garage

2

Parking Entry

3

Bicycle Storage

4

Loading Dock

5

Lobby

6

Tenant Retail

7

Tenant Office

8

Amenity Deck

9

Electrical

10

Mechanical

11

Custodial

12

Restroom

10

9

1

2

Pedestrian Entry Vehicle Entry

179'

1

5

1

3

0 28

5 10

20

40

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

9

108'

9


Parking Entry

3

Bicycle Storage

4

Loading Dock

5

Lobby

6

Tenant Retail

7

Tenant Office

8

Amenity Deck

9

Electrical

10

Mechanical

11

Custodial

12

Restroom

3 12

24'

2

28'

Parking Garage

2 6

24'

1

17'

FLOOR PLAN, GROUND FLOOR /

Pedestrian Entry

83'

5

31'

Vehicle Entry

48'

9

4

11'

8'

Proposed Curb Under SDOT Review

36'

50'

6

Current Curb Approved by SDOT

0

5 10

20

40

36'

54'

18'

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

29 


FLOOR PLAN, LEVEL 02 /

1

Parking Garage

2

Parking Entry

3

Bicycle Storage

4

Loading Dock

5

Lobby

6

Tenant Retail

7

Tenant Office

8

Amenity Deck

9

Electrical

10

Mechanical

11

Custodial

12

Restroom

5

164'

7

9 11 12

16'

36'

12

0 30

5 10

20

40

16'

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

92'


FLOOR PLAN, LEVEL 03 /

1

Parking Garage

2

Parking Entry

3

Bicycle Storage

4

Loading Dock

5

Lobby

6

Tenant Retail

7

Tenant Office

8

Amenity Deck

9

Electrical

10

Mechanical

11

Custodial

12

Restroom

5

7

164'

8

9 11 12

16'

36'

12

0

5 10

20

40

16'

92'

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

31 


Parking Entry

3

Bicycle Storage

4

Loading Dock

5

Lobby

6

Tenant Retail

7

Tenant Office

8

Amenity Deck

9

Electrical Mechanical

11

Custodial

12

Restroom

10'

9'

10

46'

2

25'

Parking Garage

15'

1

9'

FLOOR PLAN, LEVELS 04 - 06 /

5

7

9

50'

11

120'

12

10'

46'

12

0 32

5 10

20

40

10'

36'

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

15'

46'


2

Parking Entry

3

Bicycle Storage

4

Loading Dock

5

Lobby

6

Tenant Retail

7

Tenant Office

8

Amenity Deck

9

Electrical Mechanical

11

Custodial

12

Restroom

10'

105'

10

8

46'

Parking Garage

9'

1

9'

FLOOR PLAN, LEVEL 07 /

5

7

9

50'

11 12

10'

40'

46'

15'

12

0

5 10

20

40

10'

56'

15'

26'

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

33 


FLOOR PLAN, LEVELS 08 - 11 /

2

Parking Entry

3

Bicycle Storage

4

Loading Dock

5

Lobby

6

Tenant Retail

7

Tenant Office

8

Amenity Deck

9

Electrical Mechanical

11

Custodial

12

Restroom

10'

105'

10

45'

Parking Garage

9'

1

10'

Level 08 - 09, Current Legislation

5

7

11 12

12

40'

46'

15'

8

10'

8

0 34

5 10

20

40

50'

9

10'

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

56'

15'

26'


FLOOR PLAN, LEVELS 12 - 15 /

2

Parking Entry

3

Bicycle Storage

4

Loading Dock

5

Lobby

6

Tenant Retail

7

Tenant Office

8

Amenity Deck

9

Electrical Mechanical

11

Custodial

12

Restroom

8

10'

15'

9'

10

45'

Parking Garage

50'

1

10'

Levels 10 - 14, Current Legislation

5

7

11 12

50'

9

46'

95'

12

10'

8

0

5 10

20

40

10'

31'

15'

51'

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

35 


ROOF PLAN, LEVEL 16 /

2

Parking Entry

3

Bicycle Storage

4

Loading Dock

5

Lobby

6

Tenant Retail

7

Tenant Office

8

Amenity Deck

9

Electrical

10

Mechanical

11

Custodial

12

Restroom

8

11'

Parking Garage

23'

1

8'

Level 15, Current Legislation

5

100'

70'

10

9'

9'

35'

21'

11'

10

9' 0 36

5 10

20

40

9'

15'

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

44'

31'


This page intentionally left blank.

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

37 


COMPOSITE HARDSCAPE & LANDSCAPE PLAN /

LANDSCAPE PLAN

Green Roof Green Roof Composite Wood Tiles on Pedestals

Seat Element in R.O.W.

Concrete Pavers on Pedestals HARRISON STREET

Composite Wood Tiles on Pedestals

Washed River Rock Paving 7th Floor Terrace Railing. See Arch.

Powder Coated Metal Planter with Shrubs, Perennials, Ornamental Grasses and Small Trees

Window Washing Access 3rd Floor Terrace

C.I.P. Concrete Band around All Street Planting Beds Walk-off Strip Pedestrian Light Poles

Permeable Paving Proposed Curb under SDOT Review Bike Racks Planter Protection Rail WESTLAKE AVENUE N.

BIKE RACK

CONCRETE PAVERS ON PEDESTALS

COMPOSITE WOOD TILES

Bike Rack

Concrete Pavers on Pedestals

Composite Wood Tiles on Pedestals

38

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

Seat Element in R.O.W. Trash Receptacle

POWDER COATED METAL PLANTER

Powder Coated Metal Planter

CONCRETE SEAT WITH STONE CAP

Concrete Seat Element with Stone Cap in R.O.W.


