1 minute read

4.2.4 Phasing of Pilot Projects and Long-term policy initiatives

SPONGE COLLABORATIVE + WEAVING WITH WATER Team

MULLASSERY CANAL FRAMEWORK AND CANAL EDGE MASTERPLAN

Advertisement

6. Activating existing open spaces with upcycled artwork and connecting the innovation hub to other neighbourhood level institutions to provide visibility and wider awareness about neighbourhood-level waste management strategies, as well as allowing stakeholders from surrounding civic institutions access to common amenities and open spaces.

4.2.4 Pilot Phasing and Implementation Timeline

Pilot Phasing

Figure 81:Phasing of pilot projects and long-term initiatives (Image Credit:Sponge Collaborative)

A potential phasing strategy for the pilot projects, which each correspond to the Adapt, Connect and Empower principles, as well as long-term policy and planning interventions to bolster the impact of these pilots has been suggested in the table above.

This article is from: