2019
2018 2017
2016
2015
2014
2013
2012
2011
2010
ONKAR. GURUNATH . SAWANT A R C H I T E C T U R E
1993
L I F E L I N E
ARCHITECTURE
RESEARCH
DESIGN
A C H I E V E M E N T S
2018
B O A R D
2017
EDIFICE Pvt. Ltd.
Architect
Jr. ArchitectDec 2014- Jan 2016
Academic Carrer
2016
2015
Personal Details TATA Tiscon
Mind spark
Gender
Male
-Part of Interior Design Team
Nationality
Indian
Stood 2nd runner up in for G re e n To w n s h i p D e s i g n competition 2013-14.
Religion
Hindu-Maratha
Date of Birth
30th April 1993
-Green Township Design , Pune.
- Developer Vertical : Residential Apartment. Conceptual Design 3d Modeling Various Presentations
N.A.S.A Landscape Trophy
Real Estate Office,Mumbai
NIMBUS , NIT Hamirpur C.O.E.P Mindspark 2013-14 -Transforming to the modern.
Mindspark
-An Initiative by the students of Academy of Architecture to provide a support for those interested in various national and international competitions,
Language Proficiency Spoken and Written
-Container Housing
Brook Bond Taza Product Design
Won 1st prize for Green Building Design @Mindspark in next consecutive year 2012-13.
C.O.E.P Mindspark 2012-13
2013
Won 1st prize in designing the ‘ChaiChopal’ for village at U.P organized by ‘Brooke Bond Taaza’.
Credentials
-Corporate Green Design
Ethos Transparence 2012-13
Managing Qualities Dedicated Passionate Sincere Independent
-Part of Interior Design Team
T.A.T.A Tiscon Housing Comp.
Co-founded DAC (Design Architecture Committee)
My keen interest lies in integrating ideas and my skills to make the design intent achievable.
-Internship Period (Dec 2014Jan 2015) -Low Cost Housing Competition.
2014
To assimilate the coalescence of design with structure, participation and to explore the opportunities of rational and irrational design in architecture
- Hospitality Vertical : Hotel Group Taj Rishikesh. Site Execution Drawings Project Co-ordination
Bachelor of Architecture Mumbai University Secured 1st Class
My Objective
E D I F I C E Pvt. Ltd. -Jr. Architect (Aug 2015Jan 2016)
- The Issue on abandoned stone quarry lands. -Its Future use.
About Me Onkar Gurunath Sawant
Work Experience
Santulan NGO Pune. Researcher (Jan 2016May 2016)
Bachelors of Architecture -1st Class
Name
Architecture Competitions
Gandhi Samaj @Gujarat -Building Facade Design
Life Insurance Corporation -Associate Project Designer -Interior Planning.
-Club House @Ludhiana
N.A.S.A Landscape Trophy
English
-Reviving the past
2012
Hindi Mindspark Won 1st prize for Utopian Design Competition held by COEP(College Of Engineering Pune)
Marathi
C.O.E.P Mindspark 2011-12
Mindspark
-Green Building Design -Utopia Urban Design
Won Special Mention for Green Building Design @ Mindspark in 2011-12.
Brook Bond Taza. -Chai Choupal Design @ U.P
2011
N.A.S.A Landscape Trophy
Other field of Interest
-Public Promenade design
Sports, Traveling, Documenting, Sketching, Research, Writings and Critics, Theater plays.
Outstanding Academic awards.
Architecture project Guild Gallery
-Part of Interior Design Team
Selection of 1st year Architectural Design Project (Musical Painting Machine) in the list of Special Architectural invasion and presenting it under the name of ‘Architecture And Temporal Spaces’ at the Guild Art gallery, Mumbai Curated by ‘Prayas Abhinav’ on 26th July 2011.
E X T R A - C U R R I C U L U M
Sports Secretary
Architects Premier League
Awarded as a Best Sports Sec. for consecutive two year.(2012-14)
Part of the Team Dynamites (2012-2015)
Initiatives in Academic Sports Successfully leaded team for wining memories(2010-2015)
2010
A C T I V I T I E S
Maharashtra State Board (09-10) Stream : Science Secured 80%
2008
Initiatives in Extra curriculum Participation in various nonacademic events
B.ARCH. Program @ Rachana Sansad’s Academy Of Architecture, Mumbai. Higher Secondary Certificate
1997
1993
Sports / Interests. Thane Cricket Assosiation. -Played cricket for Surve Sports Academy Thane, Maharashtra.
