OZCO Project #209 10x20 Pavilion 6x6 Posts
roofing shown translucent for clarity
Pavilion Overview
V2.00 - Installation Instructions, Specifications and Project Plans are effective 2/21/2017 . This information is updated periodically and should not be relied upon after 2 years from 2/21/2017 . Please visit OZCOBP.com to get current information.
15 11'11 16 "
20'0" 1 1'6 8 "
10'0"
typ
7 11'10 16 " 1'0"
1'0" 1 8'9 4 "
7 7'5 16 " 1 9'3 2 "
1 17'6 2 "
shown without roofing for clarity
OZCO Project #209 - 10x20 Pavilion w 6x6 Posts Pavilion Overview
V2.00 - Installation Instructions, Specifications and Project Plans are effective 2/21/2017 . This information is updated periodically and should not be relied upon after 2 years from 2/21/2017 . Please visit OZCOBP.com to get current information.
Suggested Tools (others may be required) Pavilion Overview
V2.00 - Installation Instructions, Specifications and Project Plans are effective 2/21/2017 . This information is updated periodically and should not be relied upon after 2 years from 2/21/2017 . Please visit OZCOBP.com to get current information.
QTY. 6 4 1 3 24
PART NUMBER 56608 56636 56677 56668 56650
15
56680
2 11 2 2 11 6 6 1 2 2
56619 56611 56625 56612 56649 56617 56618 56647 56627 56629
6 4 14 2 26 22
6x6x8L 4x4x10L 2x8x10L 2x6x10L 2x6x8L 2x6x6L
DESCRIPTION 6x6 Post Base (6x6-PB-LS) Post to Beam Bolt Offset (P2B-BO-LS) 8” Post to Beam Coupler (P2B-SB-LS) 4” Flush Inside 45 (FI45-LS-4) OWT Timber Bolt 6-8" 2" Timber Bolt Heavy Duty Washer (OWT-TBW-2) Truss Base Fan 8:12 Truss Accent (TA-LS) OWT Timber Screw 1-3/4" "T" Tie Plate (TTP) OWT Timber Bolt 4-6" 2" Standard Rafter Clip (RC-LS-2) 4" Standard Rafter Clip (RC-LS-4) OWT Timber Screw 10" OWT Timber Screw 3-3/4" OWT Timber Screw 7-1/2" 6x6x8 4x4x10 2x8x10 2x6x10 2x6x8 2x6x6
Material List OZCO Project #209 Material List
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/12/2018 . This information is updated periodically and should not be relied upon after 2 years from 3/12/2018 . Please visit OZCOBP.com to get current information.
1
56612
56625
56628
56627
56611
56647
56619
56650
56649
56618
56608
56636
56677 (20' Pavilion only)
56680
56617
56668
OZCO Scan QR barcode with smartphone for quick access to product installation instructions Pavilion OZCO
V2.00 - Installation Instructions, Specifications and Project Plans are effective 2/21/2017 . This information is updated periodically and should not be relied upon after 2 years from 2/21/2017 . Please visit OZCOBP.com to get current information.
Laredo Sunset & Ironwood 2 great styles Same functionality choose your connection lifestyle both styles available for most products Laredo Sunset (566XX series)
Laredo Sunset & Ironwood
Ironwood (517XX series)
V2.00 - Installation Instructions, Specifications and Project Plans are effective 2/21/2017 . This information is updated periodically and should not be relied upon after 2 years from 2/21/2017 . Please visit OZCOBP.com to get current information.
2
6x6 Post 8
2'6"
1 3'2 2 "
15 2'5 16 " 1 2'3 2 " 56°
34°
8'10"
9'9"
13 2'6 16 "
2x8 Board 106"
45°
56°
2x8 Board 117"
8'0"
2x6 Board 38.5" 8:12 King Post
5 7'5 8 "
see Birds Foot template
2x6 Board 30.804" 8:12 Web cut
4x4 Post 30" with Beauty cut removed
2x6 Board 89.625" with Rafter cut
56°
1 12"
10x(length) Pavilion cut list: common to all 10' wide Pavilions Pavilion Cutlist 10
V2.00 - Installation Instructions, Specifications and Project Plans are effective 2/21/2017 . This information is updated periodically and should not be relied upon after 2 years from 2/21/2017 . Please visit OZCOBP.com to get current information.
1
5 7'5 8 " 2x6 Board 89.625" with Rafter cut
A
56°
1 1'2 2 " 1 1'5 8 "
1 12" 90°
1 14"
56°
Birds Foot 1:1 template Pavilion Cutlist 10
V2.00 - Installation Instructions, Specifications and Project Plans are effective 2/21/2017 . This information is updated periodically and should not be relied upon after 2 years from 2/21/2017 . Please visit OZCOBP.com to get current information.
