Name: Paula RodrĂguez Vara D.O.B: Santander 6-6-1993 Telephone: (+34) 664023276 Contact: Avd. del Estadio 2, 7A. Santader. (Spain) Calle Velazquez 120, 5d. CP:28006 Madrid (Spain) Email: paula_1993_428@hotmail.com Web: risu.hotglue.me/
Curriculm vitae Academic studies
Awards and exhibitions
* Magalhaes scholarship. UNIVERSIDADE FEDERAL DO RIO JANEIRO. Currently studing my fith year
* 2015
* Degree in architecture from ESCUELA TÉCNICA SUPERIOR DE ARQUITECTURA MADRID September 2011-2015 Average grade: 7.8/10 Project average grade: 9,5/10
* 2014 “With Honors 2014” Exhibition High Honor projects. Project 2. Unit Arnuncio Juárez. Organized by DPA. ETSAM
* School and High school in COLEGIO SAN AGUSTÍN. Santander. Sciences and technology. September2000-2011 Average grade: (8,2/10). Grade PAU: (11.2/14)
“With Honors 2015” Exhibition High Honor projects. Project 6-7. Unit Jesús Aparicio. Organized by DPA. ETSAM
* 2012 “BBB Matadero” Exhibition best projects. Projects 1. organized by Luis Fernandez Galiano.B Ud. Justo Isasi.
Computer skills Professional experience * 2016 January-August CDC arquitetos. Antonio Paulo Cordeiro. achitect and professor in FAU Rio de Janeiro 3D modelling, phisical modeling, image,construction, plans and detail desing Barra Shopping Rio e Janeiro. * 2015 January-June HECTOR FERNANDEZ HELORZA architect and professor in ETSAM. Madrid Private competition “House in Extremadura. Madrid”. Selecta Home invitation. First prize./ 3D modelling, phisical modeling, image, plans and detail desing * 2011-2012 (July-August) COUNSELOR in CAMP WINGATE KIRKLAND. Cape Cod. Massachusets. (E.E.U.U.) Work during the summer months (June/July/August) as free time counselor with american children between 7 and 14 years old. Lifeguard and free time counselor certificate.
* Microsoft Office; Word, Powerpoint; Excell * Adobe: Photoshop, Illustrator, InDesign, Premiere Pro. (CS6) * CAD: AutoCAD, gvSIG, VRay, Rhinoceros 5.0 * BIM: Revit * Sketchup * 3D Modelb
Languages * Spanish Native * English Advanced (FCE, E.O.I C1) * French Basic level (B1) * Portuguese Advanced level (B2)
Personal skills Dedication to drawing, photography, fashion and objets desing and video edition./ Passion for other cultures and travelling/ Easily learn new computer programmes and languages/ Highly resourceful and analytical.
Honor Grades Volunteering and activities * 2016 September-December TETO - Brasil Construction of wooden houses in Rio de Janeiro. * 2015 Workshop “taller de Integración” with CONI ONG. Project for a school in Guatemala during spring semester in the E.T. * 2014 summer Architecture VOLUNTEERING in INDIA. AIPC Pandora organisation. Madrid. Development of a housing project for the comunity in Himachal Pradesh. India/ Participation in the construction site for two months.