Sea Cadet Corps, Mumbai
Secondary School Certificate
-Cadet Training @ Training Ship Jawahar, Mumbai.
Maharashtra State Board (07-08) Secured 86%
Musical Career
Started schooling JVM’S New English School, Kalwa.
Born , Mumbai, India.
-Skilled trained for playing Tabla. -Member of ‘Akheel Bharatiya Gandharva Mahavidhya Mandal.
about
Professional Soft Skills
ResuME Ar. ONKAR SAWANT
Autodesk Autocad Autodesk Revit Architecture Sketchup CorelDraw Adobe Photoshop Adobe Illustrator Adobe In-design Microsoft Office Lumion Renders
A rc h i t e c t I R e s e a rc h e r
Contact Mob. no. +91-9969776858 /+91-9869861413
Availability :
Full Time.
LinkedIn Address
Hakones Go-Karting Powai. -Member at Powai. -Passionate of racing
I declare that the above information provided by me is true to the best of my knowledge and belief
M omis3535@gmail.com https://in.linkedin.com/in/onkar-sawant 604,Bhanu Heights, Opp. MSEDCL Office, Sec19, Kharghar, Navi Mumbai - 410210, Maharashtra, India.
2018
Page no.
PROFESSIONAL PROJECTS RESIDENTIAL TOWER
11-14
TATA HOUSING DEVELOPMENT, RAJARHAT, KOLKATA.
RESIDENTIAL MIXED USE TOWER
13 ACRES
REDEVELOPMENT RESIDENTIAL TOWER
9-10
12 ACRES
INCOR INFRASTRUCTURE, KUKATPALLY, HYDERABAD.
Page no.
ACADEMIC PROJECTS
2017
2016
4 ACRES
RADIUS GROUP, SANTACRUZ, MUMBAI.
2015
220 ACRES
ARCHITECTURE THESIS
DECODING THE DEPTH
1-8
TRANSFORMING ABANDONED QUARRIES
COMPETITIONS 2014
FOURTH YEAR
CONTAINER HOUSING
21
40 ACRES
TATA TISCON
22
GREEN SUSTAINABLE HOUSING
CHAI CHOPAL
MINDSPARK , PUNE.
BROOKE BOND TAZA
GREEN INFOSYS PARK
23
MINDSPARK , PUNE.
2013
THIRD YEAR 27 ACRES
2012
SECOND YEAR 40 ACRES
FIRST YEAR CREATIVE CREATIVE
200 acre.
100 acre.
50 acre.
2010
2008
1997
1993
HOUSING IN MMR
15
GREEN ECOTECH TOUNSHIP IN KHALAPUR , RAIGAD
FASHION INSTITUTE
16 15
INTERNATIONAL FASHION INSTITUTE AT BKC.
ICONIC FOR MUMBAI
17
SKYLINE ICONIC TOWER FOR MUMBAI, MARINE DRIVES. 60 ACRES
2011
Scale
380 ACRES
SITE SPECIFIC
18
CORPORATE RETREAT , PENN, RAIGAD
CLIMATE RESPONSIVE ARCHITECTURE
19
CULTURAL CENTER IN HOT AND DRY CLIMATE, RAJASTHAN
BUILDING NEW GROUNDS UNDERWATER DWELLING IN MUMBAI 20
MARRING MACHINE PAINTING MACHINE( CLOCK +LOCK)
Scale 50 acre.
100 acre.
200 acre.
400 acre.
Q U A R R Y
T Y P O L O G Y
FINAL YEAR. THESIS
2015
2014
2013
2012
1
TRANSFORMING ABANDONED QUARRIES
DECODING THE DEPTH
2011
Hypothesis:Architectural intervention on the land as its primary resource for operations has led to the sharp rise in the density of thebuilt forms in the core cities. City land resources are exhausted due to immense pressure of development. This has resulted into either creations of more land or sourcing alternative land on the outskirts of the core city. Living away from the cities creates difficult movement pattern and hence people prefer to be closer to the city core.
Under such circumstances, can sourcing land around the city core be a solution...? 2
SITE ANALYSIS SITE PHOTO - Abandoned Quarry Site, Pune.
Proposed Nodes within the Site
2015
Connecting
To Pune
2014
12 km Connecting Connecting
Proposed Connectivity To Nasik Alandi 160 km according to the D.P.
