BKA Sports Architecture

Page 1

BKA SPORTS ARCHITECTURE



About “Sports Architecture� We believe that creativity and innovation is born from a culture of people. In this global environment, we are committed to design that reflects the diversity of the communities and clients we serve. Sports architecture performs as social platform in the cities. It can be a landmark inspires both cities and citizens. As culture changes in an ecological way and sustainable understanding, the next generation of entertainment and sport facilities will be much more integrated. When thinking about a new facility about sports, the design should be informed by several factors including the potential site, context, climate and most importantly; culture. Considering these different parameters, we start to create opportunities for solutions and begin to define the character of a sports building on the way to arriving at the final concept. In my experience, a shared, strong concept always makes a project more deliverable and enjoyable.

BAHADIR KUL FOUNDER OF BKA M.ARCHITECT



BahadĹr Kul Architects | BKA was founded in 2003 by Bahadir Kul. Amongst its completed mega projects are Kadir Has Stadium in Kayseri, West City Terminal and Nevsehir Bus Terminal. Moreover, BKA has experience of many bespoke projects like the Open Courts Sports Complex and Skating Rink in Kayseri which was nominated for the prestigious European Union Prize Mies Van Der Rohe in 2015. BKA creates buildings that enrich peoples’ lives. The complexity, the challenges and the forces of the site make the design process more dynamic. This approach is augmented by a strong commitment to public, clients, academics and the professionals. BKA aims to create projects evolving from their dynamic and creative architecture team. BKA interested in the experiential qualities of architecture, ways in which form and material can draw out lasting emotional or cognitive manifestation. To achieve such an architecture requires careful attention to the unique parameters of each project, especially their context and typologies. Research and analysis are distilled, with relevant facts materialized.



Index Konya Stadium

010-025

Open Courts Complex In Kayseri

026-037

University Sports Hall Of Nevsehir

038-047

Gaziosmanpasa Stadium

048-057

Kayseri Waterski Park

058-067

Karbala Olympic Stadium

068-075

Skating Rink In Kayseri

076-087

Mersin Arena

088-089

Konya Sports Hall

100-107

Sivas Arena

108-115

Kepez Stadium And Urban Strip Plan

116-127

BKA Sports Architecture

128-129


Konya StadÄąum


Location Konya / Turkey

Project Year 2012

Total Floor Area 250.000m2

Construction Period 2013-2014

Capacity 42.000 Person

Client Konya Metropolitan Municipality


Begin With

Konya Stadium is located on the north of the city, 9 km away from the city center on an area of 450,000 m2. A sports hall, swimming pool, veledrom and a concourse is also available on the site plan. The transportion is provided by the railway system, private vehicles and public transport. Konya Stadium, is designed with an approach of harmonizing the cultural codes with contemporary structure. The exterior of the structure is in white-green colors which symbolizes the city football team.

012

KONYA STADIUM


KONYA STADIUM

013


Design Idea

Planning of the structure is based on UEFA criterias. The total seating capacity of the stadium which is 42,000 is seperated as the lower and the upper in the grandstand. The seating area settlement is called as the east, west, south and north. A sufficient number of toilets and buffet areas were planned under all the grandstands for the audience. The football field is covered with artificial turf that’s heated from below based on the FIFA and UEFA criterias. The top part of this area is covered with high technical featured materials which enables the arena to be used for different functions.

014

KONYA STADIUM


KONYA STADIUM

015


SPECTATOR - SOCIAL TECHNICAL TEAM - SPORTSMAN

SECTION

016

KONYA STADIUM


Exterior World Athlete locker rooms, training areas, the referee and jury rooms and various size of rooms for media and VIP entrances are planned on the western grandstand which also has a main carrier made out of concrete. Technical units and management ofďŹ ces are also in this region. Durable, robust and easy to clean aesthetic materials are used on the walls and on the ceiling. Athletes use this elevation to reach playground.

KONYA STADIUM

017


ALUMINIUM LOCK JOINING SYSTEM QUADROCLAD FACADE PANEL (25MM) JOINING ELEMENT

STEEL

Planning

RAIN WATER EMPTYING CANAL LINEAR LED LIGHTING FIXTURES

The grandstands are 2 floored and designed to be in the form of an arch with 44 steps. The distance of the grandstands to the field is between 9-11 ALUMINIUM LOCK JOINING SYSTEM

m. The most distant audience from the football field is planned to be 90 m away from the center. Audience, media, lounge, VIP, athlete, and security

QUADROCLAD FACADE PANEL (25MM)

guards entrances and circulation areas are seperated from each other.

