OMAIR SPORTS FLOORING PROPOSAL
JOGGING/RUNNING TRACK Jogging Track/ Running Track as propose The system is durable and best for outdoor conditions resistance, in comparison to other sports surface, Acrylic surfaces are very durable and require a little maintaince.Using the SBR granule with PU binder gives a best cushion and comfort to the runner/walker with safety and injury less and it is very easy to maintain, Acrylic surface is Environment Friendly Sports Surface, For the long life span some precaution must be taken by the track keepers and should have to aware the users have to follow the points. Acrylic sports surfaces are highly durable with life span of 10 years plus. But it has to be well maintained.To list some 1. Restrict non intended activities like “ biking,eating food, placing pointed chairs etc in playing area of the court. 2. No drinks/Fluids should be allowed on the court. Spilled liquid will permanently stain the surface. 3. Floor should be cleaned with smooth sweepers/cleaning machines. Care should be taken to clean the surface with a maximum 2000 psi pressure washer using a 40 deg water jet angle. 4. Make Periodical inspection of the courts to identify defects/problems. 5. Any cracks /dents founds should be immediately addressed. 6. Re-coloring of the court periodically. Suggested every 3rd year. Basic cleaning will go long run way in preventing premature wear and staining of the court surface. Regular cleaning of the Court, Remove foreign materials, Drain out rain water, Acrylic coating do not support fungus growth, so the growth of the fungus is a result from food and drink spills, decaying matter or other foreign material on surface. SBR+ACRYLIC System solution is for a wear-resistant, impermeable, soft cushioned lining track that could withstand ladies shoe heels, drinks (such as coffee, sodas) and general wastes of a public area. Application took place in following steps: Sports Jogging Track – Jogging Total Thickness 13-15mm 2-Layer Elastic Seamless Jogging Track Flooring of 11mm total thickness It consists of a shock-pad base-layer of 11mm of SBR Granules mixed with MDI PU Binder. Second layer of flexible PU pore-filler followed by UV resistant aliphatic top-coat. 1.0 Build-Up Subbase of fully cured (at least 28 days) asphalt or concrete free of any dirt or spillage, that might prevent bonding of the rubber to the asphalt. PU Primer PP1000 applied by roller on top of the subbase. SBR layer consisting of SBR1030 (granules of 1mm – 3mm size) mixed with PU Binder PB3300 installed by paving machine at 10mm thickness. Pore-Filler layer,
OMAIR SPORTS FLOORING PROPOSAL
consisting of 3-component pore-filler PV3555 (red colour) applied with metal trowel to create a nonporous layer of 1-2mm thickness. UV-Protection layer consisting of UV stable aliphatic protective top-coating PP7000 applied in 2 coats by airless spray or roller. Optionally, silica sand can be added to the first coating to avoid a slippery surface during wetness. Despite very challenging conditions with very high humidity (85%) and temperatures (44°C) during the application the team performed well and the the project was finished within the timetable and the joggers are extremely satisfied with the new cushioned surface after the completion of track. TOPCOAT SEALER SBR + PU BINDER PRIMER COAT CONCRETE BASE
Following are the References for the outdoor Acrylic jogging Track
JUMEIRAH BEACH RUNNING TRACK
OMAIR SPORTS FLOORING PROPOSAL
PALM JUMEIRAH RUNNING TRACK: AL ITTIHAD PARK
AL BARSHA POND PARK RUNNING TRACK
AL BARSHA POND PARK RUNNING TRACK
OMAIR SPORTS FLOORING PROPOSAL
AL NAHDA POND PARK JOGGING
MAMZAR BEACH RUNNING TRACK