Landscape Architecture Portfolio

Page 1






Legend 01 02 03 04 05 06 07 08 09

Roadway Science Research Center Main Axis Square Main Pedestrian Street Preserved Building Student Learning Center+Library Loboratory Teaching Buildings Group Student Association and Reunion

10 11 12 13 14 15 16 17 18 19 20

Community Slope Multi-media Center Memorial Museum Comprehensive Business Retails North Entrance Memorial Garden Retails South entrance North Hydrophilic Square South Activity Square

21 22 23 24 25 26 27 28 29 30

Viewing Platform Subsidence Platform Island on the Principal Axis Primary Loop Trail Peach Lake Entrance square (connect to school gate of HNU) Peach Lake Entrance Platform Peach Lake Entrance Platform Peach Lake Entrance Waterfront Platform Waterfront Platform













Monotonous Atrium The a trium space between the DAL lab and the main building of Hunan University is chosen as construction site. As the site comes with various problems, the common use of it is influenced and the original purpose of it is missing : To provide a space for teachers and students to relax and conduct outdoor activities. M e a n w h i l e , t h e unreasonable streamline makes the site lack of the s e n s e of s a f e t y, w h i c h means people are unable to stop and appreciate the quiet and beautiful scenery around. So we expect to construct a canopy to activate the space.

Problems Orderless Seperation

1 lack of activity space

2 not taking full advantage of the rich space level

3.Unsheltered, there is an inappropriate space connection

4 Glare area


Component Optimization Generation Of Basic Component

The Factor Of CURVATURE 1. Angle The adjustment and change o f c urva ture a re re a lize d mainly by adjusting the length and width of member bars. Different member bars lap on one another and form angles with their own width, whic h can be adjusted by changing opening positions on the bars.

2. The Shape Of Member

Unite Experiment After the basic unit structure form is established, three typical materials that are completely different are selected according to the shape, height and width of the member bar. Model experiments are conducted to explore the influence of the three different factors and different materials on entity construction.

Original Unit

bamboo stick

Increase unit's Height 18mm PVC I

cardboard

Increase unit's thickness

18mm PVC

3.Structure Node


Height Experience

Feed Back

Optimization Generation of the surface

Optimization of structural grid

Through the heneral par m e s h s i z e (900*900) was carried out on the surface

Get reasonable overall surface curvature

before

after

Wall point Ground point

On the bearing larger area,bold to bar to make the structure more stable

WIth cur vature analysis,in the large curvature of part and mechanical part of the power grid refinament to make its more reasonable Through the analysis of he curvature on the form optimizaton

Broaden activity space

Stress signal

Wall point

Ground point

plan Form visiual interference before

plan

after




Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.