STAINLESS FITTING ELEMENT ALUMINIUM LOCK JOINING SYSTEM

ALUMINIUM LOCK JOINING SYSTEM QUADROCLAD FACADE PANEL (25MM)

018

KONYA STADIUM

STEEL


KONYA STADIUM

019


FANS AND SOCIAL TECHNICAL ADMINISTRATION TEAM AND SPORTSMAN MEDIA

Shell Details + 8.95 LEVEL PLAN

The grandstands are reinforced with concrete, and roof and the facades are made of steel. Wall and roof is covered with composite panel and quadroclad panels, aluminum interlock systems and solar olimpic polycarbonate and tinted green glass is used in wall and roof covering. Metal pans with a width of 30 cm and depth of 15 cm is used to create a consant canal which defines the forms, provides the drainage of roof and facade water, and assembly the linear led lightning system. The concrete areas are made of brut concrete. FANS AND SOCIAL TECHNICAL ADMINISTRATION TEAM AND SPORTSMAN MEDIA

± 0.00 LEVEL PLAN

020

KONYA STADIUM


KONYA STADIUM

021


FANS AND SOCIAL TECHNICAL TEAM AND SPORTSMAN

SECTION

022

KONYA STADIUM


KONYA STADIUM

023


024

KONYA STADIUM


Construction The stair blocks of the upper and the lower grandstands are seperated. Radiant heaters are positioned under the roof for the audience comfort and a sub-heating system is used in order to protect the turf under heavy weather conditions.

KONYA STADIUM

025


Open Courts Complex In Kayseri


Location Kayseri / Turkey

Project Year 2010

Total Floor Area 1.952 m2

Site Area 36.782 m2

Construction Period 2012-2013 Client Greater Municipality of Kayseri


Approach Open Courts Sports Complex namely a part of Kayseri wonderland Project. The main idea of this urban design is a recreational theme park in Kayseri. The Open Courts building is one of the main cares of this environmental design. All land totally covers 500.000 square meters. Open Courts Sports Complex has 36.782 square meters for open and close areas. This new complex, increase the sites’ architectural value

R RTE

PE UP

and importance as an urban landmark on a strategically paint in Kayseri. The Project covers a service hall, 9 tennis courts, 3 basketball and volleyball area and 3 mini football area.

NT FRO

028

OPEN COURTS COMPLEX IN KAYSERI

EAF

EL

C RA


IDE

TS

LEF

HT

RIG

EAF

RL

NT

FRO

U

R PPE

IDE

TS

LEF

E

SID

HT

RIG

E

SID

F

LEA

OPEN COURTS COMPLEX IN KAYSERI

029


1. FOOTBALL AREA 2. BASKETBALL AREA 3. TENNIS COURT 4. CAR PARK

SITE PLAN

030

OPEN COURTS COMPLEX IN KAYSERI


Main Design Idea The Project highlights the dynamism of sports especially tennis. The building serves for the courts and areas as service hall in cladding dressing rooms, changing rooms showers and cafe. This project’s client is the municipality of Kayseri. Therefore they want to make areas for public use and provide citizens a multi functional sports complex. The building designed linearly so it views all the outside functions like tennis courts and football areas. In the second oor the view terrace functions as a social space for people and sportsmen.

OPEN COURTS COMPLEX IN KAYSERI

031


032

OPEN COURTS COMPLEX IN KAYSERI


OPEN COURTS COMPLEX IN KAYSERI

033


01. ENTRANCE HALL 02. HALL 03. CORRIDOR 04. LOCKER ROOM 05. LOCKER WC - BATH 06. MAN - WOMAN WC 07. DISABLED WC 08. OFFICE 09. TECHNICAL ROOM 10. STORAGE ROOM 11. PANEL ROOM 12. BASKETBALL AREA 13. TENNIS COURT 14. CAR PARK

GROUND FLOOR PLAN

Facade The building facade’s geometries enhanced by a steel structure covered with the perforated metal and aluminum panels. The facade is architecturally significant as it shows the real dynamic functions. All the elements making the facade as the dynamic cover, are unique pieces of materials. The drawings of each and every element needs to manufacture the facade. The perforated ones and the steel ones has the different potentials when covering the facade of the building.

034

OPEN COURTS COMPLEX IN KAYSERI


OPEN COURTS COMPLEX IN KAYSERI

035


Spatial Organization As the project's only closed area is the central for all the sportsmen, it reects the idea of dynamism in its language also. The forming of the reception desk especially, tells the motion of the facade at the interior level. Interior design makes the image of minimalist oors and space. It is a functional structure as it gives the idea of it belongs to the all open courts near the building.

