1 minute read

PRESTON RIDGE TRAIL

SHORT-TERM GOALS

• Develop a planting plan for areas where landscaping is allowed

• Add distinctive wayfinding signage for amenities along trail

• Add mile markers along trail

• Include larger signs in areas where trails intersect

• Add interesting monument or pavement color at trail intersection with Bluebonnet Trail

Preston Ridge Trail

LONG-TERM GOALS

• Replace older sections of trail as needed

• Add pavement treatment or at least crosswalk striping at Park Boulevard, Parker Road, Spring Creek Parkway, Hedgcoxe Road, and McDermott Road (use Legacy Drive crossing as an example)

• Look into Pedestrian Hybrid Beacons at all major roadway crossings

• Extend trail south from Eldorado Drive to Plano Parkway

• Smooth out radii where possible to meet AASHTO standards

ESTIMATED COSTS:

$6 Million*

*Assumes an average 5% annual inflation rate from 2018 to 2023.

This article is from: