ملف إعادة الإعمار 14-03-2017

Page 1


Following up on Donors’ Pledges Many delays have been encountered and there has been a slow-down in funding of pledges made at the Cairo Conference for Gaza Reconstruction. As a result, many of the planned interventions for 2015 and 2016 have been delayed. The government will continue to follow up on donor pledges during 2017.

In full coordination with World Bank, the below figures show funding disbursement till July 31, 2016

USD 1,596 million

46%

31% From total pledges

From total pledges to support Gaza

USD 5,082 million

USD 3,507 million

disbursements (in USD Million)

USD

USD

1,596

612 $385.6

$612

Gaza Reconstruction

$251.4

UNRWA(Budget Suport & Appeals)

$253.1

Humanitarian aid

$15.9

$299

Budget support(Gov.)

$98.6

$89.1

Fuel

$91

Others

$104.7 $7.4

Infrastructure

(Housing, Energy, Water, Transport and Explosive Ordinance Disposal )

Productive

(Agriculture, Non-agriculture)

Livelihoods and Social Protection Social Development

(Health, Education and Culture)

Governance


Grant from Kuwai

USD 200 million

Housing USD 75 million

2,251 Housing Units

USD 58.2 million spent out of USD 75 million allocated for housing sector. New list that includes 550 beneficiaries has been approved, and payments will be made soon (USD 4.5 million).

Progress On-going

1,186 HU

Local Governance USD 35 million 25 Municipalities 60 Projects

Economic USD 8.6 million 241 Facilities

53%

47%

Completed

1,065 HU

Gaza North Infrastructure Projects: Awarding recommendations have been approved by Kuwaiti Fund. Contract is under preparation. Khan Younis Infrastructure Projects: Khan Younis infrastructure bid has been released. Gaza, Middle area and Rafah Infrastructure Projects: Gaza, Middle area and Rafah infrastructure bids prepared and waiting for Kuwaiti Fund approval to be released and announced in local newspaper.

MoNE’s Labs Development Intervention: In process to release the bid to equip the MoNE's labs. Compensation for Productive Factories Intervention: First list that includes 32 factories has been sent to Kuwaiti Fund for approval (Wood and Construction Industries)


Livestock Intervention: agreements with 221 beneficiaries have been signed (first list).

Agriculture USD 4.9 million

Greenhouses Intervention: Beneficiaries' first list is under review with Kuwaiti Fund consultant (106 beneficiaries). Greenhouses and Livestock projects will be implemented following self-help modality. Quarantine Intervention: following up with many parties regarding the Allocated Land where that the Quarantine will be built and located.

Palestinian Water (PWA) USD 60 million

Education USD 3 million

Health USD 4 million

Designing the National Water Carrier is underway by PWA.(Kuwait Gov. through this grant will cover around 43% of the total cost of the National Water Carrier).

Awarding recommendations have been approved by Kuwaiti Fund. (winners "13 NGOs" contractual process is underway). Priorities given to institutions support vulnerable groups. i.e. people with disability, orphans, etc.

Constructing maternity building at AL Shifa Medical Complex: Project documents prepared and delivered to the National Office (NORG). NORG and Kuwaiti Fund consultant are reviewing project documents.

Ministries support: Includes a list of the needs of the ministries (cars, office equipment, furniture, etc.).

Governance USD 0.5 million

The committee formed by the National Office (NORG) and Kuwaiti Fund's consultant and the relevant ministries and the representative of the Ministry Finance (MoF) studied the offers submitted by local companies, and sent awarding recommendations report to Kuwait Fund for approval.


Construction Materials The total number of requests for purchasing construction materials submitted under the temporary Gaza Reconstruction Mechanism (GRM) by owners of damaged homes, as well as persons not impacted by the 2014 Gaza war, has surpassed 159,000.

159,000 More than

requests

Shelter stream

130,693

Finishing stream

11,569

Currently the finishing stream is not working

Residential stream

17,705

New Construction Reconstruction

The number of projects registered in the GRM

1,194

10,852 6,517

57%

funded by local resources

43%

funded by international donors

Currently, the GRM is experiencing delays in many of its components. Certain streams, such as the finishing stream has been stopped, whilst others are experiencing interruptions and long delays. This situation has affected the implementation of both the international and local projects. All sectors encountering problems and challenges for all materials stated in the Dual-use List which has been created by Israeli side.

If the current situation continues, all interventions in all sectors will encounter delays, especially the efforts toward growing the economy through implementing strategic and development projects.


