Meter Technician Certification Program Curriculum Excerpts

Page 1

Northwest Lineman College

METER TECHNICIAN CERTIFICATION PROGRAM

CURRICULUM SAMPLE EXCERPTS


Metering

LEARN MORE

2:28

Voltmeter Method 1.

Using a standard voltmeter, the meter base can be checked for back feed, short circuits, open circuit, or closed customer breaker.

With the source side energized and the customer’s disconnect open, proper voltage to the meter socket can be confirmed with the following:

Meter Testing and Installation

• A voltage reading of 120 volts between S1 and neutral; • A voltage reading of 120 volts between S2 and neutral; and

lcvid.com/mtsn

• A voltage reading of 240 volts should be read between S1 and S2

S1

Energized Source (Line)

S1

S2

120 A V

V

V

OFF

Customer Disconnect Open

V

Customer Disconnect Open Load L1

18

S2

240

A

OFF

Energized Source (Line)

NORTHWEST LINEMAN COLLEGE

Load L2

L1

L2


Self-Contained Meters | CHAPTER ONE

2. With the customer’s disconnect open, a voltage reading of zero between L1 and L2 and the neutral will confirm that the service is not back fed from another source.

S1

Source (Line)

S2

zero reading

0 A V OFF

V

Customer Disconnect Open Load L1

L2

Testing for back feed

NORTHWEST LINEMAN COLLEGE

19


NORTHWEST LINEMAN COLLEGE 7600 S MERIDIAN RD, MERIDIAN, ID 83642 PHONE: 888-LINEWORK FAX: 208-888-4275

lineman.edu

© 2016 Northwest Lineman College Published February 2016


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.