COMPANY PROFILE
E n e r g y • C o n s t r u c t i o n • Po w e r
Welcome to
our world
of strategic solutions in
energy, power and
construction services
Welcome to Taleveras Group
INTRO DUCT ION 0VERVIEW
OVERVIEW
ABOUT TALEVERAS Taleveras Group, was incorporated in 2004, by a merger of various segments of our businesses. The company was founded by Igho E.C Sanomi. Taleveras is a fully integrated company offering strategic solutions in Energy, Power and Construction Services. Our Energy activities are primarily centered on the physical sourcing and marketing of oil on a worldwide scale. We are proud of our high level of professionalism in handling of associated trade, finance, logistics, operations and risk management activities involvedwith every physical trade position we set out to embark on. Taleveras Group also performs upstream activities with a major focus on acquiring oil assets with viable proven reserves, on a structured basis. Taleveras Group has also developed a name for itself as a first classEngineering and Powers Services Provider. This sector of our Business ispromoted by the Group and its subsidiary companies. Since inception, this segment of Taleveras activities has been vibrant with a significant number of civil engineering, power distribution and transmission projects which showcase our relevant and extensive experience. introduction Taleveras Group with Consortium partners, SAIPEM and ALSTOM are already responsible for the construction, operation of 180MW open gas cycle power plant, as well as the evacuation phase, which Taleveras Group is competently handling.
4 | TALEVERAS • Company profile
OVERVIEW
Our vision is to become “A leading Global Energy & Service Company” - Igho E.C Sanomi II | Chief Executive Officer
This project amongst others has afforded us good exposure to the terrain, and allowed us to showcase our technical competence, which is evident in our work progress. Taleveras Group also provides consulting, design and technical services to the Nigerian power sector with the sole intention of augmenting the Federal Government's effort in the delivery of power to end users. We thrive on the intention to develop the Nigerian economy, which is why a project of this magnitude sparks our interest. Our energy activities are currently centred on the delivery of power to end users, thereby expanding the network for adequate transmission and distribution, which still stands as a huge shortfall in the country's electricity network. We continually establish ourselves in large scale projects which focus on improving the electricity distribution system in the country. Our project management teams have had the privilege of being exposed to difficult terrains, as a result they have been able to develop and manage various strategies required for excellent project execution. We have project teams who work on the following areas; • •
Engineering Designs : (Civil & Electrical Designs)• Manufacturing: (Production of Electrical components to specification.)
5 | TALEVERAS • Company profile
OVERVIEW
• • • •
Civil Works: (Implementation of structural works on site) Electrical Installation: (Implementation of all Electrical works) Instrumentation & Control: (Cable routing & Connectivity) Testing & Commissioning: (operation, Performance Checking)
As part of its vision, Taleveras Group intends to position itself strategically to take advantage of the growing energy needs of the country with the aim of becoming a dominant player in the energy market. Our business performance has positioned Taleveras Group at the leading edge of electricity distribution in Nigeria. The foundations of our success have been built on excellence in five key areas – safety, reliability, customer service, business efficiency and the environment. Taleveras continues to maintain key relationships and enjoys high level co-operation with first class financial institutions and banks. A combination of local and international banking relationship has yielded our desired results in the structuring of the Group's financial Standing. Taleveras intends to sustain this growth pace by partnering with the federal, state governments or private companies on projects with economic development interests. Consistent profitability, improved operating cost in all sectors of activities and proper risk management has continued to enhance our financial strength & stability.
6 | TALEVERAS • Company profile
ACTIV ITIES SECTOR INTRODUCTIONS
7 | TALEVERAS • Company profile
SECTOR INTRODUCTIONS
ENERGY Taleveras energy activities encompass the entire spectrum of Crude Oil and Refined Petroleum Products. Prior to 2004, present day subsidiaries and now associated companies of Taleveras, supplied in total, 290,000 Metric Tons of Physical Fuel Oil between the years 1998-2002, and 400,000 Metric Tons of Refined Products in 2002-2004. These figures continue to rise in recent years, seeing our total Physical Trades increase to 15 Million Barrels of Physical Crude Oil and 2 Million Tons of Physical Clean and Dirty Products in 2007 through 2008.
