http://www.pacificenvironment.org/downloads/FiTConf_Oregon_Gleason

Page 1

Oregon’s Solar Pilot Program

Jennifer Gleason Staff Attorney ELAW


2009 Oregon Legislature

HB 2121 (Governor’s bill)

Pilot solar production based policy

HB 3038 (OREP and ELAW’s bill)

Full FIT – many renewables, whole state

HB 3039 (Utilities’ bill)

Solar only, investor-owned utilities only


HB 3690 – 2010 session Clarified payments could be for energy and RECs Determined size of “small” systems Extended the deadline for implementation


PUC Orders – May 2010

Volumetric incentive rates (VIRs) set

Netmetering “plus” and Bidding


Net metering “plus� Installations: 90% of average consumption Small-scale and medium-scale Systems 10 kW or under: .55-.65/kWh Systems over 10 kW and less than or equal to 100 kW: .55/kWh Rates reviewed


Bidding

Projects over 100 kW and up to 500 kW


Not a FIT

Oregon’s program is NOT A FIT and should not be cited as a FIT http://elawspotlight.wordpress.com/2010/06/08/ oregons-new-solar-law-not-a-good-fit/


Oregonians for Renewable Energy Policy http://www.oregonrenewables.com/

http://www.elaw.org/


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.