River of Time B&W Architectural Drawings

Page 1

RIVER OF TIME

CHRIS NORCROSS

COMPREHENSIVE STUDIO ARCH 513

SCALE :

DATE :

NTS 12/20/2019

COVER SHEET

A0.01


Felipe

us de Jes

A v. S a n S e

ño el Desenga

bastian

7a. Avenida

lle de San S

Norte o Ca

ebastian

a Norte 8a. Avenid

a Norte

6a. Avenid

oniente INGRESO

A San

nida Norte o Ave 8a. Avenida

2a. Calle P

AVENIDA DE LA RECOLECCION

COMPAÑIA

Norte

DE JESUS

7a. Avenida

Alameda S

4ta. Calle P

oniente

anta Lucia

7a. Avenida

oniente

6ta. Calle P

Sur o Calle

olon

Cristobal C

a Sur

8a. Avenid

RIVER OF TIME

en

Sa

ch an

n n Sebastia

lM de lle Ca

1a. Calle del Chajon 1era. Calle del Chajon

1a. Calle Po

niente

3a. Calle P

oniente

5ta. Calle P

oniente

ch

e an lM de lle Ca

Callejon Lemus

1era. C

s

s


Calle de la

Calle de los

en

Calle de las

ta

ues

eC Call

Candelaria

Carpinteros

Animas

o

uch

Ch del

Calle del O quin

bispo Marro

Calle de las

1 era. Calle

Platerias

Oriente

uana

Real Ad Calle de la nte

C

del Rubio

ercaderes

4a. Avenida

atalinas y M

rco de las C

Calle del A

Calle Ponie

o o La Pila

to Doming alle de San

Norte

2 da. Calle

2d

Oriente

3a. Avenid

ilitas

alle de las P

niente o C a. Calle Po

o

nto Doming

Calle de Sa

3 era. Calle

Oriente

a Norte Callejon de

Concepcion

l sol

CAlle de la

ida Norte

2a. Avenida N

Poniente

Oriente

orte

4 ta. Calle

Concepcion

de Maldona

Norte

miento Real Ayunta

Calle de la

Sor Juana

Norte

5a. Avenida

a 4a. Avenid

3era.Calle

1 era. Aven

3era. Calle

Oriente

do

ida Sur

1 era. Aven

Oriente

ro

ermano Ped

5 ta. Calle

Universidad

CAlle del H

Calle de la

Calle de la N

Palacio de es Generale

Oriente

s

5a. Avenida

3era. Aven

6 ta. Calle

"A" Oriente

Calle de Sa

ida Sur

a Sur

riente

z

7a. Calle O

CHRIS NORCROSS

Calle de

a

Chipilap

nta Clara

rtez y Larra

o de Pedro C

4ta. Avenid

Sur o Calle

Sur

6a. Avenida

6 ta. Calle

Peregrinos

obleza

los Capitan

Calle de los

COMPREHENSIVE STUDIO ARCH 513

SCALE : 1/128" DATE :

= 1'-0"

12/17/2019

CONTEXTUAL SITE PLAN

A0.03


RECEIVING 104

SECURITY 105

RIVER OF TIME


SECURITY 103

LOBBY 101

COAT ROOM 102

CHRIS NORCROSS

COMPREHENSIVE STUDIO ARCH 513

SCALE :

DATE :

1/16" = 1'-0" 12/17/2019

SITE PLAN

A0.04


AREA Program Department

Program Component

Quantity Area NSFT Total net area Area (net) Area Gross (60% Eff) Quantity

Total Area (net) Type

Infraestructure /support Ticket booth Bookstore Bookstore storage/supprt Cafeteria (Public) & Kitchen (Public) Security Lockers/cloak room Staff changing area Staff lounge Administration offices Meeting room Lounges/support

1 1 1 1 1 1 2 1 3 1 1

250 1000 300 900 500 500 300 400 200 600 300

250 1000 300 900 500 500 600 400 600 600 300

250 1000 300 900 500 500 300 400 200 600 300

416.6675 1666.67 500.001 1500.003 833.335 833.335 1000.002 666.668 1000.002 1000.002 500.001

1 1 1 1 1 1 2 1 3 1 1

250 1000 300 900 500 500 600 400 600 600 300

B M M A-2 B S-1 S-1 B B B B

Museum

Gallery 1-The city Gallery-2-Architecture Gallery-3-Future Storage area IT room Receiving area Area of existing chapel

1 1 1 1 1 1

2000 2000 2000 500 250 1000

2000 2000 2000 500 250 1000 1550

2000 2000 2000 500 250 1000

3333.34 3333.34 3333.34 833.335 416.6675 1666.67

1 1 1 1 1 1

2000 2000 2000 500 250 1000

A-3 A-3 A-3 S-2 S-2 U

Archive

Reading room (Researchers) Researcher secured room Restoration workshop Security Archive area Vault Quarantine Documentation/processing room

1 1 1 1 1 1 1 1

2000 500 2000 500 3000 2000 500 1000

2000 500 2000 500 3000 2000 500 1000

2000 500 2000 500 3000 2000 500 1000

3333.34 833.335 3333.34 833.335 5000.01 3333.34 833.335 1666.67

1 1 1 1 1 1 1 1

2000 500 2000 500 3000 2000 500 1000

A-3 B B B S-1 S-1 S-1 B

Total Gross 42000.084

RIVER OF TIME

Total Net 25200

Fl Area/occupa


OCCUPANCY

ant-NET Fl Area/occupant -GROSS Occupants Department Total

15

30 30 30

50

150 60 60

Male WC

Female WC

Male Lavatories

FIXTURES Female Required Provided Required Provided Lavatories WC Count WC Count Lavatory Count Lavatory Count

