Site Leveling Plan
Site Leveling Plan
V1.00 - Installation Instructions effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is updated periodically and should not be relied upon after May 1, 2015. Please visit www.OZCOBP.com to get current information
1
11 169 16 "
11 169 16 "
locate desired center location
120"
120" 4x mark & drill per selected mounting hardware
site plan Site Leveling Plan
10x10 base shown V1.00 - Installation Instructions effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is updated periodically and should not be relied upon after May 1, 2015. Please visit www.OZCOBP.com to get current information
2
PB3 PB4
PB2 PB1
4x
leveling washers (not supplied)
identified lowest point
mounting surface not level
spirit level (not supplied)
to level: shim with washers as necessary
step 1 Site Leveling Plan
V1.00 - Installation Instructions effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is updated periodically and should not be relied upon after May 1, 2015. Please visit www.OZCOBP.com to get current information
3
PB2 PB1 beam with kit spirit level (not supplied)
dim A Post PB2
Length (L) 96"-dim A
dim A
calculated L 96=
step 2 Site Leveling Plan
V1.00 - Installation Instructions effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is updated periodically and should not be relied upon after May 1, 2015. Please visit www.OZCOBP.com to get current information
4
PB3
PB2
dim B
Post Length (L) dim A PB3 96"-(dim A + dim B)
dim B
calculated L 96-( + )=
step 3 Site Leveling Plan
V1.00 - Installation Instructions effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is updated periodically and should not be relied upon after May 1, 2015. Please visit www.OZCOBP.com to get current information
5
PB4
PB1
Post PB4
Length (L) 96"-dim C
dim C
calculated L 96=
dim C
step 4 Site Leveling Plan
V1.00 - Installation Instructions effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is updated periodically and should not be relied upon after May 1, 2015. Please visit www.OZCOBP.com to get current information
6
96"
Post
calculated L (see previous pages) 96"
no cuts required
PB1 PB2 PB3 PB4
PB1
Mark all post designation BEFORE cutting, example: "PB1"
calculated L
"Measure Twice, Cut Once"
PB2 cut
2x
calculated L PB3 cut
1x
calculated L PB4 cut
step 5 cut posts Site Leveling Plan
V1.00 - Installation Instructions effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is updated periodically and should not be relied upon after May 1, 2015. Please visit www.OZCOBP.com to get current information
7
PB3 PB4 PB2 PB1
step 6 install posts Site Leveling Plan
V1.00 - Installation Instructions effective May 1, 2015 and reflects information that available as of April 10, 2014. This information is updated periodically and should not be relied upon after May 1, 2015. Please visit www.OZCOBP.com to get current information
8