OZCO Site Leveling Plan

Page 1

Site Leveling Plan

Site Leveling Plan

V1.00 - Installation Instructions effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is updated periodically and should not be relied upon after May 1, 2015. Please visit www.OZCOBP.com to get current information

1


11 169 16 "

11 169 16 "

locate desired center location

120"

120" 4x mark & drill per selected mounting hardware

site plan Site Leveling Plan

10x10 base shown V1.00 - Installation Instructions effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is updated periodically and should not be relied upon after May 1, 2015. Please visit www.OZCOBP.com to get current information

2


PB3 PB4

PB2 PB1

4x

leveling washers (not supplied)

identified lowest point

mounting surface not level

spirit level (not supplied)

to level: shim with washers as necessary

step 1 Site Leveling Plan

V1.00 - Installation Instructions effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is updated periodically and should not be relied upon after May 1, 2015. Please visit www.OZCOBP.com to get current information

3


PB2 PB1 beam with kit spirit level (not supplied)

dim A Post PB2

Length (L) 96"-dim A

dim A

calculated L 96=

step 2 Site Leveling Plan

V1.00 - Installation Instructions effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is updated periodically and should not be relied upon after May 1, 2015. Please visit www.OZCOBP.com to get current information

4


PB3

PB2

dim B

Post Length (L) dim A PB3 96"-(dim A + dim B)

dim B

calculated L 96-( + )=

step 3 Site Leveling Plan

V1.00 - Installation Instructions effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is updated periodically and should not be relied upon after May 1, 2015. Please visit www.OZCOBP.com to get current information

5


PB4

PB1

Post PB4

Length (L) 96"-dim C

dim C

calculated L 96=

dim C

step 4 Site Leveling Plan

V1.00 - Installation Instructions effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is updated periodically and should not be relied upon after May 1, 2015. Please visit www.OZCOBP.com to get current information

6


96"

Post

calculated L (see previous pages) 96"

no cuts required

PB1 PB2 PB3 PB4

PB1

Mark all post designation BEFORE cutting, example: "PB1"

calculated L

"Measure Twice, Cut Once"

PB2 cut

2x

calculated L PB3 cut

1x

calculated L PB4 cut

step 5 cut posts Site Leveling Plan

V1.00 - Installation Instructions effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is updated periodically and should not be relied upon after May 1, 2015. Please visit www.OZCOBP.com to get current information

7


PB3 PB4 PB2 PB1

step 6 install posts Site Leveling Plan

V1.00 - Installation Instructions effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is updated periodically and should not be relied upon after May 1, 2015. Please visit www.OZCOBP.com to get current information

8