150 50 50 150 150 150 150

2.78 27.78 8.33 60.00 5.56 16.67 20.00 4.44 6.67 6.67 3.33

162.22

3.24

3.24

2.03

2.03

300 300 500

66.67 66.67 66.67 2.78 1.39 3.33

207.50

0.80

1.54

0.50

0.50

150 150 150 300 300 300 150

40.00 5.56 22.22 5.56 16.67 11.11 2.78 11.11

115.00

1.69

1.69

1.06

1.06

Total Occupancy 484.72

12.21

12

7.17

12

Total Male Total Female Total Male Total Female Lavatory Lavatory WC Fixtures WC Fixtures Fixtures Fixtures 5.73 6.47 3.58 3.58 Total Fixtures 12.21 Total Fixtures 7.17

CHRIS NORCROSS

COMPREHENSIVE STUDIO ARCH 513

SCALE :

DATE :

NTS 12/20/2019

CODE REQUIREMENTS

A0.05


43'-0"

1

2

11'-6"

A

31'-6"

B

VAULT 001

47'-0"

C

31'-6"

D

MECHANICAL SYSTEMS 002

11'-6"

E

F

RIVER OF TIME


43'-0"

3

CHRIS NORCROSS

4

COMPREHENSIVE STUDIO ARCH 513

SCALE :

DATE :

1/16" = 1'-0" 12/20/2019

BASEMENT FLOOR PLAN

A1.00


43'-0"

1

2

A 11'-6"

E.C.

31'-6"

B

RECEIVING 104

47'-0"

C

31'-6"

D

SECURITY 105

11'-6"

E TOILET 1

F

RIVER OF TIME


43'-0"

3

4

TOILET 2

SECURITY 103

LOBBY 101

COAT ROOM 102

E.C.

CHRIS NORCROSS

COMPREHENSIVE STUDIO ARCH 513

SCALE :

DATE :

1/16" = 1'-0" 12/20/2019

GROUND FLOOR PLAN

A1.01


43'-0"

1

2

A 11'-6"

E.C.

B

31'-6"

DOCUMENTATION PROCESSING 202

47'-0"

C

QUARANTINE 203

31'-6"

D

11'-6"

E TOILET 3

F

RIVER OF TIME


43'-0"

3

4

TOILET 4

GALLERY 201

E.C.

CHRIS NORCROSS

COMPREHENSIVE STUDIO ARCH 513

SCALE :

DATE :

1/16" = 1'-0" 12/20/2019

SECOND FLOOR PLAN

A1.02


43'-0"

1

2

A 11'-6"

E.C.

31'-6"

B

C

ARCHIVE

47'-0"

302

31'-6"

D

11'-6"

E TOILET 5

F

RIVER OF TIME


43'-0"

3

4

TOILET 6

GALLERY 301

E.C.

CHRIS NORCROSS

COMPREHENSIVE STUDIO ARCH 513

SCALE :

DATE :

1/16" = 1'-0" 12/20/2019

THIRD FLOOR PLAN

A1.03


43'-0"

1

2

A 11'-6"

E.C.

31'-6"

B

402

47'-0"

C

SECURE RESEARCH

31'-6"

D

11'-6"

E

F

RIVER OF TIME

STAFF ROOM 403


43'-0"

3

4

ANCILLARY SERVICES 401

E.C.

CHRIS NORCROSS

COMPREHENSIVE STUDIO ARCH 513

SCALE :

DATE :

1/16" = 1'-0" 12/20/2019

FOURTH FLOOR PLAN

A1.04


43'-0"

1

2

A 11'-6"

E.C.

31'-6"

B

C

RESTORATION WORKSHOP 47'-0"

502

31'-6"

D

11'-6"

E TOILET 7

F

RIVER OF TIME


43'-0"

3

4

TOILET 8

GALLERY 501

E.C.

CHRIS NORCROSS

COMPREHENSIVE STUDIO ARCH 513

SCALE :

DATE :

1/16" = 1'-0" 12/20/2019

FIFTH FLOOR PLAN

A1.05


43'-0"

1

2

A 11'-6"

E.C.

B

31'-6"

MEETING ROOM 603

47'-0"

C

31'-6"

D

ADMINISTRATION 604

11'-6"

E TOILET 9

F

RIVER OF TIME


43'-0"

3

4

TOILET 10

RUINS OVERLOOK ROOM 602

BOOK STORAGE 601

E.C.

CHRIS NORCROSS

COMPREHENSIVE STUDIO ARCH 513

SCALE :

DATE :

1/16" = 1'-0" 12/20/2019

SIXTH FLOOR PLAN

A1.06


43'-0"

1

2

A 11'-6"

E.C.

31'-6"

B

C

READING ROOM 47'-0"

703

31'-6"

D

11'-6"

E TOILET 11

F

RIVER OF TIME


43'-0"

3

4

TOILET 12

CAFE 702

READING ROOM 701

E.C.

CHRIS NORCROSS

COMPREHENSIVE STUDIO ARCH 513

SCALE :

DATE :

1/16" = 1'-0" 12/20/2019

SEVENTH FLOOR PLAN

A1.07


11'-6"

31'-6"

47'-0"

31'-6"

11'-6"

43'-0"

1

A

B

C

D

E

F

RIVER OF TIME 2


43'-0"

3

CHRIS NORCROSS

4

COMPREHENSIVE STUDIO ARCH 513

SCALE :

DATE :

1/16" = 1'-0" 12/20/2019

ROOF PLAN

A1.08


ROOF

19'-2"

EL +5159'-2" FF

SEVENTH FLOOR

15'-0"

EL +5140'-0" FF

SIXTH FLOOR

17'-0"

EL +5125'-0" FF

FIFTH FLOOR

15'-0"

EL +5108'-0" FF

FOURTH FLOOR

17'-0"

EL +5093'-0" FF

THIRD FLOOR

17'-0"

EL +5076'-0" FF

SECOND FLOOR

17'-0"

EL +5059'-0" FF

GROUND FLOOR

17'-0"

EL +5042'-0" FF

BASEMENT EL +5025-0" FF

SOUTHERN ELEVATION

ROOF

19'-2"

EL +5159'-2" FF

SEVENTH FLOOR

15'-0"

EL +5140'-0" FF

SIXTH FLOOR

17'-0"

EL +5125'-0" FF

FIFTH FLOOR

15'-0"

EL +5108'-0" FF

FOURTH FLOOR

17'-0"

EL +5093'-0" FF

THIRD FLOOR

17'-0"

EL +5076'-0" FF

SECOND FLOOR

17'-0"

EL +5059'-0" FF

GROUND FLOOR

17'-0"

EL +5042'-0" FF

BASEMENT EL +5025-0" FF

MUSEUM BLOCK EASTERN ELEVATION

ROOF

19'-2"

EL +5159'-2" FF

SEVENTH FLOOR

15'-0"

EL +5140'-0" FF

SIXTH FLOOR

17'-0"

EL +5125'-0" FF

FIFTH FLOOR

15'-0"

EL +5108'-0" FF

FOURTH FLOOR

17'-0"

EL +5093'-0" FF

THIRD FLOOR

17'-0"

EL +5076'-0" FF

SECOND FLOOR

17'-0"

EL +5059'-0" FF

GROUND FLOOR

17'-0"

EL +5042'-0" FF

BASEMENT EL +5025-0" FF

MUSEUM BLOCK WESTERN ELEVATION

RIVER OF TIME


ROOF

19'-2"

EL +5159'-2" FF

SEVENTH FLOOR

15'-0"

EL +5140'-0" FF

SIXTH FLOOR

17'-0"

EL +5125'-0" FF

FIFTH FLOOR

15'-0"

EL +5108'-0" FF

FOURTH FLOOR

17'-0"

EL +5093'-0" FF

THIRD FLOOR

17'-0"

EL +5076'-0" FF

SECOND FLOOR

17'-0"

EL +5059'-0" FF

GROUND FLOOR

17'-0"

EL +5042'-0" FF

BASEMENT EL +5025-0" FF

ARCHIVES BLOCK WESTERN ELEVATION

ROOF

19'-2"

EL +5159'-2" FF

SEVENTH FLOOR

15'-0"

EL +5140'-0" FF

SIXTH FLOOR

17'-0"

EL +5125'-0" FF

FIFTH FLOOR

15'-0"

EL +5108'-0" FF

FOURTH FLOOR

17'-0"

EL +5093'-0" FF

THIRD FLOOR

17'-0"

EL +5076'-0" FF

SECOND FLOOR

17'-0"

EL +5059'-0" FF

GROUND FLOOR

17'-0"

EL +5042'-0" FF

BASEMENT EL +5025-0" FF

ARCHIVES BLOCK EASTERN ELEVATION CHRIS NORCROSS

COMPREHENSIVE STUDIO ARCH 513

SCALE :

DATE :

1/16" = 1'-0" 12/20/2019

ELEVATIONS

A2.01


ROOF EL +5159'-2" FF 19'-2"

READING ROOM SEVENTH FLOOR

15'-0"

EL +5140'-0" FF

SIXTH FLOOR

17'-0"

EL +5125'-0" FF RESTORATION WORKSHOP FIFTH FLOOR

15'-0"

EL +5108'-0" FF

FOURTH FLOOR

SECURE RESEARCH

17'-0"

EL +5093'-0" FF DOCUMENTATION PROCESSING THIRD FLOOR

17'-0"

EL +5076'-0" FF QUARANTINE SECOND FLOOR

17'-0"

EL +5059'-0" FF

GROUND FLOOR

17'-0"

EL +5042'-0" FF VAULT BASEMENT EL +5025-0" FF

ROOF EL +5159'-2" FF 19'-2"

READING ROOM

SEVENTH FLOOR

15'-0"

EL +5140'-0" FF MEETING ROOM

ADMINISTRATION

SIXTH FLOOR

17'-0"

EL +5125'-0" FF RESTORATION WORKSHOP

FIFTH FLOOR

15'-0"

EL +5108'-0" FF STAFF ROOM

SECURE RESEARCH

ARCHIVE

DOCUMENTATION PROCESSING

FOURTH FLOOR

17'-0"

EL +5093'-0" FF

THIRD FLOOR

17'-0"

EL +5076'-0" FF

ARCHIVE

QUARANTINE

SECOND FLOOR

17'-0"

EL +5059'-0" FF

SECURITY

RECEIVING

MECHANICAL

VAULT

GROUND FLOOR

17'-0"

EL +5042'-0" FF

BASEMENT EL +5025-0" FF

RIVER OF TIME


CAFE

GALLERY

ANCILLARY SERVICES

GALLERY

GALLERY

ROOF

19'-2"

EL +5159'-2" FF

BOOK STORAGE

READING ROOM

CAFE

SEVENTH FLOOR

15'-0"