036

OPEN COURTS COMPLEX IN KAYSERI


OPEN COURTS COMPLEX IN KAYSERI

037


Nevsehir University Sports Hall


Location Nevsehir / Turkey Capacity 1.000 person

Project Year 2010

Construction Period 2011-2013

Total Floor Area 8.000 m2

Site Area 17.000 m2

Client Nevsehir University


Approach Nevsehir University Campus was established on the way to Avanos about 10 km away from the city center on the north. Nevsehir University Sports Hall which is in the process of formation and structuring was designed to meet the campus requirements for social and sports needs as well as the city of Kayseri. The project stands out with its technical competence as well as its architectural difference. The organic circular shape of the state of Cappadoccia region forms into modern lines in design. The design attracts attention by dominant colors as white, yellow and black on the topography of Cappadoccia region which is in pastel colors.

SECTION

040

NEVSEHIR UNIVERSITY SPORTS HALL


NEVSEHIR UNIVERSITY SPORTS HALL

041


042

NEVSEHIR UNIVERSITY SPORTS HALL


NEVSEHIR UNIVERSITY SPORTS HALL

043


03 044

GAZIOSMANPASA STADIUM NEVSEHIR UNIVERSITY SPORTS HALL


GAZIOSMANPASA STADIUM NEVSEHIR UNIVERSITY SPORTS HALL

04 045


046

NEVSEHIR UNIVERSITY SPORTS HALL


NEVSEHIR UNIVERSITY SPORTS HALL

047


Gazıosmanpasa Stadıum


Location Istanbul / Turkey Capacity 5.000 person

Project Year 2015

Site Area 41.200 m2

Total Floor Area 46.500 m2

Client Municipality of Gaziosmanpasa


050

GAZIOSMANPASA STADIUM


Approach Today’s cities make it impossible to have contact with nature and experience natural sites in dwellers’ dailylives due to endless urban transformations and acccelareted pace of living. It is fundemantally necessary to preserve and prosper urban spaces that still maintain some of the irnatural qualities in order to meet dwellers’ innate needs for social and recreational activites. Gaziosmanpasa Municipality has been subjected toone of the fastest development transitions in Istanbul Metropolitan Area. The site, which has been zoned for a sports and recreation area, is strategically located at an urban development stretch that will draw even more focus in future.

GAZIOSMANPASA STADIUM

051


Program The multi-facilty sports complex within this rapid urban development district with fast population growth incorporates the following amenities; -5000 spectators capacity stadium -Social venues for cultural activites -Foodcourtsand market spaces -Retail spaces -Sports facilities (Basketball, tennis) -Fitness area -Indoor and outdoor parking spaces Incontrast with traditional stadiums that regularly hold a game once every two weeks and standidle rest of the time, it was one of the main design objectives to come up with a multi-use facility that will stay alive throughout the week with daily social and retail activities. Moreover, various indoor and outdoor sports facilities will primarily promote development of amateur sports organizations and local sports culture, therefore fostering youthculture in the urban area.

01 PROJECT AREA

052

GAZIOSMANPASA STADIUM

02 PROJECT AREA

03 GROUND FLOOR PLAN


04 FIRST FLOOR PLAN

05 SECOND FLOOR PLAN

06 STADIUM FLOOR PLAN

07 STADIUM SHELL

GAZIOSMANPASA STADIUM

053


STADIUM ENTRY

SPORTS HALL BAZAAR UNITS ENTRY SPORTS HALL ENTRANCE

STADIUM ENTRANCE

STADIUM

CULTURAL & SPORTS HALL ENTRANCE PARKING ENTRANCE

PARKING EXIT

054

GAZIOSMANPASA STADIUM

OPEN SPORTS AREA


Context and Site The project is located at a sloped site on Kemal Seker Boulevard. Accourdingly the complex is situated along the topographical nature of the land. Stadium stands are oriented along the land’s grade, reclining towards North East part of the site. Therefore the complex is observed as integrated with the natural topography of theland. The spectators are comfortably able to enter the complex from the upper part where the building elevation meets the existing Girne Street that houses a majorinter-municipality bus station. Programs such as indoor and outdoor sports facilities and stadium stand were laidouttocreate a well integrated organization that works efficiently as a wholesports complex. On the opposite boulevard where the building stands 30 metres tall from the ground, remaining programs were laidout parallel to the street to create a facade in order to provide a prestigious attraction point with in the city.

