Reorganizing Process Of Unite D’Habitation by Woo Jae Sung

Page 1

Design Thesis May 2011

In partial fulfillment of the professional M.Arch degree, Cornell University

REORGANIZING PROCESS OF UNITE D’HABITATION The frame developed in Chicago is to modern architecture what the column was to classic architecture. In his account, not only is the frame the catalyst of modern architecture but it has even become modern architecture, appearing when not even structurally necessary. - from Surface Architecture by Mohsen Mostafavi This is the clear statement of what the frame (which is basically Domino System) means in modern architecture. The frame in modern architecture is the most hegemonic element. My thesis starts from the curiosity; what if we get rid of the frame from our modern living machines?

WOO JAE SUNG (WS92@CORNELL.EDU) ADVISORS ALEKSANDR MERGOLD + MICHAEL SILVER



CONTENTS



INTRODUCTION



Five Points of Architecture by Le Corbusier 1. The pilotis elevating the mass off the ground 2. The free plan, achieved through the separation of the load-bearing columns from the walls subdividing the space 3. The free facade, the corollary of the free plan in the vertical plane 4. The long horizontal sliding window 5. The roof garden, restoring, supposedly, the area of ground covered by the house.

The pilotis is, needless to say, the most crucial element, because the rest of these points are more or less the result of the pilotis. However, what makes the Domino system truly the design reference for architects are the second and third items, where we are talking about design freedom. This is what I call “the Domino spirit.” The Domino system is, of course, a physical platform. But its physicality should be the underlying premise for achieving flexibility within efficiency.

...

Since the Industrial Revolution, thanks to the new technologies and materials, modern architecture had faced major changes. The most significant among them has been the advent of the Domino system. Proposed by Le Corbusier in the early 20th century, it had a far-reaching impact on modern architecture at both the physical and conceptual levels.

REORGANIZING PROCESS OF UNITE D’HABITATION . INTRODUCTION . 6 / 7


DOMINO AS A MODULAR SYSTEM


Physically, or tectonically, it re-shaped our built environment with the aid of industrial products and new means of construction. Its pure and efficient structural system, made out of reinforced concrete slabs and columns, gave architects much more freedom to design facades, plans, and the building’s form itself. This created a clear distinction between the Domino system and pre-modern architectures, which were basically style-dependent 01. Some might argue that there still exist styles in modern architecture, and this might be true. However, styles in modern architecture are not tied to tectonic issues. Rather, they are closely bonded to particular Isms. In other words, tectonic issues do not matter anymore in modern architecture thanks to the existence of the efficient structural system called Domino.

01  Surface Architecture by David Leatherbarrow and Mohsen Mostafavi

GOTHIC AS A STYLE

REORGANIZING PROCESS OF UNITE D’HABITATION . INTRODUCTION . 8 / 9


At the same time, as a reliable structural system, Domino enabled architects to broaden their design perspectives and draw inspiration from outside of architecture, adding another conceptual level on architecture. In this sense, the Domino system can be thought of as a framework by which architects can have design freedom on their work. For example, one can design a building inspired by philosophy, art, socio-cultural issues, or even by the economy, as long as the building stays stable because of Domino system.


This makes it sound like the system is just a physical framework. However, the fact that it freed up modern architecture from the tectonic limitations of pre-modern architecture opened up new possibilities for interacting with the real world beyond the boundary of the discipline. This makes me hesitant to call it a mere tectonic or physical framework. Rather, it is a virtual framework. The meaning of Domino as a virtual framework can also be easily found in the Five Points of Architecture described by Le Corbusier himself; a free façade, and an open floor plan, suggesting that an architect’s desire for freedom in design process can be achieved by having Domino as a fundamental base system.

REORGANIZING PROCESS OF UNITE D’HABITATION . INTRODUCTION . 10 / 11 ��



In theory, the Domino spirit, within which the system functions as a virtual framework, should work well to provide architects with much more room to play around with design issues. However, in reality, it was not as successful as expected because people abused the efficiency of the virtual framework by misinterpreting it in an economic fashion. Sadly enough, that was just the other side of the same coin; the efficient structural system that was supposed to be a sound foundation for design freedom could be also efficient in an economic sense. This captured people’s attention, especially during the era of industrial revolution, allowing them to forget the design issues behind it. The system became a money-saving form-generator or platform. The Chicago frame would be a good example of this kind of abuse, although it enabled us to rethink the meaning and role of the architectural skin 01. By the time we arrived at the era of Chicago frame, most of the buildings in cities were factory-made, which has continued to be the case up until now.

01  Surface Architecture by David Leatherbarrow and Mohsen Mostafavi Image Left < http://architecturefarm.wordpress.com/2010/02/11/chicago-earthquake/

REORGANIZING PROCESS OF UNITE D’HABITATION . INTRODUCTION . 12 / 13 ��



There are two major reasons that explain the gap between the ideal and reality: the social paradigm and technology that supports it. As a result of industrialization, every property in a society got capitalized and needed to be controlled financially. Under these circumstances, there was no excuse for wasting time, goods, and services. The beauty of industrialization was in the mass production system that consumed less material, time, and effort while maintaining a certain level of quality. Mass production, represented by the cast-and-mold system, in turn created a whole new aesthetic standard, represented by a functional and anti-ornamental thesis of “less is more.” Of course, there were a few minor movements that exploited technology and new material to pursue more than just function and efficiency, such as Art Nouveau or the Arts and Craft Movement. However, these were just not enough to become major trends because they failed to touch the hearts of capitalists.

Image Upper Left < Cast and Mold system Image Bottom Left < Henry Ford Model T Assembly Line

REORGANIZING PROCESS OF UNITE D’HABITATION . INTRODUCTION . 14 / 15 ��



Recently, we have moved into an era of the rapid evolution where the old paradigms and systems are quickly being replaced by new ones, thanks to the advances in technology. Among these, the most significant one must be mass-customization. This century has witnessed the monotonous characteristic of mass-production, which depersonalized every single bit of our daily life in one way or another. In order to overcome this uniformity, people came up with something in between tailor-made and factory-assembled: more precisely speaking, getting tailor-made products by factory assembly systems. An early example of what we now call the mass-customization can be found in the form of art, for example, in Marcel Duchamp’s “Fountain.” 01 By adding a signature on a factory-made toilet, he tried to convert the factorymade into the tailor-made. This rough idea of mass-customization evolved into the component system, which added extra steps to the existing conveyor belt system to give customers options for their needs and taste. Furthermore, radical technological improvements such as laser/water jet cutting tools, multi-axis milling machines, and fiber placement technology 02 are entirely rewriting the concept of production from ”cast and mold” to “sculpting by machines.” Sculpting by machine, as its name implies, does not rely on a mold, meaning that there is no limitation in customizing products. More importantly, we don’t have to worry about the high costs that the customization processes used to have.

01  Image Upper Left < Marcel Duchamp’s “Fountain” 02  Image Bottom Left < Vertical Studio Course Material by Michael Silver

REORGANIZING PROCESS OF UNITE D’HABITATION . INTRODUCTION . 16 / 17 ��



People always have new ideas, and these ideas push people to invent new technologies to support them. Sometimes, new technologies let us think differently, which can also result in new ideas being generated. Ideas and technology have been interacting with each other throughout history. Le Corbusier came up with the idea of the Domino system, inspired by industrialization and new material and technology. The system was then adopted by the capitalists of the era, modified by their standards, and has been serving as a money-saving for a long time. As mentioned above, recent advances in technology are now redefining the term “cost-effective,” allowing us to reinterpret the Domino system from as a money saving form giver to an efficient virtual framework for design freedom. With that said, in this thesis, I will propose an alternative design method based on the Domino system (or the Domino spirit), not as a money-saving, physical system, but as an efficient design reference that functions on a conceptual level. For this purpose, I will analyze a typical housing unit cluster, focusing in particular on the design and building processes, to determine the implications of the Domino system as a form giver. Next, I will theoretically remove the rigid form of the building and restore it to its intact condition, revealing only the programs and the relationships between them. Finally, I will reorganize the malleable relationship with certain internal/external logics to get a prototype of this new design method. To test the prototype, I will apply it to one of the most iconic modern living machines, Le Corbusier’s Unite d’Habitation, which is in great part based on the Domino system.

REORGANIZING PROCESS OF UNITE D’HABITATION . INTRODUCTION . 18 / 19 ��



PROTOTYPE



Housing is one of the building types that has redefined itself since the Industrial Revolution when countless people moved into cities in search of new opportunities. Needless to say, finding affordable places to live was a main concern for many. This naturally increased the density of cities so that housing needed to be spatially efficient enough to hold as many people as possible within a limited area. Row houses or town houses 01, which we can still find in many old cities, are good examples of this type of housing. For a while, row houses were successful. Each unit followed a long and shallow plan that shared walls with the adjacent units, with couple of small windows at each end of the building. This might be an ideal system to get the maximum number of structurally stable units into a limited space with the least number of windows facing out. But the space inside was dark and cramped; due to the structural nature of the building material (bricks and mortar), the buildings could not have big enough windows to allow sufficient sunlight in, even in the daytime. Additionally, the brick structure was not strong enough for bigger/higher buildings to cover the exponentially increasing needs. In addressing this situation, the Domino system naturally captured architects’ attention because it was structurally efficient as well as flexible enough to design better living environments, such as those that included big windows. For this reason, many post-industrial revolution housing types, including Unite d’Habitation, started to take advantage of the Domino system. What was the role of the Domino system in modern housing? Was it just a physical form-giver, or a conceptual reference? As I mentioned in the previous chapter, my answer to this question is the former. It is evident when we look around our built environment that cities are full of Domino replicas. In this prototype chapter, I will deconstruct the design/building process of typical housing units and clusters, removing all physical traces of the Domino system as a form-giver (while maintaining it as a virtual/conceptual reference system), and reorganize them to propose an alternative prototype.

01  Image Upper Left < Row House, http://www.heritageexplorer.org.uk Image Bottom Left < Comfort in Cubes, http://prefabcosm.com

REORGANIZING PROCESS OF UNITE D’HABITATION . PROTOTYPE . 22 / 23 ��


The bubble diagram is one of the most common, but still powerful tools that architects love to use. The diagram, showing bubbles of programs and their connections to each other, is in very flexible and malleable state with lots of possibilities, before it is fitted into a grid system. In modern architectural practice, the grid is usually calculated by economic factors such as a building’s possible structural span, the number of units, or even by the dimensions of a parking spot. After the grid system is applied on top of the bubble diagram, two-dimensional boundaries are generated to separate or connect adjacent programs based on the bubble diagram. The same procedures will be repeated for every floor in the building, stacking them one by one to extrude the two-dimensional lines vertically. Extrusion is a very common, straightforward, efficient, and easy method of making walls out of two-dimensional lines.


To see how the grid worked as a form-giver, remove it from the plan. But then we need an alternative way of organizing the bubbles and expanding them three dimensionally, since we don’t want each bubble to float around in the air.

REORGANIZING PROCESS OF UNITE D’HABITATION . PROTOTYPE . 24 / 25 ��


Before we discuss the packing method, we first need to have a clear definition of what the bubbles are and how they connect to each other.


S M RA OG PR G IN S OR ON HB ATI L IG NE IRCU /C

S M RA OG PR G IN S OR ON HB ATI L IG NE IRCU /C

REQUIRED SQUARE FOOTAGE (FIXED RADIUS)

CENTER POINT (RELATIVE LOCATION)

CIRCLE : PROGRAM

VARIABLE SQUARE FOOTAGE (VARIABLE RADIUS)

CENTER POINT (RELATIVE LOCATION)

POINT : CIRCULATION

Bubbles and Points A bubble is a representation of a specific program. A program has a center point and radius to represent the required square footage. A point without a circle around it is a representation of a corridor, a hall, or any other form of space that is dedicated to circulation.

Connecting Lines Bubbles and points can be connected by lines. A solid line represents a physical connector such as a door, an opening, or any other form through which one can move from one space to another. A dotted line represents visual connectors such as a partial opening, windows, or any other form that we usually do not pass through but still can see through.

REORGANIZING PROCESS OF UNITE D’HABITATION . PROTOTYPE . 26 / 27 ��


CIRCLE TO CIRCLE : OVERLAPPING

CIRCLE TO CIRCLE : INTERSECTING

CIRCLE TO CIRCLE : NOT INTERSECTING

CIRCLE TO POINT : INTERSECTING

CIRCLE TO POINT : INCLUDED

CIRCLE TO POINT : EXCLUDED

POINT TO POINT : NOT INTERSECTING


How should we pack the bubbles? Based on cell-packing theory 01, there are seven possible packing scenarios that fall into three categories. Circle to Circle Overlapping - circles that meet at two points Intersecting - circles that meet at a single point Not intersecting - circles that do not meet Circle to Point Intersecting - a circle and a point that meet at a single point Included - a point that is inside of a circle Excluded - a point that is outside of a circle Point to Point Not intersecting - points that do not meet

...

Each packing scenario generates boundaries based on the “Circle Set Voronoi / Voronoi” rule 02. As we can see from the diagram, the boundaries generated by the rule are dependent on bubbles as well as points.

01  The Nature of Order by Christopher Alexander 02  Voronoi Diagram of a Circle Set Constructed from Voronoi Diagram of a Point Set by Deok-Soo Kim, Donguk Kim, and Kokichi Sugihara

REORGANIZING PROCESS OF UNITE D’HABITATION . PROTOTYPE . 28 / 29 ��


NOT INTERSECTING PROGRAM SPACES NOT ADJACENT TO EACH OTHER

INTERSECTING PROGRAM SPACES ADJACENT TO EACH OTHER - WALL CONNECTION

OVERLAPPING PROGRAM SPACES CONNECTED TO EACH OTHER THROUGH OPENNINGS - DOOR/OPENNING CONNECTION

CIRCULATION PROGRAM SPACE CONNECTED TO CIRCULATION PATH THROUGH DOORS / OPENNINGS


Not all of the packing examples are meaningful in real space. For example, a point-to-point connection does not necessarily have to have a boundary between points because in most cases, this type of connection implies a continuous path or a part of circulation.

By removing some packing scenarios, we can finally arrive at four meaningful packing scenarios.

Not intersecting program spaces not adjacent to each other Intersecting program spaces adjacent to each other / divided by wall(s) Overlapping program spaces connected to each other through doors / openings Circulation connection between a program space and a circulation nodal point.

REORGANIZING PROCESS OF UNITE D’HABITATION . PROTOTYPE . 30 / 31 ��


PROGRAM : DIFFERENT SIZE

PROGRAM : DIFFERENT SIZE

DISCONTINUOUS SURFACES / STRESS FLOW

CONTINUOUS SURFACE / STRESS FLOW

STACKING STRUCTURE

PIPE CELL STRUCTURE

EXTRUDING + STACKING DISCONTINUOUS WALLS

LOFTING CONTINUOUS WALLS

FORM FACTOR / VARIABLE HEIGHT

FORM FACTOR / VARIABLE HEIGHT + RELATIVE LOCATION + BUBBLE SIZE


Unlike horizontal connections, vertical ones are simple because of the fundamental human need for flat surfaces as inhabitable spaces or platforms for our activities. If a surface has a slope and you cannot rest yourself on it for a fair amount of time, the surface is not designed for “living.” It might be either for circulation, to compensate for level differences, or for “The Function of Oblique.” 01 That being said, if we stack more than two program bubbles vertically and get boundaries out of them based on the cell-packing scenarios discussed in the previous pages, they will be curvilinear surfaces in section, which are not ideal geometries for holding programs. So we usually end up putting series of flat slabs in between programs stacked vertically, whatever their relationship. This seems to make vertical connections between (vertically stacked) program bubbles less meaningful than horizontal ones. That must be the main reason why we spend a lot of time arranging program bubbles in twodimensional plans, then “extrude” planar boundaries vertically to get walls. Additionally, technical difficulty and cost issues on doubly curved surfaces confined architects to only using straight extrusion rather than “lofting.”

Lofting, a now very familiar term to architects, is a technique for making a surface out of more than two curves. The resulting surface is dependent on the initial curves. For example, let’s say we have three planar curves on different levels. By straight extrusion, the classic method of transforming two-dimensional data into threedimensional, we can make three independent walls that barely have connections with each other. Or, we can make one continuous, streamlined wall by lofting. A lofted surface, as its name implies, is a parameter driven by program bubbles or boundaries at different levels. Its form (wall) comes from the inner logic of a building, in this case, the relative location and size of the program bubbles. An extruded surface, on the other hand, is from a rigid system made out of something other than inner logic. In many cases from our history and today’s built environment, the form factor behind it has usually been frame structures.

01  The Function of the Oblique by Paul Virilio

REORGANIZING PROCESS OF UNITE D’HABITATION . PROTOTYPE . 32 / 33 ��



When we go back to the Five Points of Architecture by Le Corbusier, the physical characteristics of Domino gave architects the freedom to play around with plans because, unlike in row houses, the walls in the Domino system did not have to bear any loads. However, since we got rid of the rigid frame system from the traditional design method as a part of the study in alternative design processes, we need to somehow figure out how to support the system. The single loft surface discussed in the previous pages doesn’t seem to be a stable structure because it has no additional support to avoid buckling, such as flying buttresses that transfer the load all the way down to the foundations. However, when we bundle/pack individual lofted surfaces together, this makes a huge difference. The vascular bundle structure 01 of a plant serves as a good example of how this works. Although an individual vascular tube is made out of a very thin membrane that is unable even to hold its own weight, the bundled one constitutes a very efficient and powerful structural system.

01 http://etc.usf.edu/clipart/26100/26164/fibro-vascul_26164.htm

REORGANIZING PROCESS OF UNITE D’HABITATION . PROTOTYPE . 34 / 35 ��


STRAIGHT EXTRUSION

PLAN TYPE A

TWIST PLAN TYPE A

PLAN TYPE A PLAN TYPE A’

PLAN TYPE A

PLAN TYPE A’ (ROTATED)

ZIGZAG PLAN TYPE B PLAN TYPE A

PLAN TYPE A

PLAN TYPE B PLAN TYPE A PLAN TYPE B PLAN TYPE A

PLAN TYPE A


Although there might be many different ways to bundle pipes, they share one simple principle: the stability of the bundle structure is closely related to the geometric configuration of individual pipes. Whatever the geometric configuration, it must increase friction between individual components of the bundle. The easiest way to do that might be to increase the facing area to achieve maximum surface friction areas. That is how the bundle structure achieves stability. We can instinctively imagine that the straight bundle in the illustration will bond less strongly than the other two because its structure does not share as much surface area.

REORGANIZING PROCESS OF UNITE D’HABITATION . PROTOTYPE . 36 / 37 ��


CASE 1 : DIFFERENT NUMBER OF PROGRAM BUBBLES BUNDLING OPTIONS

PLAN TYPE A

PLAN TYPE B

PLAN TYPE C

PLAN TYPES (A / B / C)

CASE 2 : SAME NUMBER OF PROGRAM BUBBLES

CASE 3 : SAME NUMBER OF PROGRAM BUBBLES WITH DUMMIES


For the bundling process, we need to consider the number of program bubbles in each layer, because lofting is basically a parametric function of at least two curves. This idea gives us two different bundling types; the first type has a different number of program bubbles in each layer and the second has the exact same number of bubbles in each layer. Case 1 : different number of program bubbles As I briefly mentioned above, when it comes to lofting, having different numbers of bubbles is problematic. We might need to decide which bubble we should or should not remove to match the number of bubbles in different layers. This might sound okay, but it is actually not because it constitutes a critical decision about the entire form of the building. The selection / screening process for bubbles in this instance inevitably needs to be done in a random fashion, which means less or no control over the shape of building we are designing. Case 2 : same number of program bubbles Since we don’t have to rely on a random process, we have a perfect control in our design; the overall shape of the building is the product of our input on matters such as the number of programs, the size of the bubbles, and the relationships amongst bubbles. However, in reality, it seems almost impossible to have a series of floor plans with exact same number of program bubbles. Then how can we compensate for the discrepancies so as to convert this incomplete status into something complete? The answer to this question would be to use dummy cells. Case 3 : same number of program bubbles with dummies The entire body of program bubbles expanded three-dimensionally is a virtual framework that substitutes for the physical grid system of Domino. More precisely speaking, three-dimensional point grids (points that are the center points of bubbles) will be the virtual framework, and each program bubble with a specific radius based on area requirements will sit on top of the point grid shaping building plans. Needless to say, the dummy in this system will have a variable radius, depending on the size of surrounding programs, in order to accommodate a smooth transition within and between layers.

REORGANIZING PROCESS OF UNITE D’HABITATION . PROTOTYPE . 38 / 39 ��


PROTOTYPING PROCESS Below is the diagram of the overall prototyping process.

BATHRM 12

STUDY 8

BEDRM 16

STUDY 8

BATHRM 12

BEDRM 16

BATHRM 12

STUDY 8

BEDRM 16 BATHRM 12

STUDY 8

CIRCULATION DOOR

CIRCULATION

CIRCULATION

DINING 32

DOOR

CIRCULATION

CIRCULATION

KITCHEN 12

DINING 32

DOOR

CIRCULATION

KITCHEN 12

CIRCULATION

DINING 32

KITCHEN 12 DINING 32

KITCHEN 12

01 BASE PLAN

02 PROGRAM-AREA BUBBLES

BATHRM 12

CIRCULATION

DOOR

03 REMOVE FRAME STRUCTURE

04 REFIT / CIRCLE PACK

BATHRM 12

STUDY 8

STUDY 8

BEDRM 16 DOOR

CIRCULATION

CIRCULATION

DOOR

BEDRM 16

KITCHEN 12

KITCHEN 12 DINING 32

DINING 32

05 OUTBOUND CIRCLES

06 CIRCLESET VORONOI

BATHRM 12

STUDY 8

BEDRM 16 DOOR

CIRCULATION

KITCHEN 12 DINING 32

07 PROTOTYPE PLAN

CIRCULATION

CIRCULATION

CIRCULATION

BEDRM 16


BATHRM 12

STUDY 8

STUDY 8

BATHRM 12

BEDRM 16 DOOR

CIRCULATION

CIRCULATION DINING 32

DOOR CIRCULATION

KITCHEN 12

CIRCULATION

DINING 32 KITCHEN 12 BEDRM 16

08 PLAN TYPE A - 16 POINT-GRID

09 PLAN TYPE B - 16 POINT-GRID

09 3D POINT GRID

10 LOFT

REORGANIZING PROCESS OF UNITE D’HABITATION . PROTOTYPE . 40 / �� 41



REORGANIZING THE UNITE D’HABITATION



In the previous chapter, we investigated the typical building design process and, by getting rid of the process’ rigid grid system, developed an alternative prototype consisting of the point grid and program bubbles, including some dummies. In this chapter, we will choose an existing housing project and reorganize it through the prototyping process. For this purpose, I choose Le Corbusier’s Unite d’Hhabitation, an iconic modern housing project heavily reliant on the Domino system. As I mentioned earlier in the previous chapters, Le Coubusier’s intention in proposing the Domino system was to use it as a flexible framework that would give architects freedom in their design processes 01. Although the Unite d’Habitation looks like an aggregation of Domino systems in appearance, it has long been considered a beloved modern design triumph, especially when we look at the beauty of its various unit types and the design freedom within them. It is widely known and acknowledged that this freedom was made possible by the support of Domino system. At least, that is what we believe.

01  Le Corbusier, The Unite d’Habitation in Marseilles by Foundation Le Corbusier Image Left < Le Corbusier, L’Unite D’Habitation De Marseille by Jacques Sbriglio

REORGANIZING PROCESS OF UNITE D’HABITATION . REORGANIZING THE UNITE D’HABITATION . 44 / 45 ��


Unite Types : Le Corbusier-La cite radieuse de Marseille by Richard A Bisch

PLAN TYPE A

PLAN TYPE G1S

PLAN TYPE B

PLAN TYPE CS

PLAN TYPE G2S

PLAN TYPE CI

PLAN TYPE CSPI

PLAN TYPE G3S PLAN TYPE E1S

PLAN TYPE E1I PLAN TYPE H1S

PLAN TYPE E2S

PLAN TYPE H2S PLAN TYPE E2I


However, in contrast to commonly accepted belief, the Unite d’Habitation was not a product of the harmonious combination of the Domino system as a framework, and various types of units as independent objects sitting freely on top of this framework. Rather, the relationship between these elements is pretty hierarchical, with the Domino system deciding everything from unit types to building shape.