Housing Sector

Damage Assessment

171,000

Housing sector recovery needs estimated at

USD 930 million

Totally Destroyed

Severe Damaged

Major Damage

Minor Damage

11,000

6,800

5,700

147,500

6.43%

3.98%

3.33%

86.26%

Units

Totally Destroyed Damage Assessment

Available Funding

Units

6,918

11,000

USD

USD

Units

282 million

Progress Totally Destroyed

3,317

30%

USD

183 million

6,918 On-going

2,147

Units

19.5%

Funding available

1,454

13.5%

Agencies Funding million USD

No. of HU

90.5

2,335

75

2,251

QRC

49.8

1,000

1,031

MoPWH

28.5

477

77.2

1,556

Others

38.05

855

281.85

6,918

281.85

6,918

Funding million USD

No. of HU

Kuwait

75

2,251

UNRWA

Qatar

54.8

1,120

NORG

IDB

39.25

960

Kingdom of Saudi Arabia

35.6

Different Donors

Total

37%

Gap (units)

Details in annex 1

Funding Resource Donors

63%

Available Funding (units)

4,082

Units

495 million

Completed

Needed Funding / Gap

Implementing Agencies

Total


Housing Sector

Housing sector recovery needs estimated at

USD 930 million

Partial Damage Severe, Major and Minor

Damage Assessment

Available Funding

Units

Units

160,000

USD

338 million

Needed Funding / Gap

101,061

USD

63%

Available Funding (units)

58,939 Units

205 million

USD

37%

Gap (units)

133 million

Progress Partially Damaged

Details in annex 2

101,061 Completed

89,764

55.96%

On-going

11,088

Units

6.95%

Funding Resource

0.13%

Funding million USD

No. of HU

143.78

81,952

UNDP

41.8

13,849

2,169

Qatar Charity

6.08

1,078

113.13

75,004

MoPWH

6

2,197

204.87

101,061

Others

7.21

1,985

204.87

101,061

million USD

No. of HU

Kingdom of Saudi Arabia

53.48

16,186

UNRWA

Germany

22.23

7,702

IDB

16.03

Different Donors

Total

209

Agencies

Funding

Donors

Funding available

Implementing Agencies

Total


Housing Sector

Housing sector recovery needs estimated at

USD 930 million

Rental Subsidy & Cash Assistance Program

Rental subsidy has been made available for 17,829 families affected during 2014 war. The fund covered the required cost till end of 2016. There is still an urgent gap in assistance for approximately 7,330 IDP families. 300 families received caravans

Paid USD 67.4 million

gap USD 21.99 million

2016 - 2014

2017

USD Damaged before

2014

180

to reconstruct totally destroyed housing units

Agencies

Funding million USD

No. of Beneficiaries

Sweden

9.04

3,403

Norway

2.38

781

UNDP

0.82

330

Different Donors

55.15

13,315

67.39

17,829

Total

2018

5 million made available

Funding Resource Donors

gap USD 10 million

Funding million USD

No. of Beneficiaries

UNRWA

54.92

13,249

UNDP

12.47

4,580

67.39

17,829

Implementing Agencies

Total


Rubble Removal The quantity of rubble as a result of 2014 war reached

2 million tons

1,095,524 tons have been removed by UNDP 800,000 tons have been removed by the private sector and house owners

Progress to date

95%

Number of working days generated 39,364

Based on the Detailed Needs Assessment (DNA), the number of ERWs was

7,000

ERWs that have been cleared

47%

3,280

Agencies

Funding Resource Funding million USD

Rubble Removed (Tons)

Implementing Agencies

USAID

10

738,684

Sweden

3.1

282,681

Japan

2.5

42,100

Italy

0.9

32,059

0

800,000

16.5

1,895,524

Donors

Private

Total

Funding

Rubble Removed (Tons)

UNDP

16.5

1,095,000

Private

0

800,000

16.5

1,895,000

Total

million USD


Energy Sector Sector Damage USD

includes USD 10 million for the power plant, in addition to another USD 10 million for the North substation

58 million USD

The recovery projects of the sector generated in 2015 and 2016 estimated at

36.9 million

46%

Sector reconstruction and recovery interventions estimated at

Palestinian Energy Authority (PEA) is aiming at providing a continues and stable supply of electricity to the citizens of Gaza. To achieve this PEA is implementing:

Work accomplished to date

This amount includes USD 26.9 million as projects, in addition to USD 10 million fuel for the power plant from Qatar

From USD 58 million

Operational solutions

Updates

To stabilize electricity supply from different sources including the power plant, the Israeli side and the Egyptian side.

Delay in the approval process for the material and equipment needed for the sector projects from the Israeli side.

Implement interventions leading to the rehabilitation of the high voltage network; maintenance and installation of transformers; and reconnecting all areas affected by the 2014 war with electricity.

Sustainable/strategic solutions

(out of the received fund)

Gaza Strip is currently witnessing stability in electricity supply

To find lasting solutions to the problem of electricity in Gaza, including main power plant gas pipeline, increasing the capacity of the plant and finding additional sources of electricity.