The complex is covered under a roof that complements the design as a whole. This dynamic structure suits well to sports facility. The undulated folds on the roof structure animates the whole design while creating opportunities for entrance points where it’s needed and suitable with the design methodology. The existing grassland continues on the roof where it covers the stands, representing a merging behaviour between the complex and the surrounding nature. Otherpart of the roof where it declines along the existing topography consists of solar panels considering this section’s southern orientation. Evenmore, the upper part of the hill resides urban vertical wind tirbunes, there bycreating a viable and sustainable complex respectful to environmental factors.

GAZIOSMANPASA STADIUM

055


SHELL CONCEPT DIAGRAM

SHELL CONCEPT

WIND TRIBUNE DIAGRAM

SHELL CONCEPT DIAGRAM

SHELL CONCEPT DIAGRAM

SHELL MATERIAL DIAGRAM

Vehicle circulations area long the major road of Kemal Seker Boulevard where the prevailing facade strecthes. There are various landscaping features where the site meets this road. Outdoor parking zones are coordinated with the retail spaces of the complex. SOLAR PANEL DIAGRAM

Inconclusion, the contemporary design for the stadium complex will become an urban attraction. This complex will define a cultural, social, arctistic and dynamic space within the urban context fort the dwellers. The main objective is to involve the city dwellers not only as users but also as contributors and participators. The main ideological perspective is to focus on children and youth. Therefore it is the main purpose of this design to help facilitating a flourishing community around the complex which will take a major role in the city’s socialand urban context.

056

GAZIOSMANPASA STADIUM


GAZIOSMANPASA STADIUM

057


Kayseri Waterski Park


Location Kayseri / Turkey

Project Year 2010

Total Floor Area 2.300 m

2

Construction Period 2012-2013

Client Greater Municipality of Kayseri


060

KAYSERI WATERSKI PARK


Begin With Landmark of the city Kayseri Wonderland Project consists of many different facilities. One of them is the Water Ski Park having 33.000 square meters site area and a 3.000 square meters island in the artiďŹ cial lake. The main purpose of the project making an urban space for the people and making a ski-park. Besides they are passing different kind of facilities along the park. There are cafes, education areas, restaurants, open terraces, stages and other facilities for the sports events. The site features a purpose built lake that features a full and half slalom course, Ski jump and a jet ski slider park.

KAYSERI WATERSKI PARK

061


01. ENTRY DOOR 02. CAFETERIA 03. PARKING 04. SCENE 05. RINK 06. COFFEE SHOP 07. EDUCATION PLATEAU 08. OPEN TERRACE 09. RESTAURANT - CAFE 10. WC - MOSQUE 11. RINK

SITE PLAN

062

KAYSERI WATERSKI PARK


KAYSERI WATERSKI PARK

063


SECTION

064

KAYSERI WATERSKI PARK


Details The main water-ski facility is making by the help of mechanical systems around the artiďŹ cial lake. The shelter like elements in the design shows the plasticity of the water ski. The selected color "red" and the shiny material aluminum composite panel is selected for becoming a mark in the design. The design of Water Ski Park is unique that placing in Anatolia part of Turkey. Water Ski Park will be able to evolve and change throughout its lifetime, which will constantly keep the park fresh and updated.

In the main building of the park, ground oor serves as the sportsmen's activities like: cafeteria, kitchen, kitchen service, corridor, dressing rooms and showers.

KAYSERI WATERSKI PARK

065


GUTTER

RIBBED SHEET (H:56 MM)

STEEL ROOF CONSTRUCTION

ALUMINIUM COMPOSITE PARAPET LOCK JOINING SYSTEM (1 MM)

STEEL ROOF CONSTRUCTION

RIBBED SHEET (H:56 MM)

LOCK JOINING SYSTEM (1 MM)

RIBBED SHEET (H:56 MM)

STEEL ROOF CONSTRUCTION

LOCK JOINING SYSTEM (1 MM)

RIBBED SHEET (H:56 MM) STEEL ROOF CONSTRUCTION

066

KAYSERI WATERSKI PARK


KAYSERI WATERSKI PARK

067


Karbala Olympic Stadium


Location Karbala / Iraq Capacity 33.000 Person

Project Year 2012

Construction Period 2013-2016

Site Area 208.834 m2

Total Floor Area 29.300 m2

Client Iraq Ministry of Youth and Sports


070

KARBALA OLYMPIC STADIUM


KARBALA OLYMPIC STADIUM

071


072

KARBALA OLYMPIC STADIUM


Main Approach The design standards and efficiency to give extra support to the training and growth of sport in Iraq, the fundamental requirements for the 30,000 spectator which issued by the ministry of youth and sport have been incorporated to the best of our understanding with reflection of our vision on such valuable city. Our desire to provide an architectural solution that is progressive in form and substances yet sensitive to the cultural and religious context of the region. Design concept with their muted colors and texture the buildings of Karbala tend to be blended with the surroundings the key focal features of the city’s religious mosques and houses. the site is planned accordingly, to reflect the unique context of Karbala. Its oriented toward Imam Hussein Shrine providing a strong link to cornerstone of Islamic history of Karbala tragedy. The seventy three arcades that covers the stadium represent the number of martyrs were killed in that sad event. The rhythm and the proportions of the stadium bays match those patterns in the shrine and the stadium two-layer translucent skin allows air to circulate through the concourse also the white shell of the stadium inspired from the white pigeon that represents peace; the matter that Imam Hussein fought for.

KARBALA OLYMPIC STADIUM

073


Materials and technology were also present in design considerations to serve the structure by using long last materials and treatments that give the project the qualities and efficiencies needed. Possible materials considered to inherit to other neighboring structures include, precast or cast in place concrete and plaster or stone veneer over block masonry, supplemented with accenting materials will help identifying the places or points of interest. The exterior walls system of conditioned spaces shall have a sufficient value to maintain an appropriate level of comfort for athletes, spectators and visitors to the sport city. Exterior landscape and circulation system were designed to accommodate the massive crowds with sufficient car parks for athletes and VIP visitors. This stadium reflects both aesthetic values of the Holy city of Karbala and design techniques.

074

KARBALA OLYMPIC STADIUM


KARBALA OLYMPIC STADIUM

075


Skating Rink in Kayseri


Location Kayseri / Turkey Total Floor Area 2.600 m2

Project Year 2009

Construction Period 2012-2013

Client Greater Municipality of Kayseri


Begin With Skating Rink is placed 9 km far away from the city center and inside the 10.000 square meters site. With the transportation facilities like car, minibus, bus and railway system; the Ice Rink has the chance to make citizens life more sportive. When designing the form of the building, the relation between the ice and the air comes into the mind. Besides, by the meaning of ice, global warming in our today’s world has the consideration for the citizens. For the changing climates, the less green and our apathetic stands can be more conscious in this way.

078

SKATING RINK IN KAYSERI


SKATING RINK IN KAYSERI

079


01. ENTRANCE 02. FOYER 03. LOBBY 04. CHILDREN’S PLAYGROUND 05. ICE-SKATING RING 06. SPECTATOR TRIBUNE 07. PREPARATION AREA 08. BOX OFFICE 09. CHANGING ROOM 10. WC 11. SHOWER 12. MANAGER ROOM 13. STORAGE 14. WC

GROUND FLOOR PLAN

1. CAFETERIA 2. WC 3. KITCHENETTE

MEZZANINE PLAN

080

SKATING RINK IN KAYSERI


SKATING RINK IN KAYSERI

081


SECTION

082

SKATING RINK IN KAYSERI


Space Understanding

ACRYLIC COVERING COLUMN DETAIL

Ice skating ring with an area of 2000 m2 consists of two floors which are the ground floor and mezzanine floor. The total construction area is 2600 m2. The surrounding lounge accommodates public functions and social activities when not occupied for rink use. The synthetic ice ring with 30x15 m. dimensions is surrounded by the audience seating, the locker rooms and the kindergarten which is separated by the glass surfaces. The cafe on the mezzanine floor enables the audience to monitor the ring.

SKATING RINK IN KAYSERI

083


Facade & Exterior World The platform which was raised by stairs create a coherent spatial with the structure and provides a semi-open area. The roof which extends to the entrance, forms like a fringe and covers the roof patio, while the clear structure reaches to a rectangle shape. This clear prism shaped amorphous structures become noticeable and make a difference with the amorphous gaps. The colored glasses on the amorphous gaps validate that the structure was intended to build for entertainment and sports.

084

SKATING RINK IN KAYSERI


SKATING RINK IN KAYSERI

085


STAIRS SECTION

086

SKATING RINK IN KAYSERI


SKATING RINK IN KAYSERI

087


MersÄąn Arena


Location Mersin / Turkey Site Area 111.000 m2

Project Year 2012

Capacity 25.000 Person

Construction Period 2012-2013

Total Floor Area 75.000 m2

Client Housing Development Administration of Turkey


Approach

The stadium is expected to used for international and national sports. The capacity of stadium is 25.000 spectators. it is thought to be a symbolic building for the city because of its architectural design and its audience.