TYPE A

TYPE C

TYPE B

TYPE Cs C_CIRCULATION

C_LOGGIA A:7.25 R:1.52

Cs_HALL

C_LIVING A:23.41 R:2.73

Cs_LOGGIA A:7.25 R:1.52

COR

Cs_BED A:29.26 R:3.05

C_KITCHEN A:5.85 R:1.36

A_LOGGIA A:3.62 R:1.07

A_BATH A:2.93 R:.97

A_LIVING A:11.7 R:1.93

Cs_BATH A:7.32 R:1.53

B_BATH A:2.93 R:.97

A_CIRCULATION

B_CIRCULATION B_LOGGIA A:7.25 R:1.52

COR

B_LIVING A:23.41 R:2.73

COR B_KITCHEN A:5.85 R:1.36

C_HALL C_LOGGIA A:7.25 R:1.52

Cs_CIRCULATION

C_BED A:29.26 R:3.05

Cs_LOGGIA A:7.25 R:1.52

Cs_LIVING A:23.41 R:2.73

COR

C_BATH A:7.32 R:1.53

TYPE Ci

Cs_KITCHEN A:5.85 R:1.36

TYPE E1i

TYPE E1s

TYPE E2s

E1s_BATH A:7.32 R:1.53 E1s_BED A:20.48 R:2.55

Ci_CIRCULATION Ci_LIVING A:11.7 R:1.93

E1s_LOGGIA A:3.62 R:1.07

E1s_ROOM A:14.63 R:2.16

E1s_LOGGIA A:3.62 R:1.07

E1s_ROOM A:14.63 R:2.16

Ci_BED A:29.26

E1s_HALL

E1s_LIVING A:23.41 R:2.73

E2s_HALL

E1i_LOGGIA A:3.62 R:1.07

E1i_ROOM A:14.63 R:2.16

E1i_LOGGIA A:3.62 R:1.07

E1i_ROOM A:14.63 R:2.16

E1i_LOGGIA A:7.25 R:1.52

E1i_BED A:32.19 R:3.2

E2s_BATH A:2.93 R:.97

E1i_BATH A:2.93 R:.97

E2s_ROOM A:14.63 R:2.16

E2s_LOGGIA A:3.62 R:1.07

E2s_ROOM A:14.63 R:2.16

E2s_LOGGIA A:3.62 R:1.07

E2s_KITCHEN A:5.85 R:1.36 E2s_LOGGIA A:7.25 R:1.52

COR E1s_CIRCULATION

Ci_BATH A:7.32 R:1.53

E2s_BATH A:2.93 R:.97

E2s_BED A:20.48 R:2.55

COR E1i_KITCHEN A:5.85 R:1.36

E1s_BATH A:2.93 R:.97

E1s_KITCHEN A:5.85 R:1.36 E1s_LOGGIA A:7.25 R:1.52

R:3.05

E2s_BATH R:7.32 R:1.53

E1i_CIRCULATION E1i_LIVING A:11.7 R:1.93

Ci_HALL Ci_LOGGIA A:7.25 R:1.52

E1s_BATH A:2.93 R:.97

COR Ci_KITCHEN A:5.85 R:1.36

E2s_LIVING A:23.41 R:2.73

COR E2s_CIRCULATION

E1i_HALL E1i_BATH A:2.93 R:.97

E1i_BATH A:7.32 R:1.53

TYPE E2i

TYPE G1s

TYPE G3s

TYPE G2s

G3s_LOGGIA A:7.25 R:1.52

G1s_LOGGIA A:3.62 R:1.07

G1s_ROOM A:14.63 R:2.16

G1s_LOGGIA A:3.62 R:1.07

G1s_ROOM A:14.63 R:2.16

G1s_LOGGIA A:3.62 R:1.07

G1s_ROOM A:14.63 R:2.16

G1s_LOGGIA A:3.62 R:1.07

G1s_ROOM A:14.63 R:2.16

G1s_LOGGIA A:7.25 R:1.52

G1s_BED A:32.19 R:3.2

G1s_BATH A:2.93 R:.97

G1s_BATH A:2.93 R:.97 G1s_BATH A:2.93 R:.97

G2s_BATH A:2.93 R:.97

G1s_HALL

G1s_BATH A:2.93 R:.97

G2s_HALL

E2i_LIVING A:11.7 R:1.93 E2i_CIRCULATION

E2i_LOGGIA A:3.62 R:1.07

E2i_ROOM A:14.63 R:2.16

E2i_LOGGIA A:3.62 R:1.07

E2i_ROOM A:14.63 R:2.16

E2i_BATH A:2.93 R:.97

G2s_BATH A:2.93 R:.97 G2s_BATH A:2.93 R:.97

E2i_KITCHEN A:5.85 R:1.36 COR

G2s_LOGGIA A:7.25 R:1.52

G2s_ROOM A:14.63 R:2.16

G3s_LOGGIA A:3.62 R:1.07

G3s_ROOM A:14.63 R:2.16

G3s_LOGGIA A:3.62 R:1.07

G3s_ROOM A:14.63 R:2.16

G3s_LOGGIA A:7.25 R:1.52

G3s_BED A:32.19 R:3.2

G3s_BATH A:2.93 R:.97

G3s_HALL G3s_BATH A:2.93 R:.97

G3s_ROOM A:35.11 R:3.34

G2s_LOGGIA A:3.62 R:1.07

G2s_ROOM A:14.63 R:2.16

G2s_LOGGIA A:3.62 R:1.07

G2s_ROOM A:14.63 R:2.16

G2s_LOGGIA A:3.62 R:1.07

G2s_ROOM A:14.63 R:2.16

G2s_LOGGIA A:3.62 R:1.07

G3s_BATH A:7.32 R:1.53

G3s_BATH A:8.78 R:1.67

G2s_BED A:32.19 R:3.2 G2s_BATH A:7.32 R:1.53

G1s_BATH A:7.32 R:1.53

G2s_BATH A:2.93 R:.97

E2i_BATH A:7.32 R:1.53

G3s_CIRCULATION E2i_BED A:32.19 R:3.2

E2i_LOGGIA A:7.25 R:1.52

G3s_LOGGIA A:7.25 R:1.52

E2i_HALL

G3s_LIVING A:23.41 R:2.73

COR G3s_KITCHEN A:5.85 R:1.36

E2i_BATH A:2.93 R:.97 G2s_CIRCULATION G2s_LOGGIA A:7.25 R:1.52

G2s_LIVING A:23.41 R:2.73

COR G2s_KITCHEN A:5.85 R:1.36

G1s_CIRCULATION G1s_LOGGIA A:7.25 R:1.52

G1s_LIVING A:23.41 R:2.73

COR G1s_KITCHEN A:5.85 R:1.36

TYPE H1s

TYPE H2s

H1s_HALL H1s_LOGGIA A:3.62 R:1.07

H1s_ROOM A:14.63 R:2.16

H1s_LOGGIA A:3.62 R:1.07

H1s_ROOM A:14.63 R:2.16

H1s_LOGGIA A:3.62 R:1.07

H1s_ROOM A:14.63 R:2.16

H1s_LOGGIA A:3.62 R:1.07

H1s_ROOM A:14.63 R:2.16

H1s_BATH A:2.93 R:.97

H2s_BATH A:2.93 R:.97

H2s_ROOM A:14.63 R:2.16

H2s_LOGGIA A:3.62 R:1.07

H2s_ROOM A:14.63 R:2.16

H2s_LOGGIA A:3.62 R:1.07

H2s_ROOM A:14.63 R:2.16

H2s_LOGGIA A:3.62 R:1.07

H2s_ROOM A:14.63 R:2.16

H2s_LOGGIA A:3.62 R:1.07

H2s_HALL

H2s_BATH A:2.93 R:.97

H1s_BATH A:2.93 R:.97 H1s_BATH A:2.93 R:.97

H1s_BATH A:8.78 R:1.67

H2s_BATH A:2.93 R:.97 H2s_LOGGIA A:7.25 R:1.52

H2s_BED A:32.19 R:3.2 H2s_BATH A:7.32 R:1.53

H1s_BATH A:2.93 R:.97

H1s_LIVING A:23.41 R:2.73

COR H1s_CIRCULATION

H2s_BATH A:2.93 R:.97

H2s_KITCHEN A:5.85 R:1.36

H1s_KITCHEN A:5.85 R:1.36 H1s_LOGGIA A:7.25 R:1.52

H1s_BED A:35.11 R:3.34

H2s_LOGGIA A:7.25 R:1.52

H2s_LIVING A:23.41 R:2.73

COR H2s_CIRCULATION

REORGANIZING PROCESS OF UNITE D’HABITATION . REORGANIZING THE UNITE D’HABITATION . 46 / 47 ��


TYPE A

TYPE B A_LIVING

x10

CELL TYPE:

CELL TYPE:

x3

CELL TYPE:

B_LIVING

CIR

A_LOGGIA CELL TYPE:

TYPE Cs

TYPE C B_BATH

A_BATH

CELL TYPE:

x4

COR

CIR

x3

CELL TYPE:

CIR

CIR

x20

COR

B_LOGGIA x8

CELL TYPE:

COR

C_LOGGIA CELL TYPE:

B_KITCHEN

Cs_LOGGIA

C_LIVING

x8

CELL TYPE:

C_KITCHEN

x20

CELL TYPE:

x6

CELL TYPE:

Cs_BED

x8

CELL TYPE:

x28

Cs_BATH

x6

CELL TYPE:

CIR

CIR

COR

C_LOGGIA CELL TYPE:

C_BED

x8

CELL TYPE:

Cs_LOGGIA x28

TYPE E1s

CELL TYPE:

C_BATH CELL TYPE:

TYPE Ci

x6

Cs_LIVING

x8

CELL TYPE:

x6

Cs_KITCHEN

x20

CELL TYPE:

x6

TYPE E2s

TYPE E1i

E2s_BATH CELL TYPE:

CELL TYPE:

CIR

E1s_BATH

E1s_BED

CELL TYPE:

x22

x3

E2s_BATH

x6

CELL TYPE:

E2s_ROOM

x6

CELL TYPE:

COR E1i_LIVING CELL TYPE:

x12

CELL TYPE:

CELL TYPE:

x6

x22

CIR

CELL TYPE:

Ci_LIVING CELL TYPE:

CELL TYPE:

x12

E1s_LOGGIA CELL TYPE:

COR

x3

CIR

E1s_ROOM

x4

CELL TYPE:

CELL TYPE:

x13

x13

E1s_LOGGIA

x6

CELL TYPE:

E1s_BATH

x4

CELL TYPE:

x3

E1i_ROOM CELL TYPE:

E1i_BATH

x13

CELL TYPE:

x3

CELL TYPE:

CELL TYPE:

x4

E1i_ROOM CELL TYPE:

CIR

Ci_BED

x8

CELL TYPE:

CELL TYPE:

Ci_BATH CELL TYPE:

CELL TYPE:

x6

COR

x8

CIR

x3

x6

COR

E1s_LOGGIA x28

CELL TYPE:

CIR E1i_BATH

x4

E1s_KITCHEN CELL TYPE:

CELL TYPE:

CELL TYPE:

x20

E2s_LOGGIA

x13

E1i_LOGGIA CELL TYPE:

E2s_KITCHEN

E2s_LIVING

E1i_LOGGIA

Ci_LOGGIA

CELL TYPE:

x3

E1s_ROOM

Ci_KITCHEN CELL TYPE:

E2s_ROOM

E2s_BATH

E1s_BATH

CIR

E1s_LIVING

x8

CELL TYPE:

x6

E1i_LOGGIA

x20

CIR

CELL TYPE:

E1i_BED

x8

CELL TYPE:

x30

E1i_BATH CELL TYPE:

TYPE E2i

TYPE G1s

x6

TYPE G2s G1s_ROOM CELL TYPE:

TYPE G3s

G1s_BATH

x13

CELL TYPE:

x3

G3s_LOGGIA

G1s_LOGGIA CELL TYPE:

CELL TYPE:

G1s_ROOM CELL TYPE:

CELL TYPE:

G3s_ROOM

G2s_BATH

x13

CELL TYPE:

CELL TYPE:

x3

G2s_ROOM

G1s_BATH

x4

CELL TYPE:

CELL TYPE:

x3

x13

G2s_LOGGIA

G3s_LOGGIA

CELL TYPE:

CELL TYPE:

x4

CELL TYPE:

G1s_LOGGIA CELL TYPE:

CELL TYPE:

CELL TYPE:

x3

CELL TYPE:

CIR G2s_BATH

CIR

x13

CELL TYPE:

G1s_ROOM CELL TYPE:

x6

CELL TYPE:

CELL TYPE:

CELL TYPE:

CELL TYPE:

G2s_BED

G1s_BATH

x4

CELL TYPE:

x3

G2s_ROOM CELL TYPE:

x13

G2s_LOGGIA

G3s_LOGGIA

CELL TYPE:

CELL TYPE:

x4

CIR G3s_BATH

x4

CELL TYPE:

x3

G3s_ROOM CELL TYPE:

CELL TYPE:

x13

CELL TYPE:

CELL TYPE:

x4

G3s_LOGGIA

x8

G2s_BATH

G1s_BED

CELL TYPE:

x30

x6

CELL TYPE:

G2s_BATH CELL TYPE:

x3

x32

G2s_LOGGIA

G2s_LOGGIA

CELL TYPE:

x13

x3

G2s_ROOM

x30

x3

x12

CIR

x3

G2s_BATH

x13

G1s_LOGGIA E2i_LIVING

CELL TYPE:

G3s_ROOM

G1s_ROOM

x4

E2i_KITCHEN

G3s_BATH

x13

x4

G1s_BATH

COR

x8

x4

G1s_LOGGIA

G2s_ROOM CELL TYPE:

x13

G3s_BED

x8

CELL TYPE:

G3s_BATH

x30

G2s_LOGGIA CELL TYPE:

CELL TYPE:

x6

x4

G1s_LOGGIA CELL TYPE:

E2i_ROOM CELL TYPE:

CELL TYPE:

G1s_BATH

G3s_BATH

CELL TYPE:

CELL TYPE:

x6

E2i_BATH

E2i_BATH

x13

x8

CELL TYPE:

x3

x6

E2i_LOGGIA CELL TYPE:

x4

E2i_ROOM CELL TYPE:

E2i_LOGGIA CELL TYPE:

E2i_BED

x13

CELL TYPE:

CELL TYPE:

x30

E2i_LOGGIA CELL TYPE:

x8

CIR

E2i_BATH

x4

x3

CIR

CIR

CELL TYPE:

CELL TYPE:

CELL TYPE:

x20

COR

x8

CELL TYPE:

x6

H2s_BATH CELL TYPE:

CIR

CELL TYPE:

x13

x3

H2s_ROOM

CIR

CELL TYPE:

H1s_BED CELL TYPE:

H1s_BATH CELL TYPE:

H2s_BATH

x4

CELL TYPE:

H1s_ROOM CELL TYPE:

CELL TYPE:

CELL TYPE:

H1s_ROOM CELL TYPE:

x13

CELL TYPE:

H1s_BATH CELL TYPE:

CELL TYPE:

x8

H2s_BATH

x8

CELL TYPE:

x6

x4

H1s_ROOM CELL TYPE:

H1s_LOGGIA CELL TYPE:

x13

H1s_BATH

x4

CELL TYPE:

H1s_LIVING CELL TYPE:

x20

x3

H1s_KITCHEN CELL TYPE:

H2s_LIVING

x6

CELL TYPE:

COR

H1s_LOGGIA CELL TYPE:

H2s_LOGGIA CELL TYPE:

x4

H2s_ROOM

H2s_LOGGIA

CELL TYPE:

CELL TYPE:

x13

x4

x8

x20

H2s_KITCHEN CELL TYPE:

x6

COR

H2s_LOGGIA CELL TYPE:

CIR

x3

H2s_ROOM

H2s_LOGGIA

CELL TYPE:

CELL TYPE:

x13

x4

H2s_LOGGIA

x3

H1s_LOGGIA CELL TYPE:

x30

x3

H1s_BATH CELL TYPE:

CELL TYPE:

H2s_BED

H1s_BATH

x4

x3

H2s_BATH

x13

H1s_LOGGIA

x13

x32

x3

H1s_LOGGIA CELL TYPE:

x8

CIR

x8

CELL TYPE:

H2s_BATH

H2s_ROOM

H2s_LOGGIA

CELL TYPE:

CELL TYPE:

CELL TYPE:

x3

x13

x4

x20

COR

COR

G3s_LOGGIA G2s_KITCHEN CELL TYPE:

TYPE H2s

H1s_ROOM

G3s_LIVING

x20

G2s_LOGGIA

G1s_KITCHEN CELL TYPE:

TYPE H1s

CIR

G2s_LIVING

G1s_LIVING

G1s_LOGGIA

x6

x13

E2s_LOGGIA CELL TYPE:

x4

E2s_BED

E1i_KITCHEN

CELL TYPE:

x8

G3s_KITCHEN CELL TYPE:

x6

x8

x13

E2s_LOGGIA CELL TYPE:

x4


For example, it is believed that in the Unite d’Habitation there are fourteen distinct unit types that are purely unique in terms of their typology 01. However, the typology diagram shows that there are overlapping/redundant unit types among these fourteen, and when we remove the redundancy, they boil down to only six unique types. This indicates that the fourteen unit types are not the product of typological thoughts or needs, but of the ad-hoc, situational needs arising from the need to morph them into the grid system. In the simplified network diagram below, we can easily see that there are only six unique unit types.

01  Le Corbusier-La cite radieuse de Marseille by Richard A Bisch

U.TYPE 1

U.TYPE 5

U.TYPE 4 LG

LV

LV

LG

HAL

CIR

LV

LG

CIR

CIR

COR

U.TYPE 6 LG

CIR

LV

BT

LG

LG

LG HAL COR

KC

KC

KC

BD

BD

BD

CIR

CIR

CIR

HAL

U.TYPE 2

BT

COR

BT

BT HAL COR

LG LV

LG

LG

HAL

BD CIR

CIR

CIR

COR

LG

BD

BD

BT BT

BT

BT KC

BD

LV

BD CIR

CIR

BT

BT

BT

U.TYPE 3

LG

LG

LG BD CIR

LG

LG

CIR

LG

BD

BD CIR

CIR

KC

BT

BT

HAL COR

LG

LG

BD

BD

CIR

CIR

BT

BT

REORGANIZING PROCESS OF UNITE D’HABITATION . REORGANIZING THE UNITE D’HABITATION . 48 / 49 ��


In addition, these six types share some parts, meaning that they are the product of mixing and matching three unique cell cluster types. As we can see from the Diagram 1, they are composed of four cells. However, their formations are slightly different from one another. For example, Cell Cluster Type 1 (C.C. TYPE1) has one cell in the first place and another cell in the next, followed by two other cells, creating a 1-1-2 format. Cell Cluster Type 2 (C.C. TYPE 2) has a 0-2-2 format, while C.C. TYPE 3 has a 1-2-1.

U.TYPE 1

U.TYPE 5

U.TYPE 4 LG

LV

LV

LG

HAL

CIR

LV

LG

CIR

CIR

COR

U.TYPE 6 LG

CIR

LV

BT

LG

LG

LG HAL COR

KC

KC

KC

BD

BD

BD

CIR

CIR

CIR

HAL

U.TYPE 2

BT

COR

BT

BT HAL COR

LG LV

LG

LG

BD CIR

CIR

CIR

COR

LG

BD

BD HAL BT

BT

BT

BT KC

BD

LV

BD CIR

CIR

BT

BT

BT

U.TYPE 3

LG

LG

LG BD CIR

LG

LG

CIR

LG

BD

BD CIR

CIR

KC

BT

BT

HAL COR

LG

LG

BD

BD

CIR

CIR

BT

BT


As is discussed in the prototype chapter, the different number of cells in the clusters will cause a significant problem in lofting and bundling them together. That being said, we somehow need to match the number of cells and their formations, which can be easily done by adding some dummy cells to the clusters. Adding dummy cells will make the clusters have the same numbers of cells and exactly the same cell formation, in this case, 1-2-2. This formation will be the smallest scale, non-divisible framework on top of which program bubbles can be mapped.

LG BT

BT

CIR

LV

LG LV

CIR

DM

C.C.TYPE 1 - Reformatted

C.C.TYPE 1

4 CELLS (1-1-2)

5 CELLS (1-2-2)

C.C.TYPE 2 - Reformatted

KC

LV

LG

KC

BT

BT

CIR

LV

LG

C.C.TYPE 2

4 CELLS (0-2-2)

LV

LG

KC

DM

KC

CIR

CIR

LG

C.C.TYPE 3 - Reformatted BD

C.C.TYPE 3

5 CELLS (1-2-2)

4 CELLS (1-2-1)

5 CELLS (1-2-2)

REORGANIZING PROCESS OF UNITE D’HABITATION . REORGANIZING THE UNITE D’HABITATION . 50 / 51 ��


The diagram shows the entire map of the six unit types and how these are organized by the three cell-cluster types.

U.TYPE 2

LV

LG BT

KC

DM

LV

LG BT

CIR

BT

DM

CIR

HAL COR

LG

LV

LG

COR.HAL.01(CIR.LV.KC.LG.DM).01(CIR.LV.DM.LG.BT)

KC

HAL

CIR

COR

U.TYPE 3

COR.HAL.01(CIR.LV.KC.LG.BT)

LV

COR.HAL.01(CIR.LV.KC.LG.DM)

DM

U.TYPE 1

HAL

CIR

COR

LV

DM LG

KC

DM

CIR LV

LG

KC

DM LG

KC LV

LG

COR.HAL.01(CIR.LV.KC.LG.DM).05(CIR.LV.DM.LG.BT)

CIR

LG

U.TYPE 6

LG

COR.HAL.01(CIR.LV.KC.LG.DM).04(CIR.LV.DM.LG.BT)

LV

U.TYPE 5

CIR

LV

COR.HAL.01(CIR.LV.KC.LG.DM).03(CIR.LV.DM.LG.BT)

LV

U.TYPE 4

HAL

LV

BT BT BT LG

DM LV

BT LG BT

DM

BT

LV

LG BT

CIR

DM

CIR

DM LV CIR

DM

CIR

LG

DM

CIR

BT LG

DM

CIR

LV

BT LG BT

HAL COR

CIR

DM LV CIR

DM

CIR

COR

LG

DM LV

BT LG

CIR DM LV

BT LG

CIR DM LV

CIR

HAL COR


For example, a three-bedroom apartment type can be expressed with COR.HAL.01(CIR.LV.KC.LG.DM).03(CIR.LV.DM.LG.BT), where (CIR.LV.KC.LG.DM) represents a cell cluster of one circulation, living room, kitchen, and loggia; and 03(CIR.LV.DM.LG.BT) represents three cell clusters each consisting of one circulation, bedroom, bathroom, and loggia.

COR.HAL.01(CIR.LV.KC.LG.DM).03(CIR.LV.DM.LG.BT)

LG

LV

DM LG

LV

KC

CIR

CELL CLUSTER TYPE 1

UNIT TYPE 4 BT LG

DM

BT

LV

LG

DM

BT

CIR

LV

DM

CIR

HAL COR

CIR

CELL CLUSTER TYPE 3

U.TYPE 4

REORGANIZING PROCESS OF UNITE D’HABITATION . REORGANIZING THE UNITE D’HABITATION . 52 / 53 ��


TYPE A

TYPE C

TYPE B

TYPE Cs C_CIRCULATION C_LIVING A:23.41 R:2.73

Cs_BED A:29.26 R:3.05

Cs_HALL

COR C_LOGGIA A:7.25 R:1.52

A_LIVING A:11.7 R:1.93 A_LOGGIA A:3.62 R:1.07

Cs_LOGGIA A:7.25 R:1.52

C_KITCHEN A:5.85 R:1.36

Cs_BATH A:7.32 R:1.53

B_BATH A:2.93 R:.97

A_BATH A:2.93 R:.97

B_LIVING A:23.41 R:2.73

A_CIRCULATION

B_CIRCULATION

COR

COR B_LOGGIA A:7.25 R:1.52

B_KITCHEN A:5.85 R:1.36

C_BED A:29.26 R:3.05

Cs_LIVING A:23.41 R:2.73

C_HALL

Cs_CIRCULATION COR

C_LOGGIA A:7.25 R:1.52

TYPE Ci

TYPE E1i

TYPE E1s E1s_BED A:20.48R:2.55

E1s_ROOM A:14.63R:2.16

Ci_CIRCULATION Ci_LIVING A:11.7 R:1.93

E1s_LOGGIA A:3.62 R:1.07

COR Ci_KITCHEN A:5.85 R:1.36

Ci_BED A:29.26 R:3.05

E1s_BATH A:7.32 R:1.53

E2s_BATH A:2.93 R:.97 E1s_BATH A:2.93R:.97

E1i_CIRCULATION E2s_BED A:20.48 R:2.55

E1i_LIVING A:11.7 R:1.93

E1s_HALL

E2s_ROOM A:14.63 R:2.16 E2s_LOGGIA A:3.62 R:1.07

E2s_HALL E1i_KITCHEN A:5.85 R:1.36

E1s_BATH A:2.93R:.97

E1s_LIVING A:23.41R:2.73

E2s_BATH R:7.32 R:1.53

COR

E2s_BATH A:2.93 R:.97

E1i_ROOM A:14.63R:2.16

E1s_KITCHEN A:5.85 R:1.36

E1i_BATH A:2.93 R:.97

E2s_LIVING A:23.41 R:2.73

E1i_LOGGIA A:3.62 R:1.07

COR

E1i_LOGGIA A:3.62 R:1.07

E2s_KITCHEN A:5.85 R:1.36

E2s_LOGGIA A:7.25 R:1.52

E1i_HALL E1s_CIRCULATION

E2s_ROOM A:14.63 R:2.16

COR

E1i_ROOM A:14.63R:2.16

E1s_LOGGIA A:7.25 R:1.52

Ci_BATH A:7.32 R:1.53

Cs_KITCHEN A:5.85 R:1.36

TYPE E2s

E1s_ROOM A:14.63R:2.16

E1s_LOGGIA A:3.62 R:1.07

Ci_HALL

Ci_LOGGIA A:7.25 R:1.52

Cs_LOGGIA A:7.25 R:1.52

C_BATH A:7.32 R:1.53

E2s_CIRCULATION

E1i_BATH A:2.93 R:.97

E1i_BED A:32.19R:3.2 E1i_LOGGIA A:7.25 R:1.52

TYPE E2i

TYPE G1s

E1i_BATH A:7.32 R:1.53

TYPE G3s

TYPE G2s

G3s_LOGGIA A:7.25 R:1.52 G1s_ROOM A:14.63R:2.16

G3s_ROOM A:14.63R:2.16

G1s_BATH A:2.93R:.97

G1s_LOGGIA A:3.62 R:1.07 G1s_ROOM A:14.63R:2.16

G3s_HALL

G1s_BATH A:2.93R:.97

G1s_LOGGIA A:3.62 R:1.07 G1s_ROOM A:14.63R:2.16

G2s_BATH A:2.93 R:.97

G1s_BATH A:2.93R:.97

G2s_ROOM A:14.63R:2.16

G1s_ROOM A:14.63R:2.16 G2s_HALL G1s_LOGGIA A:3.62 R:1.07

G1s_BATH A:2.93R:.97

E2i_LIVING A:11.7 R:1.93 G1s_BED A:32.19R:3.2

E2i_CIRCULATION

E2i_ROOM A:14.63R:2.16

E2i_LOGGIA A:3.62 R:1.07

G2s_LOGGIA A:7.25 R:1.52

G2s_ROOM A:14.63R:2.16

G2s_BATH A:7.32 R:1.53

G1s_BATH A:7.32 R:1.53

G2s_BATH A:2.93 R:.97 G2s_BATH A:2.93 R:.97

G2s_BED A:32.19R:3.2

COR G1s_LOGGIA A:7.25 R:1.52

G2s_ROOM A:14.63R:2.16

G1s_HALL

G1s_LOGGIA A:3.62 R:1.07

E2i_KITCHEN A:5.85 R:1.36

G3s_BATH A:2.93 R:.97

G3s_LOGGIA A:3.62 R:1.07

G2s_BATH A:2.93 R:.97

G2s_ROOM A:14.63R:2.16

G3s_LOGGIA A:3.62 R:1.07

G3s_BATH A:2.93 R:.97

G3s_ROOM A:14.63R:2.16

G2s_LOGGIA A:3.62 R:1.07

G3s_LOGGIA A:7.25 R:1.52

G3s_BED A:32.19R:3.2

G3s_BATH A:7.32 R:1.53

G2s_LOGGIA A:3.62 R:1.07

G3s_BATH A:8.78 R:1.67

G2s_LOGGIA A:3.62 R:1.07

E2i_BATH A:7.32 R:1.53

E2i_BATH A:2.93 R:.97

G3s_CIRCULATION

E2i_BED A:32.19 R:3.2

E2i_ROOM A:14.63R:2.16

G3s_LIVING A:23.41R:2.73 E2i_LOGGIA A:7.25 R:1.52

COR G3s_LOGGIA A:7.25 R:1.52

E2i_LOGGIA A:3.62 R:1.07

G3s_KITCHEN A:5.85 R:1.36

E2i_HALL

E2i_BATH A:2.93 R:.97

G3s_ROOM A:35.11R:3.34

G2s_LOGGIA A:3.62 R:1.07

G2s_CIRCULATION G2s_LIVING A:23.41R:2.73 COR G2s_LOGGIA A:7.25 R:1.52

G2s_KITCHEN A:5.85 R:1.36

G1s_CIRCULATION G1s_LIVING A:23.41R:2.73 COR G1s_LOGGIA A:7.25 R:1.52

TYPE H1s

G1s_KITCHEN A:5.85 R:1.36

TYPE H2s

H1s_ROOM A:14.63R:2.16

H1s_HALL

H1s_BATH A:2.93 R:.97

H2s_BATH A:2.93 R:.97

H1s_BED A:35.11R:3.34 H2s_HALL

H2s_ROOM A:14.63R:2.16

H1s_LOGGIA A:3.62 R:1.07 H1s_ROOM A:14.63R:2.16 H1s_LOGGIA A:3.62 R:1.07

H2s_BATH A:2.93 R:.97

H1s_BATH A:2.93 R:.97 H1s_ROOM A:14.63R:2.16

H1s_BATH A:2.93 R:.97

H2s_LOGGIA A:7.25 R:1.52

H1s_ROOM A:14.63R:2.16 H1s_LOGGIA A:3.62 R:1.07

H2s_BATH A:2.93 R:.97

H2s_BED A:32.19R:3.2

H1s_BATH A:8.78 R:1.67

H1s_LOGGIA A:3.62 R:1.07

H2s_ROOM A:14.63R:2.16

H2s_BATH A:7.32 R:1.53

H1s_BATH A:2.93 R:.97

H1s_LIVING A:23.41R:2.73

H2s_BATH A:2.93 R:.97

H2s_LIVING A:23.41R:2.73

H1s_KITCHEN A:5.85 R:1.36

H2s_ROOM A:14.63R:2.16

H2s_ROOM A:14.63R:2.16

H2s_LOGGIA A:3.62 R:1.07

H2s_LOGGIA A:3.62 R:1.07

H2s_LOGGIA A:3.62 R:1.07

H2s_LOGGIA A:3.62 R:1.07

H2s_KITCHEN A:5.85 R:1.36

COR

COR

H2s_LOGGIA A:7.25 R:1.52

H1s_LOGGIA A:7.25 R:1.52

H2s_CIRCULATION H1s_CIRCULATION

CELL SIZE (EXISTING)

1.0

1.4

1.2

1.7

2.0

1.9

2.1

2.6

2.8

3.1

3.2

3.3

CELL TYPOLOGY (EXISTING)

CIR

HAL

COR

LV

LG

BT

BD

KC

CELL SIZE (PROPOSED)

CIR

HAL / COR DUMMY CELL FLEXIABLE RADIUS

1.5 ~

KT / BT SMALL CELL RADIUS 1.5 OR BELOW

2.0 ~ 1.6

LG MEDIUM CELL RADIUS 1.6 TO 2.0

2.5

LV / BD / RM LARGE CELL RADIUS 2.5

E2s_LOGGIA A:3.62 R:1.07


In the previous discussion, we established the framework for the alternative design process and also mapped required programs on the framework. Now we need to figure out the size of individual program bubbles based on their actual footprints. From the room data sheet, we can get twelve different sizes of program bubbles that fall into roughly five categories; points without area data, dummy bubbles with a flexible area, small (radius of 1.5 meters or below), medium (radius from 1.6 – 2.0 meters) and large (radius from 2.1 – 2.5 meters) bubbles, depending on the programs they contain. A point without area data, represented by single dot, is for circulation that usually does not have any areal requirement. For planning efficiency, circulation areas usually need to be minimized. Dummy bubbles can represent a hallway or a closet space, depending on how the overall plan looks. Small-sized bubbles with a radius of less than 1.5 meters can accommodate a kitchen or bathroom. Medium-sizes bubble with radius between 1.6 and 2.0 meters can be the best spot for a loggia, and large-sized ones with a radius bigger than 2.1 meters, for a bedroom or living room.

UNIT TYPE

CELL NAME

A

A_BATH A_LOGGIA A_LIVING A_CIRCULATION A_HALL B_BATH B_KITCHEN B_LOGGIA B_LIVING B_CIRCULATION B_HALL C_BATH C_KITCHEN C_LOGGIA C_LOGGIA C_LIVING C_BED C_CIRCULATION C_HALL Ci_BATH Ci_KITCHEN Ci_LOGGIA Ci_LIVING Ci_BED Ci_CIRCULATION Ci_HALL Cs_BATH Cs_KITCHEN Cs LOGGIA Cs_LOGGIA Cs_LOGGIA Cs_LIVING Cs_BED Cs_CIRCULATION Cs_HALL E1i_BATH E1i_BATH E1i_LOGGIA E1i_LOGGIA E1i_BATH E1i_KITCHEN E1i_LOGGIA E1i_LIVING E1i_ROOM E1i_ROOM E1i_BED E1i_CIRCULATION E1i_HALL E1s_BATH E1s_BATH E1s_LOGGIA E1s_LOGGIA E1s_BATH E1s_KITCHEN E1s_LOGGIA E1s_ROOM E1s_ROOM E1s_LIVING E1s_BED E1s_CIRCULATION E1s_HALL E2i_BATH E2i_BATH E2i_LOGGIA E2i_LOGGIA E2i_BATH E2i_KITCHEN E2i_LOGGIA E2i_LIVING E2i_ROOM E2i_ROOM E2i_BED E2i_CIRCULATION E2i_HALL E2s_BATH E2s BATH E2s_BATH E2s_LOGGIA E2s_LOGGIA E2s_BATH E2s_KITCHEN E2s_LOGGIA E2s_ROOM E2s_ROOM E2s_LIVING E2s_BED E2s_CIRCULATION E2s_HALL

B

C

Ci

Cs

E1i

E1s

E2i

E2s

AREA 3.30 4.40 11.00

RADIUS 1.00 1.20 1.90

x03 1

x04

x06

x08

1

CELL TYPES x12 x13

UNIT CODE (BY PROGRAM) x20

x22

x28

x30

x32

01(CIR.LV.BT.LG)

1.00 1.40 1.70 2.60

6.60 6.60 8.80 8.80 22.00 30.80

1.40 1.40 1.70 1.70 2.60 3.10

1 1

6.60 6.60 8.80 13.20 30.80

1.40 1.40 1.70 2.00 3.10

1 1

6.60 6.60 8 80 8.80 8.80 22.00 30.80

1.40 1.40 1 70 1.70 1.70 2.60 3.10

1 1

3.30 3.30 4.40 4.40 6.60 6.60 8.80 13.20 14.30 14.30 33.00

1.00 1.00 1.20 1.20 1.40 1.40 1.70 2.00 2.10 2.10 3.20

1 1

3.30 3.30 4.40 4.40 6.60 6.60 8.80 14.30 14.30 22.00 24.20

1.00 1.00 1.20 1.20 1.40 1.40 1.70 2.10 2.10 2.60 2.80

1 1

3.30 3.30 4.40 4.40 6.60 6.60 8.80 13.20 14.30 14.30 33.00

1.00 1.00 1.20 1.20 1.40 1.40 1.70 2.00 2.10 2.10 3.20

1 1

3.30 3.30 3 30 4.40 4.40 6.60 6.60 8.80 14.30 14.30 22.00 24.20

1.00 1.00 1 00 1.20 1.20 1.40 1.40 1.70 2.10 2.10 2.60 2.80

1 1

1

1

1 1

1

01(LV.KT.BT.LG)

26

01(CIR.LV.KC.LG).01(CIR.BD.BT.LG)

7

1

01(CIR.LV.KC.LG).01(CIR.BD.BT.LG)

45

1

01(CIR.LV.KC.LG).01(CIR.BD.BT.LG) 1 1

1

G1s_BATH G1s_BATH G1s_BATH G1s_BATH G1s_LOGGIA G1s_LOGGIA G1s_LOGGIA G1s_LOGGIA G1s_BATH G1s_KITCHEN G1s_LOGGIA G1s_LOGGIA G1s_ROOM G1s_ROOM G1s_ROOM G1s_ROOM G1s_LIVING G1s_BED G1s_CIRCULATION G1s_HALL G2s_BATH G2s_BATH G2s_BATH G2s_BATH G2s_LOGGIA G2s_LOGGIA G2s_LOGGIA G2s_LOGGIA G2s BATH G2s_BATH G2s_KITCHEN G2s_LOGGIA G2s_LOGGIA G2s_ROOM G2s_ROOM G2s_ROOM G2s_ROOM G2s_LIVING G2s_BED G2s_CIRCULATION G2s_HALL G3s_BATH G3s_BATH G3s_LOGGIA G3s_LOGGIA G3s_BATH G3s_KITCHEN G3s_BATH G3s_LOGGIA G3s_LOGGIA G3s_LOGGIA G3s_ROOM G3s_ROOM G3s_LIVING G3s_BED G3s_ROOM G3s_CIRCULATION G3s_HALL H1s_BATH H1s_BATH H1s_BATH H1s_BATH H1s_LOGGIA H1s_LOGGIA H1s_LOGGIA H1s_LOGGIA H1s_KITCHEN H1s_BATH H1s_LOGGIA H1s_ROOM H1s_ROOM H1s_ROOM H1s_ROOM H1s_LIVING H1s_BED H1s CIRCULATION H1s_CIRCULATION H1s_HALL H2s_BATH H2s_BATH H2s_BATH H2s_BATH H2s_LOGGIA H2s_LOGGIA H2s_LOGGIA H2s_LOGGIA H2s_BATH H2s_KITCHEN H2s_LOGGIA H2s_LOGGIA H2s_ROOM H2s_ROOM H2s_ROOM H2s_ROOM H2s_LIVING H2s_BED H2s_CIRCULATION H2s_HALL

1 1

1

1 1

1 1

6

13

G3s 1

1

1

G2s

1

1 1

1

1 1

1

1

7

H1s

1

1 1

111

1 01(CIR.LV.KC.LG).03(CIR.BD.BT.LG)

1 1

CELL NAME

G1s

1

01(CIR.LV.KC.LG).03(CIR.BD.BT.LG) 1 1

UNIT TYPE

1

01(CIR.LV.KC.LG).03(CIR.BD.BT.LG) 1 1

8

1

01(CIR.LV.KC.LG).03(CIR.BD.BT.LG) 1 1

EA

1

3.30 6.60 8.80 22.00

1

x10

89 H2s

1 1

1

1 1

1

1

AREA

RADIUS x03 1 1 1 1

3.30 3.30 3.30 3.30 4.40 4.40 4.40 4.40 6.60 6.60 8.80 8.80 14.30 14.30 14.30 14.30 22.00 33.00

1.00 1.00 1.00 1.00 1.20 1.20 1.20 1.20 1.40 1.40 1.70 1.70 2.10 2.10 2.10 2.10 2.60 3.20

3.30 3.30 3.30 3.30 4.40 4.40 4.40 4.40 6 60 6.60 6.60 8.80 8.80 14.30 14.30 14.30 14.30 22.00 33.00

1.00 1.00 1.00 1.00 1.20 1.20 1.20 1.20 1 40 1.40 1.40 1.70 1.70 2.10 2.10 2.10 2.10 2.60 3.20

1 1 1 1

3.30 3.30 4.40 4.40 6.60 6.60 8.80 8.80 8.80 8.80 14.30 14.30 22.00 33.00 35.20

1.00 1.00 1.20 1.20 1.40 1.40 1.70 1.70 1.70 1.70 2.10 2.10 2.60 3.20 3.30

1 1

3.30 3.30 3 30 3.30 3.30 4.40 4.40 4.40 4.40 6.60 8.80 8.80 14.30 14.30 14.30 14.30 22.00 35.20

1.00 1.00 00 1.00 1.00 1.20 1.20 1.20 1.20 1.40 1.70 1.70 2.10 2.10 2.10 2.10 2.60 3.30

1 1 1 1

3.30 3.30 3.30 3.30 4.40 4.40 4.40 4.40 6.60 6.60 8.80 8.80 14.30 14.30 14.30 14.30 22.00 33.00

1.00 1.00 1.00 1.00 1.20 1.20 1.20 1.20 1.40 1.40 1.70 1.70 2.10 2.10 2.10 2.10 2.60 3.20

1 1 1 1

28

x04

1 1 1 1

1 1 1 1

1 1

1 1 1 1

1 1 1 1

27

x06

1 1

1 1

1 1

1

1 1

24

x08

x10

CELL TYPES x12 x13

1 1

1 1 1 1

1 1

1 1 1 1

1 1 1 1

1 1

1 1

1 1 1 1

1 1

22

1 1 1 1

1

3

26

UNIT CODE (BY PROGRAM) x20

x22

x28

1

x30

01(CIR.LV.KC.LG).05(CIR.BD.BT.LG)

3

01(CIR.LV.KC.LG).05(CIR.BD.BT.LG)

15

01(CIR.LV.KC.LG).04(CIR.BD.BT.LG)

2

01(CIR.LV.KC.LG).05(CIR.BD.BT.LG)

1

01(CIR.LV.KC.LG).05(CIR.BD.BT.LG)

1

1

1

1

1

1

1

1

1

1 10

EA

x32

1 2

3

6

2

REORGANIZING PROCESS OF UNITE D’HABITATION . REORGANIZING THE UNITE D’HABITATION . 54 / 55 ��


By combining bubble-size types and cell-cluster types (pinpoint connection types), we can get the four complete cell cluster types. Each type is flexible because the radius of small, medium, or large bubbles is not decisive, but has a little room for changing, and because the dummy cells are totally flexible in their size as well.

DUMMY

DUMMY

TYPE 01

TYPE 01

TYPE 02

To make them easier to control, large cells for living rooms / bedrooms are moved to the center of cell clusters. Since their range of size fluctuation is relatively less than those of medium or small cells, we set their size as fixed so we can use them as pivotal points in the cell clusters.

FLEXIBLE ANGLE

FLEXIBLE ANGLE

FLEXIBLE ANGLE SMALL

FLEXIBLE ANGLE SMALL

FLEXIBLE ANGLE LARGE

MEDIUM CELL : LOGGIA RELATIVE SIZE

SMALL CELL : KITCHEN RELATIVE SIZE

DUMMY RELATIVE SIZE

DUMMY RELATIVE SIZE

ROTATION PIVOT POINT

ROTATION PIVOT POINT FIXED SIZE

ROTATION PIVOT POINT

SMALL CELL : BATH ROOM RELATIVE SIZE

SMALL CELL : BATH ROOMPASSAGE RELATIVE SIZE RELATIVE SIZE

SMALL CELL : BATH ROOM RELATIVE SIZE

HALL RELATIVE SIZE

PASSAGE RELATIVE SIZE

LARGE CELL : LIVI F

ROTATION PIVOT POINT

SMALL CELL : BATH ROOM RELATIVE SIZE

RELA

RELA

HALL RELATIVE SIZE

CORRIDOR RELATIVE SIZE CORRIDOR RELATIVE SIZE

SMALL CELL : KITCHEN RELATIVE SIZE

LARGE CELL : LIVING/ROOM FIXED SIZE

LARGE CELL : LIVING/ROOM

CORRIDOR RELATIVE SIZE

MEDIUM CELL RELA

MEDIUM CELL : LOGGIA RELATIVE SIZE

CORRIDOR RELATIVE SIZE


Then based on the way each cell cluster was organized in the previous discussion, we rearrange other cells while maintaining their original relationship with the large cells. We also need to add one more flexible-sized cell at the top of the cell cluster diagram, which will help us to define the outer boundary of building when we apply circle sets with Voronoi logic. In addition, to make shared connection points between cell clusters, we add two more cells at the bottom of the diagram, one for internal circulation and the other for external circulation. Red lines represent the boundary of cell clusters that will be shared with the adjacent cell cluster types.

MEDIUM CELL : LOGGIA RELATIVE SIZE

GE CELL : LIVING/ROOMLARGE CELL : LIVING/ROOM FIXED SIZEPOINT FIXED SIZE ROTATION PIVOT

HALL RELATIVE SIZE

TYPE 03

TYPE 03

FLEXIBLE ANGLE LARGE

FLEXIBLE ANGLE LARGE

FLEXIBLE ANGLE LARGE

FLEXIBLE ANGLE LARGE

MEDIUM CELL : LOGGIA RELATIVE SIZE

MEDIUM CELL : LOGGIA RELATIVE SIZE SMALL CELL : KITCHEN RELATIVE SIZE

PASSAGE RELATIVE SIZE

TYPE 02

XIBLE ANGLE SMALL

TYPE 02

TYPE 01

Now four cell cluster types can be flexible, with one pivotal point at the center marked in red.

SMALL CELL : KITCHEN RELATIVE SIZE

ROTATION PIVOT POINT

SMALL CELL : BATH ROOM SMALL CELL : BATH ROOM PASSAGE RELATIVE SIZE RELATIVE SIZESIZE RELATIVE

HALL RELATIVE SIZE

CORRIDOR RELATIVE SIZE

CORRIDOR RELATIVE SIZE

MEDIUM CELL : LOGGIA RELATIVE SIZE SMALL CELL : KITCHEN RELATIVE SIZE

LARGE CELL : LIVING/ROOMLARGE CELL : LIVING/ROOM FIXED SIZE FIXED SIZEPOINT ROTATION PIVOT

PASSAGE RELATIVE SIZE

DUMMY PASSAGE RELATIVE RELATIVE SIZESIZE

HALL RELATIVE SIZE

HALL RELATIVE SIZE

CORRIDOR RELATIVE SIZE

MEDIUM CELL : LOGGIA RELATIVE SIZE

MEDIUM CELL : LOGGIA RELATIVE SIZE

SMALL CELL : KITCHEN RELATIVE SIZE

ROTATION PIVOT POINT

DUMMY RELATIVE SIZE

LARGE CELL : LIVING/ROOMLARGE CELL : LIVING/ROOM FIXED SIZE FIXED SIZE

PASSAGE RELATIVE SIZE

PASSAGE RELATIVE SIZE

HALL RELATIVE SIZE

HALL RELATIVE SIZE

CORRIDOR RELATIVE SIZE

REORGANIZING PROCESS OF UNITE D’HABITATION . REORGANIZING THE UNITE D’HABITATION . 56 / 57 ��


EXISTING CONDITION (3 CORES / 7 CORRIDORS)

ROTATED (7 CORES / 3 CORRIDORS)

MERGED (3 CORES)

MERGED (3 CORES)

note : diagram doesn’t represent building factors such as numbers of unit types


Examining the existing structure of the building in terms of how individual units are tied together will help to reorganize those four cell clusters into a whole building. The first thing that we notice from the diagram of the existing floor plan is that there are three main cores in the building. The second thing might be the fact that only seven floors have corridors, though the building is seventeen stories high, because of how units, including duplexes, are organized vertically. It would be a good starting point to consider keeping three main cores while maintaining the way in which units are attached or bound to the corridors.

V.CIR

Ci

Ci

Ci

Ci

Ci

Ci

Ci

Ci

V.CIR

Ci

Ci

G2s

E2s

Cs

Cs

G2s

G2s

Cs

G2s

Cs

V.CIR

G2s

G2s

Cs

Cs

G2s

For this, we will first horizontally rotate long corridors by 90 degrees to make them vertical. Then we will combine those seven corridors into three by mixing and matching.

G1s E1i

Ci

Ci

Ci

Ci

Ci

Ci

Ci

Ci

Ci

Ci

Ci

Ci

Ci

Ci

E2i

E2i

E2i

E2i

E2i

E2i

E2i

E2i

E2i

E2i

Ci

E2i

E2i

E2i

E1s

LEVEL 16

E2i

C

V.CIR

E2s

E2s

E2s

E2s

E2s

E2s

E2s

E2s

V.CIR

G2s

E2s

E2s

E2s

E2s

E2s

E2s

E2s

E2s

E2s

E2s

E2s

V.CIR

G2s

E2s

E2s

E2s

E1i

E1s E1i

E1i Ci

E2i

E2i

E2i

E2i

E2i

E2i

E2i

E2i

Ci

E1i

E1s

E2i

E2i

E2i

E2i

E2i

E2i

E2i

E2i

E2i

E2i

E2i

E2i

Ci

E2i

E2i

E2i

LEVEL 13

E2i

C

V.CIR

E2s

E2s

E2s

E2s

E2s

E2s

E2s

E2s

V.CIR

G2s

E2s

E2s

E2s

E2s

E2s

E2s

E2s

E2s

E2s

E2s

E2s

V.CIR

G2s

E2s

E2s

E2s

H1s

G1s E1i

E1i Ci

E2i

E2i

E2i

E2i

E2i

E2i

E2i

E2i

Ci

E2i

E1s

E2i

E2i

E2i

E2i

E2i

E2i

E2i

E2i

E2i

E2i

E2i

E2i

Ci

E2i

E2i

E2i

LEVEL 10

E2i

C

V.CIR

B

B

B

B

B

B

B

B

V.CIR

V.CIR

G3s

Ci Ci C

B

B

B

B

B

B

B

B

LEVEL 08

B

Ci

V.CIR

A

A

A

A

A

A

A

A

V.CIR

V.CIR

Ci

Ci Ci

V.CIR

C

B

B

B

B

B

B

B

B

LEVEL 07

B

Ci

V.CIR

E2s

E2s

E2s

E2s

E2s

E2s

E2s

E2s

V.CIR

G2s

E2s

E2s

E2s

E2s

E2s

E2s

E2s

E2s

E2s

E2s

E2s

V.CIR

G2s

E2s

E2s

E2s

Ci

E1s E1i

E1i Ci

E2i

E2i

E2i

E2i

E2i

E2i

E2i

E2i

Ci

E1i

E1s

E2i

E2i

E2i

E2i

E2i

E2i

E2i

E2i

E2i

E2i

E2i

E2i

Ci

E2i

E2i

E2i

LEVEL 05

E2i

C

V.CIR

E2s

E2s

E2s

E2s

E2s

E2s

E2s

E2s

V.CIR

G2s

E2s

E2s

E2s

E2s

E2s

E2s

E2s

E2s

E2s

E2s

E2s

V.CIR

G2s

E2s

E2s

E2s

H1s

G1s E1i

E1i Ci

E2i

E2i

E2i

E2i

E2i

E2i

E2i

E2i

Ci

E1i

E2i

E2i

E2i

E2i

E2i

E2i

E2i

E2i

E2i

E2i

E2i

E2i

Ci

E2i

E2i

E2i

E1s

LEVEL 02

E2i

C

G3s

REORGANIZING PROCESS OF UNITE D’HABITATION . REORGANIZING THE UNITE D’HABITATION . 58 / 59 ��


DUMMY

U.TYPE 3

U.TYPE 6

U.TYPE 2 DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 1

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

U.TYPE 3 DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 3 DUMMY

DUMMY

DUMMY

U.TYPE 3

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4 DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4 DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4 DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

U.TYPE 4

DUMMY

DUMMY

DUMMY

U.TYPE 4 DUMMY

U.TYPE 6

DUMMY

U.TYPE 4

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

U.TYPE 4

DUMMY DUMMY

U.TYPE 4

DUMMY

DUMMY

U.TYPE 4 DUMMY

U.TYPE 2 DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

U.TYPE 4

U.TYPE 1 DUMMY

U.TYPE 6

DUMMY

U.TYPE 4

U.TYPE 2

U.TYPE 4 DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY DUMMY

U.TYPE 6

U.TYPE 2 DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 3 DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY

U.TYPE 3

U.TYPE 4 DUMMY

U.TYPE 4

U.TYPE 3

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY DUMMY

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 3 DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 2

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY

DUMMY

U.TYPE 3 DUMMY

U.TYPE 4

DUMMY

DUMMY

DUMMY

U.TYPE 4 DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

DUMMY

U.TYPE 4 DUMMY

DUMMY

DUMMY DUMMY

U.TYPE 4 DUMMY

U.TYPE 3 DUMMY

U.TYPE 3

U.TYPE 4

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4 DUMMY

DUMMY

DUMMY

U.TYPE 3

DUMMY

DUMMY

DUMMY

U.TYPE 6

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4 DUMMY

DUMMY

U.TYPE 4

U.TYPE 2

DUMMY

U.TYPE 4

DUMMY DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

DUMMY

D UMMY DUMMY

U.TYPE 4 DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

DUMMY

DUMMY DUMMY

DUMMY DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY

DUMMY

U.TYPE 6

DUMMY

D UMMY DUMMY

U.TYPE 4 DUMMY

U.TYPE 3 DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4 DUMMY

U.TYPE 3

U.TYPE 4 DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY

U.TYPE 1 DUMMY

U.TYPE 4

U.TYPE 3 DUMMY

DUMMY

U.TYPE 4

DUMMY

DUMMY

DUMMY

DUMMY DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

DUMMY DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 3

U.TYPE 6

DUMMY DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

U.TYPE 3 DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY

DUMMY

U.TYPE 3 DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

DUMMY

U.TYPE 4

U.TYPE 2

DUMMY

DUMMY

DUMMY

U.TYPE 4

U.TYPE 2 DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

U.TYPE 4

U TYPE 2 U.TYPE DUMMY

U.TYPE 4

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

DUMMY DUMMY

U.TYPE 4

DUMMY

DUMMY

DUMMY U.TYPE 5

DUMMY

DUMMY

U.TYPE 3 DUMMY

DUMMY

U.TYPE 4 DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY


As we can see from the diagram on the left, these vertical circulations are not efficient in terms of flow. If we can relocate small units to the bottom and big ones to the top, the circulation becomes more efficient. The table in the left shows the existing unit array where different units intermingle in random fashion to morph themselves into the physical frame. The one in the right, on the other hand, is a rearranged unit array diagram based on their size, where we can see the optimized vertical circulation flow.

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 3 DUMMY

DUMMY

DUMMY

U.TYPE 3 DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 3

U.TYPE 4 DUMMY

DUMMY U.TYPE 1 DUMMY

DUMMY

U.TYPE 1 DUMMY

DUMMY

DUMMY

U.TYPE 6

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY U.TYPE 5

U.TYPE 1 DUMMY

U.TYPE 6

U.TYPE 4 DUMMY

DUMMY

U.TYPE 6

U.TYPE 4 DUMMY

DUMMY

DUMMY

U.TYPE 4 DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 2 DUMMY

U.TYPE 4

U.TYPE 2

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY U.TYPE 6

DUMMY DUMMY

U.TYPE 4 DUMMY

DUMMY DUMMY

DUMMY

U.TYPE 4

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4 DUMMY

U.TYPE 4

U.TYPE 3 DUMMY

DUMMY

DUMMY

U.TYPE 2

U.TYPE 4

DUMMY

DUMMY

U.TYPE 4

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 3

U.TYPE 4

DUMMY

DUMMY U.TYPE 6

DUMMY

U.TYPE 4

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 2 DUMMY

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

U.TYPE 3 DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

U.TYPE 3 DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

U.TYPE 4 DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

U.TYPE 3 DUMMY

U.TYPE 4 DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

U.TYPE 3

U.TYPE 4

U.TYPE 3 DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY

DUMMY

DUMMY

U.TYPE 3 DUMMY

DUMMY

U.TYPE 2

U.TYPE 4

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 3

U.TYPE 6

DUMMY

DUMMY

DUMMY

U.TYPE 3

DUMMY

DUMMY

U.TYPE 3 DUMMY

DUMMY U.TYPE 2

DUMMY

U.TYPE 4 DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

U.TYPE 4

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY DUMMY

DUMMY

U.TYPE 3 DUMMY

DUMMY

DUMMY

U.TYPE 4

U.TYPE 2 DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

U.TYPE 2

DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

U.TYPE 4

DUMMY

DUMMY

DUMMY

U.TYPE 4 DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

U.TYPE 3 DUMMY

U.TYPE 4 DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

DUMMY

DUMMY

DUMMY DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

U.TYPE 3

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

DUMMY

DUMMY

DUMMY DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

U.TYPE 3 DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY DUMMY

U.TYPE 4

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY

DUMMY

U.TYPE 3 DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

DUMMY DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY DUMMY

U.TYPE 4

DUMMY DUMMY

DUMMY

U.TYPE 4

DUMMY

U.TYPE 2 DUMMY

U.TYPE 6

DUMMY

REORGANIZING PROCESS OF UNITE D’HABITATION . REORGANIZING THE UNITE D’HABITATION . 60 / 61 ��


UNIT TYPE 1

U.TYPE 1

C.C.TYPE 1

< ENT

U.TYPE 2

C.C.TYPE 2

< ENT

3EA / BUNDLE

UNIT TYPE 2 9 EA / BUNDLE

UNIT TYPE 3

C.C.TYPE 1

U.TYPE 3

20 EA / BUNDLE

UNIT TYPE 4

C.C.TYPE 3

U.TYPE 4

77 EA / BUNDLE

< ENT

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 3

UNIT TYPE 5

C.C.TYPE 1

1 EA / BUNDLE

U.TYPE 5

UNIT TYPE 6 U.TYPE 6

7 EA / BUNDLE

DUMMY TYPE

DUMMY

DUMMY

U.TYPE 4

DUMMY

C.C.TYPE 3

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 3

C.C.TYPE 1

C.C.TYPE 1

DUMMY

DUMMY

< ENT

< ENT

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY

U.TYPE 3

U.TYPE 3

DUMMY

U.TYPE 4

DUMMY

U.TYPE 3

U.TYPE 4

U.TYPE 3

U.TYPE 4

DUMMY

U.TYPE 3

DUMMY

DUMMY

DUMMY

U.TYPE 3

DUMMY

DUMMY

DUMMY

U.TYPE 3

U.TYPE 4 DUMMY

DUMMY

U.TYPE 4

U.TYPE 1 DUMMY

U.TYPE 1 DUMMY

U.TYPE 6

DUMMY

DUMMY

DUMMY

U.TYPE 6

DUMMY

U.TYPE 1 DUMMY

U.TYPE 3

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY

DUMMY

U.TYPE 4

U.TYPE 2

U.TYPE 3

U.TYPE 4

DUMMY U.TYPE 6

DUMMY DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 4

U.TYPE 2 DUMMY

U.TYPE 4

U.TYPE 2

DUMMY

DUMMY

U.TYPE 4

DUMMY

U.TYPE 6

DUMMY DUMMY

U.TYPE 6

DUMMY

U.TYPE 4

DUMMY

DUMMY

U.TYPE 4

DUMMY

U.TYPE 3

U.TYPE 4

DUMMY DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

U.TYPE 2

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY

U.TYPE 3

DUMMY U.TYPE 5

U.TYPE 3

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY

DUMMY

DUMMY

U.TYPE 3

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

U.TYPE 3

DUMMY

DUMMY

DUMMY

DUMMY U.TYPE 2

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

U.TYPE 3

U.TYPE 4

DUMMY

U.TYPE 3 DUMMY

U.TYPE 3

U.TYPE 4 DUMMY

DUMMY

U.TYPE 4

DUMMY

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

U.TYPE 3

U.TYPE 6

U.TYPE 2

U.TYPE 3

U.TYPE 4

U.TYPE 2

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

U.TYPE 2

DUMMY

DUMMY DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY

DUMMY

U.TYPE 4

DUMMY

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY

DUMMY DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY

DUMMY

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY

DUMMY DUMMY

U.TYPE 4

DUMMY

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY

DUMMY

U.TYPE 4

DUMMY

U.TYPE 4

DUMMY

DUMMY

C.C.TYPE 1

DUMMY

DUMMY

DUMMY

< ENT

U.TYPE 2 DUMMY

DUMMY

DUMMY

DUMMY

U.TYPE 6


As discussed previously, each unit type is made up of different combinations of cell cluster types. By substituting unit types with cell cluster types, we can get an entire map of one of three cores. This also gives us ten different floor types. The rest of the floor types are repetitions of some of these ten.

FLOOR TYPE 10

FLOOR TYPE 09

35

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

34

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

DUMMY

33

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

32

DUMMY

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

31

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

30

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

DUMMY

29

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1 C.C.TYPE 3

28

DUMMY

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

27

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

26

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

DUMMY

25

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

24

DUMMY

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

C.C.TYPE 1

DUMMY

FLOOR TYPE 08

FLOOR TYPE 07

FLOOR TYPE 06

FLOOR TYPE 05

FLOOR TYPE 04

FLOOR TYPE 03

23

DUMMY

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

22

DUMMY

C.C.TYPE 1

C.C.TYPE 3

C.C.TYPE 3

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

C.C.TYPE 3

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

21

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

20

C.C.TYPE 3

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

C.C.TYPE 3

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

C.C.TYPE 3

C.C.TYPE 1

C.C.TYPE 3

19

DUMMY

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

18

DUMMY

C.C.TYPE 1

C.C.TYPE 3

C.C.TYPE 3

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

C.C.TYPE 3

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

17

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

16

C.C.TYPE 3

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

C.C.TYPE 3

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

C.C.TYPE 3

C.C.TYPE 1

C.C.TYPE 3

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

15

C.C.TYPE 1

14

C.C.TYPE 3

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

C.C.TYPE 2

C.C.TYPE 1

C.C.TYPE 3

C.C.TYPE 3

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

13

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

12

DUMMY

C.C.TYPE 1

C.C.TYPE 3

C.C.TYPE 2

C.C.TYPE 1

C.C.TYPE 3

C.C.TYPE 3

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

C.C.TYPE 2

C.C.TYPE 1

C.C.TYPE 3

11

DUMMY

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

10

C.C.TYPE 2

C.C.TYPE 1

C.C.TYPE 3

C.C.TYPE 3

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

C.C.TYPE 2

C.C.TYPE 1

C.C.TYPE 3

C.C.TYPE 3

C.C.TYPE 1

C.C.TYPE 3

9

DUMMY

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

8

C.C.TYPE 2

C.C.TYPE 1

C.C.TYPE 3

C.C.TYPE 3

C.C.TYPE 1

C.C.TYPE 3

C.C.TYPE 3

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

7

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

DUMMY

DUMMY

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

DUMMY

DUMMY

DUMMY

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

DUMMY

FLOOR TYPE 02

FLOOR TYPE 01

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

5

C.C.TYPE 3

C.C.TYPE 1

C.C.TYPE 3

C.C.TYPE 3

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

DUMMY

C.C.TYPE 1

C.C.TYPE 3

C.C.TYPE 2

C.C.TYPE 1

C.C.TYPE 3

4

DUMMY

DUMMY

DUMMY

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

DUMMY

DUMMY

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

DUMMY

DUMMY

3

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

DUMMY

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

2

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 3

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 3

C.C.TYPE 1

C.C.TYPE 1

C.C.TYPE 3

C.C.TYPE 2

C.C.TYPE 1

C.C.TYPE 3

C.C.TYPE 2

C.C.TYPE 1

C.C.TYPE 3

1

DUMMY

DUMMY

DUMMY

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

C.C.TYPE 1

C.C.TYPE 1

DUMMY

DUMMY

DUMMY

DUMMY

C.C.TYPE 1

C.C.TYPE 1

6

C.C.TYPE 1

C.C.TYPE 1

DUMMY

REORGANIZING PROCESS OF UNITE D’HABITATION . REORGANIZING THE UNITE D’HABITATION . 62 / 63 ��


Y

01

E YP

02

1

E0

YPE

C.T

YP

C.T

3

E0

C.T

YP C.T

E YP

C.T

M M

DU

ITERATION 03 3

E0

YP

2

E0

YP

C.T

1

E0

YP

Y

MM

03

YPE 01

C.T

Y C.T PE

YP Y C.T PE

Y C.T

C.T

E0

3 PE

DU

M

YP

E0

M

1

C.T

Y

YP

Y C.T PE

C PE .TY

C.T

YP

E0

3

C.T

E0

YPE

1

C.T

C.TYPE 01

C.TYP

C.TYPE 03

C.TY

PE 0

E 03

C.TY

PE 0

03

3

1

01

03

03

C.TYPE 01

C.TYPE 03

C.TYPE 02

2

3

E0

1

E0

YP

C.T

YP

C.T

Y

M

M

DU 3

E0

YP

C.T

1

E0

YP

C.T

Y

MM

DU

3

1

E0

YP

E0

3

E0

YP

YPE 03

01

C.T YP E

Y C.T PE

C.T YP

C.T E0

YP E0

C P .TY

C P .TY

C P .TY

C

01

03

03 YPE

P C.TY E 01

03 .TYPE

C

DUM MY

01 C.TYPE

C.TYPE 03

DUMMY

ITERATION 02 P .TY

D M UM

C P .TY

C.T YPE

DU

C.T

MM

YPE

C.TY PE

C.TY

01

03

3

1

E0 3

E0 3

E0 1

E0 3

Y

E0 1

03

Y

01

P C.TY

03

PE C.TY E 02

PE 0

01

3

ITERATION 01

3

E0

1

2

E0

YP

E0

YP

C.T

C.T

03

01

C.TYPE 03

C.TYPE 01

C.TYPE 02

C.TYPE 03

C.TYPE 01

DUMMY

C.TYPE 03

C.TYPE 01

DUMMY

C.TYPE 03

C.TYPE 01

C.TYPE 03

C.TYPE 03

C.TYPE 01

C.TYPE 03

C.TYPE 03

C.TYPE 01

C.TYPE 02

C.TYPE 03

C.TYPE 01

DUMMY

C.TYPE 03

C.TYPE 01

DUMMY

C.TYPE 03

C.TYPE 01

C.TYPE 03

C.TYPE 03

C.TYPE 01

C.TYPE 03

C.TYPE 03

C.TYPE 01

C.TYPE 02

C.TYPE 03

C.TYPE 01

DUMMY

C.TYPE 03

C.TYPE 01

DUMMY

C.TYPE 03

C.TYPE 01

C.TYPE 03

C.TYPE 03

C.TYPE 01

C.TYPE 03

PIVOT ANGLE = 180.00

C.C.TYPE 1 C.C.TYPE 1 DUMMY C.C.TYPE 1 C.C.TYPE 1 C.C.TYPE 1 DUMMY C.C.TYPE 1 C.C.TYPE 1

C.C.TYPE 1 C.C.TYPE 3 C.C.TYPE 3 C.C.TYPE 1 C.C.TYPE 3 DUMMY C.C.TYPE 1 C.C.TYPE 3 DUMMY C.C.TYPE 1 C.C.TYPE 3 C.C.TYPE 2 C.C.TYPE 1 C.C.TYPE 3

DUMMY DUMMY DUMMY DUMMY C.C.TYPE 1 C.C.TYPE 1 DUMMY DUMMY DUMMY DUMMY C.C.TYPE 1 C.C.TYPE 1 DUMMY DUMMY DUMMY

C.C.TYPE 1

YPE

C.T

E 01

MY

E 03

DUM MY C.TY PE 0 1 C.TY PE 0 3 C.TY PE 0 2 C.TY PE 0 1 C.TY PE 0 3 C.TY PE 0 3 C.TY PE 0 1 C.TY PE 0 3 C.TY PE 03 C.T YPE 01 C.T YPE 03 DU MM Y C.T YPE 01 C.T YPE 03 DU MM Y

YPE

C.T

C.TYP

DUM

C.TYP E 03

C.TYP

03 C.TYP E 01

C.TYP E

C.TYPE 03

C.TYPE 01

C.TYPE 03

C.TYPE 03

C.TYPE 01

C.TYPE 02

C.TYPE 03

PIVOT ANGLE = 180.00

C.C.TYPE 1

C.C.TYPE 3

DUMMY

YP

C.T

03

2

3

C.TYPE 03

C.TYPE 01

DUMMY

C.TYPE 03

C.TYPE 01

DUMMY

C.TYPE 03

C.TYPE 01

C.TYPE 02

PIVOT ANGLE = 180.00

C.C.TYPE 1

5

C.C.TYPE 1

YP

C.T

C.T

C.T

C.T

YPE

YPE

C.T

C.T

3

PE 0

C.TY

1

MY

E 03

E 01

PE 0

PE 0

PE 0

C.TY

Y

DUMM

C.TYPE 01

C.TYP

C.TY

C.TYPE 01 C.TYPE 03

DUM

C.TY

C.TYPE 03

C.TYPE 03 C.TYPE 03

C.TYPE 03 C.TYPE 01

C.TYPE 03

PIVOT ANGLE = 178.92

C.TYPE 01

C.TYPE 03

C.TYP

C.TYPE 03

PIVOT ANGLE = 178.92

C.TYPE 01

6

4

C.C.TYPE 1

E0

YP

C.T

Y

3

PE 0

MM

DU

C.T YPE

C.T

174.59

C.TY

1

PE 0

C.TY

E 03

C.TYPE 03

C.TYP

177.87

PIVOT ANGLE = 177.87

C.TYPE 02

178.92

C.TYPE 01

C.TYPE 03

177.87

PIVOT ANGLE = 177.87

178.92

C.TYPE 03

PIVOT ANGLE = 174.59

C.TYPE 02

179.76

PIVOT ANGLE = 179.76

180.00

PIVOT ANGLE = 180.00

DUMMY

180.00

C.T

174.59

C.TYPE 03

PIVOT ANGLE = 174.59

179.00

PIVOT ANGLE = 179.00

C.TYPE 01

179.51

PIVOT ANGLE = 179.51

DUMMY

180.00

DU

178.88

C.TYPE 02

PIVOT ANGLE = 178.88

C.TYPE 01

179.00

PIVOT ANGLE = 179.00

DUMMY 180.00

C.T

178.61

C.TYPE 01

PIVOT ANGLE = 178.61

DUMMY

FLOOR TYPE 02

INITIAL CONDITION

03


Now let’s apply four cell cluster types to the floor types. In the first step, we arrange them loosely as they are. For clarity purposes, we forget about the rest of cells for now, except for the large one that comes with pivotal points at the center.

