Oracle Advanced Customer Services - 11g Adoption Services Fast, Reliable Online Database Migration Nikos Plevris - EMEA ACS Business Development March 2011
Agenda • Executive Summary • Service Positioning • Oracle 11g Compelling Features • Why 11g Migration • Migration Consideration
• ACS for Oracle 11g Adoption • Value Proposition • Packaged Offerings • Services Details
• Why and How to Sell the Services • EMEA Resources EMEA ACS Business Development - Internal Use Only
3
Executive Summary • Oracle 11g Adoption Services • Comprehensive ACS packaged Migration services from Database Upgrades to adoption and testing of product options • Experienced Oracle engineers using dedicated tools, proven methodologies and Oracle best practices
• Differentiators • • • •
Extremely fast and easy to handle Covering production Systems and large databases Includes cross-platform migration Includes knowledge transfer
• Customer Value • Faster time to deployment • Fully migrated and configured database systems • No business disruption EMEA ACS Business Development - Internal Use Only
4
Oracle 11g Database Compelling Features • Eliminates operational risk
• Accelerates overall performance • Eliminates downtime & unused redundancy • Improves security
• Lowers costs • Consolidates databases, servers and storage On Average, Oracle 11g can • • • • • •
Reduce server costs by a factor of 5 Reduce storage requirements by a factor of 10 Improve mission critical system performance by a factor of 10 Increase DBA and Developer productivity by a factor of 2 Eliminate idle redundancy in the data center Simplify their overall IT software portfolio
EMEA ACS Business Development - Internal Use Only
5
Why Customers Should Consider Migration to 11g
• Older Versions running out of support • New Applications require 11g • Access to latest features and functions Migration
Adoption
Assurance
• Database Upgrades
• 11g New Features
• Production ready
• Partial or complete Database reorganization
• RAC implementation
• Testing environments for Quality Assurance
• Migration to new Hardware environment • Deployment of new Storage System
• Advanced Compression • Partitioning • Automatic Storage Management (ASM) • Transparent Data Encryption / Security Features
ACS 11g Adoption Services
EMEA ACS Business Development - Internal Use Only
6
Migration is Good, But Customers Worry What if current applications get impacted?
How can I identify risks early?
Is my current architecture suitable for 11g at all?
I wish my staff was more experienced and had more bandwith
If we donâ&#x20AC;&#x2122;t stay within time- and cost boundaries weâ&#x20AC;&#x2122;ll be in trouble
EMEA ACS Business Development - Internal Use Only
7
Safe and Predictable Migration to Oracle 11g Challenges • End of Premier Support for Database Rel.10g - July 2011 • Applications requiring Oracle 11g for best performance • No access to new features and functionalities • Hardware refresh and capacity expansions • Systems consolidation or relocation
Capabilities • Tested, consistent migration process • Timely resolution of key issues to meet project milestones • Enhanced implementations to secure a stable production environment • Risk mitigation for large and complex environments • Covering production systems and large databases • Cross platform migration
Value • Migration process within time/cost boundaries • Business continuity during entire migration process • Full system stability and performance in production phase
• Competitive advantage through access to new features • Faster time to production • Reduced operational cost
• Knowledge Transfer
EMEA ACS Business Development - Internal Use Only
8
Tailored Offerings across the Change Management project Guidance
Assistance
Enablement
Package
Package
Package
Product Adoption
Execution
Migration and Readiness Planning
Db Tier Readiness Review
Plan Phase Advise & Plan
EMEA ACS Business Development - Internal Use Only
Product Option Adoption Assessment
Option-Specific
Phase Design & Build
Test / Development Environment
Test and Validation Phase Deploy
Production Goes Live
Post-Go live Support Phase Support
Manage
9
Guidance Package
Migration Readiness and Planning Requirements Review Database Configuration Assessment Patch Analysis Migration Planning Assessment Solution Proposal Presentation Knowledge Transfer
EMEA ACS Business Development - Internal Use Only
Guidance Package
Assistance Package
Enablement Package
• Laying the foundation for a successful Migration project • Mitigating risk and complexity • For customers seeking guidance but willing to do the Migration themselves
10
Assistance Package
Migration Readiness and Planning - Product Adoption
Guidance Package plus
11g New Features/Options Assessment
EMEA ACS Business Development - Internal Use Only
Guidance Package
Assistance Package
Enablement Package
• Ensuring 11g Database interoperability • Tailoring the best solution for customer‘s business requirements • For customers seeking guidance on new features
11
Enablement Package
Guidance Package
Assistance Package
Enablement Package
Migration Planning and Execution Assistance Package plus Migration Testing
Test & Development Environment Performance Follow Up Real Application Testing Migration Execution
• Complete planning and execution • Migration process within time and cost boundaries • Ensures post-go-live operational success • For customers seeking full coverage of migration process
Production Environment Performance Tuning Solution Presentation
EMEA ACS Business Development - Internal Use Only
12
Expert Delivery
• Proven approach from planning to test environment to production • Experienced Oracle Specialists using proven methodology – Oracle-To-Oracle (O2O) migration – Oracle-To-Oracle Online (Triple-O) (using Oracle Golden Gate) – 11g feature adoption
• Real Application Testing if applicable • Typical engagement takes 3 – 12 weeks, depending on project scope and complexity EMEA ACS Business Development - Internal Use Only
13
Sophisticated Tools & Methodology for High Efficiency ACS Delivery by Experts Using Proven Methodology
O2O
OOO
Oracle-to-Oracle Migration
Oracle-to-Oracle Online
• Intuitive toolset for fast, reliable Database migration
• O2O enhancement to allow online Database migrations.
• Highly automated and parallelized
• Utilizes the Oracle Golden Gate product
• Runs on all UNIX, Linux and Windows platforms • Suitable for production systems including very large databases.
EMEA ACS Business Development - Internal Use Only
Golden Gate High-performance software platform for real-time transactional data operations. Offers a log-based bidirectional data replication
14
What Makes 11g Adoption Service Unique Our Expertise
• Oracle Specialists • Experts with impressive track records across a broad variety of customers, industries, and business requirements • ACS takes ownership and minimizes migration risk • Documented processes and methodologies based on ITIL V3 • 24x7 support
• Seamless migration • Sophisticated tools with transparent and fault-tolerant methodology • Highly automated for reduced effort
• Oracle knows Oracle best • Product expertise • Direct links between ACS, SW development and Product Management giving ACS unique product knowledge and strategic insight EMEA ACS Business Development - Internal Use Only
15
Why you Should Sell 11g Adoption Services Today • Customer satisfaction makes your life easier – Effective change management (transparent migration - No business disruption) – Foundation for proactive account planning > Fewer escalations and complaints
• Customer Relationship – – – >
Better understanding of customer situation and requirements Foundation for your account planning meetings Ability to influence future investments Don’t miss the opportunity to get to know your customer better
• Revenue – Aging database installations need thorough analysis for migration planning – Opportunities due to new Exadata, Server & Storage environments > Findings may lead to more product- and service sales
EMEA ACS Business Development - Internal Use Only
16
How to Sell 11g Adoption service • Service type • Fixed Scope with Individual assessments & Assisted Days • Ordering Document with pre-drafted FPSE & TMSE exhibits
• Flexible bundle • This “soft bundle” is intended to provide a spectrum of services to help Sales position it in competitive migration deals • Volume & Discretionary discounts can be requested • A pre-agreed approval process apply
• Indicative prices PSLI*-based • Depending upon the lifecycle phase, sold as • Add-on to annual contracts (ASA/BCA/SSC) • Ad hoc Service at the outset of a change management cycle EMEA ACS Business Development - Internal Use Only
* PSLI = Premier Support Labor Index
17
ACS EMEA Resources • Contacts • Nikos Plevris Product Specialist ACS EMEA Business Development • Birgit Kreuz Value Proposition Leader ACS EMEA Business Development • Andrea Scaramella, ACS Delivery Director • Michael Weick, ACS Delivery Senior Manager
• Collateral • Customer presentation, Datasheet, Cheat Sheet • My.oracle.com/go/acs-emea
• Exhibits can be downloaded from Contracts Wiki • Join ACS 2.0 ACS Communities Connect Group •
OraTweet Database Group: ACS_DATABASE
EMEA ACS Business Development - Internal Use Only
18
<Insert Picture Here>
Appendix • Service Details • Delivery Level of effort • Pricing Information • Technical Details
EMEA ACS Business Development - Internal Use Only
19
19
<Insert Picture Here>
Appendix I â&#x20AC;˘ Service Details
EMEA ACS Business Development - Internal Use Only
20
20
ACS 11g Adoption Service Details Package
(4)
Customer Type
Length of Engagement (for internal reference only)
Migration Readiness & Planning (Guidance Package)
Customers looking for ACS guidance for their migration strategy
18 days
Migration Readiness & Planning – Product Adoption (Assistance Package)
Customers seeking ACS assistance on preparing their migration project. Focused on the Database System migration readiness & 11g feature adoption planning
23 days
Migration Planning & Execution (Enablement Package)
From medium to high complexity. Mission-critical system where downtime is a critical business disruption factor. Focused both on the Pre-production (Test /Development phase for QA purposes and on the Production for final check. Customer needs a wider hands on technical assistance during the migration project. Customer where performance represents a critical issue
54 - 69 days (1), (2)
(1)
Depends upon the Recommended or optional components (Days include both “Individual Assessments” effort and T&M days
(2)
Single Database estimation
(3)
PSLI used: Spain
(4)
Because of the complexity of the Task, the proposal would need to be discussed on a case by case basis and tailored to the customers’ needs. ACS Sales to agree with the customer about the content of proposed solution and effort estimation. Final solution to be agreed with ACS delivery.
EMEA ACS Business Development - Internal Use Only
21
Deliverables Phase
Deliverable
Guidance
Assistance
Enablement
Readiness Review & Planning
Requirements Report
X
X
X
Configuration Assessment for Database
X
X
X
Patch Analysis/Assessment (Minimum patching)
X
X
X
Migration Planning Assessment for Database
X
X
X
Solution Presentation
X
X
X
Knowledge Transfer
X
X
X
X
X
Product Adoption
11g New Feature Assessment
Migration Testing
Patch Analysis/Assessment
X
Test Environment Migration (Based upon O2O/Triple-O)
X
Pre-production environment (Based upon O2O/Triple-O)
X
Performance Follow-up
X
Database Replay (RAT) (might include 11g Feature testing)
X
Performance review of Source Database
X
Production Environment Migration (Based upon O2O/Triple-O)
X
Migration Execution
Performance Review of migrated Database
X
Implemented solution presentation
X
EMEA ACS Business Development - Internal Use Only
22
Offerings Links with Annual Packages & Advanced Monitoring
EMEA ACS Business Development - Internal Use Only
23
<Insert Picture Here>
Appendix II â&#x20AC;˘ Delivery level of effort
EMEA ACS Business Development - Internal Use Only
25
Recommended (R) / Optional (O)
11g Adoption Service â&#x20AC;&#x201C; Guidance
SERVICE FAMILY(*) or Individual SERVICE ITEM NAME
ASM ASE ASM Remote Local Local (dd) (dd) (dd)
ASE Remote TOTAL (dd) Days
Pricing
Guidance PACKAGE - Migration Readiness & Planning Recommended Only
2
Meeting with customer for better understanding of requirements
R
1
Configuration Assessment for Database (**)
R
3
3
Patch Analysis/Assessment (Minimum patching)
R
2
2
Migration Planning Assessment for Database
R
Solution presentation
R
Knowledge Transfer around 11g new product feature (***)
R
Readiness Review
1
0
10
6
1
18 2
5
5
2
3
2
$18K
1
3
(*) The scope of the service is always one Core Technology instance. (**) Single Database estimation
PSLI: Spain
(***) Decide on the options to include in the package, and the type of activities for each option
EMEA ACS Business Development - Internal Use Only
26
Recommended (R) / Optional (O)
11g Adoption Service - Assistance SERVICE FAMILY(*) or Individual SERVICE ITEM NAME
ASM ASE ASM Remote Local Local (dd) (dd) (dd)
ASE Remote TOTAL (dd) Days
Pricing
Assistance PACKAGE - Migration Readiness, Planning & New feature Adoption Readiness Review
Recommended Only
2
0
15
6
Meeting with customer for better understanding of requirements
R
1
Configuration Assessment for Database (**) Patch Analysis/Assessment (Minimum patching)
R R
11g New Features Assessment (Review the customer system and assess the implementation of the options)
R
5
5
Migration Planning Assessment for Database Solution presentation Knowledge Transfer around 11g new product feature (***)
R R R
5 2 2
5 3 3
1
$24K
2 3 2
1
23
1
3 2
(*) The scope of the service is always one Core Technology instance. (**) Single Database estimation
PSLI: Spain
(***) Decide on the options to include in the package, and the type of activities for each option
EMEA ACS Business Development - Internal Use Only
27
PSLI: Spain
SERVICE FAMILY(*) or Individual SERVICE ITEM NAME
Recomme nded (R) / Optional (O)
11g Adoption Service â&#x20AC;&#x201C; Enablement Package ASM Local (dd)
ASM Remote (dd)
ASE Local (dd)
ASE Remote (dd)
TOTAL Days
2
0
2
10
18
2
0
7
10
23
3 2
2 3 2
Pricing
Enablement PACKAGE - Migration Planning & Execution Readiness Review
Meeting with customer for better understanding of requirements Configuration Assessment for Database (**) Patch Analysis/Assessment (Minimum patching) 11g New Features Assessment (Review the customer system and assess the implementation of the options) Migration Planning Assessment for Database Solution presentation Migration testing
Patch Analysis/Assessment (**) Test Environment Migration (Primary method is based on O2O) Development (Pre-production) environment Performance Follow-up (**) RAT â&#x20AC;&#x201C; SPA RAT - Database Replay without any option implementation RAT - Database Replay (with Option implementation) Migration Execution Performance review of Source Database Production Environment Migration (Primary method is based on O2O ) Performance Review of migrated Database Implemented solution presentation Enablement PACKAGE - (Recommended Only Components) Enablement PACKAGE - (Recommended & Optional Components)
Recommended Only Recommended & Optional R R R
1
1
O R R Recommended Only Recommended & Optional R
5
5 9
1 0 0
0
1 11
12
9 2 19
0
21
12
29
6
6
R
9
9
R R O O O Recommended Only R R R R
2
2 2 0 0 10 17 6 2 7 2 54 69
2
1
1
0
0 10 4 2 1 1
12 6 6
$57K $74K
(*) The scope of the service is always one Core Technology instance. (**) Single Database estimation (***) Decide on the options to include in the package, and the type of activities for each option
EMEA ACS Business Development - Internal Use Only
28
<Insert Picture Here>
Appendix III â&#x20AC;˘ Pricing Information
EMEA ACS Business Development - Internal Use Only
29
Pricing Example – Fixed Scope Components • Download the latest Online Pricing Calculator OPC spreadsheet • Select Country’s PSLI
EMEA ACS Business Development - Internal Use Only
http://my.oracle.com/site/cs/753/2012/index.htm
30
11g Adoption Service – Guidance • Select “Individual Assessments” from the Software section • Enter the following quantities for the specific service components into the OPC For the product-driven Service Component selected
Part#
Pricing Calculator Service Component
Qty
Nr of Days
Meeting with Customer (Requirements Review) & Solution Presentation
L50015
Best Practices Workshop
1
2
Configuration Assessment for the Database
L50043
Oracle Software Configuration Assessment
1(*) (**)
3
Migration Planning for the Database
L50040
Migration Planning Assessment
1
10
Knowledge Transfer around 11g new product feature
L50039
Oracle Software Knowledge Session
1
3
TOTAL DAYS
18
(*) The scope of the service is always one Core Technology instance. (**) Single Database estimation