2
5 3 8 " X 45째
5 3 8 " X 45째
10x10
3 8'3 4 "
16'0" 2x8 Board 16 with 45 cuts
2x8 Board 12 with 45 cut
10x12
13'1"
10x16
2x8 Board 99.75"
12'0"
9'1"
2x8 Board 157"
10'0"
2x8 Board 109"
2x8 Board 85"
2x8 Board 10 with 45 cut
7'1"
2x8 Board 10 with one 45 cut
5 3 8 " X 45째
10'0"
5 3 8 " X 45째
10x20
10x(length) Pavilion cut list: 2x8 length wise boards Pavilion Cutlist 10
V2.00 - Installation Instructions, Specifications and Project Plans are effective 2/21/2017 . This information is updated periodically and should not be relied upon after 2 years from 2/21/2017 . Please visit OZCOBP.com to get current information.
3
if site is not level, see Ozco Site Leveling instruction
3 19'10 16 "
Locate desired center of structure
1 9'3 2 "
1 8'9 4 "
1 17'6 2 "
Site Plan - OZCO Project #209 - 10x20 Pavilion w 6x6 Posts Pavilion Site Plan
V2.00 - Installation Instructions, Specifications and Project Plans are effective 2/21/2017 . This information is updated periodically and should not be relied upon after 2 years from 2/21/2017 . Please visit OZCOBP.com to get current information.
3 4
1 2
note: all post to beams share the same ledge ITEM NO. 1 2
QTY. 6 6
PART NUMBER 6x6 Post 56608
3
8
56636
4
1
56677
DESCRIPTION 6x6x8'0" 6x6 Post Base Kit (6X6-PB-LS) Post to Beam Bolt Offset (P2B-BO-LS) 8� Post to Beam Coupler (P2B-SBLS)
OZCO Project #209 - 10x20 Pavilion w 6x6 Posts ledge Pavilion Base
V2.00 - Installation Instructions, Specifications and Project Plans are effective 2/21/2017 . This information is updated periodically and should not be relied upon after 2 years from 2/21/2017 . Please visit OZCOBP.com to get current information.
3
8
9
6
2
5
4
7
ITEM QTY. PART NUMBER DESCRIPTION NO. OZCO Project #209 - 10x20 1 1 Pavilion Base Pavilion w 6x6 Posts 2x8 2 2 2x8x9'9" Board 2x8 3 2 2x8x8'10" Board 2x8 4 4 2x8x10'0" Board 2x8 5 4 2x8x8'3 3/4" Board 6
12 4x4 Post
7
3
56668
8
12
56650
12
56680
12
56650
6
56680
9
4x4x2'6" 4" Flush Inside 45 (FI45-LS-4) OWT Timber Bolt 6-8" 2" Timber Bolt Heavy Duty Washer (OWT-TBW-2) OWT Timber Bolt 6-8" 2" Timber Bolt Heavy Duty Washer (OWT-TBW-2)
OZCO Project #209 - 10x20 Pavilion w 6x6 Posts Pavilion Beam & Support
V2.00 - Installation Instructions, Specifications and Project Plans are effective 2/21/2017 . This information is updated periodically and should not be relied upon after 2 years from 2/21/2017 . Please visit OZCOBP.com to get current information.
Building your Canopy... Simple 3 step procedure common to all size Pavilions
=
=
repeat on all sides
(HCN) provided Tool Required 3/8" Driver use this procedure for all size Pavilions (10x10 shown). same construction steps and techniques apply
10x10 Pavilion shown
(OWT Timber Screw) provided
step 1 Outer Beams Pavilion Beam & Support
V2.00 - Installation Instructions, Specifications and Project Plans are effective 2/21/2017 . This information is updated periodically and should not be relied upon after 2 years from 2/21/2017 . Please visit OZCOBP.com to get current information.
Secure with nails or screws Repeat on all sides for additional beam rigidity apply polyurethane adhesive between boards
repeat on all sides
step 2 Inside Beams Pavilion Beam & Support
V2.00 - Installation Instructions, Specifications and Project Plans are effective 2/21/2017 . This information is updated periodically and should not be relied upon after 2 years from 2/21/2017 . Please visit OZCOBP.com to get current information.
flush repeat on all sides
(HCN) provided Tool Required 3/8" Driver
(OWT Timber Screw) provided
step 3 Knee Braces Pavilion Beam & Support
V2.00 - Installation Instructions, Specifications and Project Plans are effective 2/21/2017 . This information is updated periodically and should not be relied upon after 2 years from 2/21/2017 . Please visit OZCOBP.com to get current information.
