DESING & BUILD
P1
External wall with timber cladding ventilated façade
A = 96ʼ68 m2 /// M Total = 5703ʼ8 Kg M = 58ʼ81 kg/m2 /// U = 0ʼ21 W/m2K
P1
P2
EGO-CLT 80 (no visible) internal wall + plasterboard lining with service void
A = 44ʼ69 m2 /// M Total = 2131ʼ6 Kg M = 47ʼ697 kg/m2 /// U = 0ʼ97 W/m2K
P2
P3
EGO-CLT MIX 200 floor
A = 48ʼ95 m2 /// M Total = 13314ʼ52 Kg M = 272 kg/m2 /// U = 0ʼ27 W/m2K
P4
Inverted paved roof
A = 42ʼ62 m2 /// M Total = 2778ʼ82 Kg M = 65ʼ2 kg/m2 /// U = 0ʼ31 W/m2K
M1
+
M2 P3 P4
1. Wooden board or similar 2. Rastrel de alerce seccion 3. Impermeabilizacion con lámina EPDM 4. Rastrel de alerce 30x100 5. Lamas de alarce 20x100 6. Lamas de alarce 20x100 7. Canalon de aluminio
WALL 1. Madera de alarce 20 mm 2. Rastrel 28x38 mm 3. Lamina de la fassade 4. Rastrel 38x58 5. Fibra de madera 50 mm 6. Fibra de madera 80 mm 7. EGO-CLT 100 mm 8. Placa de yeso Laminada 12.5 ml 9. Placa de yeso Laminada 12.5 ml
ROOF 1. Solade de anhidrita 2. Placa separadora de platico 3. lana de roca 40mm 4. relleno 50mm 5. barrera vapor delta WS 6. EGO-CLT 134mm 7. Rastrel de madera 58x35mm 8. Fibra de madera 50 mm 9. Placa de yeso laminado 12.5
SECTION B -B’
FLOOR 1. Tabla 20x140mm 2. Tabla 3ox140mm 3. Montante 60x100mm 4. Fibra de madera 100mm
ARCHITECTURAL PLAN 1 2 3 4 5
21 ST DECEMBER SHADOW 12:00 HRS 23º
-LIVING ROOM - DINNING ROOM -K I T C H E N -B AT H R O O M -B E D R O O M
SOUTH FACADE
21 ST SEPTEMBER SHADOW 12:00 HRS 48º 21 ST JUNE SHADOW 16:00 HRS 73º
Solar panels and photovoltaic cells to bring energy to the refuge
21 ST JUNE 16:00 HRS - 73º
RAINWATER HARVESTING
21 ST SEP 12:00 HRS - 48º
21 ST DEC 12:00 HRS - 23º
COOLING OR HEATING BY AIR CONVECTION
SECCION A - A’
SECCION B - B’
AGNIESZKA ANDRZEJEWSKA / CLÉMENT LARDON / GONZALO ALVITE / JULIÁN TEJEDA