Portfolios

Page 1

Nitinai Pansastra

PORTFOLIO Professional Experiences


Chevron (Thailand) Limited New Business Acquisition Specialist

Business Development Dec 2020 - Present ● ● ● ● ●

Develop negotiation strategies, deal with economic models independently. A feasibility study to analyzs all relevant foactors of a project inculding economic, legal, technical and scheduling. Prepare and endorses branding proposal to investor, align project in support of business objectives. Propose pricing strategy for key accounts with a focus on acheiving profitable growth and Chevron’s network plan. Monitor and communicates site performance, Collborate with internaal departments

Archievement (2021) ● ● ● ● ● ● ● ● ●

NTI Sarika,Nakornnayok NTI CPAC Nikompattana, Rayong NTI Wangpla, Rayong NTI Baankhai, Rayong NTC Phe - Samed, Rayong NTI Baankao - Phanthong, Chonburi NTI Panusnikom, Chonburi NTI Tha Mai, Chantaburi CORO Robinson, Petchaburi


CALTEX Service Station NTI Baankhai, Rayong ● Tandem 6 ● FC Volume 300K/M.

CORO Robinson, Petchaburi ● Startergate 3 ● FC Volume 400K/M.

Ra

ho C

NTC Phe - Samed, Rayong ● Startergate 3 ● FC Volume 320K/M.

lb ur i yo ng C ha ch e Pr ac ng sa hi nb o ch ur an i ta b N ur ak i or nn Sr ak ayo ae k w Tr at

NTI Panusnikom, Chonburi ● Startergate 3 ● FC Volume 300K/M.

NTI Baankao - Phanthong, Chonburi ● Tandem 6 + Startergate 3 ● FC Volume 600K/M.

NTI Sarika,Nakornnayok ● Startergate 3 ● FC Volume 320K/M.

3

8

3

Provinces

2

Eastern Territory : Target and Hotspot by AP/AO

Phase I

Phase II

Phase III

Engage Feasibility Study Propose Package

Negotiation Sign Contract Design & Permission

Constrution & Installation Training Handover


Chevron (Thailand) Limited Design Specialist

Design Specialist (Thailand & Cambodia) Jun 2018 - Nov 2020 ● Lead design services, Provide full package of gas station & facilities under brand CALTEX for Thailand and Cambodia. ● Manage design network - oversea communication, gathering information from multiple parties to ensure that what we propose is right and accuracy, reduce turnaround time and maintain delivered output with high quality. ● Focus and Explore onto business plan objective and target for the project to handover within or beat schedule, ● Drive opportunity on financial - cost reduction initiative and design efficiency. ● Contribute project bridge to link all service station with CHEVRON standard design, Provide consultancy services and collaborate with regional team to propose special project for future - A sustainable gas station.

Deliver Results ● ● ● ● ●

Provide Component standard for 2020 IMAGE PLUS, Collaborate with Design AP Increase number of service station in Cambodia by 60% Setup design standard for NEW21CC Starmart, apply for Cambodia. Setup design standard for RORO Backcourt and Toilet, with 30% cost reduction. 25 sites per year re-image / renovate works.


2020 IMAGE PLUS FORECOURT

Standard Image Guidelines ● ● ● ● ● ●

Fascia & Trademark Ceiling Column cladding Spreader Fuel Island element HWY. and Price sign

2020 Image

2020 Image Plus

Collab with CONTOUR

HK TH KH

MY SG

Upgrade 21CC Starmart - Cambodia

CALTEX Asia - Pacific

PH


Retail Mission Elevating Brand Experience for customer ● ● ● ● ● ● ● ●

Leaving a Smaller carbon footprint Reduce CO emissions

Mobility Lounge One stop shop for mobile kiosk

Mobility Hub Connected access to transportation

Renewable Energy Solar panel powered by the sun

Saving Energy Equivalent to the electricity

Safe Water Using less water and creates less wastewater

Technology enable forecourt and fueling zone Backcourt for C-Store, Retail and Kiosks Solar panels on building roof Lifestyles hub EV fast charging App enable On-Demand fueling Clean and modern restroom Safe tanks and product delivery area

AP : A sustainable gas station.