EL +5140'-0" FF RUINS OVERLOOK ROOM

BOOK STORAGE

SIXTH FLOOR

17'-0"

EL +5125'-0" FF

GALLERY

FIFTH FLOOR

15'-0"

EL +5108'-0" FF ANCILLARY SERVICES

FOURTH FLOOR

17'-0"

EL +5093'-0" FF

GALLERY

THIRD FLOOR

17'-0"

EL +5076'-0" FF

GALLERY

SECOND FLOOR

17'-0"

EL +5059'-0" FF COAT ROOM

LOBBY

SECURITY

GROUND FLOOR

17'-0"

EL +5042'-0" FF

BASEMENT EL +5025-0" FF

CHRIS NORCROSS

COMPREHENSIVE STUDIO ARCH 513

SCALE :

1/8" = 1'-0"

DATE :

12/20/2019

SECTIONS

A2.02


ROOF

19'-2"

EL +5159'-2" FF

SEVENTH FLOO

15'-0"

EL +5140'-0" FF

SECOND FLOO

17'-0"

EL +5059'-0" FF

GROUND FLOO

EL +5042'-0" FF

RIVER OF TIME


F

OR

F

OR

F

OR

F

CHRIS NORCROSS

COMPREHENSIVE STUDIO ARCH 513

SCALE :

1/2" = 1'-0"

DATE :

12/10/2019

WALL SECTION

A3.01


In order to create a structure capable of spanning 350 feet across the ruins I started by researching examples structural systems that could achieve this, and precedents which used these systems. My first instinct was to use a truss to span the ruins and support the roof. Knowing that the truss would need special accommodations for spanning so far, I looked into the Minneapolis Federal Reserve Bank, which has a truss that spans 320 feet. This truss is formed by welding typical size beams together, which produces the required stiffness and strength, but at the cost of being over 30 feet deep. After modeling a similar truss spanning over the ruins, I the structure to be too bulky. Looking for a less visually intrusive system, I started to research catenary cable structures. My first iteration at designing one involved complex curvature, which could distract too much from the ruins. My next iteration simplified it to a beam being supported by a single cable, which would be loaded in order to result in an efficient catenary form. Pleased with the catenary cable structure, I decided to explore the possibility of using columns to reduce the span distance and support the roof. I found that this method had many issues which conflicted about my concept of not damaging or interfering with the ruins. To avoid the columns landing near the ruins or having their foundations impact the ruins, I would have to spread them out far from the nave. This would mean that I am now essentially spanning perpendicularly to the nave, and after moving them far enough from the ruins to prevent any damage to them, the spanning distance would be around 150 feet and require a spanning system which may be more visually obtrusive than my first idea of using big awkward trusses. To learn more about the loads that a catenary structure would apply to my building, I researched Siza’s Portuguese Pavilion to analyze how it addresses the load from it’s concrete roof. From his plans, I learned that Siza supported his roof with a sequence of shear walls which resist the force of the roof pulling them inward. Applying this logic to my structural scheme and knowing that I would need a strong lateral bracing system which could resist the sway caused by an earthquake I started to plan out a series of shear walls. My catenary cable system consists of four trusses, the walls which support the outer trusses do not have any fenestration or need for other openings, thus making these walls primary shear walls for the buildings and bearing the load of the trusses. The inner trusses are supported by section of load bearing wall, this wall is punctured by the spaces on each floor, this wall is strengthened by joining it to the parallel wall with beams at every floor, this in a sense forms a rigid concrete Vierendeel truss. Further stability is added to the structure by designating the majority of walls between the outer and inner trusses as shear walls. Now looking to verify the rigidity of the structure, I assembled a rough mock-up to demonstrate how the cables transfer loads into the building. This mock-up was has a chain of paperclips suspended between two pieces of foamcore, which are each attached to a plywood background by two screws. The paperclip chain is loaded with nine equally spaced and evenly weighted collections of washers and nuts; under this load the chain forms a catenary arch. Without any reinforcements, the two pieces of foamcore, which are representative of the buildings, experience a large moment force, which causes them to tip inward. I thought that extending inward the walls which support the trusses would help mitigate this moment. Adding an additional screw to each side of the mock-up, I found that the foamcore resisted the moment and stood more upright. This was corrected even further when I placed a piece of plastic, which serves as the roof, between the two pieces of foamcore. This roof piece reduced the reduced the moment that the foamcore had to resist by acting as a spreader component; the horizontal component of the force from the chain is transferred directly into this plastic piece, instead of the force using the height of the foamcore as leverage, thus creating shear stress at the connections at the bottom. The forces applied to the ends of the plastic roof piece caused it to bow upwards, if the roof were to be designed with a camber or arch, then it could serve to transmit a horizontal force into the building, which would counteract the horizontal force from the truss cables; designing the roof with this shape would incorporate drainage into the form. To ensure that the roof does not cause the buildings to topple inwards, they would need a foundation which can withstand earthquakes and the various loads in the building. A typical foundation wall with a footing would not be ideal for this situation, so I instead opted to use pilings to support the building. Each floor of the museum and archive are supported by a system of precast concrete beams which rest on corbels in the load bearing concrete walls. These beams span 41 feet between the the corbels, are subjected to some high loads, and would need to be cost effective. Researching with these criteria in mind, I found that concrete double tee beams are capable of spans twice as long as my span, they can be engineered to support heavy loads, and their precast nature allows for quick, economical construction. Given that the load bearing concrete walls are left unconcealed, I decided that the floor structure should be visible to visitors too. Striving to make these beams more interesting, I began to customize them. I started with the section profile of a beam that met my criteria, I rounded the transition from the flanges into the webs to make the beam vaulted, at first I used circular curves to achieve the vaulting but I switched to using elliptical curves to help maintain the beams proportions of the flange depth to the web depth and width.