12
10
2
5
6
3
9
ITEM QTY. PART NO. NUMBER
4
8
7
1
1
Pavilion Beam & Support
2 3 4 5 6 7
2 2 4 26 22 2
2x8 Board 2x6 Board 2x6 Board 2x6 Board 2x6 Board 56619
5
56611
1
56625
8
11 13
9
Pavilion Truss 10
56612
6
56611
1
56625
11
56649
11
56680
10
6
56617
11
1
56647
12
2
56627
13
2
56629
14
6
56618
1
OZCO Project #209 - 10x20 Pavilion w 6x6 Posts
2
DESCRIPTION OZCO Project #209 - 10x20 Pavilion w 6x6 Posts 2x8x10'0" 2x6x3'2 1/2" 2x6x2'6 13/16" 2x6x7'5 5/8" 2x6x6'0" Truss Base Fan 8:12 Truss Accent (TA-LS) OWT Timber Screw 1-3/4" "T" Tie Plate (TTP) Truss Accent (TA-LS) OWT Timber Screw 1-3/4" OWT Timber Bolt 4-6" 2" Timber Bolt Heavy Duty Washer (OWT-TBW-2) 2" Standard Rafter Clip (RC-LS-2) OWT Timber Screw 10" OWT Timber Screw 3-3/4" OWT Timber Screw 7-1/2" 4" Standard Rafter Clips (RC-LS-4)
V2.00 - Installation Instructions, Specifications and Project Plans are effective 2/21/2017 . This information is updated periodically and should not be relied upon after 2 years from 2/21/2017 . Please visit OZCOBP.com to get current information.
Building your Truss... Simple 7 step procedure common to all size Pavilions
temporary securing of Ridge Beam necessary (not shown)
repeat step
predrill holes
use this procedure for all size Pavilions (10x10 shown). same construction steps and techniques apply
10x10 Pavilion shown
step 1 Pavilion Truss 10
Tool Required 3/8" Driver
(OWT Timber Screw) V2.00 - Installation Instructions, Specifications and Project Plans are effective 2/21/2017 . This information is updated periodically and should not be relied upon after 2 years from 2/21/2017 . Please visit OZCOBP.com to get current information.
=
=
tip: rafter screw heads might interfere with roofing. secure flush/below rafter or modify roofing materal as needed.
repeat step
predrill holes
10x10 Pavilion shown
Tool Required 3/8" Driver
(OWT Timber Screw)
step 2 Pavilion Truss 10
V2.00 - Installation Instructions, Specifications and Project Plans are effective 2/21/2017 . This information is updated periodically and should not be relied upon after 2 years from 2/21/2017 . Please visit OZCOBP.com to get current information.
repeat step 2 see overview page for spacing and quantity of Trusses
10x10 Pavilion shown
Tool Required 3/8" Driver
(OWT Timber Screw)
step 3 Pavilion Truss 10
V2.00 - Installation Instructions, Specifications and Project Plans are effective 2/21/2017 . This information is updated periodically and should not be relied upon after 2 years from 2/21/2017 . Please visit OZCOBP.com to get current information.
repeat step
repeat step
predrill holes
10x10 Pavilion shown
Tool Required 3/8" Driver
(OWT Timber Screw)
step 4 Pavilion Truss 10
V2.00 - Installation Instructions, Specifications and Project Plans are effective 2/21/2017 . This information is updated periodically and should not be relied upon after 2 years from 2/21/2017 . Please visit OZCOBP.com to get current information.
repeat step repeat step on all rafters
(HCN) 10x10 Pavilion shown
step 5 Pavilion Truss 10
Tool Required 3/8" Driver
repeat step on all rafters
(OWT Timber Screw)
V2.00 - Installation Instructions, Specifications and Project Plans are effective 2/21/2017 . This information is updated periodically and should not be relied upon after 2 years from 2/21/2017 . Please visit OZCOBP.com to get current information.
level repeat step
(HCN) Tool Required 3/8" Driver
10x10 Pavilion shown
(OWT Timber Screw)
step 6 Pavilion Truss 10
V2.00 - Installation Instructions, Specifications and Project Plans are effective 2/21/2017 . This information is updated periodically and should not be relied upon after 2 years from 2/21/2017 . Please visit OZCOBP.com to get current information.
repeat step 6 on all rafters
(HCN) Tool Required 3/8" Driver
10x10 Pavilion shown
(OWT Timber Screw)
step 7 Pavilion Truss 10
V2.00 - Installation Instructions, Specifications and Project Plans are effective 2/21/2017 . This information is updated periodically and should not be relied upon after 2 years from 2/21/2017 . Please visit OZCOBP.com to get current information.
1
ITEM QTY. PART DESCRIPTION NO. NUMBER 1x6 1 64 Board 1x6x10'0"
secure roofing with nails or screws
OZCO Project #209 - 10x20 Pavilion w 6x6 Posts Roofed Pavilion Truss 10 Roofing
V2.00 - Installation Instructions, Specifications and Project Plans are effective 2/21/2017 . This information is updated periodically and should not be relied upon after 2 years from 2/21/2017 . Please visit OZCOBP.com to get current information.