LANDSCAPE DETAILS /

PLANTS PLANTS ONON GRADE ON GRADE PLANTS GRADE

1

4

8 1. 2. 3. 4. 5. 6. 7. 8.

1

4

PLANTS PLANTS LEVEL ON 16 16 PLANTS ONON LEVEL 16 LEVEL

2

5

5

2

3

6

6

1

1

2

2

5

5

6

6

8

8

9

9

3

4

3

4

3

7

7

7

7 10

10

1. Acer 1. palmatum Acer palmatum / Japanese / Japanese Maple Maple 2. Ilex x2.‘Mondo’ Ilex x ‘Mondo’ / Little Rascal / LittleHolly Rascal Holly 3. Leucothoe 3. Leucothoe fontanesiana fontanesiana ‘Zeblid’ /‘Zeblid’ Scarletta / Scarletta Fetterbush Fetterbush 4. Dryopteris 4. Dryopteris erythrosora erythrosora / Autumn/ Autumn Fern Fern 5. Hakonechloa 5. Hakonechloa macra ‘Aureola’ macra ‘Aureola’ / Japanese / Japanese Forest Grass Forest Grass 6. Hemerocallis 6. Hemerocallis ‘Stella de ‘Stella Oro’ / de Stella Oro’ De / Stella Oro Daylily De Oro Daylily 8 9 9 10 10 11 11 7. Lavandula 7. Lavandula angustifolia angustifolia ‘Munstead’ ‘Munstead’ / English/ Lavender English Lavender 8. Calamagrostis × acutiflora × acutiflora ‘Karl Foerster’ ‘Karl Foerster’ / Foerster’s / Foerster’s Feather Feather Reed Grass Reed Grass Quercus 1. Quercus suber / Cork suberOak / Cork Oak 9. Rudbeckia 9. Rudbeckia fulgida / fulgida Orange/ Coneflower Orange Coneflower 8. Calamagrostis 9. Sedum 9. tetractinum Sedum tetractinum ‘Coral Reef’ ‘Coral / Chinese Reef’ / Chinese Sedum Sedum Ulmus 2. ‘Homestead’ Ulmus ‘Homestead’ / Homestead / Homestead Elm Elm 10. Prunus 10.laurocerasus Prunus laurocerasus ‘Mount Vernon’ ‘Mount /Vernon’ / 10. Escallonia 10. Escallonia ‘Compakta’ ‘Compakta’ / Compact / Compact Escallonia Escallonia Berberis 3. Berberis thunbergii thunbergii ‘Goruzam’ ‘Goruzam’ / Golden/ Ruby Golden Barberry Ruby Barberry Mount Vernon MountLaurel Vernon Laurel Liriope 4. muscari Liriope muscari / Lily Turf/ Lily Turf 11. Cornus 11. s. Cornus ‘Kelseyi’ s. ‘Kelseyi’ / Kelsey /Dogwood Kelsey Dogwood Hydrangea 5. Hydrangea paniculata paniculata ‘Jane’ / Little ‘Jane’ Lime / Little Hydrangea Lime Hydrangea Arctostaphylos 6. Arctostaphylos uva-ursi uva-ursi / Kinnikinnick / Kinnikinnick Escallonia 7. Escallonia ‘Compakta’ ‘Compakta’ / Compact / Compact Escallonia Escallonia Lavandula 8. Lavandula a. ‘Hidcote a. ‘Hidcote Blue’ / Hidcote Blue’ / Blue Hidcote English Blue Lavender English Lavender Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

39


ELEVATION, WEST ON WESTLAKE AVENUE NORTH /

1

Monocrystalline Bifacial PV Glass

2

Formed Aluminum Panel

3

Cable Guardrail

4

Aluminum Snap Cap

5

Curtain Wall Glass

6

Curtain Wall Shadow Box

7

Glass Guardrail

8

Aluminum Edge Frame

9

Perforated Metal

10

Existing Terra Cotta

11

Firestone Emblem

12

Existing Window Replica

13

Storefront Glass

14

SSG Mullions

15

Black Metal Panel

16

Existing Board-Form Concrete

17

New Cast-in-Place Concrete

18

Corrugated Concrete Panel

19

Metal Louver

20

Spandrel Glass

21

Grey Metal Panel

1 2 3

+195’ Current Legislation 4 9 5 6

8

7

40

+205’ Pending Legislation

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018


ENLARGED ELEVATION, WEST ON WESTLAKE AVENUE NORTH /

9

4 5 6

8

10

11

12

13

14

15 Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

41 


ELEVATION, SOUTH ON HARRISON STREET /

1

Monocrystalline Bifacial PV Glass

2

Formed Aluminum Panel

3

Cable Guardrail

4

Aluminum Snap Cap

5

Curtain Wall Glass

6

Curtain Wall Shadow Box

7

Glass Guardrail

8

Aluminum Edge Frame

9

Perforated Metal

1 2 3

10

Existing Terra Cotta

11

Firestone Emblem

12

Existing Window Replica

4

13

Storefront Glass

5

14

SSG Mullions

9

15

Black Metal Panel

16

Existing Board-Form Concrete

17

New Cast-in-Place Concrete

18

Corrugated Concrete Panel

19

Metal Louver

20

Spandrel Glass

21

Grey Metal Panel

42

+205’ Pending Legislation +195’ Current Legislation

6

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

8


ENLARGED ELEVATION, SOUTH ON HARRISON STREET /

4 9

5 6

8

10

11

12

13

14

15 Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

43 


ELEVATION, EAST ON ALLEY /

1

Monocrystalline Bifacial PV Glass

2

Formed Aluminum Panel

3

Cable Guardrail

4

Aluminum Snap Cap

5

Curtain Wall Glass

6

Curtain Wall Shadow Box

7

Glass Guardrail

8

Aluminum Edge Frame

1 2

9

Perforated Metal

3

10

Existing Terra Cotta

11

Firestone Emblem

12

Existing Window Replica

13

Storefront Glass

14

SSG Mullions

15

Black Metal Panel

5

16

Existing Board-Form Concrete

6

17

New Cast-in-Place Concrete

18

Corrugated Concrete Panel

19

Metal Louver

20

Spandrel Glass

21

Grey Metal Panel

+205’ Pending Legislation

4

+195’ Current Legislation

8

9

7

44

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018


ENLARGED ELEVATION, EAST ON ALLEY /

4 9

5 6

8

12

16

17

19

9

21

9

18

5

19

9

17

5

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

45 


ELEVATION, NORTH /

1

Monocrystalline Bifacial PV Glass

2

Formed Aluminum Panel

3

Cable Guardrail

4

Aluminum Snap Cap

5

Curtain Wall Glass

6

Curtain Wall Shadow Box

7

Glass Guardrail

8

Aluminum Edge Frame

9

Perforated Metal

1 2

Existing Terra Cotta

11

Firestone Emblem

12

Existing Window Replica

13

Storefront Glass

14

SSG Mullions

5

15

Black Metal Panel

6

16

Existing Board-Form Concrete

17

New Cast-in-Place Concrete

18

Corrugated Concrete Panel

19

Metal Louver

20

Spandrel Glass

21

Grey Metal Panel

+195’ Current Legislation

4

20

7 2

46

+205’ Pending Legislation

3

10

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

9

8


This page intentionally left blank.

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

47 


MATERIALS & COLOR PALETTE /

EDG NOTES Echoing public comment, the Board supported integrating texture into the facade composition to avoid a glass box appearance, similar to the vertical textural elements shown in the rendering on page 69. When further developing the materiality for the upper volume, the Board encouraged studying light, transparency, color and potentially using materials which reference the landmark below. (DC2-B-1, DC2-D, DC4-A-1

RESPONSE The tower design has developed to articulate separate masses shifting in space, separated by the balcony slots. The concept of texture has been maintained throughout the design as a crucial element showcasing a vertical expression, shadow, and dimension on the facade. The aluminium fins at each mullion line bring a richness to the facade and a vertical emphasis consistent with the historic Firestone building.

48

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018


MATERIALS & COLOR PALETTE /

1

8

15

Monocrystalline Bifacial PV Glass

Aluminum Edge Frame

Black Metal Panel

2

9

Formed Aluminum Panel

Perforated Metal

16

Existing Board Form Concrete

17

New Cast-in-Place Concrete

3

10

18

Cable Guardrail

Existing Terra Cotta

Corrugated Concrete Panel

4

Aluminum Snap Cap

11

Firestone Emblem

12

Existing Window Replica

19

Metal Louver

5

Curtain Wall Glass

6

Curtain Wall Shadow Box

7

Glass Guardrail

13

Storefront Glass

14

SSG Mullions

20

Spandrel Glass

21

Grey Metal Panel

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

49 


MATERIALS & COLOR PALETTE, TYPICAL GROUND FLOOR ENTRY /

D

A

50

C

B

A 4’ - 1”

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

Retail Curtain Wall

E

B

Retail Entry Portal


MATERIALS & COLOR PALETTE, TYPICAL GROUND FLOOR ENTRY /

Linear wall grazer at terra cotta ornament

Curtain wall

Steel structure Weather barrier

4’ - 1”

Signage light at Firestone crests

Insulation

D

Soffit at Curtain Wall

ADA Push Button

4’ - 1”

Linear wall grazer at terra cotta ornament Black metal

Line of vestibule, above 11”

Signage light at Firestone crests Low profile recessed downlight

Line of light shelf, above 6’ - 8” Property Line

C

Retail Entry Wall

E

Soffit at Entry Portal Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

51


MATERIALS & COLOR PALETTE, BIKE ROOM ENTRY /

A

B

A

Bike Room Glazing

B The bike storage room graphic adds texture and energy to the room while expressing the site’s industrial history.

52

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

Bike Room Entry


MATERIALS & COLOR PALETTE, BIKE ROOM ENTRY /

10 22

14

23

15

10

Historic Terra Cotta

13

Storefront Glass

14

SSG Mullions

15

Black Metal

22

Gradient Felt Ceiling

23

Super-graphic Wall

13

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

53 


MATERIALS & COLOR PALETTE, TOWER GASKET AT LEVEL 03 /

E

F

D

A

B

C

54

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

A

Typical Tower Slot

B

Typical Tower Glazing


MATERIALS & COLOR PALETTE, TOWER GASKET AT LEVEL 03 /

Metal panel soffit

10’ - 2” Metal panel

E

Tower Slot Balcony Curtain wall

1’ -0”

6”

1’ - 0”

Metal extrusion Metal extrusion

Metal panel soffit 6’ - 0”

C

Tower CW Fin

D

Tower Slot Fin

F

Soffit at Tower Gasket Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

55


MATERIALS & COLOR PALETTE, TYPICAL TOWER SLOTS & EXTRUSIONS /

A

56

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

B

A

Typical Slot Soffit

B

Typical Slot Bottom


MATERIALS & COLOR PALETTE, TYPICAL TOWER SLOTS & EXTRUSIONS /

8

21 4

4

Aluminum Snap Cap

5

Curtain Wall Glass

6

Curtain Wall Shadow Box

9

Perforated Metal

21

Metal Plate Panel

14 5

8

21

Aluminum Edge Frame

6

9

14

SSG Mullions

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

57 


MATERIALS & COLOR PALETTE, ALLEY FACADE /

A

58

B

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

A

Elevator Lobby

B

Office


MATERIALS & COLOR PALETTE, ALLEY FACADE /

4 9

4

Aluminum Snap Cap

5

Curtain Wall Glass

6

Curtain Wall Shadow Box

9

Perforated Metal

14

6 8

8

Aluminum Edge Frame

18

5

14

SSG Mullions

18

Corrugated Concrete Panel

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

59 


RENDERINGS /

60

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018


RENDERINGS /

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

61 


RENDERINGS /

62

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018


RENDERINGS /

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

63 


RENDERINGS /

64

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018


RENDERINGS /

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

65 


RENDERINGS /

66

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018


RENDERINGS /

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

67 


EXTERIOR LIGHTING PLAN & DETAILS /

1

In-grade uplight at columns

2

Signage light at Firestone crests

1

2 3

Low profile recessed downlights at black metal entry portals

4

Linear wall grazer at terra cotta ornament

4

5

68

Linear wall grazer at gasket soffit

6

Linear ground recessed lighting at balcony slots

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

5


EXTERIOR LIGHTING ELEVATION /

6

5 4

2

1

3

4

1

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

69 


SIGNAGE CONCEPT, BACKLIT LETTERING /

varies 5’ to 7’

2’

Cut-out lettering with LED-blacklight

Black metal

Line of vestibule, above

Line of light shelf, above

Property Line

70

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018


SIGNAGE CONCEPT, PROTRUDING FIN /

varies 5’ to 7’

8”

Black metal

Line of vestibule, above Metal fin with cut-out lettering Line of light shelf, above

Property Line

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

71


BUILDING SECTION, FACING EAST /

1

Parking Garage

2

Parking Ramp

3

Parking Elevator

4

Transformer Vault

5

Electrical

6

Rainwater Storage

7

Bicycle Storage

8

Office Lobby

9

Loading Dock

10

Tenant Retail

11

Tenant Office

12

Amenity Deck

13

Rooftop Mechanical

220’

12

13

12 +205’ Pending Legislation

11

+195’ Current Legislation

11 11 11

146’

11 11 11 11 12

11

84’

11 11 11 11

12

11

8

20’

9

10 0’

7 2 1 1

72

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

34’

3

1

1

4

5


BUILDING SECTION, FACING SOUTH /

1

Parking Garage

2

Parking Ramp

3

Parking Elevator

4

Transformer Vault

5

Electrical

6

Rainwater Storage

7

Bicycle Storage

8

Office Lobby

9

Loading Dock

10

Tenant Retail

11

Tenant Office

12

Amenity Deck

13

Rooftop Mechanical

220’

13

12 +205’ Pending legislation +195’ Current Legislation

11 11 11 11

146’

11 11 11 11 11

84’

11 11 11 12

11 11

34’ 20’

8 0’

1

1 1

1

6

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

73


DEPARTURE, ROOFTOP FEATURES /

SMC 23.48.025.C ROOFTOP FEATURES 7.

At the applicant’s option, the combined total coverage of all features listed in subsections 23.48.025.C.4 and 23.48.025.C.5 may be increased to 65 percent of the roof area, provided that all of the following are satisfied:

a. All mechanical equipment is screened; and

b. No rooftop features are located closer than 10 feet to the roof edge.

PROPOSED DEPARTURE Request departure to allow rooftop features within 10 feet of the roof edge. The proposal contains rooftop features on approximately 43% of the total roof area. The rooftop features exist within 10 feet of the roof edge for 93’ linear feet of the east facade (57% of the 162’ facade length). The east facade is the alley facade.

RATIONALE The proposal sets back 10’ at Harrison Street and Westlake Avenue North to create relationships with the landmark building below and to create a more spacious and daylit right of way. The proposal is pursuing Living Building Petal Certification. The Energy Petal requires the use of a highly efficient network of mechanical systems on the roof. The mechanical systems required use more than 25% of the roof area. The street setbacks and the mechanical system size result in a side core configuration being the most efficient solution. However, the side core configuration requires stair and elevator overruns to be placed within 10’ of the east facade and roof edge. A traditional center core configuration would place unsightly mechanical systems or mechanical screen walls closer to the perimeter of the building. Rooftop features that are less visible from the street below strengthen the relationship between the landmark building and the simple massing of the addition. The proposed departure more strongly supports the mission of the South Lake Union Design Guideline DC2.I Architectural Concept and Consistency than a design with a center core configuation.

74

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018


DEPARTURE, ROOFTOP FEATURES /

10’ Rooftop Setback Rooftop Features Area Requiring Allowance

1 Traditional center core configuration

2 Set back building perimeter from property line

3 Set back core from prominent building roof edge

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

75


DEPARTURE, PARKING SPACE STANDARDS /

SMC 23.54.030 PARKING SPACE STANDARDS

PROPOSED DEPARTURE

RATIONALE

B.

Parking space requirements. The required size of parking spaces shall be determined by whether the parking is for a residential, live-work, or non-residential use. In structures containing residential uses and also containing either non-residential uses or live-work units, parking that is clearly set aside and reserved for residential or live-work use shall meet the standards of subsection 23.54.030.B.1; parking for all other uses within the structure shall meet the standards of subsection 23.54.030.B.2. All uses shall provide barrier-free accessible parking if required by the Building Code, Subtitle I of Title 22, or the Residential Code, Subtitle IA of Title 22.

Request departure to allow the proposal to provide fewer large parking stalls than the minimum ratio requires.

The constraints of the site, the building structural system, and the atypical shoring strategy required to preserve the landmark building severely limit the possible locations for large size stalls.

2. Non-residential uses

Stalls

Medium

Large

Minimum Required

24 35%

N/A

24 35%

Quantity Provided

24 35%

30 45%

13 20%

c. When 20 or more parking spaces are provided, a minimum of 35 percent of the parking spaces shall be striped for small vehicles. The minimum required size for small parking spaces shall also be the maximum size. A maximum of 65 percent of the parking spaces may be striped for small vehicles. A minimum of 35 percent of the spaces shall be striped for large vehicles.

76

Small

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

Total Stalls = 67

Rather than make adjustments to accommodate the required number of large stalls the proposal uses the limited space below grade for parking for smaller vehicles and bike parking. Providing stalls for smaller vehicles and bicycles supports the project’s mission of promoting sustainable transportation methods. The proposed departure supports the goals of the Seattle Design Guideline PL4 Active Transportation.


DEPARTURE, PARKING SPACE STANDARDS /

Possible Area for Large Stalls

179'

108' Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

77 


DEPARTURE, PEDESTRIAN STREET FACADE SETBACK /

SMC 23.47.240 PEDESTRIAN STREET FACADE SETBACK

PROPOSED DEPARTURE

RATIONALE

A.

Street-level development standards in Section 23.48.040 apply to all streets in SM-SLU zones designated as Class 1 Pedestrian Streets, Class 2 Pedestrian Streets, or Neighborhood Green Streets as shown on Map A for 23.48.240.

Request departure to allow the facade to be set back 4’ - 1” from the street lot line on Westlake Avenue North and Harrison Street.

B.

General facade requirements

The proposed design creates emphasis on the landmark building structure and architecture by setting the ground floor glazing back from the property line and thus creating a clear visual distinction between old and new. The setback creates a more dramatic podium facade than a scheme that has glazing at the property line and provides a spatial transition zone between active pedestrian oriented uses and the sidewalk.

1.

Permitted setbacks from street lot lines. Except on lots subject to the provisions of subsection 23.48.240.C, the street-facing facades of a structure are permitted to set back from the street lot line as follows:

a. The street-facing facades of structures abutting Class 1 Pedestrian Streets, as shown on Map A for 23.48.240, shall be built to the street lot line for a minimum of 70 percent of the facade length, provided that the street frontage of any required outdoor amenity area, or other required open space, or usable open space provided in accordance with subsections 23.48.240.E, 23.48.240.F, or 23.48.245.B.4.c is excluded from the total amount of frontage required to be built to the street lot line (Exhibit A for 23.48.240).

The original Firestone building had open vehicle bays along both street frontages. The proposed design recreates a similar spatial experience to acknowledge the significance of the bay structure of the historic building. The setback glazing adds approximately four feet to the pedestrian width of the sidewalk. At the corner the pedestrian realm width ranges from approximately 20’ to 26’ and along the rest of the street frontages the pedestrian realm width ranges from approximately 15’ to 20’. The Landmarks Preservation Board and the Architectural Review Committee of the Landmarks Board support the proposed design of the retail glazing set back. The proposed departure supports the goals of Seattle Design Guidelines CS3.A.1 Fitting Old and New Together, CS3.B Local History and Culture, and PL1.B Walkways and Connections.

400 Westlake Avenue North, Circa 1930 78

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018


DEPARTURE, PEDESTRIAN STREET FACADE SETBACK /

Setback Area Requiring Departure

20’

4’ - 1”

A

A

15’

20’

26’

Typical Ground Floor Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

79


POTENTIAL DEPARTURE, OVERHEAD WEATHER PROTECTION /

SMC 23.49.018 OVERHEAD WEATHER PROTECTION

PROPOSED DEPARTURE

RATIONALE

A. Continuous overhead weather protection shall be required for new development along the entire street frontage of a lot except along those portions of the structure facade that:

Rehabilitate the existing historic structure while preserving the existing facade without adding structural or architectural elements to create overhead weather protection.

The Landmarks Board has discouraged the addition of canopies to the historic building.

1. are located farther than five (5) feet from the street property line or widened sidewalk on private property; or

2. abut a bonused open space amenity feature; or

3. are separated from the street property line or widened sidewalk on private property by a landscaped area at least two (2) feet in width; or

4. are driveways into structures or loading docks.

80

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

Continuous overhead weather projection would compromise the integrity of the historic Firestone facades. A key component of this proposal is an effort to revitalize and restore the original terra cotta facade to its original condition. Weather protection would require significant modification to the historic facade - and deep structural members would be required for a canopy spanning between the existing 30’ - 50’ structural bays. Continuous overhead weather protection along Westlake Avenue North and Harrison Street would obstruct visibility of terra cotta detailing on the facade - much of which is most prominently visible from the sidewalk below. The proposal seeks to use entry vestibules that provide cover for those entering and exiting retail spaces and the office lobby. A continuous soffit along the street will provide pedestrians with limited weather protection on Westlake Avenue North and Harrison Street.


POTENTIAL DEPARTURE, OVERHEAD WEATHER PROTECTION /

Designated Overhead Weather Protection Zone Area 10’ - 15’ Above Sidewalk

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

81


APPENDIX A, MHA DESIGN OPTION /

The City Council is considering legislation that allow additional development capacity in the City of Seattle, raising the 2030 / LBPP height bonus from +20’ to +30’ feet. These sheets illustrate the visual impacts of this additional height, in case the project chooses to pursue the new code for the project.

WEST ELEVATION

WEST ELEVATION

195’ Building Height, Current Legislation

205’ Building Height, Pending Legislation

82

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018


APPENDIX A, MHA DESIGN OPTION /

SOUTH ELEVATION

SOUTH ELEVATION

195’ Building Height, Current Legislation

205’ Building Height, Pending Legislation

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

83


APPENDIX A, MHA DESIGN OPTION /

VIEW FROM SOUTHWEST

VIEW FROM SOUTHWEST

195’ Building Height, Current Legislation

205’ Building Height, Pending Legislation

84

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018


APPENDIX A, MHA DESIGN OPTION /

VIEW FROM HARRISON STREET

VIEW FROM HARRISON STREET

195’ Building Height, Current Legislation

205’ Building Height, Pending Legislation

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

85


APPENDIX B, BOARD GUIDANCE FROM EDG /

City of Seattle Department of Construction & Inspections Nathan Torgelson, Director

EARLY DESIGN GUIDANCE OF THE WEST DESIGN REVIEW BOARD

Project Number: 3022779 Address: 400 Westlake Ave Applicant: Eric Mott, Perkins Will Date of Meeting: Wednesday, December 14, 2016 Board Members Present: Katherine Idziorek, Chair Christine Harrington Homero Nishiwaki Boyd Pickrell Janet Stephenson SDCI Staff Present: Magda Hogness SITE & VICINITY Site Zone: Seattle Mixed (SM‐SLU 160/85‐240) Nearby Zones: (North) SM‐SLU 160/85‐240 (South) SM‐SLU 160/85‐240 (East) SM‐SLU 160/85‐240 (West) SM‐SLU 160/85‐240 Lot Area: 19,407 sf

Current Development: The site is currently occupied by a two story commercial building originally constructed in 1929. The reinforced concrete structure has terra cotta ornament on the exterior, characteristic of the Art Deco style. The building is in the process of being designated as a historic landmark by the Seattle Landmarks Preservation Board. Surrounding Development and Neighborhood Character: The project site is located in the South Lake Union neighborhood, characterized by the close proximity to Lake Union and downtown and a mix of predominately office, commercial, and institutional uses. Nearby development is largely comprised of reinforced concrete structures containing office uses. Adjacent to the north is a six‐story office building. To the east, is a four‐story office building. Across Harrison St. to the south, is a six‐story office building. A five‐story building containing office/laboratories uses is located across Westlake to the west. The SLU streetcar runs along the north edge of both blocks, with a stop located along Westlake to the northwest. Lake Union, two blocks to the north, offers nearby public green space. Access: The subject property currently has vehicular access from Westlake Ave and the alley Environmentally Critical Areas: None PROJECT DESCRIPTION The proposal is for a 12‐story addition to an existing two story landmark building (Firestone Auto Supply and Service Building) and includes ground floor retail and parking for 140 vehicles. The design packet includes information presented at the meeting, and is available online by entering the project number at this website: http://www.seattle.gov/DPD/aboutus/news/events/DesignReview/SearchPastReviews/default.a spx The packet is also available to view in the file, by contacting the Public Resource Center at SDCI: Mailing Public Resource Center Address: 700 Fifth Ave., Suite 2000 P.O. Box 34019 Seattle, WA 98124‐4019 Email:

PRC@seattle.gov

EARLY DESIGN GUIDANCE #3022779 Page 2 of 8

86

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018


APPENDIX B, BOARD GUIDANCE FROM EDG /

EARLY DESIGN GUIDANCE December 14, 2016 PUBLIC COMMENT The following public comments were offered at this meeting  Strongly supported the proposal, in particular the beautiful ground level façade, set back from the landmark building.  Acknowledged the ongoing efforts for the Market to MOHAI pedestrian corridor project.  Would like to see well‐lit streets that are comfortable and safe for pedestrians; also stated a preference for a minimum 8 ft wide sidewalk zone.  Supported the departure.  Stated a preference for a skinny and taller massing proportion.  Concerned with the banality of a glass facade; would like more to see variation in the façade materials.  Lack of support for a skinny, cube on top architectural concept. All public comments submitted in writing for this project can be viewed using the following link and entering the project number: http://web6.seattle.gov/dpd/edms/ PRIORITIES & BOARD RECOMMENDATIONS After visiting the site, considering the analysis of the site and context provided by the proponents, and hearing public comment, the Design Review Board members provided the following siting and design guidance. 1. Massing and Relationship Landmark and to Context: The Board discussed the strengths of the different massing options and unanimously supported the notches and balconies shown in the massing Option 3 alternatives as the voids and projections form a playful counterpoint to the rational landmark building. The Board specified their preference for the taller height shown in Alternate 3.B, which incorporates the Living Building Pilot code provisions and anticipated HALA height and FAR bonuses, as the slender proportion has the best potential to create a vertical architectural presence. The Board directed the applicant to proceed with one of the Option 3 alternatives. (CS2‐A‐2, CS2‐C‐1, DC2) 2. Architectural Concept and Materiality: The Board was supportive of an architectural concept that is complimentary to the landmark, but can also stand on its own and gave guidance for further design development. a. The Board found the depth of the proposed insets and balconies critical to the dynamism of the façade. The Board unanimously agreed these insets should remain open to the sky as shown. (CS2‐A‐2, DC2‐A‐2, DC2‐B, DC2‐C‐1) b. Echoing public comment, the Board supported integrating texture into the façade composition to avoid a glass box appearance, similar to the vertical textural elements shown in the rendering on page 69. When further developing the materiality for the upper volume, the Board encouraged studying light, transparency, color and potentially using materials which reference the landmark below. (DC2‐B‐1, DC2‐D, DC4‐A‐1)

EARLY DESIGN GUIDANCE #3022779 Page 3 of 8

c. The Board noted the proposal will be very visible on all four elevations and agreed that all facades should be clad with the same quality of materials. The Board also suggested exploring a light and air easement in order to be able to continue glazing over to the north façade. (DC2‐A, DC2‐B, DC4‐A‐1) d. The Board expressed interest in seeing how the Living Building Petals will be integrated into the project and notated their support for integral sustainability rather than gratuitous sustainable strategies. (CS1‐I‐i.)

3. Streetscape and Entries: The Board was supportive of the design intent to preserve the character of the building with large, recessed glazing and ensuring the visibility the terra cotta detailing. a. The Board strongly supported the scale of the recessed bay glazing as it reinforces the original architecture. While the Board supported the idea of operable glazing, they acknowledged this feature will be dependent on future tenants. In either case, the Board encouraged the glazing to be as open and porous as possible. (PL3‐C‐1, DC2‐B) b. Related to the proposed departure for overhead weather protection, the Board recommended exploring other ways to provide pedestrian amenities along the streetscape, such as seating, public art, selection of tree species, etc. in a way that is celebratory of the South Lake Union neighborhood. (PL1‐B, PL1‐III‐i) c. In order to identify the entries and improve wayfinding, the Board recommended studying limited overhead protection at entries, setting back the glazing further into a recessed type of arcade, differentiating paving, and/or other pedestrian cues. (CS2‐B‐ 2, PL1‐B, PL1‐III‐I, PL3‐A) d. For the streetscape design, the Board recommended referring to the Market to MOHAI Pedestrian Corridor Plan for desirable sidewalk width and anticipated pedestrian volumes. (CS2‐B‐2, PL1‐B, PL1‐III‐i) 4. Signage and Lighting: The Board viewed signage as a unique opportunity for an artistic expression to reflect and acknowledge the automotive historical character and requested a developed signage plan for the next meeting. Agreeing with public comment, the Board supported well‐lit streets and recommended adding pedestrian lighting or incorporating the existing pedestrian lighting to increase visibility. (CS3‐B, DC4‐B, DC4‐C‐1) DEVELOPMENT STANDARD DEPARTURES The Board’s recommendation on the requested departure(s) will be based on the departure’s potential to help the project better meet these design guidelines priorities and achieve a better overall project design than could be achieved without the departure(s). The Board’s recommendation will be reserved until the final Board meeting. At the time of the Early Design Guidance the following departure was requested: 1. Overhead Weather Protection (SMC 23.49.018): The Code requires continuous overhead weather protection. In order to avoid obscuring the terra cotta detailing on the Landmark façade, the applicant proposes recessed glazing instead of overhead canopies. EARLY DESIGN GUIDANCE #3022779 Page 4 of 8

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

87


APPENDIX B, BOARD GUIDANCE FROM EDG /

The Board indicated initial support for the departure request provided that other pedestrian amenities along the streetscape are incorporated into the design and legibility for the entry is further developed. The Board agreed the resulting design has the potential to improve the pedestrian realm and better meet Design Guidelines DC2‐B, Architectural and Façade Composition and DC2‐D, Scale and Texture.

DESIGN REVIEW GUIDELINES The priority Citywide and Neighborhood guidelines identified as Priority Guidelines are summarized below, while all guidelines remain applicable. For the full text please visit the Design Review website. CONTEXT & SITE CS1 Natural Systems and Site Features: Use natural systems/features of the site and its surroundings as a starting point for project design. South Lake Union Supplemental Guidance: CS1‐I Responding To Site Characteristics CS1‐I‐i. Sustainable Design: New development is encouraged to take advantage of site configuration to accomplish sustainability goals. The Board is generally willing to recommend departures from development standards if they are needed to achieve sustainable design. Refer to the Leadership in Energy and Environmental Design* (LEED) manual which provides additional information CS2 Urban Pattern and Form: Strengthen the most desirable forms, characteristics, and patterns of the streets, block faces, and open spaces in the surrounding area. CS2‐A Location in the City and Neighborhood CS2‐A‐2. Architectural Presence: Evaluate the degree of visibility or architectural presence that is appropriate or desired given the context, and design accordingly. CS2‐B Adjacent Sites, Streets, and Open Spaces CS2‐B‐2. Connection to the Street: Identify opportunities for the project to make a strong connection to the street and public realm. CS2‐C Relationship to the Block CS2‐C‐1. Corner Sites: Corner sites can serve as gateways or focal points; both require careful detailing at the first three floors due to their high visibility from two or more streets and long distances. CS3 Architectural Context and Character: Contribute to the architectural character of the neighborhood. CS3‐A Emphasizing Positive Neighborhood Attributes

