Paula Rodríguez Vara CV+PORTFOLIO

Page 1


Name: Paula RodrĂ­guez Vara D.O.B: Santander 6-6-1993 Telephone: (+34) 664023276 Contact: Avd. del Estadio 2, 7A. Santader. (Spain) Calle Velazquez 120, 5d. CP:28006 Madrid (Spain) Email: paula_1993_428@hotmail.com Web: risu.hotglue.me/


Curriculm vitae Academic studies

Awards and exhibitions

* Magalhaes scholarship. UNIVERSIDADE FEDERAL DO RIO JANEIRO. Currently studing my fith year

* 2015

* Degree in architecture from ESCUELA TÉCNICA SUPERIOR DE ARQUITECTURA MADRID September 2011-2015 Average grade: 7.8/10 Project average grade: 9,5/10

* 2014 “With Honors 2014” Exhibition High Honor projects. Project 2. Unit Arnuncio Juárez. Organized by DPA. ETSAM

* School and High school in COLEGIO SAN AGUSTÍN. Santander. Sciences and technology. September2000-2011 Average grade: (8,2/10). Grade PAU: (11.2/14)

“With Honors 2015” Exhibition High Honor projects. Project 6-7. Unit Jesús Aparicio. Organized by DPA. ETSAM

* 2012 “BBB Matadero” Exhibition best projects. Projects 1. organized by Luis Fernandez Galiano.B Ud. Justo Isasi.

Computer skills Professional experience * 2016 January-August CDC arquitetos. Antonio Paulo Cordeiro. achitect and professor in FAU Rio de Janeiro 3D modelling, phisical modeling, image,construction, plans and detail desing Barra Shopping Rio e Janeiro. * 2015 January-June HECTOR FERNANDEZ HELORZA architect and professor in ETSAM. Madrid Private competition “House in Extremadura. Madrid”. Selecta Home invitation. First prize./ 3D modelling, phisical modeling, image, plans and detail desing * 2011-2012 (July-August) COUNSELOR in CAMP WINGATE KIRKLAND. Cape Cod. Massachusets. (E.E.U.U.) Work during the summer months (June/July/August) as free time counselor with american children between 7 and 14 years old. Lifeguard and free time counselor certificate.

* Microsoft Office; Word, Powerpoint; Excell * Adobe: Photoshop, Illustrator, InDesign, Premiere Pro. (CS6) * CAD: AutoCAD, gvSIG, VRay, Rhinoceros 5.0 * BIM: Revit * Sketchup * 3D Modelb

Languages * Spanish Native * English Advanced (FCE, E.O.I C1) * French Basic level (B1) * Portuguese Advanced level (B2)

Personal skills Dedication to drawing, photography, fashion and objets desing and video edition./ Passion for other cultures and travelling/ Easily learn new computer programmes and languages/ Highly resourceful and analytical.

Honor Grades Volunteering and activities * 2016 September-December TETO - Brasil Construction of wooden houses in Rio de Janeiro. * 2015 Workshop “taller de Integración” with CONI ONG. Project for a school in Guatemala during spring semester in the E.T. * 2014 summer Architecture VOLUNTEERING in INDIA. AIPC Pandora organisation. Madrid. Development of a housing project for the comunity in Himachal Pradesh. India/ Participation in the construction site for two months.

Publications * 2016

With Honors P6, por DPA Etsam, Madrid Publication of the best desing projects done during the year. * 2015 Next publication of best projects Ud. Jesús Aparicio.DAP. ETSAM Publication of the best desing projects done during the year. * 2014 “El sueño de la Razón” Academic Yearbook by Alberto Campo Baeza . DAP. ETSAM Publication showing the work done throught the desing process * 2012 BBB bueno, bonito y barato. Luis Fernandez GalianoMatadero Madrid. DPA. ETSAM Publication of the best projects donde during the year

* 4th year * 3rd year * 2nd year * 1st year

Architectural desing 7. Ud Vicens. Profesor Luis Basabe (Special Honors 10/10) Architectural desing 6. Ud Aparicio. (Special Honors 9,5/10) Architectural desing 5. Ud Maroto. (Special Honors 9,5/10) Architectural desing 4 Ud Campo Baeza (8,5/10) Architectural desing 3. Ud Juarez (9/10) Architectural desing 2. Ud Juarez (Special Honors 10/10) DAI II-I Professor Javier Raposo (9/10) Geometry and architectural drawing (8,5/10) Architectural desing 1. Ud Isasi (8/10)

Referees * Antonio Paulo Cordeiro. Architect and professor department of architectural desing FAU Rio de Janeiro * Hector Fernandez Helorza. Architect and professor department of architectural desing E.T.S.A.Madrid/ helorza@yahoo.com * Alberto Campo Baeza. Head architect and professor department of architectural desing en la E.T.S.A.Madrid * Will Rubenstein. Camp Wingate Kirkland director./ heywill@campwk.com


Idex Academic works ARCHITECTURAL DESING 00. HOUSING in Rio de Janeiro 01.MULTYPLAYER CITY. 02. CO-HOUSING in COPENHAGUE 03. SHELTER in the ANTARTIDA 04. DREAMED HOUSE 05. CALI MASTERPLAN 06. HIGH RISE CITY

/ Professor Antonio Paulo Cordeiro·· P7. UD.Vicens / Professor Luis Basabe · P6. UD. Aparicio · P6. UD. Aparicio · P6. UD. Aparicio · P5. UD. Maroto · P4. UD. Campo Baeza · OTHER WORKS

01. CONSTRUCTION III. Endless House 02. URBANISM I-II 03. URBAN PLANNIG and INFORMATIO GRAPHICS 04. LINEAR PARK Rio de Janeiro

Professor Anaya · Projeto paisgistico. Professor Isabella


[Axonometry]

[Axonometry]

//Proposed intervention in Fuencarral utopia for the future city

2.50

2.50

2.50

2.50

2.50

2.50

2.50

1.67

2.50

4.78

P3

2.28 ° 78

2.02

0.60 1.25

0.28 0.08 0.500.08 0.65

0.87 0.95

0.08

0.87

5.86

0.68 0.08

3

0.83

0.69

P3

0.60 1.89

1.67 BANHEIRO A = 2,53m

0.75

2.28

0.75

+6,15

12 11 10 09 08 06 05 04 03 02 01

0.92

0.50

1.00

0.43

0.75

0.08 0.74 11.40

P3

0.75

0.68

3.97 0.73

4

0.50

4

1.65

0.82

1.65

+6,15

4

5.00

0.60 2.75

0.58

4.44

1

0.97

1.00

1.90

0.90

0.59

0.58

0.58

1.72

0.53

J2

P1

7.31

1.00

0.58 1.72

0.53

0.58

1.72

0.53

J2 2.91

33°

0.6

8

24°

6 2.6

J1

9

0.6

6

0.6

6

HALL A = 6,88m

+6,15

2 7.7

3

1

1.0

0

0.58

1.9

33°

5.92

2

2.20

0.6

3.30

0.23

+5,75

2

5.87

5.75

2

2.28

3.00

J2

2

2

5.27

0.90

0.60

+6,15

0.58

2

SALA A = 38,48m

+5,75

+5,75

2

P3

6.99

2

QUARTO A = 13,48m

SALA A = 38,48m

+5,75

2

0.60 0.16

5.73

2

P1

0

0.9

0 1.00

0.60

0.90 1.90

0.58

0.21

0.58

0.53

0.58

0.54

1.72

0.59

0.58

0.58 1.72

0.53 1.00

0.88

1.90

0.67

2.28

0.60

2 0.90

SALA A = 38,48m

+5,75

2

0.90

°

2.40

P1

2.28

0.67

0.84

0.60 0.60 +6,15

0.67

0.90

5.87

0.90

0.67 0.75

BANHEIRO A = 4,53m

+6,15

BANHEIRO A = 2,53m

0.83

1.43

1.43

2

3.23

0.60 0.08 0.60 COZINHA A = 7,29m

0.27

°

99

0.94

7.75

0.65

°

0.88

2.28

3.96 1.03 0.43 0.60 0.68 0.83 0.08 0.30

4.46

QUARTO A = 13,48m

+5,75

2

4.81

4.47

QUARTO A = 13,48m

2

83

1.63

3

4 0.39

0.68 0.78

4

2.28

P4

+6,15

COZINHA A = 7,29m

0.83

0.70

2.79

P6

2.84

2

0.93

2

0.90

0.65 0.90

0.90

0.90 1.20

0.52

4 2.92

1.7

0.50

QUARTO A = 13,48m

80

0.61

1.90

2.85

2.70

0.83

4

0.83

2

P3

2.36

1.00 36°

4.66

4.95

0.60 0.08

0.68

0.90

0.66

J1

2.28

1.56

0.75

0.60 1.89

0.60

0.84

0.90

0.69

0.58

HALL A = 4,70m 0.80

2.50 BANHEIRO A = 7,66m

+6,15

VIVIENDA TIPO 3 90,00m

0.60 0.53

3

4

P5 0.76

2.88

1

1.01

2.55

0.72

4

2.69

0.66

+5,75

+5,75

4

0.66

0.47

°

3.19J2

ÁREA DE CIRCULAÇÃO EXTERNA A = 90,89m

+6,15 °

97

4

0.66

0.56

QUARTO A = 13,48m

0.70

1.59

0.59

0.54

2

0.78

P3

COZINHA A = 7,00m +6,15

+6,15

P5

0.58 1.72

+5,75

0.60

P6

0.90

3.10

4.83 0. 1.7257

1.72

0.60

1.03

0.48

0.58

0.60

0.58

1.14

2.73 0.61

SALA A = 13,48m

2

0.47

P2 1.72

2.51

0.08

5.72 0.53

P3

BANHEIRO A = 7,66m

4

+5,75

2

0.60 0.12

0.60 0.12 0.87

1.43

0.58

5.44

P1

°

55

J2

0.92

0.90 1.90

0.67

1.48

0.66

0.59

2

2.14 0.59 0.87 0.95

1.14 2.69J1

80

0.58

1 1.00

4.66

3.38 4.30 0.90

0.67 0.28 0.08 0.50 0.08 0.65

27°

7.84

2.73

1.59 1.10

+5,75

0.82

2.84

3.96

2

5.94

0.300.15

2.55

+6,15

2

VIVIENDA TIPO 2 120,00m

°

0.42

10

VIVIENDA TIPO 1 60,00m

55

1.75

2.20

1.29

0.54

5.17

2.40

HALL A = 4,30m

1.90

2.50

SALA A = 25,78m

+5,75

2

0.58

1.72

3.10

2

P3

SALA A = 17,15m

2

0.58

2.18

0.90

P4 0.83

BANHEIRO A = 4,53m

4.23

ESCADA DE INCÊNDIO A = 15,87m

2.43

0.66

+6,15 0.82

BANHEIRO A = 2,53m

+6,15

0.60 1.25

1.60

1.14

0.66

0.82

0.76

0.90 0.08 0.30

2.69

2

P3

0.75

2.08

2.20 1.03 0.43 0.60 0.68 0.83

4.11 0.92

2.73

QUARTO A = 13,48m

+5,75

2

0.68

4.05

P5

3

0.83

0.75

0.08 0.83

0.75

4 0.39

4.15

3.26

2

+6,15

COZINHA A = 7,29m

P4

+5,75

11

P5

0.66

J1

2.84

0.83

0.68 0.08

2

2.78

1.65

3.56 0.67 0.90

0.68

5.00 QUARTO A = 19,20m

+5,75

2

P3

0.68

0.75

0.08 0.74

0.70

13.05

