OUR OCCUPIER EXPERIENCE

INDUSTRIAL | COMMERCIAL | RETAIL | HOTEL | LATER LIVING | OCCUPIER | INFRASTRUCTURE | LIFE SCIENCES | EDUCATION

1.

OVERVIEW OF GOODRICH

FOR OVER 30 YEARS, GOODRICH CONSULTING HAS BEEN DELIVERING EXCEPTIONAL CONSTRUCTION CONSULTANCY TO CLIENTS ACROSS THE UK

Founded in 1992, the company has grown from strength to strength, seeing the team expand at its Northampton headquarters, and more recently the acquisition of a Birmingham and Bristol office. The owner-managed firm is led by six Partners, supported by an experienced team of project managers, project surveyors, building surveyors, and technical administrators.

For us, our team is what sets us apart, alongside our commitment to delivering an outstanding service on every project we work on. With expertise from both client and contractor backgrounds, our workforce ranges in experience levels which enables us to fit the right team for your job.

We aim to provide our clients with dedicated experts to support the smooth and successful delivery of your vision, from conception to completion and beyond, through the following core service lines:

• Project Management

• Employer’s Agent

• Quantity Surveying

• Building Consultancy

• Principal Designer

Reliability and flexibility are key to any successful project, which is why we adopt a forwardthinking, proactive approach to our work, supported by our industry knowledge, ongoing research and benchmarking of current market trends.

In addition to our core services noted above, we also offer the following supplemental services:

• Life Cycle Assessments / Costing

• Clerk of Works, or Quality Monitoring

• Fund Monitoring

• Facilities and Property Management

We are proud to have developed strong repeat partnerships with our clients, some of which span over the 30 years we have been in business. Our enviable position as experts within industrial, commercial, and education sectors has enabled our entry into new areas such as retail, later living, infrastructure, hotel, and occupier fit-out. Our people and portfolio of work allow us to provide invaluable insight across a variety of industry sectors.

2. OUR CORE OFFERING

Project Management

We have an incredibly strong team of experienced project managers, who are responsible for the successful delivery of your construction project. Working closely with our clients, the team are well equipped to organise, control, and monitor ongoing construction operations. In addition to our project management team, we have a strong and capable technical administration department, which ensures all crucial paperwork is completed. We pride ourselves on the hands-on leadership and guidance we offer, from pre-commencement to completion.

Quantity Surveying

The quantity surveying team’s strengths lie in their diverse backgrounds within client organisations, professional practice and contracting. This breadth of exposure enables us to offer broad skillsets and experience on all projects across our sectors.

Our technical administration department provides additional support to the surveying team, ensuring the work produced is issued promptly and of the highest quality.

With our team’s collective industry expertise, combined with a wealth of benchmarking data we acquire from our live projects, we can provide our clients with recommendations that accurately align with the changing business landscape.

In addition, we have access to RICS Membership, BCIS data, CostX measurement software and JCT online, whilst actively supporting quantity surveying apprenticeships with Nottingham Trent University, allowing us to continue onboarding new talent for the future of construction.

Employer’s Agent

As employer’s agent, we ensure the project is structured correctly and that the investment value of the scheme is protected. As well as representing our client, we will administer the contract and complete all appointments, warranties, and other key legal documents, alongside organising, chairing, and recording meetings / key events.

We are there to support, advise and organise our clients. Depending on the requirement the role will be fulfilled by one of our senior project managers or project surveyors, with backup support from the wider technical team.

Principal Designer

As a business, we have invested heavily in training key members of the project management team as principal designers. As members of the APS, Association for Project Safety, we are competent in influencing how risks to health and safety are managed throughout the project.

When appointed as project managers on a scheme, we can extend our appointment to include principal designers where required.

Building Consultancy

The breadth of experience within our professional team means that we have worked across all property sectors, which allows us to provide our clients with detailed and reliable advice across the full property life cycle.

We understand our client’s requirements, working seamlessly to provide proactive advice on a range of technical issues, including acquisition surveys and fund monitoring reporting, technical due diligence, landlord and tenant dilapidations claims, planned preventative maintenance, party wall matters, together with building refurbishment and fit out project management and contract administration services for projects of all shapes and sizes.

It is our professional team’s experience, knowledge, understanding and logical, lateral thinking that affords us the ability to provide the accurate, timely and focused advice our clients expect.

WE UNDERSTAND OUR CLIENT’S REQUIREMENTS, WORKING SEAMLESSLY TO PROVIDE PROACTIVE ADVICE ON A RANGE OF TECHNICAL ISSUES

Data Analysis

Our team regularly extract cost information from our current projects based on the contract data, which allows us to highlight trends and gain a clearer picture of projections and averages based on £sq. ft GIA, and provide a percentage breakdown of costs based on the different elements of the build.

