HP
HP0-D08
Implementing HP Converged Infrastructure Solutions Click the link below to buy full version as Low as $25 http://www.examkill.com/HP0-D08.html
ExamKill is team of experienced and educated professionals working day and night to develop preparation material for different fields in IT. These industries are including HP, IBM, Comptia, Orcale, Apple, Adobe, Nortel, Novell, Checkpoint etc with the following features.
Free Samples:
Free samples download are available for almost every product to check before
buy.
Complete Course Coverage: Experienced professionals are making sure to cover complete course so that you pass final exam.
Updated Material: Preparation material is updated and new; you can compare us with other providers in the same industry.
Privacy Protection:
Examkill team makes sure not to reveal your private information
including your credit card and other secret information.
Excellent Customer Support: You will get reply from examkill support within 8 hours for all your questions/concerns about anything.
www.examkill.com
Question: 1 What does a single star rating from Smart Solver mean in the context of HP Insight Dynamics capacity planning? A. One or more workloads do not fit in the system: the utilization limits are violated. B. All workloads fit in the system but little or no headroom is available. C. All workloads fit and at least 25% headroom for any single workload is available. D. All workloads fit and at least 75% headroom for any single workload is available.
Answer: B Question: 2 Which component is necessary to enable a customer to implement quick power calibration? A. Itanium 9300 processor B. Virtual Connect Enterprise Manager C. Virtual Connect Flex-I 0 D. Integrated lights-Out2
Answer: D Question: 3 Which tool should you use both during and after installation to ensure that the Windows Central Management Server is installed correctly? A. HP Insight Dynamics - VSE Configurator B. HP Systems Insight Manager C. HP Insight Software Advisor D. Configure and Repair Agent
Answer: C
http://www.examkill.com/HP0-D08.html
Adobe Apple Cisco CompTIA HP EMC IBM Microsoft Oracle Juniper
2
Question: 4 What are the top level default folders in the HP Rapid Deployment software (RDP 6.0 and later) deployment console dobs window? (Select two.) A. HP Deployment Toolbox B. Server Replication C. Virtual Machine Deployment Toolbox D. Server Deployment Toolbox E. System Jobs
Answer: A, E Question: 5 When using the What-if Action to perform an Automated System Consolidation to VMs, what Smart Solver Solution Constraint can be enforced to provide a more accurate solution? A. number of virtual machines per server B. limit total networking I/O capacity C. account for CPU virtualization overhead D. maximum number of servers to use
Answer: C Question: 6 Which software is available to provided advanced integration and management of 3rd party virtual machine environments? (Select two.) A. HP Insight Control B. HP Insight Control for Linux C. HP Insight Dynamics for ProLiant D. HP Insight Control for Vmware vCenter E. HP Insight Control for Microsoft System Center
Answer: D, E
http://www.examkill.com/HP0-D08.html
Adobe Apple Cisco CompTIA HP EMC IBM Microsoft Oracle Juniper
3
Question: 7 What are features of Insight Remote Support Standard (lnsight RSS)? (Select two.) A. base option of extended business hours I1 3x5) monitoring B. HP Proprietary communications security protocols C. automatic service dispatch based on customer preferences D. included with Insight Control licenses E. does not require HP Systems Insight Manager
Answer: C, E Question: 8 Click the Exhibit button.
Which server shown in the exhibit is the best candidate for the new workload? A. akroyd01 B. akroyd02 C. akroyd04 D. akroydO5
http://www.examkill.com/HP0-D08.html
Adobe Apple Cisco CompTIA HP EMC IBM Microsoft Oracle Juniper
4
Answer: A Question: 9 With a new installation of Insight Dynamics for Pro Liant (version 6.0), which database is part of the installation for environments that do not have an existing database? A. Microsoft SQL 2005 Express SP3 B. Microsoft SQL Server 2005 Enterprise C. Microsoft SQL Server 2008 SPI Express D. Microsoft SQL Server 2008 SPI Enterprise
Answer: A Question: 10 What costs are represented in the Cost window in Insight Orchestration Designer? (Select three.) A. IP addresses B. administrative overhead C. storage D. servers E. applications F. power
Answer: A, C, D
http://www.examkill.com/HP0-D08.html
Adobe Apple Cisco CompTIA HP EMC IBM Microsoft Oracle Juniper
5
HP
HP0-D08
Implementing HP Converged Infrastructure Solutions Click the link below to buy full version as Low as $25
http://www.examkill.com/HP0-D08.html
We also provide PDF Training Material for: Hot Exam HP2-K25
HP2-E50
HP3-X12
HP2-K28
HP2-N26
HP3-X05
HP2-B65
HP2-B48
HP3-X10
HP2-E23
HP3-E37
HP2-E35
HP2-E43
HP0-M52
HP2-E40
HP3-C02
HP2-P21
HP2-E48
HP2-E42
HP0-M55
HP2-E49
HP2-H19
HP0-M51
HP3-L07
HP2-E46
HP2-E47
HP3-C30
HP3-C32
http://www.examkill.com/HP0-D08.html
www.examkill.com
Adobe Apple Cisco CompTIA HP EMC IBM Microsoft Oracle Juniper
6