Sample Plumbing Contract

Page 1

Plumbing Contract Specifications: Install all components, as per drawings, specifications and to the requirements of local building codes, and plumbing codes. All material to be C.S.A. approved. Supply own tools and equipment necessary to complete all work. Arrange necessary inspections. Layout locations of fixtures, taps and drains on site with owner. Arrange and co-ordinate delivery of all materials. Arrange for service layout and connect service with local utility. Repair any damage incurred from installations. Install separate shut offs to all locations for both hot and cold potable water supply. Obtain and pay for required permits. Supply Install Inspected ______

______ _____

All rough in of water and drain pipes.

______

______ _____

Kitchen sink and taps.

______

______ _____

Garbarator.

______

______ _____

Dishwasher.

______

______ _____

Refrigerator ice maker water line.

______

______ _____

Bathroom sinks and taps.

______

______ _____

Toilets and seats.

______

______ _____

Bathtubs and taps.

______

______ _____

Bidets and taps.

______

______ _____

Showers and taps.

______

______ _____

Spa.

______

______ _____

Laundry tubs and taps.


______

______ _____

Washing machine drain and taps.

______

______ _____

Exterior hosebibs.

______

______ _____

Plumbing traps.

______

______ _____

Sump pumps.

______

______ _____

Well pump.

______

______ _____

Sewage and/or greywater pump.

______

______ _____

Municipal sewer and water connections.

______

______ _____

Septic and well connections.

______

______ _____

Stack gasket on roof.

______

______ _____

Trench for service connection's.

______

______ _____

Backfill for trench.

______

______ _____

Water softener.

______

______ _____

Water purification system, of type;

_______________________

______

______ _____

Hot water heater, of type and size;

_______________________

Hot water heater to be rented _______, or Purchased _______________, for $_______.__ Plumbing fixture allowance; $_______________________________.______ Tap allowance; $_______________________________.______ $______________.____ for _____________________________________ $______________.____ for _____________________________________

Sub total: $____________________._____ G.S.T.: $____________________._____ P.S.T: $____________________._____ TOTAL: $____________________._____ Obligations of owner to contractor: Site preparation___________________________________________ Other___________________________________________________ Lead time required ________________________________________ Terms of payment: Hold back of 10% for 30 days upon completion ($___________.____) Contractors on site time to be: _______________________________________________ Service and rough in:_______________________________________________ Connect and finish:_______________________________________________

This is a DtiCorp.com document


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.