8 | TALEVERAS • Company profile
SECTOR INTRODUCTIONS
Taleveras is active in the following Range of Activities: •
Crude Oil and Condensate Trading
•
Refined Oil Product Trading
•
Petrochemical Trading
•
Natural & Petroleum Gas Supply and Trading
•
Crude & Product logistics and Storage
•
Shipping and Transportation
Taleveras is committed to developing New Energies such as Bio Fuels, Electricity and Emissions Trading. Our Upstream Development and Participation was further boosted with the award of Two Oil Blocks in the oil bidding rounds held in Nigeria in 2005. However, Production Sharing Contracts have not yet been executed on these two Fields. Taleveras is committed to integrating fully into upstream activities and has defined strategic initiatives to promote this Interest in coming years.The Physical Turnover of Taleveras trading arm (Taleveras Petroleum Trading BV) is currently running in Excess of $3 Billion Dollars under.
“The Guiding Principles for this growth, are principles of respect, integrity, humility, professionalism,transparency and a desire to positively impact on our various counterparts”- Igho E. C. Sanomi II
9 | TALEVERAS • Company profile
SECTOR INTRODUCTIONS
POWER Taleveras draws on a wide and diverse range of expertise from its pool of experienced Engineers, Technical Partners and Consultants, when meeting the needs of Power Generation, Transmission and Distribution. We have the following projects to showcase: 3 Number, 4x 15MVA 33/11KV Injection Substations located in Federal Capital Territory of Nigeria. 4 Number, 1x 15MVA 33/11KV injection Substation located in Swali, Opollo, Ovum and Gbarian Ubie in Bayelsa State in the Niger Delta Region of Nigeria. 2 Number 1x 7.5MVA 33/11KV Injection Substation Located in Abonema and Degema in Rivers State in Niger Delta Region Nigeria.We have had a number of
10 | TALEVERAS • Company profile
SECTOR INTRODUCTIONS
very positive technical Management appointments in the Group in the past 2 years. These appointments have enhanced our Power Services Unit.We have had a number of very positive technical Management appointments in the company in the past 2 years. These appointments have enhanced our Power Services Unit and added to our optimism regarding the future and ongoing prospects for our Group's Power Division. We continue to explore new frontiers and offer innovative technological solutions in this field of practice. We constantly reflect our interest by participating in multi-million dollar tenders and bids in other to extend our services and build a formidable Power Company.
“The power of light inspires us to bring it to your doorstep” - Engr. Johnson Obafisoye | Group Head, Power Projects
11| TALEVERAS • Company profile
SECTOR INTRODUCTIONS
LIST OF PROJECTS EXECUTED BY TALEVERAS GROUP S/N
PROJECT TITLE
PROJECT DESCRIPTION
CLIENT
EMPLOYED STAFF
AWARD DATE
1
CONSTRUCTION OF 8 NOS BASE 132KV SUBSTATION WITH THE ERECTION OF 132KV DOUBLE CIRCUIT TRANSMISSION LINES OVER AN AREA SPAN OF 18KM IN AFAM, RIVERS STATE
IN JANUARY, 2010, THE RIVERS STATE GOVERNMENT AWARDED THIS PROJECT TO THE CONSORTIUM COMPRISING TALEVERAS, SAIPEM AND ALSTOM AFTER CONDUCTING A STRICT DUE DILLIGENCE OF THE CONSORTIUMS' WORK REFERENCE.
RIVERS STATE GOVERNMENT
TOTAL STAFF: 55
JANUARY, 2010
ALSTOM WAS COMMISSIONED TO PUT UP THE POWER ISLAND BY SUPPLYING 180MW OPEN CYCLE GAS TURBINE(OCGT), SAIPEM HANDLED THE EPC WORK, WHILE TALEVERAS GROUP WAS RESPONSIBLE FOR THE EVACUATION PHASE. OUR STAGE INVOLVED THE EVACUATION OF POWER FROM ALSTOM OCGT PLANT IN AFAM
12 | TALEVERAS • Company profile
SUPERVISORY STAFF:5 TECHNICAL STAFF: 5 CLERICAL AND ADMINISTRATI VE STAFF: 15 UNSKILLED WORKERS:30
SECTOR INTRODUCTIONS
S/N
PROJECT TITLE
PROJECT DESCRIPTION
CLIENT
THIS INVOLVED THE CONSTRUCTION OF 2 LINE BAYS, 2 TRANSFORMER BAYS AND A COUPLER BUS TO POWER 2 NOS 60 MVA POWER TRANSFORMER WITH 6 NOS 33KV OUTGOING FEEDERS.
3
CONSTRUCTION OF SWITCHYARD AND ASSOCIATED TRANSMISSION LINES- RUMUOSI, RIVERS STATE.
TALEVERAS GROUP WAS CONTRACTED IN MARCH 2012 BY THE RIVERS STATE GOVERNMENT TO CONSTRUCT A 132/33KV SWITCHTARD AND ERECT HIGH VOLTAGE TRANSMISSION LINES OVER 28KM SPAN OF LAND IN RUMUOSI LOCATED IN RIVERS STATE. THEREFORE, CONSIDERING THE ON GOING STATUS OF THE PROJECT, TALEVERAS GROUP IS COORDINATING AND EXECUTING THE ENGINEERING DESIGNS AFTER CONDUCTING A DETAILED SITE SURVEY, PARTIALLY PROCURING THE HIGH VOLTAGE
EMPLOYED STAFF
AWARD DATE
UNSKILLED WORKERS:28
RIVERS STATE GOVERNMENT
TOTAL STAFF: 50
MARCH 2012
SUPERVISORY STAFF:6 TECHNICAL STAFF: 5 CLERICAL AND ADMINISTRATI VE STAFF: 15 UNSKILLED WORKERS:24
13 | TALEVERAS • Company profile
SECTOR INTRODUCTIONS
S/N
PROJECT TITLE
PROJECT DESCRIPTION
CLIENT
EMPLOYED STAFF
AWARD DATE
RIVERS STATE GOVERNMENT
TOTAL STAFF: 51
JUNE, 2010
TO PORT HARCOURT MAINS LOCATED IN TRANS AMADI. FOLLOWING THIS STAGE, WAS A FURTHER CONSTRUCTION OF DOUBLE CIRCUIT TRANSMISSION LINE OVER 18KM TO POWER UP THE TRANSMISSION STATION IN ELELENWO WHICH TALEVERAS GROUP WAS ALSO CONTRACTED TO EXECUTE. THIS PROJECT WAS COMPLETED IN 18MONTHS, A TURN AROUND TIME THAT HAD NEVER BEEN ACHIEVED IN STATE. 1ST SYNCHRONIZATION WAS 2
CONSTRUCTION OF 2 NOS 60MVA 132/33KV TRANSMISSION STATION IN ELELENWON, RIVERS STATE.
FOLLOWING THE SUCCESSFUL AND TIMELY COMPLETION OF PHASE 1 IN AFAM, THE RIVERS STATE GOVERNMENT AWARDED PHASE 2 TO TALEVERAS GROUP, WHICH WOULD BE TO CONSTRUCT 2 NOS 60MVA 132/33KV TRANSMISSION STATION IN ELELENWON.
14 | TALEVERAS • Company profile
SUPERVISORY STAFF:6 TECHNICAL STAFF: 5 CLERICAL AND ADMINISTRATI VE STAFF: 12
SECTOR INTRODUCTIONS
S/N
PROJECT TITLE
PROJECT DESCRIPTION
CLIENT
EMPLOYED STAFF
AWARD DATE
PHCN/NIPP
TOTAL STAFF: 50
2007
REINFORCE AFAM TRANSMISSION STATION AND ERECT A 330/132KV DOUBLEC CIRCUIT TRANSMISSION LINE AFAM III-IV 5
6
CONSTRUCTION OF 33/11KV AND 11/0.45KV INJECTION SUBSTATION AND ERECTION OF 33KV, 11KV & 0.415KV TRANSMISSION LINES; DEGEMA, ABONEMMA, RIVERS STATE.
CONSTRUCTION OF 33/11KV AND 11/0.45KV INJECTION SUBSTATION AND ERECTION OF 33KV, 11KV & 0.415KV TRANSMISSION LINES; DEGEMA, ABONEMMA, RIVERS STATE.
CONSTRUCTION OF 33/11KV AND 11/0.45KV INJECTION SUBSTATION AND ERECTION OF 33KV, 11KV &
CONSTRUCTION OF 33/11KV AND 11/0.45KV INJECTION SUBSTATION AND ERECTION OF 33KV, 11KV & 0.415KV TRANSMISSION LINES; OPOLO, SWALI, OVOM, GBARIAN BAYELSA STATE.
SUPERVISORY STAFF:6 TECHNICAL STAFF: 5 CLERICAL AND ADMINISTRATI VE STAFF: 15 UNSKILLED WORKERS:24
PHCN/NIPP
TOTAL STAFF: 50
2007
SUPERVISORY STAFF:6 TECHNICAL STAFF: 5 CLERICAL AND
15 | TALEVERAS • Company profile
SECTOR INTRODUCTIONS
S/N
PROJECT TITLE
PROJECT DESCRIPTION
CLIENT
EMPLOYED STAFF
AWARD DATE
PHCN/TCN
TOTAL STAFF: 60
2008
EQUIPMENTS AND INSTALLED THE EQUIPMENTS ACCORDING TO THE DESIGN AND PROJECT TIMELINE. OUR TURN AROUND TIME FOR TURNKEY ARE USUALLY 18MONTHS WHICH IS THE STANDARD WE UPHOLD 4
REINFORCEMENT OF AFAM TS WITH 1X150MVA,330/ 132/33KV TRANSFORMER AND CONSTRUCTION OF AFAM IV – AFAM III DOUBLE CIRCUIT 132KV LINE (LOT 2008 – 10)
TALEVERAS GROUP WAS AWARDED THIS PROJECT IN 2008 TO AUGMENT THE CURRENT TRANSMISSION CAPACITY IN THE AFAM AREA OF RIVERS STATE. AS ALSTOM IS SUCCESSFULLY RUNNING AFAM VI, PHCN THOUGHT IT BEST TO SEARCH FOR A COMPETENT TRANSMISSION CONTRACTOR THAT CAN INCREASE TRANSMISSION BY LEVERAGING ON AFAM III AND IV FRAMEWORK. THEREFORE WE WERE COMMISSIONED TO SUPPLY 1 NOS 150MVA TRANSFORMER TO
16 | TALEVERAS • Company profile
SUPERVISORY STAFF:5 TECHNICAL STAFF: 15 CLERICAL AND ADMINISTRATI VE STAFF: 10 UNSKILLED WORKERS:30
SECTOR INTRODUCTIONS
S/N
PROJECT TITLE
PROJECT DESCRIPTION
CLIENT
CONSTRUCTION OF 4X15MVA INJECTION SUBSTAION AT THREE(3) LOCATIONS IN ABUJA
AWARD DATE
ADMINISTRATIVE
0.415KV TRANSMISSION LINES; OPOLO, SWALI, OVOM, GBARIAN BAYELSA STATE.
7.
EMPLOYED STAFF
STAFF: 15 UNSKILLED WORKERS:24
CONSTRUCTION OF 2 INCOMING LINES TO POWER 4 NOS 15MVA 33/11KV TRANSFORMER WITH 24 NOS OF OUTGOING FEEDERS. BOTH 33KV AND 11KV SWITCHGEARS ARE SITUATED OUTDOOR.
PHCN
TOTAL STAFF: 50
2005
SUPERVISORY STAFF:6 TECHNICAL STAFF: 5 CLERICAL AND ADMINISTRATI VE STAFF: 15 UNSKILLED WORKERS:24
17 | TALEVERAS • Company profile
SECTOR INTRODUCTIONS
FINANCIAL STRENGTH AND STABILITY Current comapny Consolidated Global Turnover is presently in excess of USD$ 3 Billion and anticipated to increase in coming years. Taleveras intends to sustain this Growth pace by expanding it’s activities into new regions. Taleveras continues to maintain key relationships and enjoys a high level of co-operation with First Class Financial Institutions and Banks. A combination of Local and International Banking Relationship have yielded our desired results in the structuring of Taleveras Financial Standing.
18 | TALEVERAS • Company profile
SECTOR INTRODUCTIONS
Current Combined Bank Lines of Credit are in excess of $ 1.5 Billion Dollars. Consistent Profitability, improved operating cost in all sectors of activities and Proper Risk Management has continued to enhance our Financial Strength & Stability. Net assets growth is expected to increase in line with Taleveras plans to acquire and develop Infrastructural and operational assets to compliment our service Delivery efforts and promote a more diverse Income base.
“A Simple and Prudent Financial Model has worked for us, not to mention the tremendous level of support we receive from our Banks. Our banks have shown faith in us and how we manage our various portfolios”
- Oghens Sanomi | Chief Financial Officer
19 | TALEVERAS • Company profile
SECTOR INTRODUCTIONS
CONSTRUCTION As a company, Taleveras prides itself in its ability to inculcate the drive for development and welfare by providing professional Engineering Services to different parts of Sub-Saharan Africa, primarily Nigeria. This arm of our business was born in July 1998, with the incorporation of Dickens & Mabel International Ltd, a multi-disciplined Engineering construction firm. In 2004, this arm of our business was merged into Taleveras, as a Special Project Unit, still maintaining its brand and name. Through this arm we have consistently recorded achievements stemming partly from the urge to improve the most basic of needs which impacts on the immediate society such as: Construction of Roads & Bridges, provision of Quality Buildings, Upgrade of Hostels, Reconstruction of Educational Facilities in Colleges and
20 | TALEVERAS • Company profile
SECTOR INTRODUCTIONS
universities, Construction of Housing Estates and Provision of Town/City settlement Infrastructure. A few years later, the special projects unit evolved into two parts: Business development Team and Special Project Team. Our Business Development Team seeks for projects that are in line with overall Group objectives, while the Special Projects Team Monitor the projects from award stage to completion. Taleveras Team of Project Managers, Business Development Managers, Engineers and Surveyors are made up of young to middle aged professionals, with vibrant ideas, quality experience and energy. These managers are consistently engaged in: 1. The involvement in the initial stages of construction: feasibility studies in the design and development s t a g e , securing value by proffering engineering alternatives and the holistic evaluation of structural integrity issues. 2. Planning and coordination of construction activities as well as bespoke designing of deliverables to secure uninterrupted construction activities; thus eliminating any risk of construction delays. 3. The formation of formidable technical partnerships for synergy in project administration and supervision. Cost and quality control, Health, safety procedures and measures, all carried out to match international standards. 4. The use of up to date and modern technology including software. Subcontracting techniques and management procedures as well as competent, well trained and highly motivated team of experts; capable of carrying out high profile projects and providing customized services to suit any particular set of circumstances. Our client list ranges from Federal Government of Nigeria- Ministries and Institutions,State Governments, Major Oil Exploration and Production Companies within the Gulf of Guinea, Private Investors and Corporate Organizations
“One goal, one target, one result……perfection. This is our watch word” - Bola Emmanuel | Chief Operating Officer
21| TALEVERAS • Company profile
AT A GLANCE COMPANY DESCRIPTION
22 | TALEVERAS • Company profile
COMPANY DESCRIPTION
TALEVERAS AT A GLANCE
23 | TALEVERAS • Company profile
COMPANY DESCRIPTION
Abridged Profile of Subsidiaries
ENERGY TRADING Our inherent energy trading strategy is based upon our commitment to the continued growth and strengthening of our physical positions in the crude oil and petroleum product markets, with a long-term focus on enhancing our market share to become the leading player in West African energy trading. We recognize that our growth has been fertilized by our existing partnerships with major petroleum companies, and we aspire to continue developing valuable, long-term relationships with leading producers and refiners of crude oil and marketers of petroleum products. For us, diversification of our trading portfolio is vital to balance our product mix and maximize our efficiency and profitability. We invest in strategic assets that complement our existing trading business, and seek to grow our global footprint by expanding our operations into new, robust regions of the world, positioning the firm to take advantage of attractive conditions in the international energy marketplace. Fundamentally, we remain committed to conducting our business upon transparent financial and operational
24 | TALEVERAS • Company profile
COMPANY DESCRIPTION
platforms, thus augmenting our existing reputation as a reliable partner. We strive to operate responsibly with great respect for the natural environmental and the social welfare of the communities of our areas of operation. Taleveras' directors and senior managers leverage diverse international backgrounds and experiences to present a well-rounded team capable of executing successfully in energy markets around the world. The team has utilized acute market knowledge and long-standing relationships to grow the business into a well-recognized and respected energy firm. Our trade team draws upon many years of combined experience with Major refiners and niche trading companies to form an agile ability to exploiut arbitrage, optimize cargo values and competitively supply end-users. Our relationships around the world with refiners, blenders and other strategic suppliers and financial partners enable us to source the ideal product specifications, most efficient vessels and maximize cargo value.
25 | TALEVERAS • Company profile
COMPANY DESCRIPTION
TALEVERAS TEAM In Taleveras we are conscious that our level of success is highly dependent on thestrength of our team. And as such we pride ourselves on our continuous effort todevelop and nurture the social intelligence skills of each individual employee, which will enable them to constantly support each other through the use and contribution of their skills in the collective operation of the company. Consequently ensuring we ensue acompetitive footing in the present knowledge based global business market where individual perfection is not as desirable as a high level of collective performance. Over time, Taleveras has emerged into a colossal entity due to the creation of strategicteams for the purpose of developing business and efficiently executing construction and Power projects alongside oil trading activities. We are committed to working as a team with our partners to get the job done as quickly, inexpensively and efficiently as possible. We are a multidisciplinary, experienced and highly motivated group of individuals. At Taleveras, we deal with each other more as a family than team members. This instills a sense of solidarity, self worth, and responsibility with the way we execute our job, we strive for perfection and excellence.
26 | TALEVERAS • Company profile
Taleveras is our clock, we are a collection of cog wheels, and each of these cogs is a team of teeth, if there is one tooth on a single cog wheel that is defective then the combined effort of the whole team is compromised, so we endeavor to keep our teeth strong and sharp.
CSR Corporate Social Responsibility Taleveras Group has adopted a proactive rather than reactive stance inTour societal roles within our communities. We have a strong sense of responsibility on how we relate to the ills of our existing society. InTaleveras we have continued to contribute to areas of Animal Rights, Preservation, Sports, less privilege Societies, Health, Culture and social development. We also promote awareness of African Development and Integration.OurCompany supports the works of Organizations such as Lifeline, Food for One Million, Cercopan (a conservation NGO dedicated in conserving Nigeria Primates Through rehabilitation of orphans and Community Rainforest), IBMGIO, Rotary, Oxfam, Red Cross, and a host of other NGOs. This is a way of reaching out and impacting positively on our Earth and Life in General.
“At Taleveras, we are committed to a safer and friendlier environment. We care and always look for a means to impact positively on humanity and preserve life” - Eghogho Sanomi Executive Director Member, Board of Directors
27 | TALEVERAS • Company profile
QA ACTIVITIES Quality Assurance Quality Assurance (QA) activities for all projects occur at several levels but three distinct levels can be identified. Organizational or Programmatic Level At the organizational level, QA activities ensure that the program or organization is successful by overseeing the infrastructure necessary for individual projects in the program, and making sure programs have the resources they need to be successful. Project Level At the project level, QA activities support the success of an individual project by ensuring that accurate information is channeled to the right people at the right time so that decisions can be made during project implementation that are defensible and cost-effective. Technical Level At the technical level, QA activities ensure that the individual technical activities that generate, process, or synthesize data (or other information) for the decision process are performing within accepted limits. These activities are also commonly known as quality.
28 | TALEVERAS • Company profile
HSE POLICY Health, Safety & Environment Taleveras in fulfilling its legal obligation and its moral responsibility to provide a place of employment which is free from recognized hazards, having set forth this Statement of Policy reinforcing its commitment to maintaining a safe environment, both at the work site and in the community. This Statement of Policy is the cornerstone of the company's Health, Safetyand Environmental Management System (HSEMS). It is communicated openly and at every opportunity to employees, customers, vendors and subcontractors and has equal status with other primary business objectives. Violations of the policy should be immediately brought to the attention of management. The Company's philosophy is that, in the performance of our work, the health safety andwelfare of the people involved and the protection of assets and the environment are of primary concern. We believe that accidents are caused, and therefore, can be prevented. The safety and health of employees and subcontractors: Accident prevention and environmental protection is each operating units responsibility. Employees at all levels will be held responsible and accountable for preventing job related illnesses and injuries; equipment and environmental accidents through the diligent and consistent application of the company's HSEMS. Employee safety performance will be a major consideration in decisions affecting promotions, salary actions and continued employment.
29 | TALEVERAS • Company profile
Head Office 13b Katsina Ala Crescent Maitama, Abuja FCT, Nigeria Switch Board +234 9 6707957 Tel +234 9 8734885 Fax +234 9 2226043 London Office 23 Berkeley Square, W1j 6he, London, Uk Tel +44 203 178 6937 Fax +44 203 178 6938 Dubai Office Festival Tower, 19th Floor, Office No. 1933 Festival City, Dubai, PO box 36605 UAE Tel+971 4 293 2477 fax +971 4 293 2602 Cape Town Office LG Building, No 1 Thibault Square 28th Floor, Cape Town 8000 South Africa Tel+2721 425 4253/4 Fax +2721 425 4354
www.taleverasgroup.com
Copyright 2012 Š Taleveras Group