The Dispatch October 2021

Page 8

Members of the Freeport, Texas team

Watco Teams Begin Performing Operations at Texas Locations After signing an agreement in July of 2020,

The Freeport, Texas, facility is located on the

Watco acquired the rail infrastructure assets

coast just south of Houston, and Watco team

and related equipment of Dow Inc. at six

members began self-servicing the facility on

major North American sites. These operations

July 1. Freeport is the largest of the sites with

sit under Watco’s Division 5 management

91 team members. The Freeport facility

group, whose specialty is switching

includes 76 miles of track and the team

operations. When Watco acquired the assets,

provides services to six customers at the

a third-party contractor was handing the

location. There are a total of 10 locomotives and

rail-related operations, but recently Watco

three trackmobiles dedicated to Freeport.

team members began performing those duties at two of the locations. Services provided at the facilities include switching railcars, washing polyethylene rail cars, track maintenance through a third-party contractor, and shipment scheduling assistance.

8 The Dispatch | October 2021

A two-hour drive southwest down the Gulf Coast from Freeport will land you at another Texas location in Seadrift. This facility saw 68 new team members join the team when they began performed operations at the site on September 1. The Seadrift site has 35 miles of


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.