OZCO Project #297 - Duo Beam Patio Pergola
OZCO Project #297 - Duo Beam Patio Pergola
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/11/2016 . This information is updated periodically and should not be relied upon after 2 years from 3/11/2016 . Please visit OZCOBP.com to get current information.
1
4877 192.00 660 26.00 typ
1.00 25 X 45°
2.94 75 X 45°
CL
89 3.50 typ 152 6.00
152 6.00 2684 105.69
914 36.00 2316 91.19
2596 102.19 2456 96.69
4432 174.50
Overview-Front OZCO Project #297 - Duo Beam Patio Pergola
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/11/2016 . This information is updated periodically and should not be relied upon after 2 years from 3/11/2016 . Please visit OZCOBP.com to get current information.
3
CL
CL
533 21.00 typ
Overview-Top OZCO Project #297 - Duo Beam Patio Pergola
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/11/2016 . This information is updated periodically and should not be relied upon after 2 years from 3/11/2016 . Please visit OZCOBP.com to get current information.
4
5055 199.00 4877 192.00
495 19.50
2438 96.00 posts
2578 101.50 posts
4420 174.00
Overview-Right OZCO Project #297 - Duo Beam Patio Pergola
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/11/2016 . This information is updated periodically and should not be relied upon after 2 years from 3/11/2016 . Please visit OZCOBP.com to get current information.
5
12
9 4
8
3 2
7 11 6
ITEM NO.
QTY.
PART NUMBER
1
4
56608
2
12.6
56617
3
2.324
56639
4
3
2x6 Board
5
0.32
56626
0.1
56621
1
56616
1
56611
0.08
56625
5 1 10
6
7
3
56635
8
14
9 10 11 12
8 2 2 2
2x6 Board 2x4 Board 6x6 Post 6x6 Post 6x6 Post
DESCRIPTION 6x6 Post Base Kit (6X6-PB-LS) 2" Standard Rafter Clip (RC-LS-2) 6-8" Joist Hanger Flush (JHF-68-LS) 2x6x192.00 Screw, OWT 2-3/4" (70mm) Timber with HCN 1 1/2" Hex Cap Nut (HCN) Flush Inside 45 (FI-45) Truss Accent (TA-LS) OWT Timber Screw 1-3/4" 6" Post to Beam (P2BLS-6) 2x6x192.00 2x4x192.00 6x6x96.00 6x6x36.00 6x6x101.50
Bill of Material OZCO Project #297 - Duo Beam Patio Pergola
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/11/2016 . This information is updated periodically and should not be relied upon after 2 years from 3/11/2016 . Please visit OZCOBP.com to get current information.
6
QTY. PART NUMBER 4 56608 13 56617 3 56635 1 56616 2 56611 1 56625 1 56626 1 56621 3 56639 2 2 17 8
6x6x12L 6x6x10L 2x6x16L 2x4x16L
DESCRIPTION 6x6 Post Base (6x6-PB-LS) 2" Standard Rafter Clip (RC-LS-2) 6" Post to Beam (P2B-LS-6) Flush Inside 45 (FI-45) Truss Accent (TA-LS) OWT Timber Screw 1-3/4" Screw, OWT 2-3/4" (70mm) Timber with HCN 1 1/2" Hex Cap Nut (HCN) 6-8" Joist Hanger Flush (JHF-68-LS) 6x6x12 6x6x10 2x6x16 2x4x16
Material List OZCO Project #297 - Duo Beam Patio Pergola
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/13/2018 . This information is updated periodically and should not be relied upon after 2 years from 3/13/2018 . Please visit OZCOBP.com to get current information.
7
56639 56616
56635 56608
56621 56611
56617
56625
56626 OZCO Project #297 - Duo Beam Patio Pergola
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/11/2016 . This information is updated periodically and should not be relied upon after 2 years from 3/11/2016 . Please visit OZCOBP.com to get current information.
7
Laredo Sunset Ironwood vs.
2 great styles same functionality
Ironwood (517XX series)
OZCO Project #297 - Duo Beam Patio Pergola
choose your connection lifestyle both styles available for most products
Laredo Sunset (566XX series)
V2.00 - Installation Instructions, Specifications and Project Plans are effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is updated periodically and should not be relied upon after October 15, 2016. Please visit www.OZCOBP.com to get current information.
8
OZCO Project #297 - Duo Beam Patio Pergola
V2.00 - Installation Instructions, Specifications and Project Plans are effective 3/11/2016 . This information is updated periodically and should not be relied upon after 2 years from 3/11/2016 . Please visit OZCOBP.com to get current information.
9