090

MERSIN ARENA


Site

The stadium is located in Yenisehir, Mersin with an area of 55.000 square meters. The stadium’s landscape designed to connect pedestrians with the area. The stadium located on the main road connects stadium to city center .This leads to Mersin Stadium as a cultural center for spectators. In design process, one of the criteria is reducing trafďŹ c jam, so that it is planned

1.295 spots for cars and 46 spots for buses for public transportation in the master plan.

MERSIN ARENA

091


092

MERSIN ARENA


MERSIN ARENA

093


SECTION

094

MERSIN ARENA


Facade The stadium ground will be covered with high quality artificial grass that fits the FIFA and UEFA criteria. Spectators keep eye on whole stadium clearly. This shows that It can be used for different sports and gathering purposes but it is mainly programmed as a soccer field.

MERSIN ARENA

095


096

MERSIN ARENA


MERSIN ARENA

097


Exterior World The stadium, designed on an elliptic form. Stadium’s shell shape is observed from this elliptic form. The shell is a symbolic form which defines relation between landscape and structure also sets a boundry to area. Moreover, dynamic form which is created by elliptic form covers all tribune areas from top. The material used for shell is suitable for climate in Mersin and it provides spectators and soccer players a comfortable area. In the stadium, there are police station, restaurant, retails, health center and box office.Additionally, there are VIP area, administration office,UEFA club acceptance field, restaurant, food-court etc. between two tribunes.

098

MERSIN ARENA


MERSIN ARENA

099


Konya Sports Hall


Location Konya / Turkey

Project Year 2012

Total Floor Area 22.000 m2

Construction Period 2013-2014

Site Area 40.000 m2

Capacity 10.000 Person

Client Greater Municipality of Konya


10+1+10 MM TEMPER GREEN LAMINATED GLASS

10+1+10 MM TEMPER GREEN LAMINATED GLASS

ALUMINIUM COMPOSITE PANEL COATING (4MM)

FOYER

SPORTSMAN ENTRY

102

KONYA SPORTS HALL

TERRACOTTA FACADE COATING (1.5x30x100 CM)


KONYA SPORTS HALL

103


104

KONYA SPORTS HALL


KONYA SPORTS HALL

105


MASS

106

KONYA SPORTS HALL

FOOTS

SHELL

SEPERATING

COVERING


Design Idea Konya which is a growing and developing city with many attractions and has desire to host national and international competitions lead to the idea of constructing a gymnasium with a capacity of 10 000 people. The gynasium is planned to be located which is linked to the existing rail system is on a main road that is convenient to the tourist attraction sites. The main design criteria is based on the transportation convenience. 5 shell structures were aimed to unite in order to provide pedestrian ways. These main shells act as a shelter to the audience meeting platforms by covering each other. The forms unite each other by glass surfaces. The pedestrian ways, athlete, referee, press and protocol entrances are deďŹ ned on these surfaces.

KONYA SPORTS HALL

107


Sivas Arena


Location Sivas / Turkey Site Area 131.000 m2

Project Year 2012-2013

Capacity 33.000 Person

Construction Period 2013-2016

Total Floor Area 58.700 m2

Client Housing Development Administration of Turkey


1. ENTRANCE 2.SPECTATOR PARKING AREA 3. VIP PARKING AREA 4. GUEST SPECTATOR PARKING AREA 5. SPECTATOR BUS PARKING AREA 6. OUTSIDE BROADCAST VEHICLE PARKING AREA 7. PROTOCOL PARKING AREA 8. TICKET OFFICE 9. ENTRANCE OF INDOOR PARKING AREA

SITE PLAN

110

SIVAS ARENA


SIVAS ARENA

111


SECTION

112

SIVAS ARENA


Spatial Organization Sivas has a climate of dry and cold and has the powerful wind. Sivas Arena has the design principles for the less energy consumption by using rain drainage, alternative energy production and passive solar systems. According to the academic researches, in cold climate regions it is a preferance for making the structure shell against the cold winds. Sivas Arena has the second facade which protects the heat loss of the interior.