With around 8 million sq. ft analysed so far and a combined job value of £0.5 billion, we have provided cost advice on a wide variety of building types ranging from £100k to £100m, and everything in between.

This insight helps our precision with cost analysis by using the real-time data we harvest.

Q3 2022
WITH THE BUSINESS LANDSCAPE CONSTANTLY CHANGING, WE UNDERSTAND THE IMPORTANCE OF PROVIDING OUR CLIENTS WITH ACCURATE COST PROJECTIONS

ADDITIONAL SERVICES

Life Cycle Assessments / Costing

Life-Cycle Costing (LCC) and Life-Cycle Assessment (LCA) is the analysis of the potential environmental impacts of our building elements during their life cycle. LCA and LCC are rapidly becoming the standard method for the long-term cost appraisal of buildings and civil infrastructure projects. Demonstrating the value for money and environmental impact over the long term is an essential tool our team can offer for those involved in the design, construction, operation, and risk analysis of construction projects.

Quality Monitoring

We recognise the importance of quality when it comes to building. That’s why we have a mix of experts, many with building surveying and on-site backgrounds, who are placed to provide a constructive view on the quality and appropriateness of your built asset as the works progress.

Fund Monitoring

We have provided fund monitoring services to Barwood Capital, NatWest, Octopus and Handelsbanken for a variety of building projects. We are practical and realistic, providing guidance and advice as the project progresses from the agreement of funding through to completion.

Facilities and Property Management

We can care for your asset as part of our facilities and property management services, in a way that suits your business.

Covering all services from a soft-landing handover to operators and occupiers, management and provision of all hard and soft facilities services to the asset and occupiers, management of all operational health and safety compliance, budget and financial management, and reactive services management.

Our consultative services available include property operating budgets, services charge advice, operating lifecycle plans and operational best practice advice.

3.

OUR CLIENTS 4.

5. Environmental Social Governance

At Goodrich, we realise that we need to be strategic about our social responsibility and raise awareness of our individual and collective impact on the planet.

By being a part of Planet Mark and collating key data on our business, we can access invaluable insight to understand the effect of our carbon footprint and identify critical areas where we can make improvements. From the knowledge we gain, we can make decisions that positively influence our future actions allowing continuous improvements to be made across the business and within our community.

As a company, we are working hard to reduce our footprint, because we know it’s the right thing to do. Our aim is to continue to take proactive steps forward to drive a positive change for both our planet and society to help build a brighter future for all.

Our social value is measured across three main categories:

Our People

Developing skills for the future, equality, health, safety & wellbeing

Our Planet

Climate change, land use, nature loss, freshwater availability

Prosperity

Innovation, employment generation, community, and social vitality

Over the next year as we grow and develop as a business, we have targeted ourselves to work towards achieving a 5% reduction in our total and individual carbon footprint.

Our teams have also been tasked with suggesting ideas to support local communities, schools and charities, and so far, we have managed to donate over £7,000 to worthy causes across the country.

Total carbon footprint 75.3 tCO2e Total carbon reduction 5% 3.8 tCO2e Carbon reduction per employee 5% 0.2 tCO2e
*tCO2e – tonnes (t) of carbon dioxide (CO2) equivalent (e)
AS A COMPANY, WE ARE WORKING HARD TO REDUCE OUR CARBON FOOTPRINT, BECAUSE WE KNOW IT’S THE RIGHT THING TO DO

6.

Sector overview

Occupier Sector

Customer requirements and operational needs can change over time, and therefore buildings may require a fit-out to meet the new needs of their occupier. We have successfully delivered ‘full turnkey’ projects for our clients due to our flexible approach and understanding of programme and budget constraints that may be associated.

We work closely with the occupier to establish project deliverables and key milestones to be achieved, whilst working collaboratively with the wider team to maximise the area available to ensure it fulfils the brief.

CASE STUDY

Project Name:

Client Name:

Project Details:

Project Malbec, Andover Business Park

Goodman

Design and construction of a 115,000 sq ft warehouse unit together with a 2,500 sq ft single-storey office, associated external works to include hard standings, car parking, road, landscaping and drainage.

Project Postcode:

Project Value:

Contract Duration:

Key Facts:

Plot 7, Andover Business Park, Monxton Road, Andover, SP11 8HT

£10 million

44 weeks

• Base build and full fit-out to suit specific tenant requirements

• The build includes a bespoke fine wine storage facility, with specialist temperature and humidity-controlled equipment

CASE STUDY

Project Name:

Client Name:

Project Details:

Project Address:

Project Value:

Contract Duration:

Key Facts:

LG Electronics, Leighton Buzzard

LG Electronics Ltd

Fit-Out works to Unit 4 for LG Electronics UK Ltd

Grovebury Road, Leighton Buzzard

£609,000

8 weeks

LG Electronics Ltd had a lease event within their existing building in Milton Keynes. Operationally their warranty and repair facility had out grown their existing building.

Having secured a pre-let on a new building in Leighton Buzzard, LG needed a rapid fit-out of the new building to provide a turnkey solution to allow operations to be moved over a single weekend to limit impact.

LG did not want to hold over their lease in the existing building, so a fixed completion date was set for a rapid fit-out of the new building.

LG Electronics successfully relocated on time, in budget and exited their existing building lease on time.

CASE STUDY

Project Name:

Client Name:

Project Details:

Project Address:

Project Value:

Contract Duration:

Key Facts:

Project Tesla

SEGRO plc / Ball Engineering

Full turnkey construction of a new 660,000 sq ft building to operate as a can making facility for Ball

Maynard Road, Burton Latimer, Northampton NN15 5ZS

£51 million

63 weeks

▪ The building is split into four distinct areas which are the offices, the production hall, the storage area and the technical rooms. There are detailed / complex M&E installations throughout the manufacturing hall

▪ EPC A rated

▪ Close working with the occupier was required to provide infrastructure for their plant install machinery

▪ 15 staged early access dates helped the occupier maintain the go live programme. Goodrich managed over £8 million worth of change requests for this project

▪ The technical rooms act to support the 24-hour can production operation and house equipment, spares and supplies

▪ Within the building there are a number of ATEX rated rooms that hold flammable liquids and specialist trenches and sumps to collect and hold liquid spillages

CASE STUDY

Project Name:

Client Name:

Project Details:

Project Address:

Project Value:

Contract Duration:

Key Facts:

Southern Hub, Poyle

DHL Express

New 142,350 sq ft DHL Express Headquarters and Parcel Sortation Hub with integral offices

Southern Hub, Unit 1 Horton Rd, Colnbrook, Slough SL3 0BB

£19 million

47 weeks

• Works involved the demolition and remediation of existing buildings

• Solar PV panels to the roof to align with DHL’s ‘go green’ strategy

• Full fit-out of offices, external service yard areas i.e. fuel islands, vehicle wash facilities

• BREEAM ‘Excellent’ and EPC ‘A’

CASE STUDY

Project Name:

Client Name:

Project Details:

Project Address:

Project Value:

Contract Duration:

Key Facts:

Residential Care Home and Extra Care Apartments, Shipston-on-Stour

Taylor & Taylor Shires

Design and construction of a new 70-bedroom care home and 11 Extra Care apartments

Tilemans Lane, Shipston-on-Stour

£6.4 million

70 weeks

• The care home consists of a first-floor dementia unit and two separate extra care apartment blocks

• We carried out an extensive cost exercise to come up with cost-effective solutions to bring the inherited unaffordable proposal down in cost, saving our client 12% and allowing the development to go live

• The main features of the care home include a cinema room, a fine dining area, a spacious bar, and an activity room for knitting, arts and crafts etc. Residents at the care home also have an external raised terrace area for extra space

• The project has been completed to the highest standard without compromise

CASE STUDY

Project Name:

Client Name:

Project Details:

Bedford Girls’ School, Sixth Form Common Room and Café Refurbishment Project

The Harpur Trust

The spaces were converted back in 2005 and were in need of a refresh as the common room had slowly developed into an uninspiring corridor. The area itself felt dark with a miss match of furniture and fittings, and little connection to the inner garden courtyard. The café was underutilised due to a lack of cooking facilities, with students preferring to use local shops for lunch. We developed the brief with the school with these key design drivers in mind

Project Address:

Project Value:

Contract Duration:

Key Facts:

Cardington Road, Bedford

We had a strict project limit of £550,000 including fees, planning costs, equipment, furniture, building works and VAT

We had the 6 weeks during the summer break to deliver the scheme

The post-pandemic economy was a serious consideration on this scheme, and the team had concerns about furniture and equipment availability, along with contractor interest and availability. Therefore, we brought in specialist furniture and catering advisors and recommended early contractor involvement from October 2021. We also advised on placing orders for the furniture, café servery, equipment and bifold doors at the earliest opportunity. The sector demanded negotiation, and the school managed to gain agreement from the charity board. Securing this flexibility was a key decision in the successful delivery of this scheme.

A short delivery programme is always a key consideration on school projects, so we arranged for the asbestos, structural and services inspections during the half-term break.

One of the most important aspects was that the project cost was immovable on this scheme and therefore our estimating, contractor negotiation and postcontract cost control had to be accurate. Due to our team’s efforts, the project came in just under budget and, most importantly, met the client’s brief fully.

“I like working with professionals like Goodrich Consulting. The project was very well managed.”
Hodgkin Bursar

DAVID BRIDGES

Position: Associate Project Manager

Qualifications: BA (Hons) MSc MRICS

David is a chartered Building Surveyor with over 11 years’ experience. In his previous role he led the Southwest Building Consultancy team for LSH, advising both public and private sector clients throughout the property life cycle. He joined Goodrich in April 2022 to support business activity in the Southwest and beyond. David has extensive experience in the delivery of complex, multi-stakeholder refurbishment and new build projects across a broad range of property types.

Project Details

Tungsten Properties

Whitney Phase 3

Tungsten Park, Witney is an award winning multi-let industrial estate to the West of Witney town centre. David is acting as project manager for the third phase of the development. The site extends to 9 acres and offers a variety of unit sizes ranging from 23,500 sq ft to 74,000 sq ft.

The scheme is a speculative development being constructed to achieve BREEAM ‘Excellent’ sustainability credentials and is due to complete in March 2023.

Bloombridge, Bicester Gateway

As project manager on this scheme, David is working alongside Bloombridge Development Partners on 12 ‘Knowledge Economy’ units in Use Class E totalling 161,157 sq ft.

Currently in the pre-contract stage, specific features of the building will include enhanced elevational treatments, increased power supply, planning for flues/louvres to be obtained with the base build application, a higher percentage of base build office space, a roof level plant deck with capacity for Cat B plant to suit a laboratory occupier and will achieve a BREEAM ‘Excellent’ rating.

Peel Ports, Project Finsa

David is acting as project manager on this development which comprises a quay side warehouse and trade counter facility, with a separate office and showroom constructed entirely in Compressed Laminate Timber (CLT), which is to be constructed for Finsa UK, commencing on site in June 2023 for an anticipated 32 weeks at 169,230 sq ft

He will be overseeing the demolition of three buildings on the site, licensed asbestos removal works, and the decommissioning of two sub-stations within the existing buildings, which also serve neighbouring properties.

The office/showroom design will accommodate the unloading of materials from the quay via a crane. The site investigations are to include a Lidar scan and dive survey of the quay wall. Berthing and anchorage load requirements are to be accommodated in the new development.

BRIAN GOTCH

Position: Senior Project Surveyor

With over 40 years’ experience in the industry, of which the last 8 have been with Goodrich, some of the industrial projects Brian has worked on are listed below. In the previous 25 years with Gotch Saunders & Surridge (GSS Architecture) as Associate and Partner, Brian was involved in the Project Management and Quantity Surveying of numerous education projects for Nursery, Primary, Secondary, College and University Clients in the Public, Independent, Private and Academy sectors.

Brian is used to dealing with both Clients and Contractors at all levels.

Project Details

Equation Properties, Verda Park, South Oxfordshire

Brian acted as Project Surveyor on this project which involved the design and construction of three terraced warehouses providing twelve, one storey warehouses with a clear height to the underside of haunch of 9m for the 100 and 200 Units, and 12m for the 300 Units, together with associated car parking, service yards, drainage, landscaping and incoming services. The units vary from 4,800 sq. ft. to 49,000 sq ft. Total 147,000 sq ft. Works were on site for 40 weeks and the development reached BREEAM ‘Excellent’ and Net Zero Carbon.

This project comprised the fit-out of an 800,000 sq ft warehouse, office, separate vehicle maintenance unit, dekit building, HGV wash and weigh station, with Brian as Project Surveyor for the 35-week duration.

The development consisted of 64 dock bays, a freezer box of 80,000 sq ft, chill marshall, offices, restaurant and other welfare and office amenities; respecting the diverse workforce and the health and wellbeing of all employees.

Tungsten Properties, Bardon Road, Coalville

Brian was the Project Surveyor on this multi-unit industrial development on Bardon Road, Coalville, Leicestershire for Tungsten Properties. The project comprised four separate blockscontainingfiveindividualunits,allcontainingoffices. Together the units totalled 187,752 sq ft as base build and 191,320 sq ft including the Winbro fit-out scheme. Works completed after 60 weeks and achieved a BREEAM rating of ‘Very Good’

Northampton Borough Council, St Michaels MSCP, Northampton

Brian provided all pre and post contract QS services for the construction of the St Michaels MSCP with 464 car parking spaces and refurbishment of the existing 1073 space Mayorhold Car Park in Northampton. Refurbishment works included scabbling of damaged concrete, cleaning and treatment of reinforcement, application of resin concrete repair and waterproofing of the final surface.

Coop, Project Gray, Biggleswade