Publications * 2016
With Honors P6, por DPA Etsam, Madrid Publication of the best desing projects done during the year. * 2015 Next publication of best projects Ud. Jesús Aparicio.DAP. ETSAM Publication of the best desing projects done during the year. * 2014 “El sueño de la Razón” Academic Yearbook by Alberto Campo Baeza . DAP. ETSAM Publication showing the work done throught the desing process * 2012 BBB bueno, bonito y barato. Luis Fernandez GalianoMatadero Madrid. DPA. ETSAM Publication of the best projects donde during the year
* 4th year * 3rd year * 2nd year * 1st year
Architectural desing 7. Ud Vicens. Profesor Luis Basabe (Special Honors 10/10) Architectural desing 6. Ud Aparicio. (Special Honors 9,5/10) Architectural desing 5. Ud Maroto. (Special Honors 9,5/10) Architectural desing 4 Ud Campo Baeza (8,5/10) Architectural desing 3. Ud Juarez (9/10) Architectural desing 2. Ud Juarez (Special Honors 10/10) DAI II-I Professor Javier Raposo (9/10) Geometry and architectural drawing (8,5/10) Architectural desing 1. Ud Isasi (8/10)
Referees * Antonio Paulo Cordeiro. Architect and professor department of architectural desing FAU Rio de Janeiro * Hector Fernandez Helorza. Architect and professor department of architectural desing E.T.S.A.Madrid/ helorza@yahoo.com * Alberto Campo Baeza. Head architect and professor department of architectural desing en la E.T.S.A.Madrid * Will Rubenstein. Camp Wingate Kirkland director./ heywill@campwk.com
Idex Academic works ARCHITECTURAL DESING 00. HOUSING in Rio de Janeiro 01.MULTYPLAYER CITY. 02. CO-HOUSING in COPENHAGUE 03. SHELTER in the ANTARTIDA 04. DREAMED HOUSE 05. CALI MASTERPLAN 06. HIGH RISE CITY
/ Professor Antonio Paulo Cordeiro·· P7. UD.Vicens / Professor Luis Basabe · P6. UD. Aparicio · P6. UD. Aparicio · P6. UD. Aparicio · P5. UD. Maroto · P4. UD. Campo Baeza · OTHER WORKS
01. CONSTRUCTION III. Endless House 02. URBANISM I-II 03. URBAN PLANNIG and INFORMATIO GRAPHICS 04. LINEAR PARK Rio de Janeiro
Professor Anaya · Projeto paisgistico. Professor Isabella
[Axonometry]
[Axonometry]
//Proposed intervention in Fuencarral utopia for the future city
2.50
2.50
2.50
2.50
2.50
2.50
2.50
1.67
2.50
4.78
P3
2.28 ° 78
2.02
0.60 1.25
0.28 0.08 0.500.08 0.65
0.87 0.95
0.08
0.87
5.86
0.68 0.08
3
0.83
0.69
P3
0.60 1.89
1.67 BANHEIRO A = 2,53m
0.75
2.28
0.75
+6,15
12 11 10 09 08 06 05 04 03 02 01
0.92
0.50
1.00
0.43
0.75
0.08 0.74 11.40
P3
0.75
0.68
3.97 0.73
4
0.50
4
1.65
0.82
1.65
+6,15
4
5.00
0.60 2.75
0.58
4.44
1
0.97
1.00
1.90
0.90
0.59
0.58
0.58
1.72
0.53
J2
P1
7.31
1.00
0.58 1.72
0.53
0.58
1.72
0.53
J2 2.91
33°
0.6
8
24°
6 2.6
J1
9
0.6
6
0.6
6
HALL A = 6,88m
+6,15
2 7.7
3
1
1.0
0
0.58
1.9
33°
5.92
2
2.20
0.6
3.30
0.23
+5,75
2
5.87
5.75
2
2.28
3.00
J2
2
2
5.27
0.90
0.60
+6,15
0.58
2
SALA A = 38,48m
+5,75
+5,75
2
P3
6.99
2
QUARTO A = 13,48m
SALA A = 38,48m
+5,75
2
0.60 0.16
5.73
2
P1
0
0.9
0 1.00
0.60
0.90 1.90
0.58
0.21
0.58
0.53
0.58
0.54
1.72
0.59
0.58
0.58 1.72
0.53 1.00
0.88
1.90
0.67
2.28
0.60
2 0.90
SALA A = 38,48m
+5,75
2
0.90
°
2.40
P1
2.28
0.67
0.84
0.60 0.60 +6,15
0.67
0.90
5.87
0.90
0.67 0.75
BANHEIRO A = 4,53m
+6,15
BANHEIRO A = 2,53m
0.83
1.43
1.43
2
3.23
0.60 0.08 0.60 COZINHA A = 7,29m
0.27
°
99
0.94
7.75
0.65
°
0.88
2.28
3.96 1.03 0.43 0.60 0.68 0.83 0.08 0.30
4.46
QUARTO A = 13,48m
+5,75
2
4.81
4.47
QUARTO A = 13,48m
2
83
1.63
3
4 0.39
0.68 0.78
4
2.28
P4
+6,15
COZINHA A = 7,29m
0.83
0.70
2.79
P6
2.84
2
0.93
2
0.90
0.65 0.90
0.90
0.90 1.20
0.52
4 2.92
1.7
0.50
QUARTO A = 13,48m
80
0.61
1.90
2.85
2.70
0.83
4
0.83
2
P3
2.36
1.00 36°
4.66
4.95
0.60 0.08
0.68
0.90
0.66
J1
2.28
1.56
0.75
0.60 1.89
0.60
0.84
0.90
0.69
0.58
HALL A = 4,70m 0.80
2.50 BANHEIRO A = 7,66m
+6,15
VIVIENDA TIPO 3 90,00m
0.60 0.53
3
4
P5 0.76
2.88
1
1.01
2.55
0.72
4
2.69
0.66
+5,75
+5,75
4
0.66
0.47
°
3.19J2
ÁREA DE CIRCULAÇÃO EXTERNA A = 90,89m
+6,15 °
97
4
0.66
0.56
QUARTO A = 13,48m
0.70
1.59
0.59
0.54
2
0.78
P3
COZINHA A = 7,00m +6,15
+6,15
P5
0.58 1.72
+5,75
0.60
P6
0.90
3.10
4.83 0. 1.7257
1.72
0.60
1.03
0.48
0.58
0.60
0.58
1.14
2.73 0.61
SALA A = 13,48m
2
0.47
P2 1.72
2.51
0.08
5.72 0.53
P3
BANHEIRO A = 7,66m
4
+5,75
2
0.60 0.12
0.60 0.12 0.87
1.43
0.58
5.44
P1
°
55
J2
0.92
0.90 1.90
0.67
1.48
0.66
0.59
2
2.14 0.59 0.87 0.95
1.14 2.69J1
80
0.58
1 1.00
4.66
3.38 4.30 0.90
0.67 0.28 0.08 0.50 0.08 0.65
27°
7.84
2.73
1.59 1.10
+5,75
0.82
2.84
3.96
2
5.94
0.300.15
2.55
+6,15
2
3°
VIVIENDA TIPO 2 120,00m
°
0.42
10
VIVIENDA TIPO 1 60,00m
55
1.75
2.20
1.29
0.54
5.17
2.40
HALL A = 4,30m
1.90
2.50
SALA A = 25,78m
+5,75
2
0.58
1.72
3.10
2
P3
SALA A = 17,15m
2
0.58
2.18
0.90
P4 0.83
BANHEIRO A = 4,53m
4.23
ESCADA DE INCÊNDIO A = 15,87m
2.43
0.66
+6,15 0.82
BANHEIRO A = 2,53m
+6,15
0.60 1.25
1.60
1.14
0.66
0.82
0.76
0.90 0.08 0.30
2.69
2
P3
0.75
2.08
2.20 1.03 0.43 0.60 0.68 0.83
4.11 0.92
2.73
QUARTO A = 13,48m
+5,75
2
0.68
4.05
P5
3
0.83
0.75
0.08 0.83
0.75
4 0.39
4.15
3.26
2
+6,15
COZINHA A = 7,29m
P4
+5,75
11
P5
0.66
J1
2.84
0.83
0.68 0.08
2
2.78
1.65
3.56 0.67 0.90
0.68
5.00 QUARTO A = 19,20m
+5,75
2
P3
0.68
0.75
0.08 0.74
0.70
13.05
4.70 1.35
4.70
0.67
1.35
1.35
0.68
1.04
P3
1.59
0.66
0.54
QUARTO A = 13,48m
QUARTO A = 18,87m
P3
12 11 10 09 08 06 05 04 03 02 01
1.00
J1
0.90
3.84
2.01
5.91
0.70 0.08
0.91
10
12
+6,15
0.58
1.72
2.88
5.00
09
13
1.67 BANHEIRO A = 2,53m
0.43
35°
07 08
P3
4
0.90
06
4
2.69
3
4.15
05
15 14
4
0.50
17 16
4
0.66
2
0.84
0.68 0.08
0.60 0.60 +6,15
4
0.83
P5
+6,15
°
04
0.08
1.63 BANHEIRO A = 2,53m
77
18
3
4
0.50
03 1.91
02
+6,15
3.94
20 19
3.08
0.25
1.20 DUCHA A = 1,51m
P5
3.23
0.60 0.08 0.60 COZINHA A = 7,29m
0.75
2.28
°
2.28
REVESTIMENTO 07
0.80 1.24
1.53
1.20
01
3.00 1.05
0.90
1.20
2.55
1.26 1.07
P2
4.05
0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30 0.30
0.08 1.68
0.80
2.50
12°
J2
SALA A = 12,78m
2
0.58 0.50
1.72
0.63
0.85
0.66
0.53
0.58
0.58
1.14 0.66
+5,75
2
0.93
0.60
+6,15
COZINHA A = 7,00m
2
2
2.50
°
2
0.60
0.60
1.08
+5,75
2 0.85
2.40
2.50
5.75
2
CORREDOR A = 5,74m
P2 2.73 1.59
0.66
QUARTO A = 19,20m
2
3.23 0.60
7.70
17°
1.14
0.66
0.66
+5,75
0.60
2.50
°
22 21
2.50
63
2.50
J1
2
0.93
12°
2.73
0.66
7.39
1 1.72
1.20
ELEVADOR A = 1,90m
5.23 1.59
0.48
J1 SALA A = 17,15m
+5,76
2.50
77
69
2.20
0.66
0.66
3.28
P2
1.14
0.66 2.69
0.66
ESCADA DE INCÊNDIO A = 7,12m
1.45 1.14
2.50
13°
0.15
2.50
1.55
P2
2.73 1.59 1.18
2.37 ÁREA TÉCNICA A = 3,72m
2.50
12°
17°
21°
P2
0.08
2.50
1.90
1.67
//Proposed intervention in Fuencarral utopia for the future city
24° 10°
2.32
16 15 14 13 12 11 10 09 08 06 05 04 03 02 01
0.06
16 15 14 13 12 11 10 09 08 06 05 04 03 02 01
0.95
ESCADA EXTERIOR A = 6,08m
1.67
ESCADA EXTERIOR A = 6,08m
1.16
1.67
0.06
0.50
0.25
1.90
RESUMEN DE CUADRO DE ESQUADRILHAS TIPO
V-1 V-2 V-3
ANCH. ALFEIZ. AMBIENTE 2.69 0.2 S.U.M. 1.20 S.U.M. 1.72 3.83 2.15 S.U.M.
CANT. ALTO 01 2.5 01 1.55 0 01
P-1 P-2
01
P-3
06
P-4
08
P-5
08
2.5 2.50
2.10 2,73
2.10
0.90
00. P-6
2.1
2.1
0.20 0.20
MOV.
PA
OBSERVACION
Corrediza
Ventana de aluminio PFK (Cristal de 4mm)
Corrediza
Ventana de aluminio PFK (Cristal de 4mm) Ventana de aluminio PFK (Cristal pavonado de 6mm)
Ventiluz
ACCESO VIVIENDA
Corrediza
FECHAMENTO JANELA
Corrediza
Madera rebajada Madera rebajada
INTERIOR VIVIENDA
Acrilico
0.80
INTERIOR VIVIENDA
Acrilico
0.70
INTERIOR_SANITARIO
Melamina
02 03 04
TE
PAREDES
MATERIAIS DE ACABAMENTO 01
Revestimento para Fachada Plaqueta Europedra Classic Marfim 22,8x11,4cm Porcelanato Acetinado Borda Reta Travertino Claro 54x54cm Artens
INTERIOR VIVIENDA
Porcelanato Acetinado Borda Reta Bianco COZINHA 58,4x58,4cm Cecrisa
TROPICAL HYBRID
BANHEIRO
05
Mixed ude building // Spring 2016
01
PI
TETO
MATERIAIS DE ACABAMENTO
AMBIENTE CORREDOR EXTERIOR
Falso teto de pladur Plaqueta Classic recobrimento madeira 38,8x12,18 cm
01
Piso Vinílico Tarkett Decorflex Residence Amendoim 70m Bobina Piso Vinílico Durafloor Loft Treviso 4mmx20cmx1,21m
PROJETO DE EXECUÇAO DE HABITAÇAO
AMBIENTE CORREDOR EXTERIOR
02
Falso teto de pladur Plaqueta Classic recobrimento travertino52x42 cm
INTERIOR VIVIENDA
03
Falso teto de pladur Plaqueta Classic IMpermeabilizante 52x42 cm
COZINHA
Brilhante Borda Arredondada 03 Piso Cerâmico Elegance Bege 52x52cm Ceral COZINHA
04
Falso teto de pladur Plaqueta Classic IMpermeabilizante 52x42 cm
BANHEIRO
04
02
05
PROJETO:
HACHURA BANHEIRO
PISO
MATERIAIS DE ACABAMENTO
AMBIENTE CORREDOR EXTERIOR
INTERIOR VIVIENDA
Porcelanato Acetinado Borda Reta Bianco BANHEIRO 58,4x58,4cm Cecrisa
HACHURA CONSTRUIR HACHURA AREA PERIMETRAL HACHURA AREA PERIMETRAL
ALUMNA:
PROFESSOR
PAULA RODRÍGUEZ VARA
ANTONIO PAULO CODEREIRO
DESCRIPCIÓN: PLANO
HABITAÇAO PARA OS PESCADORES PLANTA TIPO. MATERIAIS E MEDIDAS
LAMINA:
D-2
// arch desing. UFRJ Rio de Janeiro//
Porcelanato Acetinado Borda Reta Quartzita 62,5x62,5cm Elizabeth
EXT SEM COBERTURA
DISTRITO:
DEPARTAMENTO:
CONSTRUÇAO
ESCALA:
1:75
FECHA:
10-3-2016
From the structure of an abandoned building on the island of fundao , campus of the Federal University of Rio de Janeiro , port and naval factory area , building its reoccupation it is intended to create a hybrid building: housing and space work and leisure .Due to weather conditions a building where the living space is minimal, leaving all the permientral circulation , so that it becomes relationship spaces arises.
Vegetation and wood have a key role in the project, giving an image to own outside the Tropical arquitetura
[Axonometry]
//Proposed intervention in Fuencarral utopia for the future city
01.MULTYPLAYER CITY.
Urban project // Spring 2015
// P7. UD.Vicens// Professor LuiS Basabe //
The surroundings of the ancient town of FUENCARRAL B., built by the INV 1956 is marked by institutional neglect and scars of the crisis. Although it includes the potential enclave due to the recent revival of “Operation Chamartín” making this node, with its rich history, identity well defined and organized citizenship in our focus reflection on the transformation of the city / After a long reflection and coming to understand the city as a support network that sustain us, a project in which they live and giving them infrastructure programmatic use in addition to its own distribution network function arises. / After a negotiation between various stakeholders such as the Market, Citizenship, technical, cooperatives and institutions it is activated and provided with new features by taking advantage of the gaps interventions perimeter of the city. As a result mixed and compact city.
[Fuencarral B Analysis]
[Proto-plan + elevations]
// morphological , demographic and infrastructural analysis
// ecosystems as infrastructure units +
Ecosistemas como unidades infraestructurales + Programa por ecosistemas
[Catalog Ecosystem]
// interconnections within the city
[Species Catalogue]
// Inhabited structures support
[Species Catalogue]
// Inhabited structures tube
[Interior vs exterior ]
[Co-working areas ]
// housing flexible system
// relational units . mixed uses
large-scale structure turned over to the city of copenhagen, cultural public use. Space relations and exchange of views with versatile rooms that favor the variability of uses
02.
CO-HOUSING in COPENHAGUE. Housing-Public building // Autum 2014
// arch desing 6. Ud. JesĂşs Aparicio/
The project rethink a different way of living for ancient people in Copenhague. An intentional community of private homes clustered around shared space. Households have independent incomes and private lives, but neighbors collaboratively plan and manage community activities and shared spaces. /Large bar-building with mixed uses on the seafront freeing the large plot of 11000m2 providing a large park in the city of Copenhagen. / The building is set inhabited by a large truss, aimed at cultural use for the city, from which hangs the rest of the housing program / A flexible system, in which the housing unit is reduced to minimum, going to be set only by a series of furniture [bed-bathroom-dressing room-kitchen-studiobreak] organized and divided every spare generating plant poses different types of housing due to needs of its inhabitants./ the game of transparencies, with the use of plastic materials and glass favors the relationship between the different rooms of the interior. The use of tissue can play with the different privacies giving the whole a versatility that favors the coexistence of uses
[Mapping project]
// Construction details , plant situation and explanation of project section
Section 1:50 . Detail of mobile platforms
Section set at 1: 250 . Project dialogue with its surroundings
assembly plant scale 1: 250. Project dialogue with its surroundings
[generated design situations]
[Adaptation System]
// spatial situations depending on the environment
// prefabricated mounting system
03.
SHELTER in the ANTARTIDA. Housing // Autum 2014
// P6. Ud. JesĂşs Aparicio//
Construction of a shelter for three researchers in Antarctica arises. The project consists of a system of easy assembly and construction that can sertransportado in xperia ship. Able to adapt to harsh weather conditions and offer researchers a comfortable and conditioned space to spend the months of study. A construction system consists of a series of ribs extending fiberglass U-shaped able to adapt to different situations and an envelope formed by a double network capable of supporting different envelopes such as ice, water or other materials that allow intend thermally isolate and let light.
[Adaptation rhythms]
[Eco-appropiation strategy]
//variability situations adapting to place
//skins ecological system adaptation to the environment
04. DREAMED HOUSE
Housing-Public building // Autum 2014
// P6. Ud. Jesús Aparicio//
A shell capsule capable of traveling anywhere in the world, facing the most dispares.Consiste conditions in a very light structure, easy to assemble and disassemble.To adapt to different conditions an enclosure that resembles the concept of “onion skin” a series of overlapping layers to suit each situation arises; so, we have a solar envelope, other impervious another plant, another transparent to watch and other inflatable to float./ A housing with basic services necessary for my lifestyle and endless possibility of main change the furniture and the interior rooms, playing with light and different materials
[Masterplan]
[Sector 3 detail:Cultural Exchange Center]
// situation plan and sectors explanation
// situation plan and sectors explanation
05.
CALI RE-HABILITATION MASTERPLAN Urbanism // Spring 2014
// arch desing 5. Ud. Javier Maroto//
The project is located in the commune Morichal Node fifteen city of Cali in Colombia, Corresponding to the lowest strata of society Cali. /In response to the problems that arise in this strategic point in the city, we propose a system of activation of the neighborhood by the vacuum, we implemented in the center of gravity of this community, but it could be extrapolated and grow around this center colonizing the rest of this area. /Upon detection of excessive overcrowding of housing in the urban fabric as densified system congestion arises and emptying of the urban fabric, and treatment of the void -in vacum-, through which to activate the full./ A training center, production and distribution in the large gap in the node, which is developed as a system of thematic groups around major gaps examines relationship, it moves to the urban fabric, creating voids that function as seats An intervention is proposed in adjacent homes to these places, serving as a space for access and connection to these homes.
8 metros
∆ Unión cubierta pilar de hormigón
∆
[ Urban strategy ]
8 metros
∆
∆
13,5metros
//Housing intervention and public space
Unión triangulación cubierta
Patio residencial Cubierta azoteas, co-workin
Cubierta que une diferentes azoteas para crear espacios activos de colaboración ciudadana.
Se crean plazas que activan el vacío dotándolo de programa y crando áreas de influencia a su alrededor
Cubierta guadua para las espacio
∆
13,5metros
Intervención en azotea
Intervención en plazas
Patios para favorecer la ventilación dentro de la vivienda
∆
Chimenea solar
∆
Azotea descubierta
2.70 m ∆ Celosías ventilacición cruzada
2.70 m Marquesina con cubierta vegetal
∆ Elementos urbanos para niños
Cubierta textil de cañizo
Celosías de madera balata
2.70 m Puestos de mercado
Adoquín filtrante
∆
Tierra prensada
1 2 3 escala 1/100
1 2 3 escala 1/100
4m
∆
10 metros
∆
7.70 metros
4m
∆
Cubierta de madera de cagüi
centro de producción creativa para la reactivación del núcleo
8.50 metros
∆
Espacios permeables y de gradación del espacio público y privado. Forman conjuntos de programa asociado.
∆ Cubierta vegetal
Transición al centro de producción creativa para la reactivación del núcleo
Biblioteca virtual
Espacios de caráctar público, arquitectura con estructuras tensadas y mobiliario urbano.
Alero
Cubierta textil de cáñamo
Terraza volcada hacia los vacíos
celosías de fibra de vidrio
Zonas trabajo común
Lámpara reciclada de mimbre Huerto urbano
mediateca Rampas de acceso público
Escalera acceso privado
COFFEE
Instalaciones electricas colgadas
escalera colgada
Cafeterías temáticas
empalizada de bambú
áreas de descanso
Zonas de juego
Uso del agua de lluvia para regadío
Escalera privada
Plataforma de madera elevada
Césped natural
plataformas elevadas de madera
1 2 3 escala 1/100
Depósito recogida de agua
∆ forjado aligerado colgado
5.60 metros
∆
9,5 metros
4m
∆
tirante de acero arriostramiento panel
cerramiento carrizo
perfil en U
tornillos
capa de compresión 3x3 bambú atado con alambre
anclaje a forjado
∆
8 metros ∆
13,5metros
∆
10metros
#5 invernadero y punto limpio de materias primas aprovechables y material cultural Programa de transición entre la nueva construcción y vivienda existente. Fase de almacenamiento y clasi-
∆
∆
#8 calle comercial El espacio cercano a la calle se va degradando a programa enfocado a la visualización del producto. La escala se reduce.
2.70 m ∆
2.70 m ∆
2.70 m
Espacios co -working
Zonas de estar
Espacio cubierto Empalizadas privatización del espacio
Puesto de mercado
Set de rodaje
1 2 3 escala 1/100
4m
1 2 3 escala 1/100
4m
1 2 3 escala 1/100
4m
∆
[residential Sector]
//social and bioclimatic estrategys
[Production sector]
//ecological and economic strategies
[ Urban interventions ]
//Housing intervention and public space
urban greenhouses . production center autรณtonas plant species for use in subsequent investment and public spaces of the city
Creation and empty spaces to generate external relationship. Decongestion of the district and boost community life use of architectural tools such as urban mobliario , paving, hedges and vegetation to create different spatial situations
treatment of critical areas within the neighborhood as background bags , cut roads , disused plots , or occupied . treatment loopholes
relationship of the project with the city. dialoguing architecture , which follows the laws of the existing and respects the environment in which it sits , generating a mixturdada , accessible city and favors mobility
[ Catalogue ]
//Furniture, paving,growths, structure
[ project construction details ] //Housing intervention and public space
[ nterconnections area]
//Housing intervention and public space
[ macro-section]
//proto-city proposal in lisbon
06.
HIGH RISE CITY Mix-used building // Autum 2013
// P4. Ud. Alberto Campo Baeza///
Support activities and infrastructure that collect traffic flows, shelter many uses miss the wind and the light and see Lisbon/ This new reality is assumed, giving value to the land. The area chosen is at the confluence of the largest number of flows./ The project is a high city, a system of streets, a first order of “avenues” that articulate the circulation main body adapting to the land, considering mainly two things, the views and the topography rise, and a second order “side streets”, secondary circulation/ Outside, it is confused with what is inside what is outside. Inside moreover, limits have been deleted, has created a new landscape, a new topography. It is a continuous system of elements, changing movements and actions. The flooring, furniture generate another topography smaller scale, human scale, by walking, running, watch, play, ie enjoy. /
[ macro-section]
//proto-city proposal in lisbon
Academic works OTHER WORKS 01. CONSTRUCTION III. Endless House 02. URBANISM I-II 03. URBAN PLANNIG and INFORMATIO GRAPHICS 04. LINEAR PARK Rio de Janeiro
Professor Anaya · Projeto paisgistico. Professor Isabella
[ structural diagrams]
[ structural-section]
//analysis of possible structural systems
// cuts and plant construction
01.
ENDLESS HOUSE Housing // Autum 2014
// ConstrucciĂłn II. Prof. JesĂşs Anaya //
In the course of construction 3, it is proposed to choose a project published later built but not solve its construction system. Thus solving a complex variable curvature surface through BARS STRUCTURE Complex Geometry of double curvature. Reference: Pavilion Frei Otto Mannheim./ The structural shell is formed by a series entrecruzadoas steel bars connected by struts or perpendicular knots to the surface in each cross point. This main body supports the entire inner substructure hung, formed by a series of capsules formed by a supporting structure DeAcero double supporting ribs through a casing glass plates./Also hanging from the main monocoque etsructura a series of pieces made with panels reinforced with aluminum ribs; and a series of helical ramps connecting with other capsules.