Keeping it cool sustainability Facilitating heat transfer with full LED lighting


Cambodia Project ● ● ● ● ●

● Siem Reap ● Battambong

● Muldulkhiri ● Kampong Thom ● Kampong Chanang

● Kampong Cham

● Phnom Penh

● Kampong Spheu ● SHV

Design standard guidelines. Forecourt & Backcourt Underground tanks Starmart & Coffee Plus Toilet improvement

● Kampot

Archievement (2018-2020) NTI/NTC ● ● ● ● ● ● ● ● ● ● ●

Skun Kampot Angtasom Bayonmeancheuy Poipetcity Takeo Town Tuol Kork Krang Thanung Kampongthom Tuol Pongror Bavetcity

Renovate - Contract Extension ● ● ● ● ● ●

Sihanoukville Angkor Calmette Bokor Petloksang Odem

CALTEX Cambodia

Collab with SUOSDEY WORKS / NSI

Forecourt

21CCStarmart and Upgrade Coffee Plus


Forecourt - Backcourt & C-Store Design

CALTEX Thailand Collab with CONTOUR

Petchprathep (2019) ● ● ● ●

CORO site Flagship FC Volume 700K/M. Pilot Smartstation


PortoGO, Samutsakorn (2019) ● CORO site ● Flagship ● FC Volume 500K/M.

Robinson, Petchaburi (2020) ● CORO site - Partnership with Robinson ● Flagship ● FC Volume 400K/M.

Daothunya, Phathumthani (2019) ● RORO site - Renovation ● Flagship ● FC Volume 800K/M.

Feasibility Study ● ● ● ● ●

Master Layout SNP & Hotspot BOQ CAPEX Safety Moments

The Mood, Nakornpathom (2020) ● CORO site ● Flagship ● FC Volume 500K/M.


Frasers Property Industrial Thailand Design Manager

Design Manager 2012 - 2018 ● ● ● ●

Lead design services, Planning and Implementing design support to sales and marketing which focuses on industrial estate, Formulate design strategy to aligns with architectural feasibility study which will confirm project is viable. Coordinate the preparation of tender documentation and reviewing for submissions. Maintain relationship with clients, business partner, contractor and in-house organizations to ensure that delivery project successfully with quality and services. ● Assist project manager to lead the communication, monitoring and evaluation construction progress to complete on schedule and on budget. Drives project cost reduction initiative - enhance productivity. ● Advance project retrospective, analysis and lookback with operation team, design-construction team and multi-party specific ways to improve future works.

BTS Warehouse project ● ● ● ● ● ● ● ● ● ●

Makro & CPF Cold Storage : Mahachai DHL, Central watson, Rhenus logistics, DSV, Fujixerox: Bangplee Nestle, Linfox : Wangnoi L’oreal : Bangna BigC, BMW : BFTZ Familymart : Sriracha Daikin, Mitsubishi motors : LCB Ford, DB Schenker: Theparak ThaiBev, Weber : Lumphun Lazada : Bangpakong and etc.


Central and Eastern Area

Industrail Estate - Logistics Park Rataining Wall

Wastewater Treatmenr

Fuji Xerox

Ph.2

U-Ditch Driange DG.

Bangplee Bangpakong

DSV Watsons Ph.2

Rhenus

Phantong Pavement Concrete

LCB

Makro

● ● ● ● ●

Bangplee km.22 Land Area : 115 Rais Salable Area : 72,000 sq.m. Containers Yard

Ayutthaya Samutsakorn Lumphun Khonkaen Suratthani Eastern Seaboard

Security Gateway

Phase I

Phase II

Phase III

Client’s requirement Feasibility Study Design implementation

DWG. Review BOQ Tender documentation

Constrution process On-site modification Handover Lokback and Improvement

Built - to - Suit

Suitable

Functional

Convenient

Safety


Master Layout Design Leamchabang II is an ideal location for logistics operators as it is bonded with neighboring major industrial estates such as Laemchabang Industrial Estate, Pinthong Industrial Estate, and the Eastern Seaboard Area.

PU

PU

BL

U ND ER GR OUND WATE R TANK 9 .6 W X 18 .1 L X 2H

BL

IC

IC AD RO

RO AD

Canteen 700 sq.m. PU

CAN

U ND ER GR OUND WATE R TANK 9 .6 W X 18 .1 L X 2H

BL

AL

IC

Expansion Phase

RO AD

- 3.50

PUBLIC WAY

CANAL

LIC WA Y

Built - to - Suit Expansion Phase

- 4.50

PUB

CAN

Mitsubishi 34,000 sq.m.

AL

FIR 9.6

E WA PR OTE TE CTI W X R TAN ON 18.1 K LX 2H

FIR E PR OTEC TION WATE R TANK

FIR E PR OTEC TION WATE R TANK

PUBLIC ROAD

9 .6 W X 18 .1 L X 2H

9 .6 W X 18 .1 L X 2H

9 .6 W X 18 .1 L X 2H

FIR E PR OTEC TION WATE R TANK

FIR E PR OTEC TION WATE R TANK

Samsung 18,000 sq.m.