RIVER OF TIME


CHRIS NORCROSS

COMPREHENSIVE STUDIO ARCH 513

SCALE :

DATE :

NTS 12/19/2019

STRUCTURAL NARRATIVE

S0.00


43'-0"

1

2

11'-6"

A

31'-6"

B

47'-0"

C

FOOTING 6'-0"

D FOOTING 3'-0"

31'-6"

PILE 1'-0"Ø

C.M.U. RETAINING WALL

11'-6"

E

F

RIVER OF TIME

FOUNDATION 1" O.C. PILES 5'-42


43'-0"

3

4

FOOTING 6'-0"

PILE 1'-0"Ø

FOUNDATION 1" O.C. PILES 5'-42

CHRIS NORCROSS

COMPREHENSIVE STUDIO ARCH 513

SCALE :

DATE :

3/16" = 1'-0" 12/19/2019

STRUCTURAL FOUNDATION PLAN

S1.01


43'-0"

1

2

A 11'-6"

10'-0"

11'-53 8" 21'-73 8"

9'-55 8"

ELEV. CORE PERFORATION

31'-6"

B

47'-0"

C

LOAD BEARING CONCRETE SHEAR WALL

D

31'-6"

CONTINUOUS CONCRETE CORBEL

PRECAST VAULTED CONCRETE BEAMS W/ DAPPED ENDS

C.M.U. RETAINING WALL

E 11'-6"

10'-0"

21'-73 8"

1" 9'-108 MECH. CHASE PERFORATION

F

RIVER OF TIME


43'-0"

3

CHRIS NORCROSS

4

COMPREHENSIVE STUDIO ARCH 513

SCALE :

DATE :

3/16" = 1'-0" 12/19/2019

STRUCTURAL BASEMENT FLOOR PLAN

S1.02


43'-0"

1

2

A 11'-6"

10'-0"

21'-73 8"

9'-55 8"

ELEV. CORE PERFORATION

EDGE OF SLAB

31'-6"

B

11'-53 8"

LOAD BEARING CONCRETE SHEAR WALL

47'-0"

C

D

31'-6"

CONTINUOUS CONCRETE CORBEL

PRECAST VAULTED CONCRETE BEAMS W/ DAPPED ENDS

E

EDGE OF SLAB

11'-6"

10'-0"

21'-73 8"

1" 9'-108 MECH. CHASE PERFORATION

F

RIVER OF TIME

1'-0" PLUMBING CHASE


43'-0"

3

4

1" 9'-108

1'-0" PLUMBING CHASE

10'-0"

3" 21'-78

MECH. CHASE PERFORATION

EDGE OF SLAB

LOAD BEARING CONCRETE SHEAR WALL

CONTINUOUS CONCRETE CORBEL

PRECAST VAULTED CONCRETE BEAMS W/ DAPPED ENDS

EDGE OF SLAB 11'-53 8"

10'-0"

3" 21'-78

9'-55 8"

ELEV. CORE PERFORATION

CHRIS NORCROSS

COMPREHENSIVE STUDIO ARCH 513

SCALE :

DATE :

3/16" = 1'-0" 12/19/2019

STRUCTURAL FIRST FLOOR PLAN

S1.03


43'-0"

1

2

A 11'-6"

10'-0"

21'-73 8"

9'-55 8"

ELEV. CORE PERFORATION

EDGE OF SLAB

31'-6"

B

11'-53 8"

47'-0"

C

LOAD BEARING CONCRETE SHEAR WALL

D

31'-6"

CONTINUOUS CONCRETE CORBEL

PRECAST VAULTED CONCRETE BEAMS W/ DAPPED ENDS

E

EDGE OF SLAB

11'-6"

10'-0"

21'-73 8"

1" 9'-108 MECH. CHASE PERFORATION

F

RIVER OF TIME

1'-0" PLUMBING CHASE


43'-0"

3

4

1" 9'-108

1'-0" PLUMBING CHASE

10'-0"

3" 21'-78

MECH. CHASE PERFORATION

EDGE OF SLAB

LOAD BEARING CONCRETE SHEAR WALL

EDGE OF SLAB

CONTINUOUS CONCRETE CORBEL

PRECAST VAULTED CONCRETE BEAMS W/ DAPPED ENDS

EDGE OF SLAB 11'-53 8"

10'-0"

3" 21'-78

9'-55 8"

ELEV. CORE PERFORATION

CHRIS NORCROSS

COMPREHENSIVE STUDIO ARCH 513

SCALE :

DATE :

3/16" = 1'-0" 12/19/2019

STRUCTURAL SECOND FLOOR PLAN

S1.04


43'-0"

1

2

A 11'-6"

10'-0"

21'-73 8"

9'-55 8"

ELEV. CORE PERFORATION

EDGE OF SLAB

31'-6"

B

11'-53 8"

47'-0"

C

LOAD BEARING CONCRETE SHEAR WALL

D

31'-6"

CONTINUOUS CONCRETE CORBEL

PRECAST VAULTED CONCRETE BEAMS W/ DAPPED ENDS

E

EDGE OF SLAB

11'-6"

10'-0"

21'-73 8"

1" 9'-108 MECH. CHASE PERFORATION

F

RIVER OF TIME

1'-0" PLUMBING CHASE


43'-0"

3

4

1" 9'-108

1'-0" PLUMBING CHASE

10'-0"