[ structural diagrams]
//analysis of possible structural systems
[ urban plots]
[ urban masterplan]
//analysis of possible urban systems
//analysis
88 1 1
E6
1000
200
ESTRATO 6
E1
100 1
#2
ESTRATO 1
VIVIENDA EN ESQUINA
#3
CON ZONA PÚBLICA
#1
DOS VIVIENDAS
EN EL MEDIO
#2
1 #1.1
#1
EXPOSICIÓN
VIVIENDA / ESPACIO VENTA
#1.2
E5
RATIOS POR HABITANTE
CATWALK, PASALERAS DE MODA
1
VIVIENDA/ TALLER
#3 TALLER / ESPACIO VENTA
SECTOR 1
#1.3
ESTRATO 5
RESIDENCIAL
FERIAS DE ARTESANÍA
EJEMPLO DE CIUDAD DESARROLLADA [MADRID]
1000
CON ESPACIO LIBRE
VIVIENDA ENTRE M E D I A N E R A S
100
E2
#1.4 Bibliotecas: 1 por 15000 habs
GALERÍAS DE ARTE
Equipamientos: 5 m2s/hab
300
1
Zonas Verdes: 5 m2s/hab
E4
por vivienda: 0,966 m2s/hab
20.000
1
CAFETERÍAS TEMÁTICAS
Analyze and map the environment of Aranjuez and his garden as a series of variables such as vegetation, geology, hydrology, clinometría, hipsometría. Thus different aspects of the landscape are studied in terms of the adequacy of future interventions or expansions of the city in a natural environment, or the impact that these actions could involve the landscape
1
#1.3
CENTROS MATERIAL
#1.2
8000
1
U R B A N O S
#1.1
#3.2 BIBLIOTECAS TEMÁTICAS
#3.3 ASESORÍA DE
TALENTOS
50
8000
PRODUCCIÓN
CONTENEDORES
#3.1
en cifras
#2.1
CENTROS
PRODUCCIÓN
COMPLEMEN-
TARIOS
#2.4 COMERCIO EN VIVIENDA
CIUDAD DE CORDOBA: 24.500 4000 EL VALLADO: 21.100 3450 EL RETIRO: 8.000 1630 COMUNEROS: 8.300 1680 LAUREANO GÓMEZ: 7.300 1480 MOJICA: 9.000 3100 TOTAL: 88.379 15.389
02.
M A T E R I A L
ESPACIOS
HABITANTES VIVIENDAS
03.
#1
MINORISTA
Suelo comercial: 0,1 m2s/hab
// Urbanismo II//
D I G I T A L
PRODUCCIÓN
#3
MERCADO DE VENTA
PRODUCCIÓN
PRODUCCIÓN
DIGITAL
#2.3
ESTRATO 4
#2
SECTOR 2
VENTA DEL PRODUCTO
REORDENADOS
Tejido cultural por habitante: 0,322 m2s/hab
LA CIUDAD Y EL MEDIO Urbanism // Spring 2013
C A L I SECTOR 3 SERVICIOS
#2
#2.2 PUESTOS
AMBULANTES
por vivienda: 5,894 m2s/viv
BARRIO
M O R I C H A L
TIENDAS
Tejido educativo por habitante: 1,965 m2s/hab
ESTRATO 2
RESIDUOS
#1
VISUALIZACIÓN DEL PRODUCTO
#2.1
#3.4 PUNTOS DE INFORMACIÓN
PUNTOS
L I M P I O S
1
1
E3 ESTRATO 3
1 1000 15.000
1
3
1 15
URBANISM DIAGRAMS ANALISYS Urbanism // Spring 2014 Proposal urban scale in which we study and qualify the internal fabric of the neighborhood morichal in Cali Colombia./ This analysis of traffic, roads and public space in the district fifteen, detect a series of blocks that interrupt the urban fabric, cutting the streets and blocking traffic. These apples potential places the call and are the sites proposed in the intervention./ Enhancing the orthogonal grid that favors ventilation and circulation flows, we find
[ re- habilitation]
[ re- habilitation]
// vegetal landscape proposal
// vegetal landscape proposal
04.
LINEAR PARK. Vicente de carvalho. Rio e Janeiro Landscaping // Spring 2016 Re - enablement and proposal of a linear park for the recovery of Vicente de Carvalho avenue in the city of Rio de Janeiro , where he is one of the subway stations and bus busiest city . Capitalizing on the wall there is creating a divided into four sectors , leisure , cultural , sport and trade park is proposed. In funcióm each use are added a “ imputs “ the existing wall style high line New York , generating a series of space as a bathing area a recracional area, a wall - graffiti , benches , areas of proyeccción , stands for shows, hawking zones . All it is taking into account the importance of vegetation , water , pavements and street furniture type . Besides improving road access, creating parking, a bicycle lane and shaded areas for proposed
Publications 2012
2016
June 2012
“TEJIDOS, LÍMITES Y DINAMISMO” DAI. Javier Raposo
BBB bueno, bonito y barato. DAP. ETSAM
September 2014 “El sueño de la Razón” Yearbook Alberto Campo Baeza . DAP. ETSAM
Exhibitions
Paula Rodríguez Vara Portfolio · 2016
Área de cultura y
Projetos 1. BBB Matadero
exposiciones ETSAM
ETSAM