85%

Funding Resource Funding

Disbursed

World Bank

15.00

7.40

IDB

8.00

4.50

UNDP

0.24

0.24

JICA

0.35

0.35

Different Donors

3.32

2.62

26.91

15.11

Donors

million USD

Total

million USD


Water Sector

Reconstruction and Recovery Interventions

Sector Damage USD

34.5 million

Emergency Phase Progress

USD

100%

22.3million

Reconstruction and Recovery Progress

% 001 95%

Work has started towards strategic projects

Strategic Projects

Updates

The Central Water Desalination Project estimated budget is USD 410 million. “Working closely with EU donors to secure the funding� National Carrier: with total budget of USD 140 million. USD 60 million have been secured by the State of Kuwait (43% of the total cost). Other donors are showing interest in funding this strategic project. Other projects: Waste water plants, the use of treated wastewater for irrigation and small desalination plants.

Currently the sector is implementing interventions beyond emergency. This includes vital projects like new reservoirs in Gaza North and Gaza City.

Agencies

Funding Resource Funding

Donors

Delay in the approval process for the material and equipment needed for the sector projects from the Israeli side.

million USD

Implementing Agencies

Funding million USD

60

NORG

60

KFW

25.6

MDLF *

57.7

Denmark

13.4

CMWU

25.2

UNICEF *

13.4

Others

4.2

Kuwait

10

USAID

51.5

Different Donors

Total

160.5

Total * Shared funding with other sectors

160.5


Agriculture Sector

Sector Damage USD

266 million

Funding made available for reconstruction and recovery estimated at

USD

63.1million Projects

19 Projects

5 Projects USD

18.01 million

USD

Before 2014

27 Projects

20.32 million

USD

2014

16.88 million

2015

7.80 million

USD

2016

Agencies

Funding Resource Funding

Donors

10 Projects

million USD

Implementing Agencies

Funding million USD

USAID

9.5

Qatar Charity

15.5

IDB

8.9

MercyCorps

9.7

Qatar

8.6

UAWC

9.6

Australia

5.5

FAO

5.3

Different Donors

30.6

Others

23

Total

Kuwaiti Grant Projects

Total

63.1

USD

4.9

million

2017

63.1


Economic Sector Economic Sector Damage

5,427

facilities affected during 2014 war

damage (direct and indirect) estimated at

USD

284

million

Sector Interventions Qatar Government Grant (USD 9 million) 3,195 facilities with minor damages have been paid 100% of their registered losses.

Qatar Charity Grant

60%

covered

of the total affected facilities

Other Grants

An intervention with total amount of USD 7 million has been started to cover around 251 facilities in food, paper, aluminum and metal industries. Another new intervention with total amount of USD 7 million has been started. 200 facilities will benefit, including in the industrial, trading, services and tourism sectors.1,200 job opportunities will be created

Kuwaiti Grant

USD 3.3 million funded by DFID and implemented by DAI (PMDP) to support the reconstruction of infrastructure for damaged business. USD 2.2 million funded and implemented by dierent agencies including IR, MoA, Premier Urgence through small scale projects to support farmers, women and other vulnerable groups.

It is expected to implement an intervention in 2017 with total amount of USD 8.6 million to support businesses (271 facilities) in the construction and wood sectors.

Funding Resource

Agencies

Funding

Donors

million USD

Implementing Agencies

Funding million USD

GCC

14

PMDP

4.71

Qatar Charity

9

PA

17.6

Kuwait

8.6

DFID

4.71

Total

36.31

Qatar Charity

14

Total

36.31


Local Government and Municipalities Sector

The Local Government and Municipalities sector damage as a result of 2014 war was

USD

88

million

mainly in roads, public facilities, equipment and solid waste

Progress

The sector plans to spend during 2017

USD

35

24%

USD

to date

72.8 USD

million

million

37.8 Other grants and municipal fund

Kuwaiti Grant

Funding Resource Funding million USD

Roads

Public Buildings

Kuwait

35.00

64.40

15

KFW *

15.40

Denmark *

13.40

EU *

9.35

58.64

27

Different Donors *

19.60 123.04

42

Donors

Total * Shared funding with other sectors

92.75

million


Health Sector Spending to date

Sector Damage USD

24 million

USD

22.3million

Work is underway in the implementation of various projects, according to the health sector needs in Gaza. So, the sector continues in providing the citizens with all services. The work is according to plans prepared by the Ministry of Health (MoH). These projects include; repair of hospitals, clinics, supply of fuel and medical equipment, large scale water desalination plant in AL SHIFA complex and other services (cleaning, food, etc.).