4.70 1.35

4.70

0.67

1.35

1.35

0.68

1.04

P3

1.59

0.66

0.54

QUARTO A = 13,48m

QUARTO A = 18,87m

P3

12 11 10 09 08 06 05 04 03 02 01

1.00

J1

0.90

3.84

2.01

5.91

0.70 0.08

0.91

10

12

+6,15

0.58

1.72

2.88

5.00

09

13

1.67 BANHEIRO A = 2,53m

0.43

35°

07 08

P3

4

0.90

06

4

2.69

3

4.15

05

15 14

4

0.50

17 16

4

0.66

2

0.84

0.68 0.08

0.60 0.60 +6,15

4

0.83

P5

+6,15

°

04

0.08

1.63 BANHEIRO A = 2,53m

77

18

3

4

0.50

03 1.91

02

+6,15

3.94

20 19

3.08

0.25

1.20 DUCHA A = 1,51m

P5

3.23

0.60 0.08 0.60 COZINHA A = 7,29m

0.75

2.28

°

2.28

REVESTIMENTO 07

0.80 1.24

1.53

1.20

01

3.00 1.05

0.90

1.20

2.55

1.26 1.07

P2

4.05

0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30

0.08 1.68

0.80

2.50

12°

J2

SALA A = 12,78m

2

0.58 0.50

1.72

0.63

0.85

0.66

0.53

0.58

0.58

1.14 0.66

+5,75

2

0.93

0.60

+6,15

COZINHA A = 7,00m

2

2

2.50

°

2

0.60

0.60

1.08

+5,75

2 0.85

2.40

2.50

5.75

2

CORREDOR A = 5,74m

P2 2.73 1.59

0.66

QUARTO A = 19,20m

2

3.23 0.60

7.70

17°

1.14

0.66

0.66

+5,75

0.60

2.50

°

22 21

2.50

63

2.50

J1

2

0.93

12°

2.73

0.66

7.39

1 1.72

1.20

ELEVADOR A = 1,90m

5.23 1.59

0.48

J1 SALA A = 17,15m

+5,76

2.50

77

69

2.20

0.66

0.66

3.28

P2

1.14

0.66 2.69

0.66

ESCADA DE INCÊNDIO A = 7,12m

1.45 1.14

2.50

13°

0.15

2.50

1.55

P2

2.73 1.59 1.18

2.37 ÁREA TÉCNICA A = 3,72m

2.50

12°

17°

21°

P2

0.08

2.50

1.90

1.67

//Proposed intervention in Fuencarral utopia for the future city

24° 10°

2.32

16 15 14 13 12 11 10 09 08 06 05 04 03 02 01

0.06

16 15 14 13 12 11 10 09 08 06 05 04 03 02 01

0.95

ESCADA EXTERIOR A = 6,08m

1.67

ESCADA EXTERIOR A = 6,08m

1.16

1.67

0.06

0.50

0.25

1.90

RESUMEN DE CUADRO DE ESQUADRILHAS TIPO

V-1 V-2 V-3

ANCH. ALFEIZ. AMBIENTE 2.69 0.2 S.U.M. 1.20 S.U.M. 1.72 3.83 2.15 S.U.M.

CANT. ALTO 01 2.5 01 1.55 0 01

P-1 P-2

01

P-3

06

P-4

08

P-5

08

2.5 2.50

2.10 2,73

2.10

0.90

00. P-6

2.1

2.1

0.20 0.20

MOV.

PA

OBSERVACION

Corrediza

Ventana de aluminio PFK (Cristal de 4mm)

Corrediza

Ventana de aluminio PFK (Cristal de 4mm) Ventana de aluminio PFK (Cristal pavonado de 6mm)

Ventiluz

ACCESO VIVIENDA

Corrediza

FECHAMENTO JANELA

Corrediza

Madera rebajada Madera rebajada

INTERIOR VIVIENDA

Acrilico

0.80

INTERIOR VIVIENDA

Acrilico

0.70

INTERIOR_SANITARIO

Melamina

02 03 04

TE

PAREDES

MATERIAIS DE ACABAMENTO 01

Revestimento para Fachada Plaqueta Europedra Classic Marfim 22,8x11,4cm Porcelanato Acetinado Borda Reta Travertino Claro 54x54cm Artens

INTERIOR VIVIENDA

Porcelanato Acetinado Borda Reta Bianco COZINHA 58,4x58,4cm Cecrisa

TROPICAL HYBRID

BANHEIRO

05

Mixed ude building // Spring 2016

01

PI

TETO

MATERIAIS DE ACABAMENTO

AMBIENTE CORREDOR EXTERIOR

Falso teto de pladur Plaqueta Classic recobrimento madeira 38,8x12,18 cm

01

Piso Vinílico Tarkett Decorflex Residence Amendoim 70m Bobina Piso Vinílico Durafloor Loft Treviso 4mmx20cmx1,21m

PROJETO DE EXECUÇAO DE HABITAÇAO

AMBIENTE CORREDOR EXTERIOR

02

Falso teto de pladur Plaqueta Classic recobrimento travertino52x42 cm

INTERIOR VIVIENDA

03

Falso teto de pladur Plaqueta Classic IMpermeabilizante 52x42 cm

COZINHA

Brilhante Borda Arredondada 03 Piso Cerâmico Elegance Bege 52x52cm Ceral COZINHA

04

Falso teto de pladur Plaqueta Classic IMpermeabilizante 52x42 cm

BANHEIRO

04

02

05

PROJETO:

HACHURA BANHEIRO

PISO

MATERIAIS DE ACABAMENTO

AMBIENTE CORREDOR EXTERIOR

INTERIOR VIVIENDA

Porcelanato Acetinado Borda Reta Bianco BANHEIRO 58,4x58,4cm Cecrisa

HACHURA CONSTRUIR HACHURA AREA PERIMETRAL HACHURA AREA PERIMETRAL

ALUMNA:

PROFESSOR

PAULA RODRÍGUEZ VARA

ANTONIO PAULO CODEREIRO

DESCRIPCIÓN: PLANO

HABITAÇAO PARA OS PESCADORES PLANTA TIPO. MATERIAIS E MEDIDAS

LAMINA:

D-2

// arch desing. UFRJ Rio de Janeiro//

Porcelanato Acetinado Borda Reta Quartzita 62,5x62,5cm Elizabeth

EXT SEM COBERTURA

DISTRITO:

DEPARTAMENTO:

CONSTRUÇAO

ESCALA:

1:75

FECHA:

10-3-2016

From the structure of an abandoned building on the island of fundao , campus of the Federal University of Rio de Janeiro , port and naval factory area , building its reoccupation it is intended to create a hybrid building: housing and space work and leisure .Due to weather conditions a building where the living space is minimal, leaving all the permientral circulation , so that it becomes relationship spaces arises.

Vegetation and wood have a key role in the project, giving an image to own outside the Tropical arquitetura


[Axonometry]

//Proposed intervention in Fuencarral utopia for the future city

01.MULTYPLAYER CITY.

Urban project // Spring 2015

// P7. UD.Vicens// Professor LuiS Basabe //

The surroundings of the ancient town of FUENCARRAL B., built by the INV 1956 is marked by institutional neglect and scars of the crisis. Although it includes the potential enclave due to the recent revival of “Operation Chamartín” making this node, with its rich history, identity well defined and organized citizenship in our focus reflection on the transformation of the city / After a long reflection and coming to understand the city as a support network that sustain us, a project in which they live and giving them infrastructure programmatic use in addition to its own distribution network function arises. / After a negotiation between various stakeholders such as the Market, Citizenship, technical, cooperatives and institutions it is activated and provided with new features by taking advantage of the gaps interventions perimeter of the city. As a result mixed and compact city.


[Fuencarral B Analysis]

[Proto-plan + elevations]

// morphological , demographic and infrastructural analysis

// ecosystems as infrastructure units +

Ecosistemas como unidades infraestructurales + Programa por ecosistemas


[Catalog Ecosystem]

// interconnections within the city


[Species Catalogue]

// Inhabited structures support

[Species Catalogue]

// Inhabited structures tube


[Interior vs exterior ]

[Co-working areas ]

// housing flexible system

// relational units . mixed uses

large-scale structure turned over to the city of copenhagen, cultural public use. Space relations and exchange of views with versatile rooms that favor the variability of uses

02.

CO-HOUSING in COPENHAGUE. Housing-Public building // Autum 2014

// arch desing 6. Ud. JesĂşs Aparicio/

The project rethink a different way of living for ancient people in Copenhague. An intentional community of private homes clustered around shared space. Households have independent incomes and private lives, but neighbors collaboratively plan and manage community activities and shared spaces. /Large bar-building with mixed uses on the seafront freeing the large plot of 11000m2 providing a large park in the city of Copenhagen. / The building is set inhabited by a large truss, aimed at cultural use for the city, from which hangs the rest of the housing program / A flexible system, in which the housing unit is reduced to minimum, going to be set only by a series of furniture [bed-bathroom-dressing room-kitchen-studiobreak] organized and divided every spare generating plant poses different types of housing due to needs of its inhabitants./ the game of transparencies, with the use of plastic materials and glass favors the relationship between the different rooms of the interior. The use of tissue can play with the different privacies giving the whole a versatility that favors the coexistence of uses


[Mapping project]

// Construction details , plant situation and explanation of project section

Section 1:50 . Detail of mobile platforms

Section set at 1: 250 . Project dialogue with its surroundings

assembly plant scale 1: 250. Project dialogue with its surroundings


[generated design situations]

[Adaptation System]

// spatial situations depending on the environment

// prefabricated mounting system

03.

SHELTER in the ANTARTIDA. Housing // Autum 2014

// P6. Ud. JesĂşs Aparicio//

Construction of a shelter for three researchers in Antarctica arises. The project consists of a system of easy assembly and construction that can sertransportado in xperia ship. Able to adapt to harsh weather conditions and offer researchers a comfortable and conditioned space to spend the months of study. A construction system consists of a series of ribs extending fiberglass U-shaped able to adapt to different situations and an envelope formed by a double network capable of supporting different envelopes such as ice, water or other materials that allow intend thermally isolate and let light.


[Adaptation rhythms]

[Eco-appropiation strategy]

//variability situations adapting to place

//skins ecological system adaptation to the environment

04. DREAMED HOUSE

Housing-Public building // Autum 2014

// P6. Ud. Jesús Aparicio//

A shell capsule capable of traveling anywhere in the world, facing the most dispares.Consiste conditions in a very light structure, easy to assemble and disassemble.To adapt to different conditions an enclosure that resembles the concept of “onion skin” a series of overlapping layers to suit each situation arises; so, we have a solar envelope, other impervious another plant, another transparent to watch and other inflatable to float./ A housing with basic services necessary for my lifestyle and endless possibility of main change the furniture and the interior rooms, playing with light and different materials


[Masterplan]

[Sector 3 detail:Cultural Exchange Center]

// situation plan and sectors explanation

// situation plan and sectors explanation

05.

CALI RE-HABILITATION MASTERPLAN Urbanism // Spring 2014

// arch desing 5. Ud. Javier Maroto//

The project is located in the commune Morichal Node fifteen city of Cali in Colombia, Corresponding to the lowest strata of society Cali. /In response to the problems that arise in this strategic point in the city, we propose a system of activation of the neighborhood by the vacuum, we implemented in the center of gravity of this community, but it could be extrapolated and grow around this center colonizing the rest of this area. /Upon detection of excessive overcrowding of housing in the urban fabric as densified system congestion arises and emptying of the urban fabric, and treatment of the void -in vacum-, through which to activate the full./ A training center, production and distribution in the large gap in the node, which is developed as a system of thematic groups around major gaps examines relationship, it moves to the urban fabric, creating voids that function as seats An intervention is proposed in adjacent homes to these places, serving as a space for access and connection to these homes.


8 metros

∆ Unión cubierta pilar de hormigón

[ Urban strategy ]

8 metros

13,5metros

//Housing intervention and public space

Unión triangulación cubierta

Patio residencial Cubierta azoteas, co-workin

Cubierta que une diferentes azoteas para crear espacios activos de colaboración ciudadana.

Se crean plazas que activan el vacío dotándolo de programa y crando áreas de influencia a su alrededor

Cubierta guadua para las espacio

13,5metros

Intervención en azotea

Intervención en plazas

Patios para favorecer la ventilación dentro de la vivienda

Chimenea solar

Azotea descubierta

2.70 m ∆ Celosías ventilacición cruzada

2.70 m Marquesina con cubierta vegetal

∆ Elementos urbanos para niños

Cubierta textil de cañizo

Celosías de madera balata

2.70 m Puestos de mercado

Adoquín filtrante

Tierra prensada

1 2 3 escala 1/100

1 2 3 escala 1/100

4m

10 metros

7.70 metros

4m

Cubierta de madera de cagüi

centro de producción creativa para la reactivación del núcleo

8.50 metros

Espacios permeables y de gradación del espacio público y privado. Forman conjuntos de programa asociado.

∆ Cubierta vegetal

Transición al centro de producción creativa para la reactivación del núcleo

Biblioteca virtual

Espacios de caráctar público, arquitectura con estructuras tensadas y mobiliario urbano.

Alero

Cubierta textil de cáñamo

Terraza volcada hacia los vacíos

celosías de fibra de vidrio

Zonas trabajo común

Lámpara reciclada de mimbre Huerto urbano

mediateca Rampas de acceso público

Escalera acceso privado

COFFEE

Instalaciones electricas colgadas

escalera colgada

Cafeterías temáticas

empalizada de bambú

áreas de descanso

Zonas de juego

Uso del agua de lluvia para regadío

Escalera privada

Plataforma de madera elevada

Césped natural

plataformas elevadas de madera

1 2 3 escala 1/100

Depósito recogida de agua

∆ forjado aligerado colgado

5.60 metros

9,5 metros

4m

tirante de acero arriostramiento panel

cerramiento carrizo

perfil en U

tornillos

capa de compresión 3x3 bambú atado con alambre

anclaje a forjado

8 metros ∆

13,5metros

10metros

#5 invernadero y punto limpio de materias primas aprovechables y material cultural Programa de transición entre la nueva construcción y vivienda existente. Fase de almacenamiento y clasi-

#8 calle comercial El espacio cercano a la calle se va degradando a programa enfocado a la visualización del producto. La escala se reduce.

2.70 m ∆

2.70 m ∆

2.70 m

Espacios co -working

Zonas de estar

Espacio cubierto Empalizadas privatización del espacio

Puesto de mercado

Set de rodaje

1 2 3 escala 1/100

4m

1 2 3 escala 1/100

4m

1 2 3 escala 1/100

4m


[residential Sector]

//social and bioclimatic estrategys

[Production sector]

//ecological and economic strategies


[ Urban interventions ]

//Housing intervention and public space

urban greenhouses . production center autรณtonas plant species for use in subsequent investment and public spaces of the city

Creation and empty spaces to generate external relationship. Decongestion of the district and boost community life use of architectural tools such as urban mobliario , paving, hedges and vegetation to create different spatial situations

treatment of critical areas within the neighborhood as background bags , cut roads , disused plots , or occupied . treatment loopholes

relationship of the project with the city. dialoguing architecture , which follows the laws of the existing and respects the environment in which it sits , generating a mixturdada , accessible city and favors mobility


[ Catalogue ]

//Furniture, paving,growths, structure


[ project construction details ] //Housing intervention and public space

[ nterconnections area]

//Housing intervention and public space


[ macro-section]

//proto-city proposal in lisbon

06.

HIGH RISE CITY Mix-used building // Autum 2013

// P4. Ud. Alberto Campo Baeza///

Support activities and infrastructure that collect traffic flows, shelter many uses miss the wind and the light and see Lisbon/ This new reality is assumed, giving value to the land. The area chosen is at the confluence of the largest number of flows./ The project is a high city, a system of streets, a first order of “avenues” that articulate the circulation main body adapting to the land, considering mainly two things, the views and the topography rise, and a second order “side streets”, secondary circulation/ Outside, it is confused with what is inside what is outside. Inside moreover, limits have been deleted, has created a new landscape, a new topography. It is a continuous system of elements, changing movements and actions. The flooring, furniture generate another topography smaller scale, human scale, by walking, running, watch, play, ie enjoy. /


[ macro-section]

//proto-city proposal in lisbon


Academic works OTHER WORKS 01. CONSTRUCTION III. Endless House 02. URBANISM I-II 03. URBAN PLANNIG and INFORMATIO GRAPHICS 04. LINEAR PARK Rio de Janeiro

Professor Anaya · Projeto paisgistico. Professor Isabella


[ structural diagrams]

[ structural-section]

//analysis of possible structural systems

// cuts and plant construction

01.

ENDLESS HOUSE Housing // Autum 2014

// ConstrucciĂłn II. Prof. JesĂşs Anaya //

In the course of construction 3, it is proposed to choose a project published later built but not solve its construction system. Thus solving a complex variable curvature surface through BARS STRUCTURE Complex Geometry of double curvature. Reference: Pavilion Frei Otto Mannheim./ The structural shell is formed by a series entrecruzadoas steel bars connected by struts or perpendicular knots to the surface in each cross point. This main body supports the entire inner substructure hung, formed by a series of capsules formed by a supporting structure DeAcero double supporting ribs through a casing glass plates./Also hanging from the main monocoque etsructura a series of pieces made with panels reinforced with aluminum ribs; and a series of helical ramps connecting with other capsules.


[ structural diagrams]

//analysis of possible structural systems


[ urban plots]

[ urban masterplan]

//analysis of possible urban systems

//analysis

88 1 1

E6

1000

200

ESTRATO 6

E1

100 1

#2

ESTRATO 1

VIVIENDA EN ESQUINA

#3

CON ZONA PÚBLICA

#1

DOS VIVIENDAS

EN EL MEDIO

#2

1 #1.1

#1

EXPOSICIÓN

VIVIENDA / ESPACIO VENTA

#1.2

E5

RATIOS POR HABITANTE

CATWALK, PASALERAS DE MODA

1

VIVIENDA/ TALLER

#3 TALLER / ESPACIO VENTA

SECTOR 1

#1.3

ESTRATO 5

RESIDENCIAL

FERIAS DE ARTESANÍA

EJEMPLO DE CIUDAD DESARROLLADA [MADRID]

1000

CON ESPACIO LIBRE

VIVIENDA ENTRE M E D I A N E R A S

100

E2

#1.4 Bibliotecas: 1 por 15000 habs

GALERÍAS DE ARTE

Equipamientos: 5 m2s/hab

300

1

Zonas Verdes: 5 m2s/hab

E4

por vivienda: 0,966 m2s/hab

20.000

1

CAFETERÍAS TEMÁTICAS

Analyze and map the environment of Aranjuez and his garden as a series of variables such as vegetation, geology, hydrology, clinometría, hipsometría. Thus different aspects of the landscape are studied in terms of the adequacy of future interventions or expansions of the city in a natural environment, or the impact that these actions could involve the landscape

1

#1.3

CENTROS MATERIAL

#1.2

8000

1

U R B A N O S

#1.1

#3.2 BIBLIOTECAS TEMÁTICAS

#3.3 ASESORÍA DE

TALENTOS

50

8000

PRODUCCIÓN

CONTENEDORES

#3.1

en cifras

#2.1

CENTROS

PRODUCCIÓN

COMPLEMEN-

TARIOS

#2.4 COMERCIO EN VIVIENDA

CIUDAD DE CORDOBA: 24.500 4000 EL VALLADO: 21.100 3450 EL RETIRO: 8.000 1630 COMUNEROS: 8.300 1680 LAUREANO GÓMEZ: 7.300 1480 MOJICA: 9.000 3100 TOTAL: 88.379 15.389

02.

M A T E R I A L

ESPACIOS

HABITANTES VIVIENDAS

03.

#1

MINORISTA

Suelo comercial: 0,1 m2s/hab

// Urbanismo II//

D I G I T A L

PRODUCCIÓN

#3

MERCADO DE VENTA

PRODUCCIÓN

PRODUCCIÓN

DIGITAL

#2.3

ESTRATO 4

#2

SECTOR 2

VENTA DEL PRODUCTO

REORDENADOS

Tejido cultural por habitante: 0,322 m2s/hab

LA CIUDAD Y EL MEDIO Urbanism // Spring 2013

C A L I SECTOR 3 SERVICIOS

#2

#2.2 PUESTOS

AMBULANTES

por vivienda: 5,894 m2s/viv

BARRIO

M O R I C H A L

TIENDAS

Tejido educativo por habitante: 1,965 m2s/hab

ESTRATO 2

RESIDUOS

#1

VISUALIZACIÓN DEL PRODUCTO

#2.1

#3.4 PUNTOS DE INFORMACIÓN

PUNTOS

L I M P I O S

1

1

E3 ESTRATO 3

1 1000 15.000

1

3

1 15

URBANISM DIAGRAMS ANALISYS Urbanism // Spring 2014 Proposal urban scale in which we study and qualify the internal fabric of the neighborhood morichal in Cali Colombia./ This analysis of traffic, roads and public space in the district fifteen, detect a series of blocks that interrupt the urban fabric, cutting the streets and blocking traffic. These apples potential places the call and are the sites proposed in the intervention./ Enhancing the orthogonal grid that favors ventilation and circulation flows, we find


[ re- habilitation]

[ re- habilitation]

// vegetal landscape proposal

// vegetal landscape proposal

04.

LINEAR PARK. Vicente de carvalho. Rio e Janeiro Landscaping // Spring 2016 Re - enablement and proposal of a linear park for the recovery of Vicente de Carvalho avenue in the city of Rio de Janeiro , where he is one of the subway stations and bus busiest city . Capitalizing on the wall there is creating a divided into four sectors , leisure , cultural , sport and trade park is proposed. In funcióm each use are added a “ imputs “ the existing wall style high line New York , generating a series of space as a bathing area a recracional area, a wall - graffiti , benches , areas of proyeccción , stands for shows, hawking zones . All it is taking into account the importance of vegetation , water , pavements and street furniture type . Besides improving road access, creating parking, a bicycle lane and shaded areas for proposed


Publications 2012

2016

June 2012

“TEJIDOS, LÍMITES Y DINAMISMO” DAI. Javier Raposo

BBB bueno, bonito y barato. DAP. ETSAM

September 2014 “El sueño de la Razón” Yearbook Alberto Campo Baeza . DAP. ETSAM

Exhibitions

Paula Rodríguez Vara Portfolio · 2016

Área de cultura y

Projetos 1. BBB Matadero

exposiciones ETSAM

ETSAM


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.