Operational guidelines for non reimbursable technical cooperation

Page 1

Operational Guidelines for Non-Reimbursable Technical Cooperation GN-2629-1


Working Group Composition and Scope •

The recommendations herein contained supersede:

Proposal to Establish a new Platform for Knowledge and Capacity Building Products (GN2549), Interim Operational Guidelines for technical cooperation to finance Knowledge and Capacity Building Products (KCPs) and Operational Inputs (OIs) (OP385-2).

This proposal presents findings and recommendations by the Working Group created to improve the approach of the Bank’s TC; the Working Group was coordinated by SPD and included TC users from COFs and Headquarters.

A Consultative Group formed by all Country Representatives (26), all VPS and VPP Sector Division Chiefs also validated the Working Group findings at different stages of the discussion.

Management will present to the Board for approval a Procurement Policy for the contracting of TC consulting services by the Bank.


Principles of the Recommendations BEFORE

AFTER

Taxonomy

4 KCP categories + Operational Inputs

3 categories

Strategic Financing

Ad-hoc committees with limited accountability

Bank-wide committees with strategic and eligibility decisions published internally

Programming

No programming

Annual programming + rolling process

Approval

4 approval processes for KCPs + Operational Inputs

Single approval process for all TCs

Review

Lack of standardized criteria

Standardized checklist approach

Execution

Automatic extension and complex fiduciary management

No automatic extensions, simplified fiduciary management

Monitoring and Evaluation

Lack of compliance, focus on financial performance

Single monitoring system for all TCs focused on results


Taxonomy of Bank Products and Technical Cooperation Technical Cooperation

1

2

3

4

5

6

Loans/ Guarantees

Grants

Operational Support

Client Support

Research and Dissemination

Corporate Input Products

Origination

Purpose

Dema nd-dri ven

Investment + Policy Reform + Technical Assistance

DTF

Ba nk-dri ven

Ca pa ci ty bui l di ng + Knowl edge cre a ti on a nd di s s emi na ti on

Funding

OC + FSO

Beneficiaries

Publ i c a nd pri va te s ector cl i ents i n borrowi ng member countri es

Knowl edge cre a ti on a nd di s s emi na ti on

Net Income + DTF + Admi ni s tra ti ve Budget

Publ i c a nd pri va te s ector cl i ents i n borrowi ng member countri es + Externa l a udi ences + the Ba nk


Governance of Technical Committees for Funds Role • Strategic direction and reporting of results • Eligibility review of individual proposals • Quality review as part of the QRR Composition • Standard composition for all OC-Special Programs and parallel Multidonor trust funds • Sector Managers – Chair, Representative, VPS and VPP Division Chief, ORP, GCM, VPC and VPP Managers.


Programming and Approval 1

2

3

4

Annual and rolling basis programming in official lists

TC Abstract for identification of funding source

QRR for TC Plan of Operations or Annex

Certification of funds

• CPDs • RD Programmin g Document • OPR

Submitted by team leader to GCM

Checklists by selected units for minimum required standards

Approval according to corresponding delegation of authority


Monitoring and evaluation system •

Single system for systematic reporting on TC progress: •

Basic information on the TC type

Focused on tracking activities and outputs.

All TCs, regardless of the source of funding, report once a year.

TC completion report: •

Required to close the TC.

Final monitoring report with an additional information on activities and outputs.

Generated by the TC monitoring system.

Selective TC evaluation at project, sector or country level. •

Sample of TCs selected within each fund (single, multi-donor and Special Program).

Evaluation based on funds results frameworks (multi-donor funds or special programs).

Criteria for evaluation: timeliness and pertinence (OS TCs ); usefulness and value added (OS TCs ); and pertinence in providing knowledge in areas where gaps have been identified (RD TCs) .


Document Structure • TC Abstract (2 to 3 pages) - IDBDocs # 36279458      

Objective and Justification Description of activities Indicative Budget Execution Agency and structure Risks and issues ESG classification

• TC Document (7 pages) - IDBDocs # 36279477  If OS TC: Description of associated Loan/Guarantee  Objective and justification  Description of activities/components and budget 

Results matrix

Budget

Monitoring Arrangements

Audit/evaluation reports

   

Execution Risks and issues Exceptions to Bank policy ESG Strategy

Annexes: 1. 2. 3. 4.

Letter of Request/Portfolio Review Aide Memoire/CPD TORs QRR Checklists Procurement Plan


Processing TCs as of September 15th 2011: Processing the TC Abstract 1. Registration OPUS - Register the TCs programmed annually in CPDs (CS-TCs and OS-TCs), RD Programming Document (RD TCS) or Operational Program Report (Regional TCs). 1 GCMCountry Department |GCMSector Focal Points

2. Authorization of Abstract

OPUS - Fill required information, generating “ Basic Information for TC Abstract”and follow table of contents for TC Abstract. IDBDocs - Save TC Abstract, relating documents to TC number. Project Team Leader (PTL)

OPUS - Authorize TC draft as INVENTORY. PTLDiv ision Chief |Unit Chief | Manager or Country Representativ e or Regional Manager(s)

Single windowSend TC abstract PTL

3. Funds Assignment

OPUS - Enter fund assignment and amount.

Request attorney assignment from LEG/SGO or LEG/NSG.

GCM

PTL

TC Eligible and with Funds Assigned Funds


TC Document Review and Approval 4. Technical Review Convene and chair QRR/ERM (virtual or physical) for review of TC Document. QRR distribution list should include: VPC, VPS, VPP, FIN, PDP, GCM, LEG, SPD, ESG & assigned GCM fund manager with copy to OPC2

Prepare TC document PTL

Additional peer reviewers may be appointed by chair in special cases. Clear TC Document and reflect comments in QRR minutes.

5. Final Approval

PTLDivision Chief |Unit Chief or Manager or Country Representative

Prepare and send final TC Package to GCM for “ Certification of Funds”by GCM Division Chief. PTL

Certify availability of corresponding funds 3. OPUS and LMS - Process approval. GCMDivision Chief



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.