NEW ROOFTOP MECHANICAL UNITS

NEW ROOFTOP MECHANICAL UNITS

Centre Avenue

1

HVAC Location Elevation 0

8'

16'

32'

2 1.11

NEW ROOFTOP MECHANICAL UNITS

Elevator Bulkhead

3 1.11

1 1.11

Ne

w

its

l Un

Ro

oft

op

ica

an

ch

op

Me

ch

an

Me

ica

l Un

oft

w

Ro

its

Ne

New Rooftop Mechanical Units

Elevator Bulkhead

3 1.12 2 1.12

Bellefield Avenue 1 1.12

2

HVAC Location Section

Schenley High School Conversion - PMC Rooftop HVAC Location October 2, 2013

0

PITTSBURGH, PA

8'

16'

32'

3

HVAC Preliminary Layout 0

20'

40'

80'


General Notes: Cleaning as Required Removal of Misc. Signage and Light Fixtures

+68'-0" 6 Story +58'-0" 5 Roof +48'-0" 4 Penthouse

+30'-9" 3 Third Floor Plan

+16'-0" 2 Second Floor Plan Replace Greenhouse in kind, materials to match existing

±0" 1 First Floor Plan

-11'-6" -1 Ground Floor Plan New Lighting to Replicate Original

-26'-6" -2 Basement Plan

Stairs to be Repaired

LOUVERS AND OR MECHANICAL UNITS TO BE REMOVED AND GLAZING TO BE INSTALLED IN ORIGINAL WINDOW OPENING

-43'-0" -3 Sub Basement

1 1.10

Property Elevation

+68'-0" 6 Story

+68'-0" 6 Story

+58'-0" 5 Roof

+58'-0" 5 Roof

+48'-0" 4 Penthouse

+48'-0" 4 Penthouse

+30'-9" 3 Third Floor Plan

+30'-9" 3 Third Floor Plan

+16'-0" 2 Second Floor Plan

16'

32'

0

8'

16'

32'

Replace Greenhouse in Kind Materials to Match Existing

±0" 1 First Floor Plan

±0" 1 First Floor Plan

-11'-6" -1 Ground Floor Plan

-11'-6" -1 Ground Floor Plan New Lighting to Replicate Original

New Lighting to Replicate Original

-26'-6" -2 Basement Plan

Stairs to be Repaired

-43'-0" -3 Sub Basement

2 1.10

8'

+16'-0" 2 Second Floor Plan Replace Greenhouse in Kind Materials to Match Existing

-26'-6" -2 Basement Plan

0

-43'-0" -3 Sub Basement

East Elevation

Schenley High School Conversion - PMC Building Elevations October 2, 2013

New Awning Over Entry Stairs to be Repaired

0

PITTSBURGH, PA

8'

16'

32'

3 1.10

LOUVERS AND OR MECHANICAL UNITS TO BE REMOVED AND GLAZING TO BE INSTALLED IN ORIGINAL WINDOW OPENING

New Lobby Entrance

Bellefied Elevation


General Notes: Cleaning as Required Removal of Misc. Signage and Light Fixtures

+68'-0" 6 Story +58'-0" 5 Roof +48'-0" 4 Penthouse

+30'-9" 3 Third Floor Plan

+16'-0" 2 Second Floor Plan

New Lighting to Replicate Original

New Lighting to Replicate Original

New Lighting to Replicate Original

±0" 1 First Floor Plan

-11'-6" -1 Ground Floor Plan

Existing ADA Ramp

-26'-6" -2 Basement Plan

1 1.11

Bigelow Standard Elevation

NOTE: NO CHANGES ON THIS ELEVATION 0

+68'-0" 6 Story

+68'-0" 6 Story

+58'-0" 5 Roof

+58'-0" 5 Roof

+48'-0" 4 Penthouse

+48'-0" 4 Penthouse

+30'-9" 3 Third Floor Plan

+30'-9" 3 Third Floor Plan

+16'-0" 2 Second Floor Plan

+16'-0" 2 Second Floor Plan

Window to be Replaced

±0" 1 First Floor Plan

±0" 1 First Floor Plan

-11'-6" -1 Ground Floor Plan

-11'-6" -1 Ground Floor Plan New doors and transom to match original

-26'-6" -2 Basement Plan

-26'-6" -2 Basement Plan

2 1.11

North Elevation

NOTE: NO CHANGES ON THIS ELEVATION

Schenley High School Conversion - PMC Building Elevations October 2, 2013

0

PITTSBURGH, PA

8'

16'

32'

3 1.11

South Elevation

NOTE: NO CHANGES ON THIS ELEVATION 0

8'

16'

32'

8'

16'

32'


2 1.12

2 1.12 Awning Over Lobby Entry

3 1.12

3 1.12

New Lobby Entry New Railing

1'-6"

9'

Ramp to Lobby Entry

RAMP DOWN TO ENTRY

3 1.12

Building Section at New Lobby Entrance

2 1.12

Elevation at New Lobby Entrance

0

2'

ACCESSIBLE ENTRANCE AND LOADING LOBBY

UP

1 1.12

New Lobby Plan

Schenley High School Conversion - PMC Lobby October 2, 2013

0

PITTSBURGH, PA

2'

4'

8'

0

1'

2'

4'

4'

8'


New Transom to Replicate Original

New Aluminum Doors to Replicate Original

New Transom to Replicate Original New Lighting to Replicate Original

New Aluminum Doors to Replicate Original

1

Elevation at Replacement Door

10" Globe

8" x 8" Wall Bracket Mounting Plate

3" O.D. X 3" High Tenon (Typical)

6 1/2"

4

(4) 9/16" ∅ Holes

6 1/2" Antique Street Lamp Cast Aluminum Arm Assembly with Dark Bronze Finish Tamper Resistant Stainless Steel Hardware

2 Schenley High School Conversion - PMC Proposed Lighting and Door Changes October 2, 2013

PITTSBURGH, PA

Light Fixture Detail

3

Light Fixture Detail

Wall Section Thu Replacement Door