- 4.50

PUBL

U ND ER GR OUND WATE R TANK 9 .6 W X 18 .1 L X 2H

IC BL PU Y WA

AD IC RO IC BL PU

IC BL PU

AY W

Ready Built 9,500 sq.m. Daikin DC 14,000 sq.m.

FIR E PR OTEC TION WATE R TANK 9 .6 W X 18 .1 L X 2H

AY W

ReadyBuilt FZ 14,000 sq.m.

PUBLIC ROAD

PUBLIC WAY

- 5.40

CAN AL

IC BL PU

Ready Built Expansion Phase

Y WA

Expansion Phase

Standard Elevation

PU

BLIC

AD RO

PU C

BLIC

A N

AD RO

A L

P UB

LI C

D ROA

U ND ER GR OUND WATE R TANK 9 .6 W X 18 .1 L X 2H

- 5.70

C

A

N

A

L

µ µ µ¦ ³ ¦³Ã¥ r

: 180 Rais : 200 Rais : 66,000 sq.m. : 70,000 sq.m.

D UN RO NK RG TA X 2H R DE TE 18.1L UN WA X W 9.6

Existing Area Expansion Area Warehouse BTS Warehouse RDB

«µ¨

¨

¥Á¤µ¨ ¥Á ¦¦ ¦¦®¤µ® ¨¤´ �´ � µ¥Â®µ¥¨¤Â® Ø Ø

TICON BILLBOARD

● ● ● ●

- 6.54

Leam Chabang Develop project plan

Detail Typical


Archievement

DHL & BIG C Bangkok Freetrade Zone

Nestle Wangnoi, Ayutthaya

● Land Area : 85 Rais ● Salable Area : 65,000 sq.m.

● Land Area : 45 Rais ● Salable Area : 43,000 sq.m.

Weber Lumphun

DG Warehouse Bangna KM39

● Land Area : 6.5 Rais ● Salable Area : 3,500 sq.m.

● Land Area : 14 Rais ● Salable Area : 9,000 sq.m.


Archievement Automated Storage & Retrieval System | AS/RS Collab with Dematic High-density storage configuration creates a compact footprint and controls access to inventory. Makro

AS/RS

CPF

Ph.2

30.00 m. Height

Left wing ● Chilled rm. ● Frozen rm. ● Corridor & Anti rm.

● ● ● ●

AS/RS -25C with 8 tons/sq.m. Chilled rm. Frozen rm. Corridor & Anti rm.

Right wing ● ● ● ● ● ● ● ●

Head Office Chilled rm. Frozen rm. Corridor & Anti rm. Seafood Packing and busket cleaning Meat Rawmat

Yard

Makro - CPF Cold Storage Mahachai, Samutsakorn ● Land Area ● Salable Area

: 55 Rais : 27,500 sq.m.

Wastewater Treatment


Study Project

Case Study

Study Project : Sahathai Prapadeang, Samutprakarn

Study Project : Leschaco Sriracha, Chonburi

● Land Area : 45 Rais ● Salable Area : 43,000 sq.m.

● Land Area : 40 Rais ● Salable Area : 18,000 sq.m. + Test Track

Master Layout & Prototype Model Sustainable site Green Warehouse concept by environment conservation policies

Study Project : TBL Konkaen / Lumphun / Suratthani ● Land Area : 20 Rais ● Salable Area : 12,000 sq.m.

● ● ● ● ● ●

Construction activity pollution prevention Optimize energy performance Water saving Materials and Resource Indoor environemnt Innovation - Ventilation

L’oreal DC Bangna KM.39 ● Land Area : 30 Rais ● Salable Area : 25,000 sq.m.

Collab with MEINHARDT


Estim8 Estimator - Key Account Manager

Key Accunt Manager 2010 - 2012 ● Estimating services for timber and building products to Australian - New Zealand clients. ● Create architectural – structural drawings and estimating exclusively with PRYDA fabricators, Australian standard. ● Generate quotations in an identical format to fabricator for roof trusses, wall frames, floor system with rapidly and accuracy. Frabricator Melbourne, Australia ● ● ● ● ●

Bunnings Countrytruss Trusswall Wines Roof Truss & Wall Frame Prefabtech


PRYDA Australia

Pryda Australia is a supplier of software, equipment, and engineering for Truss and Frame manufacture, as well as a manufacturer of an extensive range of timber connectors and structural brackets

Roof

Wall frame Floor

Residential Project ● Architectural ● Structural

Phase I

Phase II

Request job by Fabricator Plan Reading Review and Feedback

Process to PRYDA 3D Model Design structure and Connectors Generate qoutations / Take-off and return to Fabricator

Estimating Services - Engineering wood


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.