1

E 03

03

E0

1

YPE

3

YP

C.T

YP

C.T

E0

C.TYP

C.T

C.TYPE 03

C.TY

03

3

E0

1

YPE

3

YP

E0

C.T

YP

C.T

C.TYP E0

C.TYPE 03

01 C.TYPE

E 02 C.TYP

03 YPE C.T

YP

1 E0

C.TY

02

PE 0

C.T

YPE

YPE

C.T

YP

C.T

YP

1

03

E0

3

E0

1

3

E0

YPE

C.T

YP

3

E0

YP C.T

C.T 01

3

PE 0 C.TY

Y

C.TYPE 01

DUMM

3

03

Y

M

M

DU

3

E0

YP

C.T

1

PE 0

C.TY

3

C.TYP E0

C.TYPE 03 C.TYPE 01

C.TYPE 03 C.TYP

E 03

C.TY

PE 0

C.T

YPE

C.T

Y

C.TYPE 03

01

DUM M

PE

03

C.T Y

YP E

C.T

2

3

E0

E0

C.T YP

1

YP

E0

C.T

YP C.T

E 01

3 PE 0

C.TYP

C.TY

DUMMY

C.TYPE 03

PE 0 3

C.TYP E 01

C.TY

Y

MM

DU

YP

E0 1

YP

C.T

E0

03

1

C.TYPE 03

C.TYPE 03

C.T

C.TYPE 03 C.TYPE

PE 0

C.TYPE 01

PIVOT ANGLE = 171.52

M

ITERATION COMPLETED

C.TYPE

MY

PIVOT ANGLE = 176.10

Y

C.T

C.TYPE 01

C.TY

DUM

C.TYPE 02

C.TYPE 01

E0

3

E0

1

M

Y

03

C.TYPE 01

PIVOT ANGLE = 163.67

M DU

Y

DUMM

C.TYPE 03

YPE

PIVOT ANGLE = 171.52

3

PE 0

C.TY

C.TYPE 03

01

1

E0

YP

C.T

MY

3

Y

M

M

DU

DUM

C.T

DUMMY

1

E0

E0

YP

01

C.TYPE 01

M

C.TYPE 03 C.TYPE 02 C.TYPE C.TYP 01 E 01 C.T C.TYYPE 03 PE 0 3 C.T YPE 03 C.T YP E0 1 C.T YP E0 3

3

E0

YP

YP

DU

PIVOT ANGLE = 170.88

171.52

C.TYPE 03

C.T

C.T

E YP

C.T

3

C.T

C

2 E0 E0

E0

C.TYPE 03

PE 0

3

E 01

MY

PIVOT ANGLE = 170.88

PE .TY

01

C.TYP

DUM

C.TYPE 02

YP

3

03

PIVOT ANGLE = 175.24

YPE

C.TYPE 01

1

DUMMY

E0

MY

YPE

YP

2

3

3

PE 0

E0

E0

C.TY C.T

1

3

YP

YP

C.TYPE 03

03

E0

E0

C.T C.T DUM

C.TYPE 01

ITERATION 06

3

C.TYPE 03

DUMMY

E0

C.TYPE 01

DUMMY

3

PE 01

PE 0

2

C.TY

C.TY

PE 0

1

Y

E0

C.T

YP

3

1

Y 3

PE 0

C.TY

YP

171.52

01

YPE

C.T

176.10

Y

C.T

C.T

163.67

M

M

DU

3

YP

E0

C.T

YP

E0

3

PIVOT ANGLE = 163.67

PE 0

YP

C.T

3

Y

YP

MM

170.88

C.TY

C.TYPE 02 C.TYPE 03

E0

YPE

YP

C.T

E0

DU

YP

03

170.88

C.T C.T

1

PE 0

C.TYPE

C.TY

C.TYPE 01

C.TYPE 02

C.TYPE 03

C.TYPE 03

3

E 01

PE 0

C.TYP

C.TY

03

175.24

C.T

03

01

01

PE 0

M

C.T C.T

C

01

.TY PE

PE

3

C.T Y

E0

YP

C.T

163.67

C.TYPE C.TY

C.T

M

C.TYPE 02

01 C.TYPE

YP

DU

YP

E YP

C.TYPE 01

PE

C.TYPE 03

ITERATION 05

C.TYPE 03

C.T

C.T

03

C.TYPE 03

E 03

C.TY

C.TYPE 01

DUMMY

C.TYPE 01 C.TYP

YPE

C.TYPE 01

PIVOT ANGLE = 170.93

C.TYPE 03

PIVOT ANGLE = 170.93

C.TYPE 02

E 01

C.TYPE 03

03

MY DUM

1

C.TYPE 03

C.TY PE 0 3 C.T YPE 01 C.T YPE 03 DU M M Y

PIVOT ANGLE = 177.72

03

C.TYPE 03

C.T

C.T

C.TYP

C.TYPE 01

ITERATION 04

YPE

C.TY PE

C.TYPE 02

1

E0

YP

C.T

E0

C.TYPE 03

C.TYPE 01

Y

MM

E 03

C.TYP

Y

M

M

DU

DU

C.TY

YP

C.TYPE 01

PIVOT ANGLE = 165.16

1

E0

1 PE 0

C.T

PIVOT ANGLE = 172.44

DUMMY Y

MM

DU

YP

C.TYPE 03

C

C.T

PIVOT ANGLE = 172.44

170.93

C.T

C.TYPE 02

170.93

C.T

PIVOT ANGLE = 178.47

177.72

YP

C.TYPE 01

165.16

3

E0

P .TY

C.T

DUMMY

1

E0

YP

C.T

C.T

172.44

YP

172.44

C.T

178.47

YP

167.29

C.T

PIVOT ANGLE = 167.29

In the step two, by changing the angle of the boundary lines, we find the optimal solution for packing entire cell cluster types. Diagrams are iteration process done in Grasshopper plug-in of Rhino 3d, to find optimal angles for all cell cluster types through series of trial-error method.

REORGANIZING PROCESS OF UNITE D’HABITATION . REORGANIZING THE UNITE D’HABITATION . 64 / 65 ��

E0

3

02

1


TEN FLOOR TYPES WITH PIVOTAL CELLS ONLY.

TEN FLOOR TYPES WITH ALL CELLS INCLUDED.

TEN FLOOR TYPES WITH A VORONOI CIRCLE SET BOUNDARY.

TEN FLOOR TYPES


REORGANIZING PROCESS OF UNITE D’HABITATION . REORGANIZING THE UNITE D’HABITATION . 66 / �� 67



CONCLUSION


TYPE

03

TYPE 04

TYPE 01

TYPE 03

TYPE

01

01

01

TYPE

TYPE

04 PE TY

PE TY

03 TY PE

04 PE 01

01

PE

PE

TY

TY

TY

TY

01 PE

TY

TY

PE

TY PE

04

03

TY

PE

03

TY

03

PE

03

TYPE

01

TYPE

TYP

E 04

TEN FLOOR TYPES OVERLAY DIAGRAM

04

TYPE 03

03 TYPE

TYPE 01

TYPE 03

TEN FLOOR TYPES OVERLAY DIAGRAM

01 PE

TY PE 02

PE

03

PE

PE TY

TY

03

TY

04

TY

TYPE

TYPE

PE

02

04 03 TYPE

03

TYPE

01 TYPE

TYP

01

E 01 TYPE 01

TYPE

TYPE 01

TYPE 01

TYPE 03

TYPE 04

TYPE 04

03 TYPE

03 TYPE

03

TYPE 03

TYPE

TY

01

TY

PE

TY

03

PE

TYPE

04

01

TY PE

TY

TYPE 03

TYPE

TYPE

03

TYPE 01

TYPE 01

TYPE 03

TYPE 04

TYPE 03

TYPE 04

TYPE 03

TYPE 04

TY

03

PE

01

03 PE

TY PE TY 03

03

PE 04

PE

TY

PE TY

04 TY PE 01

PE

01

01

PE

TYPE 04

03

TYPE

TYP E 03

TYPE 04

TYPE 01

01

FLOOR TYPES 08 PLAN

TYPE 03

TYPE

04

03

TYPE 01

TYPE 02

TYPE 03

E 01

TYPE

TYP

TYPE

04

03

TYPE

TYPE

03

FLOOR TYPES 08 PLAN

01

TY

TYPE

FLOOR TYPES 03 PLAN

PE TY

TY

FLOOR TYPES 03 PLAN

04

PE

01


VERTICAL CIRCULATIONS

TEN FLOOR TYPES CELL CLUSTERS / UNIT TYPES

REORGANIZING PROCESS OF UNITE D’HABITATION . CONCLUSION . 70 / 71 ��



REORGANIZING PROCESS OF UNITE D’HABITATION . CONCLUSION . 72 / 73 ��



REORGANIZING PROCESS OF UNITE D’HABITATION . CONCLUSION . 74 / 75 ��



This project was initiated by a simple question: why are most of the walls/façades around us perpendicular to the floor? There might be pros and cons, but as is clearly investigated in “The Oblique Function” by Claude Parent and Paul Virilio, we could also use them in different ways, unless they are perpendicular to the floor plate. From the history of conflict amongst walls, façade, or cladding versus the structural skeleton described in Mohsen Mostafavi’s Surface Architecture, our era has already witnessed the separation of walls/façade from the overall structure of a building. Although there might be technical / economic difficulties in actively designing and building non-vertical walls, it seemed to me that there must also be something profound behind the process that forces us to stick with rectilinear extrusion building types. So I traced back the history of architecture to the point when wall / façade did not have to work as load-bearing element, and that brought me to the era of the Domino system proposed by Le Corbusier. From that point onward, no radical change has been made from a structural point of view. Although this is somehow tied up with “International Style,” as its name implies, the style is rather a universal logic that is widely adaptable to site-specific conditions. In that sense, the style that came with the Domino system was to provide a flexible framework allowing architects greater design freedom, rather than functioning as a formal language associated with structural ideas, as the pre-modern styles did. Le Corbusier’s Five Points of Architecture constitute another clear message that the intention of the Domino system was to encourage architects’ free will in their design processes. However in reality, the system, which was supposed to be a flexible framework, does not work as planned. Instead, it functions more as a formal style made out of a monotonous series of slabs and columns, as we can easily see from our built environment. This misappropriation—combined with other reasons such as material, building techniques, as well as cost—is actually holding back architects from moving on creatively. Then why not remove this rigid system from our buildings and see how that works? Through the prototyping process, I proposed a flexible point grid system with various sizes of program bubbles, including dummy cells, which in turn creates an organic building shape while maintaining the rational logic of the Domino system as a virtual framework. Although I used the prototype to reorganize the Unite d’Habitation based on its existing inner logic, I suppose it is also capable of accommodating other logic from outside of architecture that might serve as a malleable framework.

REORGANIZING PROCESS OF UNITE D’HABITATION . CONCLUSION . 76 / 77 ��



References Surface Architecture by David Leatherbarrow and Mohsen Mostafavi Le Corbusier, L’Unite D’Habitation De Marseille by Jacques Sbriglio The Adaptable House by Avi Friedman Spatial Synthesis in Computer-Aided Building Design by Charles N. Eastman Algorithms and Computation, Lecture Notes in Computer Sceience 1969 Architectural Morphology by Philip Steadman Shape as Memory by Michael Leyton Paul Virilio by Ian James Re Constructing Architecture by Thomas A. Dutton Objectile by Bernard Cache + Patrick Beaucé Modern Housing Prototypes by Roger Sherwood On Growth and Form by D’Arcy Wentworth Thompson The Paul Virilio Reader by Steve Redhead Softspace by Sean Lally and Jessica Young Super - Recursive Algorithms by Mark Burgin

REORGANIZING PROCESS OF UNITE D’HABITATION . CONCLUSION . 78 / 79 ��


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.