Available Funding USD

25.8million

Kuwait Fund agreed to fund the reconstruction of a new maternity building at AL Shifa medical complex. The estimated budget is

Progress to date

39%

USD

4 million

Reconstruction projects assigned for 31 affected health facilities of which 12 facilities were affected before 2014 war.

Funding Resource

Agencies

Funding

Donors

million USD

Implementing Agencies

Funding million USD

IDB

10

IR

7

Oman

5

K&A

5

Kuwaiti Grant

4

NORG

4

1.7

CPR

5

Different Donors

Total

25.7

Qatar Charity

2.1

Others

7.6

Total

25.7


Education Sector

547 Sector Damage

Education Facilities

including public, private and UNRWA schools

MOEHE Schools and Private Schools

UNRWA Schools

176

Total Affected

96%

170

Repaired to date

Total Affected

9

Repaired to date

Total Affected

100%

83

Repaired to date

Kindergartens

Higher Education Institutions

14

83

64%

5

On-going

274

Total Affected

66%

180

Repaired to date

Funding Resource

Agencies

Funding

Donors

million USD

Implementing Agencies

Funding million USD

Qatar

21.2

UNDP

21.35

Japan

3.06

IR

4.11

Kuwait

3

UNICEF

3.56

IDB

2.59

NORG

3

Others

6.07

Others

3.9

Total

35.92

Total

35.92


Totally Destroyed Housing Units

Annex 1

Details of current commitments Funds USD million

Units

UNRWA - SFD

30

871

On-going

UNRWA - KFW 01

9.51

252

On-going

UNRWA - KFW 02

10.5

304

On-going

UNRWA - USA

20

360

On-going

UNRWA - SFD

5.5

158

On-going

UNRWA - IDB

10

260

UNRWA - IDB

5

130

QRC

50

1,000

On-going

Kuwaiti Grant

75

2,251

On-going

Italy Grant of Al Nada neighborhood

10.4

92

Italy Grant Reconstruction of Italian

5.34

50

3

63

On-going

Welfare Association

4.2

120

On-going

TIKA

12.5

320

On-going

Qatar Charity - IDB

20

450

5

120

UNOPS & NRC

5.46

100

Dar Ketab Association

0.3

15

On-going

0.077

2

Completed

281.71

6,918 Housing units

( Numbers may change

New Agreement ( Numbers may change

New Agreement ( Numbers may change

New Agreement ( Numbers may change

New Agreement ( Numbers may change

(

FUNDS 2014 War Caseload

New Agreement

(

UNDP - SFD

( Numbers may change

(

Palesitian Housing Council - IDB

New Agreement

(

Qatar Charity - Al Zafer Tower

( Numbers may change

(

tower complex

New Agreement

(

Development and reconstruction

Status

(

Project and Donor


Partially Damaged Housing Units

Annex 2

Details of current commitments Fundsg USD million

Severe Major Damaged Housing Units

Minor Damaged Housing Units

Total Units

UNDP - IDB

10

640

286

926

On-going

UNDP - Korea

0.3

-

154

154

Completed

UNDP- OFID

1.2

70

88

158

On-going

UNDP- SFD

30.3

340

12271

12,611

On-going

UNRWA - Japan

5.1

527

0

527

Completed

UNRWA - KFW01

4.5

436

0

436

On-going

UNRWA - KFW02

10.87

1,283

0

1,283

On-going

UNRWA - KFW

6.85

-

5983

5,983

Completed

UNRWA - SFD

23.18

1,645

1930

3,575

On-going

UNRWA - Multi donors

65

730

60400

61,130

Completed

UNRWA - Multi donors

21.54

395

8193

8,588

UNRWA - Belgium

2.27

94

0

94

On-going

UNRWA - ECHO

4.46

336

336

On-going

6

-

2197

2,197

Completed

1.33

22

259

281

On-going

Organization

Qatar - NORG Italy - Through MoPWH Italy - MoPWH

AlNada Project (17 buildings/partially damaged)

1.29

-

Italy - MoPWH

Rehabilitation of 4 buildings/severe damaged

1.21

-

Welfare Association

1.69

Qatar Charity - IDB

Status

ONLY the first installment was paid to the beneficiaries the project has stopped for lack of funding

-

Update in process - New agreement

0

-

Update in process - New agreement

-

1209

1,209

Completed

5

410

0

410

On-going

Qatar Charity

0.53

-

275

275

Completed

Qatar Charity

0.54

-

393

393

Completed

Fares Al Arab Association

0.2

-

72

72

Completed

IMAR Gaza

0.3

26

0

26

On-going

Al Rahma Association

0.23

50

0

50

On-going

ACTED

0.48

-

251

251

Update in process - New agreement

Others - UNOPS & QRC

0.47

5

91

96

Completed

204.84

7,009

94,052

101,061

TOTAL