Plumbing Contract Specifications: Install all components, as per drawings, specifications and to the requirements of local building codes, and plumbing codes. All material to be C.S.A. approved. Supply own tools and equipment necessary to complete all work. Arrange necessary inspections. Layout locations of fixtures, taps and drains on site with owner. Arrange and co-ordinate delivery of all materials. Arrange for service layout and connect service with local utility. Repair any damage incurred from installations. Install separate shut offs to all locations for both hot and cold potable water supply. Obtain and pay for required permits. Supply Install Inspected ______
______ _____
All rough in of water and drain pipes.
______
______ _____
Kitchen sink and taps.
______
______ _____
Garbarator.
______
______ _____
Dishwasher.
______
______ _____
Refrigerator ice maker water line.
______
______ _____
Bathroom sinks and taps.
______
______ _____
Toilets and seats.
______
______ _____
Bathtubs and taps.
______
______ _____
Bidets and taps.
______
______ _____
Showers and taps.
______
______ _____
Spa.
______
______ _____
Laundry tubs and taps.
______
______ _____
Washing machine drain and taps.
______
______ _____
Exterior hosebibs.
______
______ _____
Plumbing traps.
______
______ _____
Sump pumps.
______
______ _____
Well pump.
______
______ _____
Sewage and/or greywater pump.
______
______ _____
Municipal sewer and water connections.
______
______ _____
Septic and well connections.
______
______ _____
Stack gasket on roof.
______
______ _____
Trench for service connection's.
______
______ _____
Backfill for trench.
______
______ _____
Water softener.
______
______ _____
Water purification system, of type;
_______________________
______
______ _____
Hot water heater, of type and size;
_______________________
Hot water heater to be rented _______, or Purchased _______________, for $_______.__ Plumbing fixture allowance; $_______________________________.______ Tap allowance; $_______________________________.______ $______________.____ for _____________________________________ $______________.____ for _____________________________________
Sub total: $____________________._____ G.S.T.: $____________________._____ P.S.T: $____________________._____ TOTAL: $____________________._____ Obligations of owner to contractor: Site preparation___________________________________________ Other___________________________________________________ Lead time required ________________________________________ Terms of payment: Hold back of 10% for 30 days upon completion ($___________.____) Contractors on site time to be: _______________________________________________ Service and rough in:_______________________________________________ Connect and finish:_______________________________________________
This is a DtiCorp.com document