Installation Instructions, 56677 8� Post to Beam Coupler (P2B-SB-LS) 51777 8� Post to Beam Coupler (P2B-SB-IW)
upper fasteners sold separately; OWT Timber Screws or OWT Timber Bolts
Typical Installation Laredo Sunset shown 56677
Installation Instructions, 56677
51777
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/28/2016 . This information is updated periodically and should not be relied upon after 2 years from 3/28/2016 . Please visit OZCOBP.com to get current information.
1
Laredo Sunset & Ironwood 2 great styles Same functionality choose your connection lifestyle both styles available for most products Laredo Sunset (566XX series)
Laredo Sunset & Ironwood
Ironwood (517XX series)
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/28/2016 . This information is updated periodically and should not be relied upon after 2 years from 3/28/2016 . Please visit OZCOBP.com to get current information.
3
127 5.00
1.47 MIN 1.88 MAX
314 12.35 kit contains 2 assemblies
56677 Installation Instructions, 56677
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/28/2016 . This information is updated periodically and should not be relied upon after 2 years from 3/28/2016 . Please visit OZCOBP.com to get current information.
4
127 5.00
51 48 2.00 1.88
305 12.00 kit contains 2 assemblies
56677 Installation Instructions, 56677
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/28/2016 . This information is updated periodically and should not be relied upon after 2 years from 3/28/2016 . Please visit OZCOBP.com to get current information.
5
Suggested Tools (others may be required) Installation Instructions, 56677
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/28/2016 . This information is updated periodically and should not be relied upon after 2 years from 3/28/2016 . Please visit OZCOBP.com to get current information.
6
beam width
mark location to mount ledge
step 1 Installation Instructions, 56677
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/28/2016 . This information is updated periodically and should not be relied upon after 2 years from 3/28/2016 . Please visit OZCOBP.com to get current information.
7
(Hex Cap Nut) provided Tool Required 3/8" Driver
step 2 Installation Instructions, 56677
(OWT Screw) provided V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/28/2016 . This information is updated periodically and should not be relied upon after 2 years from 3/28/2016 . Please visit OZCOBP.com to get current information.
8
OWT Timber Screw beam rests on ledge
56621
both sold separately
(HCN) Tool Required 3/8" Driver
(OWT Timber Screw)
step 3 Timber Screws Installation Instructions, 56677
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/28/2016 . This information is updated periodically and should not be relied upon after 2 years from 3/28/2016 . Please visit OZCOBP.com to get current information.
9
see Installation Instructions, OWT Timber Bolts BEFORE proceeding
OWT Timber Bolt sold separately
beam rests on ledge
(HCN) Tool Required 3/8" Driver
(Timber Bolt)
step 3 Timber Bolts Installation Instructions, 56677
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/28/2016 . This information is updated periodically and should not be relied upon after 2 years from 3/28/2016 . Please visit OZCOBP.com to get current information.
10