RUBIX MOTEL
LOBBY FLOOR PLANS1:200 N 3
1
1
1
BATMAN STREET
THE SITE IS LOCATED IN WEST MELBOURNE, AN AREA JUST OUTSIDE THE CBD. THE AREA IS VERY QUIET BUT PROVIDING MANY PUBLIC TRANSPORTATION SURROUNDING IT
2
2
DESIGN AND PROGRAMME SPENCER STREET
THE BRIEF INTENT WAS TO DESIGN A MOTEL 30 YEARS INTO THE FUTURE FOR TWO GROUPS: NAVA (NATIONAL ASSOCIATION FOR VISUAL ARTISTS) AND A YOGA ASSOCIATION. THE MOTEL ITSELF SHOULD CONSIST OF 15 GUEST SUITES WITH EACH SUITE HAVING IT’S OWN PRIVATE WORKPLACE.
WEST ELEVATION
BASEMENT 1. BIKE SHED 2. MECHANICAL PLANT ROOM
SECTION1:200
GROUND FLOOR 1. RECEPTION 2. LOUNGE AREA 3. CLOAK STORAGE
mezzanine 1. UPPER Lounge area
SOUTH ELEVATION
SUITES PLANS & SECTIONS 1:100
OFFICE SPACE
ARCHITECTURE FIRM RECEPTION
1
1
SUITES
4
1
1
4
2.a
1 5 2
2.b
3 4 3 1.a
1.b
1.c
1
3 2
2
LEVEL 1 1. STORAGE 2. SUITES FOR THE DISABLED *OTHER SPACES ARE THE 1ST LEVEL TO GUEST SUITES [BEDROOM, WASHROOMS, TV, CABINET]
2
LEVEL 2
LEVEL 3
1. OUTDOOR BALCONY 2. CREATIVE ROOM FOR DSIG GROUPS [E.G: YOGA, ART CLASS] *OTHER SPACES ARE THE 2ND LEVEL TO GUEST SUITES [LOFTS]
LEVEL 4
1. STORAGE
1. OUTDOOR BALCONY
*OTHER SPACES ARE THE 1ST LEVEL TO GUEST SUITES [BEDROOM, WASHROOMS, TV, CABINET]
*OTHER SPACES ARE THE 2ND LEVEL TO GUEST SUITES [LOFTS]
LEVEL 5 1. SEMINAR SUITES 2. SECRETARIATES FOR DSIG 3. CARETAKER/ MANAGER RESIDENCE 4. FACILITY OFFICE
LEVEL 6 1. 2. 3. 4. 5.
RESTAURANT KITCHEN COLD ROOM ARCH. FIRM RECEPTION CLIENTS MEETING AND SCREENING AREA
LEVEL 7 1. CEO OFFICE 2. DISCUSSION AREA 3. CREATIVE TEAM WORKING DESKS 4. PANTRY
- LIFT CORE - MOTEL SERVICES AREA
- SPACES OPEN FOR PUBLIC TYPICAL WALL STRUCTURE ON HIGHER LEVELS
STRUCTURAL SYSTEM
- ATRIUM
- SPACES SPECIALLY FOR DSIG GROUPS
- ARCHITECTURE FIRM TYPICAL WALL STRUCTURE LIFT CORE TO FLOORS
- GUEST SUITES / LOFTS