3" 21'-78

MECH. CHASE PERFORATION

EDGE OF SLAB

EDGE OF SLAB

LOAD BEARING CONCRETE SHEAR WALL

CONTINUOUS CONCRETE CORBEL

PRECAST VAULTED CONCRETE BEAMS W/ DAPPED ENDS

EDGE OF SLAB 11'-53 8"

10'-0"

3" 21'-78

9'-55 8"

ELEV. CORE PERFORATION

CHRIS NORCROSS

COMPREHENSIVE STUDIO ARCH 513

SCALE :

DATE :

3/16" = 1'-0" 12/19/2019

STRUCTURAL THIRD FLOOR PLAN

S1.05


43'-0"

1

2

A 11'-6"

10'-0"

21'-73 8"

9'-55 8"

ELEV. CORE PERFORATION

EDGE OF SLAB

31'-6"

B

11'-53 8"

C

47'-0"

LOAD BEARING CONCRETE SHEAR WALL

EDGE OF SLAB

D

31'-6"

CONTINUOUS CONCRETE CORBEL

EDGE OF SLAB

EDGE OF SLAB

PRECAST VAULTED CONCRETE BEAMS W/ DAPPED ENDS

E

EDGE OF SLAB

11'-6"

10'-0"

21'-73 8"

1" 9'-108 MECH. CHASE PERFORATION

F

RIVER OF TIME

1'-0" PLUMBING CHASE


43'-0"

3

4

1" 9'-108

1'-0" PLUMBING CHASE

10'-0"

3" 21'-78

MECH. CHASE PERFORATION

EDGE OF SLAB

LOAD BEARING CONCRETE SHEAR WALL

CONTINUOUS CONCRETE CORBEL

PRECAST VAULTED CONCRETE BEAMS W/ DAPPED ENDS

EDGE OF SLAB 11'-53 8"

10'-0"

3" 21'-78

9'-55 8"

ELEV. CORE PERFORATION

CHRIS NORCROSS

COMPREHENSIVE STUDIO ARCH 513

SCALE :

DATE :

3/16" = 1'-0" 12/19/2019

STRUCTURAL FOURTH FLOOR PLAN

S1.06


43'-0"

1

2

A 11'-6"

10'-0"

21'-73 8"

9'-55 8"

ELEV. CORE PERFORATION

EDGE OF SLAB

31'-6"

B

11'-53 8"

47'-0"

C

EDGE OF SLAB

LOAD BEARING CONCRETE SHEAR WALL

D

31'-6"

CONTINUOUS CONCRETE CORBEL

PRECAST VAULTED CONCRETE BEAMS W/ DAPPED ENDS

E

EDGE OF SLAB

11'-6"

10'-0"

21'-73 8"

1" 9'-108 MECH. CHASE PERFORATION

F

RIVER OF TIME

1'-0" PLUMBING CHASE


43'-0"

3

4

1" 9'-108

1'-0" PLUMBING CHASE

10'-0"

3" 21'-78

MECH. CHASE PERFORATION

EDGE OF SLAB

LOAD BEARING CONCRETE SHEAR WALL

EDGE OF SLAB

CONTINUOUS CONCRETE CORBEL

PRECAST VAULTED CONCRETE BEAMS W/ DAPPED ENDS

EDGE OF SLAB 11'-53 8"

10'-0"

3" 21'-78

9'-55 8"

ELEV. CORE PERFORATION

CHRIS NORCROSS

COMPREHENSIVE STUDIO ARCH 513

SCALE :

DATE :

3/16" = 1'-0" 12/19/2019

STRUCTURAL FIFTH FLOOR PLAN

S1.07


43'-0"

1

2

A 11'-6"

10'-0"

21'-73 8"

9'-55 8"

ELEV. CORE PERFORATION

EDGE OF SLAB

31'-6"

B

11'-53 8"

EDGE OF SLAB

LOAD BEARING CONCRETE SHEAR WALL

47'-0"

C

EDGE OF SLAB

D

31'-6"

CONTINUOUS CONCRETE CORBEL EDGE OF SLAB PRECAST VAULTED CONCRETE BEAMS W/ DAPPED ENDS

E

EDGE OF SLAB

11'-6"

10'-0"

21'-73 8"

1" 9'-108 MECH. CHASE PERFORATION

F

RIVER OF TIME

1'-0" PLUMBING CHASE


43'-0"

3

4

1" 9'-108

1'-0" PLUMBING CHASE

10'-0"

3" 21'-78

MECH. CHASE PERFORATION

EDGE OF SLAB

EDGE OF SLAB

LOAD BEARING CONCRETE SHEAR WALL

EDGE OF SLAB

CONTINUOUS CONCRETE CORBEL

PRECAST VAULTED CONCRETE BEAMS W/ DAPPED ENDS

EDGE OF SLAB 11'-53 8"

10'-0"

3" 21'-78

9'-55 8"

ELEV. CORE PERFORATION

CHRIS NORCROSS

COMPREHENSIVE STUDIO ARCH 513

SCALE :

DATE :

3/16" = 1'-0" 12/19/2019

STRUCTURAL SIXTH FLOOR PLAN

S1.08


43'-0"

1

2

A 11'-6"

10'-0"

21'-73 8"

9'-55 8"

ELEV. CORE PERFORATION

EDGE OF SLAB

31'-6"

B

11'-53 8"

EDGE OF SLAB

47'-0"

C

EDGE OF SLAB

LOAD BEARING CONCRETE SHEAR WALL

D

31'-6"

