PLAZA En experience
comfort
sustainAbility
LOCATION and history
FOUDED September 7, 1630
ONE OF THE WORLDS BEST KNOWN ACADEMIC HUBS
TOP INDUSTRIES Education, Biotechnology, Tourism, Financial services
CONCEPT AND INSPIRATION Experience, Comfort & Sustainability are at the heart of Plaza En. Located in the Old Boston, Massachusetts Meatpacking district, this renovated 1890s warehouse will be transformed into a cutting edge, business class hotel, reflecting the City of Boston itself. The Design is inspired by the old and the new, pulling materials and textures from vintage androgynous fashion, blended into today’s interpretation. The Goal of Plaza En is for each guest to feel totally encompassed by the rich history of the city throughout their entire stay and to offer the best user experience possible while at the same time maintaining a small environmental footprint.
SUSTAINABILITY FEATURES Locally sourced/organic commissary options
Rapidly renewable bamboo flooring throughout lobby 20 percent or higher rapidly renewable/recycled content on all textiles Wallcoverings that meet LEED requirements when used with a low VOC emitting adhesive Large windows for added natural light to reduce the need for interior lighting during the day LED bulbs in all lighting fixtures
Lockable Bicycle storage underground to encourage bike transportation for workers/local visitors Antique & classically designed furniture pieces that are given a new purpose or that can last with changing interior styles Guests encouraged to reuse towels and bedding throughout their stay – place signage in every guestroom
Green Roof Recycled Rainwater systems on roof to be used for toilets and watering interior/exterior plants Dual-flush toilets to save on water Located close to local transit and bike paths Recycling in every room and by every trash can Compost in the breakfast area
FIRST FLOOR ZONES
NOT IN CONTRACT
MAIN RECEPTION CHECK IN SEPERATE VALET STATION AND CONCIERGE SELF CHECKOUT COMMESARY -
-
FULL BAR VARIETY OF SEATING AREAS BREAKFAST AREA SEPERATE SUNROOM ADJECENT TO ENTRANCE VESTIBULE
CIRCULATION AND CONSIDERATIONS
MAIN CIRCULATION PATTERN NATURAL SUNLIGHT -
-
NOT IN CONTRACT
FIRST FLOOR REFLECTED CEILING PLAN
guest room floor zones -
vip suite double room large king room family suite -
-
LEVEL 3 CODED FURNISHINGS PLAN Project name Date
1
Level 3 - FURNITURE PLAN
Drawn by
HOTEL PROJECT 12/7/18 NH & NS
vip suite
double and king rooms
RENDERINGS
main lobby
-
-
-
1
Level 1 CODED FURNISHINS PLAN 3/32" = 1'-0"
-
-
-
-
-
-
-
Level 1 CODED FURNISHINS PLAN 3/32" = 1'-0"
-
-
LEVEL 1 CODED FURNISHINGS PLAN Project name Date Drawn by Checked by
HOTEL PROJECT 12/7/18 NH & NS JM
A1.001 Scale
3/32" = 1'-0"
1
Level 1 CODED FURNISHINS PLAN 3/32" = 1'-0"
LEVEL 1 CODED FURNISHINGS PLAN Project name Date Drawn by Checked by
HOTEL PROJECT 12/7/18 NH & NS JM
A1.001 Scale
-
-
-
-
-
1
Level 1 CODED FURNISHINS PLAN 3/32" = 1'-0"
LEVEL 1 CODED
3/32" = 1'-0"
12/6/2018 5:29:12 PM
1
12/6/2018 5:29:12 PM
-
-
-
-
1
Level 1 CODED FURNISHINS PLAN 3/32" = 1'-0"
-
-
-
-
-
-
-
Level 1 CODED FURNISHINS PLAN 3/32" = 1'-0"
-
LEVEL 1 CODED FURNISHINGS PLAN HOTEL PROJECT 12/7/18 NH & NS JM
Project name Date Drawn by Checked by
A1.001 3/32" = 1'-0"
Scale
1
12/6/2018 5:29:12 PM
1
Level 1 CODED FURNISHINS PLAN 3/32" = 1'-0"
LEVEL 1 CO FURNISHING Project name Date Drawn by Checked by
A1.0 Scale
-
-
-
-
-
1
Level 1 CODED FURNISHINS PLAN 3/32" = 1'-0"
LEVEL 1 CODED FURNISHINGS PLAN Project name Date Drawn by Checked by
HOTEL PROJECT 12/7/18 NH & NS JM
PM
-
-
-
-
1
Level 1 CODED FURNISHINS PLAN 3/32" = 1'-0"
sunroom
-
-
-
1
Level 1 CODED FURNISHINS PLAN 3/32" = 1'-0"
-
-
-
-
-
-
1
Level 1 CODED FURNISHINS PLAN 3/32" = 1'-0"
-
LEVEL 1 CODED FURNISHINGS PLAN Project name Date Drawn by Checked by
HOTEL PROJECT 12/7/18 NH & NS JM
A1.001 Scale
3/32" = 1'-0"
1
Level 1 CODED FURNISHINS PLAN 3/32" = 1'-0"
12/6/2018 5:29:12 PM
-
-
-
-
-
1
Level 1 CODED FURNISHINS PLAN 3/32" = 1'-0"
-
-
breakfast area
-
-
-
1
Level 1 CODED FURNISHINS PLAN 3/32" = 1'-0"
-
-
-
-
Level 1 CODED FURNISHINS PLAN 3/32" = 1'-0"
LEVEL 1 CODED FURNISHINGS PLAN Project name Date Drawn by Checked by
HOTEL PROJECT 12/7/18 NH & NS JM
A1.001 Scale
3/32" = 1'-0"
-
-
-
-
-
1
Level 1 CODED FURNISHINS PLAN 3/32" = 1'-0"
LEVEL 1 CODED FURNISHINGS PLAN Project name Date Drawn by Checked by
HOTEL PROJECT 12/7/18 NH & NS JM
9:12 PM
1
12/6/2018 5:29:12 PM
-
double
and
king rooms
-
-
-
-
-
-
LEVEL 3 CODED FURNISHINGS PLAN Project name Date
1
Level 3 - FURNITURE PLAN 3/32" = 1'-0"
Drawn by Checked by
HOTEL PROJECT 12/7/18 NH & NS JM
A3.002 Scale
-
-
1
Level 3 - FURNITURE PLAN
3/32" = 1'-0"
-
12/6/2018 6:06:38 PM
-
-
-
-
-
1
Level 3 - FURNITURE PLAN 3/32" = 1'-0"
vip suite
-
-
-
-
-
-
LEVEL 3 CODED FURNISHINGS PLAN Project name Date
1
Level 3 - FURNITURE PLAN 3/32" = 1'-0"
Drawn by Checked by
HOTEL PROJECT 12/7/18 NH & NS JM
A3.002 Scale
3/32" = 1'-0"
12/6/2018 6:06:38 PM
-
-
-
-
THANK YOU