OZCO Project #222 - 23x14 Pavilion
OZCO Project #222 - 23x14 Pavilion
V2.00 - Installation Instructions, Specifications and Project Plans are effective 9/6/2018 . This information is updated periodically and should not be relied upon after 2 years from 9/6/2018 . Please visit OZCOBP.com to get current information.
1
SCAN QR CODE FOR PRODUCT INSTALLATION INSTRUCTIONS OR VISIT OZCOBP.COM. SPECIALTY INSTRUCTIONS AVAILABLE FOR SITE LEVELING & OTHERS
56636 56677
56609
56643
56668 56617
56611 56618 56651
56680
56621
56625
56612
56628 OZCO Project #222 - 23x14 Pavilion
OZCO Construct-Ed how to training
V2.00 - Installation Instructions, Specifications and Project Plans are effective 9/6/2018 . This information is updated periodically and should not be relied upon after 2 years from 9/6/2018 . Please visit OZCOBP.com to get current information.
2
10
1
9
8
12 11 5 7 4
2
6
3
Bill of Material OZCO Project #222 - 23x14 Pavilion
V2.00 - Installation Instructions, Specifications and Project Plans are effective 9/6/2018 . This information is updated periodically and should not be relied upon after 2 years from 9/6/2018 . Please visit OZCOBP.com to get current information.
3
ITEM NO. 1
QTY. 1
2 3 4 5 6
7 2 2 2 14 7 6 9
56609 56677 56636 56636 56651 56680 56617-10 56618
8x8 Post Base (8x8-PB-LS) 8� Post to Beam Coupler (P2B-SB-LS) Post to Beam Bolt Offset (P2B-BO-LS) Post to Beam Bolt Offset (P2B-BO-LS) OWT Timber Bolt 8-10" 2" Timber Bolt Heavy Duty Washer (OWT-TBW-2) 2" Standard Rafter Clip (RC-LS-2) 4" Standard Rafter Clips (RC-LS-4)
3 7 1 3 9 2 2 1 2
56643 56611 56625 56612 56611 56625 56668 56628 56621
Truss Base Fan 6:12 Truss Accent (TA-LS) Screw, OWT 1-3/4" (45mm) Timber "T" Tie Plate (TTP) Truss Accent (TA-LS) Screw, OWT 1-3/4" (45mm) Timber 4" Flush Inside 45 (FI45-LS-4) Screw, OWT 5-3/4" (145mm) Timber with HCN 1 1/2" Hex Cap Nut (HCN)
7 8 9
10
11 12
PART NUMBER Project #222 - 23x14 Pavilion
DESCRIPTION see cutlist
some parts are grouped/used with others during assembly. when duplicate part numbers show on bill of material table, add together for total quantity needed. quantities reflect packages of components required
Bill of Material OZCO Project #222 - 23x14 Pavilion
V2.00 - Installation Instructions, Specifications and Project Plans are effective 9/6/2018 . This information is updated periodically and should not be relied upon after 2 years from 9/6/2018 . Please visit OZCOBP.com to get current information.
4
QT Y . 7 2 4 14
PA RT NUMBER 56609 56677 56636 56651
DESCRI PT I ON
7
56680
6 9 3 16 3 3 2
56617 56618 56643 56611 56625 56612 56668
8x8 Post Base (8x8-PB-LS) 8� Post t o Beam Coupler ( P2B-SB-LS) Post t o Beam Bolt Offset (P2B-BO-LS) OWT T imber Bolt 8-10" 2" T imber Bolt Heavy Dut y Washer ( OWT -TBW2) 2" St andard Raft er Clip ( RC-LS-2) 4" St andard Raft er Clips ( RC-LS-4) T russ Base Fan 6:12 T russ Accent ( TA -LS) Screw, OWT 1-3/4" (45mm) Timber "T " T ie Plat e (T T P) 4" Flush I nside 45 (FI 45-LS-4)
1
56628
Screw, OWT 5-3/4" (145mm) T imber wit h HCN
2
56621
1 1/2" Hex Cap Nut (HCN)
7 2 2 3 1 2 4 4 32 3 4
8x8x8L 2x8x24L 2x8x6L 2x8x12L 2x8x8L 2x8x10L 2x6x10L 2x6x12L 2x6x8L 2x6x6L 4x4x6L
8x8x8 2x8x24 2x8x6 2x8x12 2x8x8 2x8x10 2x6x10 2x6x12 2x6x8 2x6x6 4x4x6
Material List OZCO Project #222 - 23x14 Pavilion
V2.00 - Installation Instructions, Specifications and Project Plans are effective 9/6/2018 . This information is updated periodically and should not be relied upon after 2 years from 9/6/2018 . Please visit OZCOBP.com to get current information.
5
12
11
15
18
20
10
17
19
16
9
14
28
22
25
23 26 27
21
5
8
13
3
2
4
6 7
1 24
Cutlist OZCO Project #222 - 23x14 Pavilion
V2.00 - Installation Instructions, Specifications and Project Plans are effective 9/6/2018 . This information is updated periodically and should not be relied upon after 2 years from 9/6/2018 . Please visit OZCOBP.com to get current information.
6
ITEM NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
QTY. 7 2 2 1 3 4 25 2 1 2 1 8 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
DESCRIPTION 8x8 Cedar 2x8 Cedar 2x8 Cedar 2x8 Cedar 2x6 Cedar 2x6 Cedar 2x6 Cedar 2x6 Cedar 2x8 Cedar 2x6 Cedar 2x6 Cedar 4x4 Cedar 2x8 Cedar 2x6 Cedar 2x8 Cedar 2x6 Cedar 2x6 Cedar 2x6 Cedar 2x6 Cedar 2x6 Cedar 2x6 Cedar 2x6 Cedar 2x6 Cedar 2x6 Cedar 2x6 Cedar 2x6 Cedar 2x6 Cedar 2x8 Cedar
LENGTH 8' 22'7 7/8" 4'10 15/16" 12'10" 3'2" 2'8 5/8" 7'8 7/8" 7'2 13/16" 7'11 1/16" 2'8 5/8" 5'8 1/16" 3' 12'7 7/8" 1'2 3/8" 9'4 15/16" 1'2 3/8" 2'8 1/4" 4'2 1/8" 2'11 1/4" 4'5 1/8" 5'11" 2'11 1/4" 4'5 1/8" 5'11" 2'8 1/4" 4'2 1/8" 5'8 1/16" 9'4 15/16"
Cutlist OZCO Project #222 - 23x14 Pavilion
V2.00 - Installation Instructions, Specifications and Project Plans are effective 9/6/2018 . This information is updated periodically and should not be relied upon after 2 years from 9/6/2018 . Please visit OZCOBP.com to get current information.
7
7 22'7 8 " 3" X 45°
3" X 45° 3'0" supports
8'0" posts 1'0"
1 11'10 16 "
1'0"
10'0"
12'10"
3'7"
20'0"
Front OZCO Project #222 - 23x14 Pavilion
OZCO Construct-Ed how to training
V2.00 - Installation Instructions, Specifications and Project Plans are effective 9/6/2018 . This information is updated periodically and should not be relied upon after 2 years from 9/6/2018 . Please visit OZCOBP.com to get current information.
8
7 22'7 8 " CL
1'4"
1'4" 1'4"
1'4" 1'4"
1'4" 1'4"
CL
14'0"
1'4" spacing
Top OZCO Project #222 - 23x14 Pavilion
OZCO Construct-Ed how to training
CL V2.00 - Installation Instructions, Specifications and Project Plans are effective 9/6/2018 . This information is updated periodically and should not be relied upon after 2 years from 9/6/2018 . Please visit OZCOBP.com to get current information.
9
15'0"
3" X 45°
1 1'8 16 "
1 8 16 "
1 8 16 "
12'0"
Right OZCO Project #222 - 23x14 Pavilion
OZCO Construct-Ed how to training
V2.00 - Installation Instructions, Specifications and Project Plans are effective 9/6/2018 . This information is updated periodically and should not be relied upon after 2 years from 9/6/2018 . Please visit OZCOBP.com to get current information.
10