CONTINUOUS CONCRETE CORBEL EDGE OF SLAB PRECAST VAULTED CONCRETE BEAMS W/ DAPPED ENDS

E

EDGE OF SLAB

11'-6"

10'-0"

21'-73 8"

1" 9'-108 MECH. CHASE PERFORATION

F

RIVER OF TIME

1'-0" PLUMBING CHASE


43'-0"

3

4

1" 9'-108

1'-0" PLUMBING CHASE

10'-0"

3" 21'-78

MECH. CHASE PERFORATION

EDGE OF SLAB

EDGE OF SLAB

LOAD BEARING CONCRETE SHEAR WALL

EDGE OF SLAB

CONTINUOUS CONCRETE CORBEL EDGE OF SLAB PRECAST VAULTED CONCRETE BEAMS W/ DAPPED ENDS

EDGE OF SLAB 11'-53 8"

10'-0"

3" 21'-78

9'-55 8"

ELEV. CORE PERFORATION

CHRIS NORCROSS

COMPREHENSIVE STUDIO ARCH 513

SCALE :

DATE :

3/16" = 1'-0" 12/19/2019

STRUCTURAL SEVENTH FLOOR PLAN

S1.09


The program of the archives and vault require the air inside these spaces to be maintained within a particular temperature and humidity range to prevent the decay and deterioration of artifacts. In the galleries similar conditions are needed within the display cases and some cooling and dehumidification in the galleries too. The galleries can not be conditioned as a whole like the archives because the majority of people visiting the museum will be accustomed to much warmer interior spaces. Furthermore, there would be a considerable amount of cool air lost to the unconditioned floors adjacent to the galleries when people pass between floors; this is not as much of a concern for the archives due to their much lower occupancy levels. Leaving the galleries unconditioned is not an option because the temperature differential between inside and outside of the display cases would be prone to the formation of condensation of the glass, so the gallery spaces must be conditioned to act as a buffer between the microclimate within the display cases and the exterior Guatemalan climate. Other program areas for the most part need only minor conditioning; the cafe, bookstore, lobby, and admin offices are fine just active ventilation while being passively heated or cooled. The restoration workshop, research room, and reading room will need temporary heating, cooling, and ventilation during working hours, but artifacts are expected to return a climate controlled case or the archives during non working hours. After researching other systems and consulting with an engineer at Arup, it was determined that a variable air volume system to be the only system capable of serving the needs of the program and suitable for the climate. A variable refrigerant flow system is not reliable or consistent enough for conditioning the archives. Radiant systems would form condensation during the humid rainy season. A constant air volume system would be wasteful of energy. Using a variable air volume system addresses all of the issues other systems have; but it comes at the cost of needing room for ducts and a large air handling unit. To reduce the size of of the mechanical room, I opted to use geothermal heat pumps in order to avoid boilers, chillers, and cooling towers. The primary supply and return ducts are located in a mechanical chase in either building; from the supply duct branch ducts branch off at each level and trifurcate into three sub-floor supply ducts with floor supply grills. A single return grill near the mechanical chase allows for the room to be conditioned through the displacement of old air with new air. The mechanical chase is adjacent to the toilet rooms in both buildings, this means that the chase can be utilized for a third duct which exhausts the air from the toilet rooms.

RIVER OF TIME


CHRIS NORCROSS

COMPREHENSIVE STUDIO ARCH 513

SCALE :

DATE :

NTS 12/19/2019

MECHANICAL NARRATIVE

M0.00


43'-0"

1

2

11'-6"

A

31'-6"

B

C

47'-0"

BRANCH SUPPLY DUCT 2'-0"x9"

FLOOR SUPPLY GRILL

RETURN DUCT 2'-3"x10"

D

31'-6"

FRESH AIR LOUVERS 100 SF

AHU

EXHAUST LOUVERS 80 SF

HEAT PUMP

E 11'-6"

VERTICAL SUPPLY DUCT 5'-0"x4'-0"

F

RIVER OF TIME

VERTICAL RETURN DUCT 5'-0"x4'-0"


43'-0"

3

CHRIS NORCROSS

4

COMPREHENSIVE STUDIO ARCH 513

SCALE :

DATE :

3/16" = 1'-0" 12/19/2019

MECHANICAL BASEMENT FLOOR PLAN

M1.01


43'-0"

1

2

11'-6"

A

31'-6"

B

47'-0"

C

31'-6"

D

E 11'-6"

VERTICAL SUPPLY DUCT 5'-0"x4'-0"

F

RETURN DUCT 2'-3"x10"

VERTICAL RETURN DUCT 5'-0"x4'-0"

BATHROOM EXHAUST

RIVER OF TIME


43'-0"

3

4

BATHROOM EXHAUST

VERTICAL RETURN DUCT 5'-0"x4'-0" RETURN DUCT 2'-3"x10"

CHRIS NORCROSS

VERTICAL SUPPLY DUCTS 5'-0"x4'-0"

COMPREHENSIVE STUDIO ARCH 513

SCALE :

DATE :

3/16" = 1'-0" 12/19/2019

MECHANICAL FIRST FLOOR PLAN

M1.02


43'-0"

1

2

11'-6"

A

31'-6"

B

C

47'-0"

BRANCH SUPPLY DUCT 2'-0"x9"

FLOOR SUPPLY GRILL

31'-6"

D

E 11'-6"

VERTICAL SUPPLY DUCT 5'-0"x4'-0"

F

RETURN DUCT 2'-3"x10"

VERTICAL RETURN DUCT 5'-0"x4'-0"

BATHROOM EXHAUST

RIVER OF TIME


43'-0"