SIVAS ARENA

113


114

SIVAS ARENA


SIVAS ARENA

115


Kepez Stadium and Urban Strip Plan


Location Antalya / Turkey Capacity 10.000 Person

Project Year 2015 Site Area 95.000 m2

Total Floor Area 21.040 m2 Client Municipality of Kepez


RESEARCH CENTER

BAZAAR

HIGH SCHOOL

COVERED MARKED

118

KEPEZ STADIUM AND URBAN STRIP PLAN


SPORTS HALL

SPORTS COMPLEX

STADIUM

KEPEZ STADIUM AND URBAN STRIP PLAN

119


Begin With The project, which consists of a mid-size stadium and an urban strip plan, is located at the municipality of Kepez, fastest developing region in Antalya. The rapid growth and cultural heritage of this area is the main focus that drives the design of this project. Creating a lively and safe neighborhood and an attractive urban space full of diverse activities is the main objective that will support the general improvement and boost the brand value of this growing region of Kepez.

SECTION - 2

120

KEPEZ STADIUM AND URBAN STRIP PLAN


The cultural heritage of this region, when rejuvenated with the compilation of this urban strip, is to be exemplary throughout the whole cosmopolitan area, attracting turism right into the center of Kepez. It aim the represent a genuine story to local dwellers and visitor by providing a high diversity events within a lively urban zone. The area located between the major transportation shafts and at the center of the development zone in Kepez consist of the following amenities; - Traditional market places and bazaars - Elmalılı Hamdi Yazır historical research center - Recreation areas - Cultural constitutions - A hotel - Stadium and urban squares

SECTION - 3

KEPEZ STADIUM AND URBAN STRIP PLAN

121


SOCIAL / CULTURAL / COMMERCIAL UNITS MOSQUE PROJECT

MARKET PLACE

COMMERCIAL UNITS

122

KEPEZ STADIUM AND URBAN STRIP PLAN

SECONDARY EDUCATION INSTITUTIONS

CULTURAL CENTER DISTRICT HOUSE

KEPEZ ARENA SPORTS HALL

TENNIS COURT

SECONDARY EDUCATION INSTITUTIONS

SOCIAL / CULTURAL / COMMERCIAL UNITS


Main Design Idea

The project area that we like to call "the urban strip" stretches out between Ceyhan Blvd and Yesilirmak Blvd, prevailing a 1 kilometer long area of Seyhan Blvd with various vacant lots at both sides. Therefore the project requires to be evaluated at a master plan scale in order to make sure a full integration to the metropolitan area. These vacant lots on Seyhan Blvd. are surrounded by lots that consists of various primary and secondary education facilities, a farmers market area, existing mosques and a planned mosque, an urban park known as Sehitler Parkı and a facilities complex belonging to Kepez Municipality Sports Team. The fact that the region has already highly populated and still continues to draw population makes this 92.000 m2 project area immensely critical for the city's and the dwellers' future.

The fundamental approach for the urban planning project is to create a km long strip that is consistently rich with diversified experience and make sure this cultural enrichment spreads out homogenously at all directions towards the surrounding districts. First step to achieve this is to provide a safe, comfortable and pleasing walking paths along the whole boulevard. This walking paths are consistently surrounded by rest, retail and recreation areas that turns the strip into a chain of lively avenues. These areas have a green zone to create a buffer zone between the traffic and human circulation, ensuring the safety and comfort of pedestrians. These various avenues create different levels of access and privacy zones parallel to the boulevard, defining a new rhythm of life and civic experience full of urban features.

KEPEZ STADIUM AND URBAN STRIP PLAN

123


Context PEDESTRIAN CIRCULATION

Existing buildings on the project site features a sports complex for Kepez Municipality, including an administration building, indoor and outdoor sports facilities and a 2.500 spectator stadium. Yet none of these are adequate for the current needs of the region. The sports facilities are to be renewed and expanded for higher capacity with a design approach that aims to create an urban focus area within the region. Rather than designing a stadium that only fills once every two weeks during a sports event, it is designed to be lively and active during all days of a week. The stadium spaces will consists of various retail shops at dense traffic facades and accommodate all needs of the sports team, ensuring that it will stay active from within and from outside. Therefore the sports facilities will bring a high positive impact on the cultural fabric of the district. In order to establish an active urban square and increase usage of retail CAR CIRCULATION

shops at the stadium facade, a canopy extending both sides of the boulevard is envisioned. This canopy, while defining an urban square, also provides better climate for many people approaching the stadium and regulates the vehicle traffic flow on the boulevard while people are accessing from the surrounding recreation and parking areas. The km long boulevard possesses traditional market strips and retail streets as it leads people to the stadium from the major crossing boulevards. At both of these ends there is iconic building in order to guide people's attention towards the center of the boulevard. While one side houses a hotel, the other side houses the Elmalılı Hamdi Yazır Research center, across the street from the planned mosque. These two new buildings are well integrated with the existing buildings around site, considering their location and program. As one travels from the ends towards the inner part, there is a double strip of modular units for various retail opportunities. These units create a retail facade parallel to the

PEDESTRIAN DENSTY

124

KEPEZ STADIUM AND URBAN STRIP PLAN

boulevard, as well as a inner courtyard like street like a traditional bazaar.