2013 3 km
The Pedestrian scope in the Site
2012
3
The Depth
TRANSFORMING ABANDONED QUARRIES
DECODING THE DEPTH
2011
Existing Water bodies on the Site
Ideal Notion for the Site 0
500
1500
4
SCHEMATIC FORM and DESIGN EVOLUTION
2015
2014
Evolution of the Design Concept
2013
2012
2011
5
TRANSFORMING ABANDONED QUARRIES
DECODING THE DEPTH
Building the Core of the Design- The Connectivity to the varying Depths Isometric View of Building Node 2
Isometric View of Building Node 3
A R C H I T E C T U R E
S C H E M A T I C
SCHEMATIC
P R O C E S S
RENDER
2 1 Access Road Elevated Road Access road for Parking 3
The coceptual ideas for the Design of the Core
Connecting Nodes
Raising Cores
Elevated Access
Block massing
Approaches
Circulation
Massing
6
To Moshi Village
The attempts to build on these pits like an inverted building forms a challenge for upcoming future. Such proposals may widen up the vision and perception to look over such sites and permute various Architectural technology, Environment and landscape possibilities to build over such abandoned land. Thus transforming these urban voids in to the habitable land may stands as a smart solution. Top +51.60m
2015 Buffer Plantation
Buffer Plantation Road +31.60m Ramp Dn
2014
3
Service Girder +27.60m
18
+25.40m Parking Floor Service Floor
13 16
+22.20m +20.00m
2013
Main Entry
2
Entry 1
3
Entry 2
4
Towards Safari Park
5
Proposed extension to Safari Park
6
Plaza
7
Cultural Centre
8
Labour Housing
9
Round About
18
Service Floor Ramp Up
1
10
Commercial Centre
11
Mall and Drive through
12
Club House and Sports Centre
13
Golf Course
14
Stadium
15
Hotel
16
Nursery
17
Recreational Areas
18
Parking
19
Stadium
20
Hotel
21
Pumping Station and Water Treatment Plan
14
11
8
Third Floor +15.00m 12
Second Floor +10.00m
2012
2012
7
To International Convention Cent er
First Floor +5.00m Ground oor Pumping and maintenance oor
2011
21 4 10
17 6 9
+0.00m
2011
17 2
17
7
TRANSFORMING ABANDONED QUARRIES
DECODING THE DEPTH
5
Exploded view of Building 2
Typical Section through Building 2 M O D E L
15
P H O T O S
di lan
d Roa
A To
1
0
500
1500
Proposed Master Plan , Moshi Pune 8
S I T E
D E V E L O P M E N T
S I T E
D E V E L O P M E N T
I C O N I C V I E W
2016
F.S.I Volume subdivision
2015
Formation Of two separate towers.
Height Variations
Rationalized Form
Exploring the Crown P R O P O S E D
The Lantern P L A N S
Unit Plan – 4 BHK (Sale Component) Carpet Area: 2640 sq.ft .
2013
S. Chatterjee Road
Central Avenue
2014
02 02 01
2012
02
03
13
14
16 15
10
17 11
12
04
02
01
05
07
08 18
19
06
20
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. 20.
Entrance Foyer Living (4.2 x 7.1 | 13’9” x 23’4”) Open Deck Living/Dining (4.95 x 4.65 | 16’3” x 15’3”) Show Kitchen (3.0 x 1.6 | 9’10” x 5’3”) Fry Kitchen (2.75 x 3.85 | 9’ x 12’8”) Master Bedroom (4.2 x 6.25 | 13’9”x 20’6”) Dresser (2.7 x 1.65 | 8’10” x 5’5”) Master Bedroom Toilet (2.7 x 2.85 | 8’10” x 9’4”) Bedroom 02 (3.9 x 4.3 | 12’10” x 14’5”) Dresser 02 (3.5 x 1.65 | 11’6” x 5’5”) Toilet 02 (2.7 x 1.65 | 8’10” x 5’5”) Bedroom 03 (3.6 x 4.3 | 11’10” x 14’1”) Toilet 03 (2.7 x 1.65 | 8’10” x 5’5”) Bedroom 04 (3.6 x 4.3 | 12’ x 14’1”) Toilet 04 (2.7 x 1.65 | 8’10” x 5’5”) Powder Room (1.65 x 1.45 | 5’5” x 4’9”) Utility Servant’s Room Servants Toilet
1. 2. 3. 4. 5. 6. 7.
Living/Dining (7.15 x 3.6 | 23’6” x 11’10”) Kitchen (2.4 x 3.05 | 7’11” x 10’) Utility Master Bedroom (4.1 x 3.65 | 13’5” x 12”) Master Bedroom Toilet (1.5 x 2.45 | 4’11” x 8’1”) Bedroom 02 (3.05 x 3.65 | 10” x 12”) Common Toilet (1.5 x 2.45 | 4’11” x 8’1”)
09
2011
9
4BHK Apartment (Sale Component)
2.
2BHK Apartment (Redevelopment Component)
Unit Plan – 2 BHK (Redevelopment Component)
Master Plan
RADIUS GROUP, SANTACRUZ, MUMBAI.
REDEVELOPMENT RESIDENTIAL
1.
C O N T E X T
O F
T H E
S I T E
Carpet Area: 791 sq.ft . 03
03 07
05
06
04 02
02
06
07 01
05 01
04
01
02
04 06
Surrounding Building
Access
Best Views
Wind Flow
Sun-Path
03
07
05
10
D E S I G N
To Hi-Tech City Railway Station
D E V E L O P M E N T
P R O P O S E D
P L A N S
I C O N I C V I E W
COMMERCIAL
2016 Design Volume
2015 D E
A
3 BHK (Type-A9 a) 1700 Sq.Ft
3 BHK (Type B5) 1600 Sq`.Ft
2014
F A C A D E
T R E A T M E N T
Wide
Road
F.S.I Volume subdivision
2.5 BHK (Type A1) 1210 Sq.Ft
24 m
2013
CLUB
A.
B.
C.
Split Volume
2012
B FRAME
BANDS
STRIPS
C 2011
11
e Road
Master Plan
18 m Wid
INCOR INFRASTRUCTURE, HYDERABAD
RESIDENTIAL MIXEDUSE
Rationalize Form
S I T E
Height Variations
Maximized Views
SERIES OF FRAMES
Response to Sun-Path
Response to Wind Flow
BANDS – EXTENDED DECKS
D E V E L O P M E N T
Site Accesses
Amenities and Landscape
STRIPS
ELEVATION STRATEGY
12
D E S I G N
D E V E L O P M E N T
P R O P O S E D Secondary Entry / Exit
P L A N S
I C O N I C V I E W
Main Entry / Exit
2016 A- Tower A B- Tower B C- Tower C D- Tower D E- Tower E F- Tower F T- Town home CH- Courtyard home CL- Club house AM- Amenity U- Utility Block
2015
2014
Plazas were introduced within the amenity spine to keep a check on the built up areas. These punctures created contiguous but varied programmatic nodes.
2013
2012
A U
AM
3 BHK (Type 1) 1600 Sq`.Ft
CL
F A C A D E
B
3 BHK (Type 2) 1600 Sq`.Ft
3 BHK 1700 Sq.Ft
T R E A T M E N T BALCONY
WINDOWS
CH D AM
T
C T
CH
FAÇADE WITH DEEPER FINS
2011 E
13
TATA HOUSING DEVELOPMENT , KOLKATA.
RESIDENTIAL TOWER
Pavilions introduced between functions. U
U
F
FRAMED DUPLES UNITS
S I T E A.
Circulation
B.
Spine
Retail Boulevard
C.
Orientation
D.
Amenity Edges
D E V E L O P M E N T E.
F.
Open Spaces
Massing
.
Standard horizontal overhang Dropped edge for better shading Dropped edge substituted by louvers Vertical louvers Ideal Orientation- South Orientation - East + West Ideal Orientation- South + West Ideal Orientation - South
14
Contours
Central Garden Central Water Body Rent Own (MIG)
Pausing node
Bunglow Type A (HIG) Bunglow Type B (HIG) Bunglow Type C (HIG)
Connecting roads
1.
2015
Contour Modication
2.
B
Bio Gas Plant Cattle Farming Poultry Farming Mushroom Cultivation Vermiculture Fertilizers Ayurvedic and herbal
Schematic Plan Evolution
Node formation
A’
A Linear Axis
2014
3.
Schematic Zoning
4.
Radial Axis
Connectivity
Housing Process and Planning
Institutions LIG Housing Type A LIG Housing Type B Farmlands Cottages Vegetable Farms
Inter node 2012
FASHION INSTITUTE
2013
2011
15
GREEN ECO-TECH TOWNSHIP ,KHALAPUR
HOUSING IN MMR
5.
HIG and MIG Housing
6.
P R O C E S S
Housing Block
LIG Housing
MASTER PLAN H O U S I N G Bedroom
B’
M O D U L E
STUDY
SECTION B B’
MASTER PLAN MODELS
SCHEMATIC
A’
Living Area
INTERNATIONAL FASHION INSTITUTE AT BKC.
SECTION A A’
RENDER
Schematic Volume Study
Chimney Outlet
A Parking
Conceptual Planning
Housing Moule A- Rent Own (MIG)
Outer court
Section A A’
Iso. Plan
Building A
Building B
Building C
View from Backyard
Corridor View
Model view
16
Building A
Building B
SCHEMATIC CONCEPT PROCESS
Viewing Deck
Recreational Zone
Administration Area
Parking
Reception
Bowling
Pool
Staggered Plates Connecting Floors
Connections
Refreshment Zone
C.
B.
A.
Connectors
2015
First Floor
Volumes
Toilet Squash court Schematic Volumes Study
Volumes
2014
D. Schematic Plans
2013
SECTION B B’
SPA Room
Ofce Space 1
GYM Area
Entry 2012
SECTION C C’
Open Terrace
Plan @56m
Main Core
MASSING MODULE Secondary Core Floor Plate
Secondary plates Floor Plate Center Core
Secondary Core
Interconnect oors
Recreational Zone
Bedroom 1
Bedroom 2
Interspacing Massing A
M O D E L
P L A N S
Massing B
CORPORATE RETREAT IN PENN.
PROCESS
Road
Typical Floor Plan
SITE SPECIFIC PROJECT
SKYLINE ICONIC TOWER FOR MUMBAI.
ICONIC FOR MUMBAI 17
Ground Floor Plan
Executive Villa
Ground Floor Recreational Zone Exploded Isometrics
Administration Area
2011 Ofce Space 2
Swimming Pool
Changing Room
E.
Exit
T.T
SECTION A A’
B
A
First Floor
C
Kitchen Dinning Toilet Living area Entrance
Cut Plan
Master Plan
Isometric Model
Porch
Frontyard
Ground Floor Executive Bunglow 18
6.
10. 14. 11.
7.
2012
1. Gathering Space 2. Administration Office 3. School for Kids 4. Community Kitchen 5. Classroom Cum Research 6. Community Space 7. Public Square
2011
1.
16.
18. Congregational Space
18.
2.
12.
19
CULTURAL CENTER IN RAJASTHAN.
CLIMATE RESPONSIVE
MASTER PLAN A R C H I T E C T U R E
Entrance of the Center
View of Community Space
V I E W S
View of Congregational Space
BUILDING NEW GROUNDS
3.
SUSPENSION PISTON DETAIL
RETRACTABLE WALL DETAIL
9.
4.
2013
INTERNAL STAIRCASE
PLAN
PROFILE WHEN OPENED
PROFILE WHEN INFLATED
PROFILE WHEN DEFLATED
A R C H I T E C T U R E
View of Exhibition Space
M O D E L S
M A R R Y I N G
17.
EXTERNAL VIEW
UNDERWATER DWELLING IN MUMBAI.
2014
9. ExhibitionSpace 10. Library 11. Residential Unit 12. Play Ground 13. Toilet 14. Open Field 15. Storage room 16. Activity room 17. Creative Workshop
M A C H I N E
8.
5.
2015
8. Pottery Workshop
The task was to get a simple mechanical machine. The mechanism of machine is to be identiď€ ed to make an appropriate pair with another chosen machine. The project should progress with building new integrated mechanism of the paired machines. The function performed by the new machine should differ or add complexity to the original function of the machine.
20
CONCEPT
2015
THOUGHTS
M O D U L E
V I E W S Creating terraces
2014
2013
A. Block Structure
M O D U L E
2012
S T A C K
B.
C.
D.
Block Extrude
Block Transformation
Creating Spaces
M O D U L E
P E R M U T A T I O N
2011
21
A. TATA TISCON
CONTAINER HOUSING
M I N D S P A R K , P U N E.
C H A I
C H O P A L,U P
C. D. E. B.
SCHEMATIC
S E C T I O N Basic Block Structure
Block Explode A
Block Transformation
Block Stretched to create Spaces
Final View
22
2015
2014
2013
T H A N K Y
O
U
2012
23
MINDSPARK ,PUNE.
GREEN INFOSYS PARK
2011
C O N T A C T -
ONKAR.G.SAWANT
Mob. no. +91-9969776858 /+91-9869861413 E-mail LinkedIn
M omis3535@gmail.com https://in.linkedin.com/in/onkar-sawant