3

4

BATHROOM EXHAUST

VERTICAL RETURN DUCT 5'-0"x4'-0" VERTICAL SUPPLY DUCTS 5'-0"x4'-0"

RETURN DUCT 2'-3"x10"

BRANCH SUPPLY DUCT 2'-0"x9"

FLOOR SUPPLY GRILL

CHRIS NORCROSS

COMPREHENSIVE STUDIO ARCH 513

SCALE :

DATE :

3/16" = 1'-0" 12/19/2019

MECHANICAL SECOND FLOOR PLAN

M1.03


43'-0"

1

2

11'-6"

A

31'-6"

B

C

47'-0"

BRANCH SUPPLY DUCT 2'-0"x9"

FLOOR SUPPLY GRILL

31'-6"

D

E 11'-6"

VERTICAL SUPPLY DUCT 5'-0"x4'-0"

F

RETURN DUCT 2'-3"x10"

VERTICAL RETURN DUCT 5'-0"x4'-0"

BATHROOM EXHAUST

RIVER OF TIME


43'-0"

3

4

BATHROOM EXHAUST

VERTICAL RETURN DUCT 5'-0"x4'-0" VERTICAL SUPPLY DUCTS 5'-0"x4'-0"

RETURN DUCT 2'-3"x10"

BRANCH SUPPLY DUCT 2'-0"x9"

FLOOR SUPPLY GRILL

CHRIS NORCROSS

COMPREHENSIVE STUDIO ARCH 513

SCALE :

DATE :

3/16" = 1'-0" 12/19/2019

MECHANICAL THIRD FLOOR PLAN

M1.04


43'-0"

1

2

11'-6"

A

31'-6"

B

C

47'-0"

BRANCH SUPPLY DUCT 2'-0"x9"

FLOOR SUPPLY GRILL

31'-6"

D

E 11'-6"

VERTICAL SUPPLY DUCT 5'-0"x4'-0"

F

RETURN DUCT 2'-3"x10"

VERTICAL RETURN DUCT 5'-0"x4'-0"

BATHROOM EXHAUST

RIVER OF TIME


43'-0"

3

4

BATHROOM EXHAUST

VERTICAL RETURN DUCT 5'-0"x4'-0" VERTICAL SUPPLY DUCTS 5'-0"x4'-0"

EXHAUST LOUVERS 80 SF AHU

HEAT PUMP

FRESH AIR LOUVERS 100 SF

CHRIS NORCROSS

COMPREHENSIVE STUDIO ARCH 513

SCALE :

DATE :

3/16" = 1'-0" 12/19/2019

MECHANICAL FOURTH FLOOR PLAN

M1.05


43'-0"

1

2

11'-6"

A

31'-6"

B

C

47'-0"

BRANCH SUPPLY DUCT 2'-0"x9"

FLOOR SUPPLY GRILL

31'-6"

D

E 11'-6"

VERTICAL SUPPLY DUCT 5'-0"x4'-0"

F

RETURN DUCT 2'-3"x10"

VERTICAL RETURN DUCT 5'-0"x4'-0"

BATHROOM EXHAUST

RIVER OF TIME


43'-0"

3

4

BATHROOM EXHAUST

VERTICAL RETURN DUCT 5'-0"x4'-0" VERTICAL SUPPLY DUCTS 5'-0"x4'-0"

RETURN DUCT 2'-3"x10"

BRANCH SUPPLY DUCT 2'-0"x9"

FLOOR SUPPLY GRILL

CHRIS NORCROSS

COMPREHENSIVE STUDIO ARCH 513

SCALE :

DATE :

3/16" = 1'-0" 12/19/2019

MECHANICAL FIFTH FLOOR PLAN

M1.06


43'-0"

1

2

11'-6"

A

31'-6"

B

47'-0"

C

31'-6"

D

E 11'-6"

VERTICAL SUPPLY DUCT 5'-0"x4'-0"

F

RETURN DUCT 2'-3"x10"

VERTICAL RETURN DUCT 5'-0"x4'-0"

BATHROOM EXHAUST

RIVER OF TIME


43'-0"

3

4

BATHROOM EXHAUST

VERTICAL RETURN DUCT 5'-0"x4'-0" RETURN DUCT 2'-3"x10"

CHRIS NORCROSS

VERTICAL SUPPLY DUCTS 5'-0"x4'-0"

COMPREHENSIVE STUDIO ARCH 513

SCALE :

DATE :

3/16" = 1'-0" 12/19/2019

MECHANICAL SIXTH FLOOR PLAN

M1.07


43'-0"

1

2

11'-6"

A

31'-6"

B

C

47'-0"

BRANCH SUPPLY DUCT 2'-0"x9"

FLOOR SUPPLY GRILL

31'-6"

D

E 11'-6"

VERTICAL SUPPLY DUCT 5'-0"x4'-0"

F

RETURN DUCT 2'-3"x10"

VERTICAL RETURN DUCT 5'-0"x4'-0"

BATHROOM EXHAUST

RIVER OF TIME


43'-0"

3

4

BATHROOM EXHAUST

VERTICAL RETURN DUCT 5'-0"x4'-0" VERTICAL SUPPLY DUCTS 5'-0"x4'-0"

RETURN DUCT 2'-3"x10"

BRANCH SUPPLY DUCT 2'-0"x9"

FLOOR SUPPLY GRILL

CHRIS NORCROSS

COMPREHENSIVE STUDIO ARCH 513

SCALE :

DATE :

3/16" = 1'-0" 12/19/2019

MECHANICAL SEVENTH FLOOR PLAN

M1.08


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.