EARLY DESIGN GUIDANCE #3022779 Page 5 of 8

88

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

CS3‐A‐2. Contemporary Design: Explore how contemporary designs can contribute to the development of attractive new forms and architectural styles; as expressed through use of new materials or other means. CS3‐B Local History and Culture CS3‐B‐1. Placemaking: Explore the history of the site and neighborhood as a potential placemaking opportunity. Look for historical and cultural significance, using neighborhood groups and archives as resources. CS3‐B‐2. Historical/Cultural References: Reuse existing structures on the site where feasible as a means of incorporating historical or cultural elements into the new project. PUBLIC LIFE PL1 Connectivity: Complement and contribute to the network of open spaces around the site and the connections among them. PL1‐B Walkways and Connections PL1‐B‐1. Pedestrian Infrastructure: Connect on‐site pedestrian walkways with existing public and private pedestrian infrastructure, thereby supporting pedestrian connections within and outside the project. PL1‐B‐2. Pedestrian Volumes: Provide ample space for pedestrian flow and circulation, particularly in areas where there is already heavy pedestrian traffic or where the project is expected to add or attract pedestrians to the area. PL1‐B‐3. Pedestrian Amenities: Opportunities for creating lively, pedestrian oriented open spaces to enliven the area and attract interest and interaction with the site and building should be considered. South Lake Union Supplemental Guidance: PL1‐III Pedestrian Open Spaces and Entrances PL1‐III‐i. Public Realm Amenity: New developments are encouraged to work with the Design Review Board and interested citizens to provide features that enhance the public realm, i.e. the transition zone between private property and the public right of way. The Board is generally willing to consider a departure in open space requirements if the project proponent provides an acceptable plan for features such as: a. curb bulbs adjacent to active retail spaces where they are not interfering with primary corridors that are designated for high levels of traffic flow; b. pedestrian‐oriented street lighting; c. street furniture. PL3 Street‐Level Interaction: Encourage human interaction and activity at the street‐level with clear connections to building entries and edges. PL3‐A Entries PL3‐A‐1. Design Objectives: Design primary entries to be obvious, identifiable, and distinctive with clear lines of sight and lobbies visually connected to the street. PL3‐A‐4. Ensemble of Elements: Design the entry as a collection of coordinated elements including the door(s), overhead features, ground surface, landscaping, lighting, and other features. PL3‐C Retail Edges EARLY DESIGN GUIDANCE #3022779 Page 6 of 8


APPENDIX B, BOARD GUIDANCE FROM EDG /

PL3‐C‐1. Porous Edge: Engage passersby with opportunities to interact visually with the building interior using glazing and transparency. Create multiple entries where possible and make a physical and visual connection between people on the sidewalk and retail activities in the building.

PL4 Active Transportation: Incorporate design features that facilitate active forms of transportation such as walking, bicycling, and use of transit. PL4‐B Planning Ahead for Bicyclists PL4‐B‐1. Early Planning: Consider existing and future bicycle traffic to and through the site early in the process so that access and connections are integrated into the project along with other modes of travel. PL4‐B‐2. Bike Facilities: Facilities such as bike racks and storage, bike share stations, shower facilities and lockers for bicyclists should be located to maximize convenience, security, and safety. PL4‐B‐3. Bike Connections: Facilitate connections to bicycle trails and infrastructure around and beyond the project. DESIGN CONCEPT DC2 Architectural Concept: Develop an architectural concept that will result in a unified and functional design that fits well on the site and within its surroundings. DC2‐A Massing DC2‐A‐1. Site Characteristics and Uses: Arrange the mass of the building taking into consideration the characteristics of the site and the proposed uses of the building and its open space. DC2‐A‐2. Reducing Perceived Mass: Use secondary architectural elements to reduce the perceived mass of larger projects. DC2‐B Architectural and Facade Composition DC2‐B‐1. Façade Composition: Design all building facades—including alleys and visible roofs— considering the composition and architectural expression of the building as a whole. Ensure that all facades are attractive and well‐proportioned. DC2‐B‐2. Blank Walls: Avoid large blank walls along visible façades wherever possible. Where expanses of blank walls, retaining walls, or garage facades are unavoidable, include uses or design treatments at the street level that have human scale and are designed for pedestrians. DC2‐C Secondary Architectural Features DC2‐C‐1. Visual Depth and Interest: Add depth to facades where appropriate by incorporating balconies, canopies, awnings, decks, or other secondary elements into the façade design. Add detailing at the street level in order to create interest for the pedestrian and encourage active street life and window shopping (in retail areas). South Lake Union Supplemental Guidance: DC2‐I Architectural Concept and Consistency DC2‐I‐i. Roofscape Design: Design the “fifth elevation” — the roofscape — in addition to the streetscape. As this area topographically is a valley, the roofs may be viewed from locations outside the neighborhood such as the freeway and Space Needle. Therefore, EARLY DESIGN GUIDANCE #3022779 Page 7 of 8

views from outside the area as well as from within the neighborhood should be considered, and roof‐top elements should be organized to minimize view impacts from the freeway and elevated areas.

DC4 Exterior Elements and Finishes: Use appropriate and high quality elements and finishes for the building and its open spaces. DC4‐A Exterior Elements and Finishes DC4‐A‐1. Exterior Finish Materials: Building exteriors should be constructed of durable and maintainable materials that are attractive even when viewed up close. Materials that have texture, pattern, or lend themselves to a high quality of detailing are encouraged. DC4‐B Signage DC4‐B‐1. Scale and Character: Add interest to the streetscape with exterior signs and attachments that are appropriate in scale and character to the project and its environs. DC4‐B‐2. Coordination with Project Design: Develop a signage plan within the context of architectural and open space concepts, and coordinate the details with façade design, lighting, and other project features to complement the project as a whole, in addition to the surrounding context. DC4‐C Lighting DC4‐C‐1. Functions: Use lighting both to increase site safety in all locations used by pedestrians and to highlight architectural or landscape details and features such as entries, signs, canopies, plantings, and art. DC4‐C‐2. Avoiding Glare: Design project lighting based upon the uses on and off site, taking care to provide illumination to serve building needs while avoiding off‐site night glare and light pollution. DC4‐D Trees, Landscape, and Hardscape Materials DC4‐D‐1. Choice of Plant Materials: Reinforce the overall architectural and open space design concepts through the selection of landscape materials. RECOMMENDATIONS BOARD DIRECTION At the conclusion of the EARLY DESIGN GUIDANCE meeting, the Board recommended moving forward to MUP application.

EARLY DESIGN GUIDANCE #3022779 Page 8 of 8

Martin Selig Real Estate 400 Westlake | Project 3022779 | West Design Review Board | April 18, 2018

89


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.