The facades and units are arranged with features directly taken from Antalya's Kaleiçi (inner castle) districts retail shops. These work from both facades, from courtyard and from street, as the Kaleiçi shops, creating a harmony with the traditional life style and social habits of local. This design approach creates economic and cultural efficiency. Units are arranged with careful consideration of the sun direction, making sure that retail facades stay at shade during the hotter hours of the day. Inner square for green courtyards, shaded rest areas, void units to create porches and house small retail benches (common in Turkey) are scattered along the retail zones to enrich the experience which will bring economic and civic values to the district and surrounding neighborhoods. All units at the retail zone have a shallow water pool around the perimeter of a multiple unit blocks. Retail units are accessed by crossing this two step pools. Project site is located at hot climate zone which makes it very uncomfortable to be active at outdoors during hot summer months. These water pool provide a huge improvement for the passive climatization of the outdoor spaces. Retail facades are also equipped with folding shades that also improves the aesthetics of the shops.

KEPEZ STADIUM AND URBAN STRIP PLAN

125


Facade Details SHAPING OF ROOF FOR SUN LIGHT

Every once in a while, the shaded areas are expanded in order to create rest areas or small squares for miscellaneous civic activities. All SOLAR CONTROL AIR CIRCULATION

these areas are surrounded with recreation are green belts in order to slow down vehicle trafďŹ c, ensuring the maximum comfort of locals and visitors. Carefully and consistently designed at all scales, the resulting urban strip and the stadium will become an attraction zone. The area will increase involvement of locals and visitors of all ages and socio-economics in terms of cultural, sportive, social, artistic and economic activities. The strip will be lively throughout the whole year

COMMERCIAL UNITS CONTINUTY

with various groups of users and participators. This new civic area will play a tremendously important role for the development of the social fabric within Kepez Municipality.

126

KEPEZ STADIUM AND URBAN STRIP PLAN


KEPEZ STADIUM AND URBAN STRIP PLAN

127


BKA SPORTS ARCHITECTURE


Stadium & Arenas

Sports Halls & Gymnasiums

Kayseri Kadir Has City Stadium

Konya Gymnasium

Mersin Stadium

Kadir Has Sports Hall

Konya Stadium

Yasar Dogu Sports Hall

Karbalaa Olympic Stadium

Baghdad Stadium

Al Sunbula Stadium Sivas Arena Eskisehir Stadium Samsun Arena Gaziantep Arena Malatya Stadium Corum Arena Izmir Karsıyaka Stadium Gaziosmanpasa Stadium Atatürk Olympic Stadium Erbil Stadium Duhok Stadium Baghdad Stadium

Adana Sports Hall Erbil Salaaddin University Sports Hall and Swimming Pool Club Erbil Sports Hall Nevsehir University Sports Hall Kayseri Gymnasium Mus Alparslan University Indoor Swimming Pool And Gymnasium Samsun Gymnasium Van Sports Hall Karşıyaka Sports Hall Al-Sunbula Sports Hall Acıbadem Primary School Sports Hall Iraq 7000 Spectators Sports Hall

Yaounde Staidum Stade Roger Milla Batumi Stadium Kaliningrad Stadium

Others

Tiqar Stadium

Kayseri Athletics Track And Trıbune

Oil Club Stadium

Kayseri Olympic Swimming Pool

Iraq 5000-1000 Spectators Stadiums

Kayseri Waterski Park

Stadium Makhmoor Al-Sada Stadium Hatay Stadium İzmir Stadium

Open Courts Complex In Kayseri Skating Rink In Kayseri Bakırkoy Tennis Court

Ankara Stadium

Kepez Stadium And Urban Strıp Plan

Kasımpaşa Stadium

Kusadası Camp Training Center

Batumi Stadium

Kızılırmak Recreation Area


Manolya street No.:12 Bebek district Beşiktaş / İstanbul Phone: +90 212 265 01 00 • Fax: +90 212 265 62 92 E-mail: info@bahadirkul.com

www.bkaarchitecture.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.