EMEA ACS Business Development - Internal Use Only
31
11g Adoption Service – Assistance 1/2 • Select “Individual Assessments” from the Software section • Enter the following quantities for the specific service components into the OPC For the product-driven Service Component selected
Part#
Pricing Calculator Service Component
Qty
Nr of Days
Meeting with Customer (Requirements Review) & Solution Presentation
L50015
Best Practices Workshop
1
2
Configuration Assessment for the Database
L50043
Oracle Software Configuration Assessment
1(*) (**)
3
Migration Planning for the Database
L50040
Migration Planning Assessment
1
10
Knowledge Transfer around 11g new product feature
L50039
Oracle Software Knowledge Session
1
3
TOTAL DAYS
18
(*) The scope of the service is always one Core Technology instance. (**) Single Database estimation
EMEA ACS Business Development - Internal Use Only
32
11g Adoption Service – Assistance 2/2 • Select “Software T&M – Country 1” from the Software section • Enter the following number of days for the Assisted Days
Part #
Daily Rate
Nr of Days
A97132
Senior Engineer(11g New Features Assessment ) TOTAL ASSISTED DAYS
5 5
(*) The scope of the service is always one Core Technology instance. (**) Single Database estimation
EMEA ACS Business Development - Internal Use Only
33
11g Adoption Service – Enablement 1/2 • Select “Individual Assessments” from the Software section • Enter the following quantities for the specific service components into the OPC For the product-driven Service Component selected
Part#
Pricing Calculator Service Component
Qty
Nr of Days
Meeting with Customer (Requirements Review) & Solution Presentation
L50015
Best Practices Workshop
2
4
Configuration Assessment for the Database
L50043
Oracle Software Configuration Assessment
1(*) (**)
3
Performance Follow Up (2) Performance Review of the Source Database (6) Performance Review of the Migrated Database (7)
L50044
Oracle Software Performance Assessment
5
15
Migration Planning for the Database (9) Implemented Solution Presentation (1)
L50040
Migration Planning Assessment
1
10
Patch Analysis
L50045
Patch Assessments
2
8
TOTAL DAYS
40
(*) The scope of the service is always one Core Technology instance. (**) Single Database estimation
EMEA ACS Business Development - Internal Use Only
34
11g Adoption Service – Enablement 2/2 • Select “Software T&M – Country 1” from the Software section • Enter the following number of days for the Assisted Days Part #
Daily Rate
Nr of Days
A97132
Senior Engineer (O2O Migration Testing and Execution)
14
A97132
Senior Engineer (If optional Real Application Testing SPA/DB Replay has been selected)
10
A97132
Senior Engineer (If optional
5
11g New Features Assessment has been selected)
(*) The scope of the service is always one Core Technology instance. (**) Single Database estimation
EMEA ACS Business Development - Internal Use Only
35
<Insert Picture Here>
Appendix IV â&#x20AC;˘ Technical Details
EMEA ACS Business Development - Internal Use Only
36
36
Oracle to Oracle (O2O) Architecture Source System
Target System
Oracle >= 9.2
Oracle >= 11g
> 1000 GB/h (calculated on overall Database size)
PL/SQL Package (Script generator) Large Tables (>= 20 MB) Transferred directly over network Export
Import Index Creation
For Tables < 20 MB
paralyzed 1 â&#x20AC;&#x201C; 5%of Database Size
In Dump Files
EMEA ACS Business Development - Internal Use Only
37
Oracle to Oracle Online (Triple-O/ Golden Gate) Zero Downtime Database Upgrade / Migration
• Upgrade from prior releases to Oracle Database 11g Release 2 • Verify data consistency • Minimize risks with failback option and phased migration
Switchover
Application
Real-time changed data Capture
Delivery Route WAN/LAN/Web/IP
Oracle Database 8i/9i/10g
Delivery Failback Data Flow
Oracle Capture Database 11g Release 2
Compare & Verify
EMEA ACS Business Development - Internal Use Only
38
We encourage you to use the newly minted corporate tagline “Hardware and Software, Engineered to Work Together.” at the end of all your presentations. This message should replace any reference to our previous corporate tagline “Software. Hardware. Complete.”
39
40