1. Massing Cheam North and Worcester Park Local CommitteeCOUNCILLORS’ MEETING 15.12.14 1. Massing COUNCILLORS’ MEETING 15.12.14 Thursday,- Maintain 5th March, 2015 ‘gap’ to maximise sunlight and
Site of Victoria House, London Road London BoroughRoad of Sutton Proposals forLondon Victoria House, North Cheam, London Borough of Sutton North Cheam, London Borough of Sutton North Cheam, Borough of Sutton Proposals for Victoria House, North Cheam, London Borough of Sutton
create an active enlivened rear courtyard. Maintain ‘gap’an to maximiseNorth sunlight and -for Site ofCheam, Victoria House, Proposals Victoria House, Cheam, London Borough of Sutton North London Site of Victoria House, London Road North create an active anHouse, enlivened rear courtyard. Proposals for Victoria Cheam, London Borough of Sutton
Competition Collective Architecture Winning Submission
Sheet 1 - Site Analysis and Concept Diagrams 5.1 Proposal for Victoria House, Cheam, LB Sutton
5.2 Enhancing Cheam's Urban Realm twin towers form distinctive landmark
strong residential neighbourhoods connect and feed the commercial
good public transport links
creating a gap forms a south facing communal garden linked to the public realm on London Road
towers allow multiple aspect
to St Helier Railway Station & Morden Underground
strong street trees carried along Church Hill Road and into the urban realm on London Road connecting neighbourhoods
towers step down linking residential and commercial neighbourhoods
'all day' parking not convenience
to Cheam Railway Station
end on parking well policed makes for good convenience parking
mass steps down to match scale of residential neighbourhood
bus stops to Worcester Park Railway Station
distinctive landmark strengthens node / intersection and creates an identity for Cheam
to Stoneleigh Railway Station
busy commercial street
Existing site, Neighbourhood and Analysis bad connection / break in street frontage
Identity and Connectivity
private space overshadowed
ll
i hH
nd
on
Ro
light material bounces the sunlight for all
stepped connection continues the street frontage
c
ur
Ch
Lo
mass broken down
d
a Ro
Enhancing Urban Realm and Neighbourhood
strong street trees not continued at site
ad
the sunny communal rear garden is accessed by all bringing a sense of belonging
towers minimise overshadowing and let light through
multi functional sunny and vibrant urban realm, linked directly to the shops which benefit from footfall
poor urban realm prohibits foot fall and weakens commercial
morning
evening oad
en R
Mald
good solar aspect not exploited on
mm
o mC
morning
evening good solar aspect fully exploited
ad
the communal garden enjoys direct sunlight
sunlight steams between the towers
Ro
ea
Ch
poor landmark alien character afternoon
Existing Massing, Urban Realm and Orientation
afternoon
Proposed Massing, Orientation and linking Commercial to Urban Realm
noon
Connecting the Sun to the Urban Realm
Competition Collective Architecture Winning Submission
Sheet 2 - Ordering Principles,Tenures, Public Realm and Distribution Neighbourhoods
Connectivity
Distinctive
Legacy
Precedents
Pedestrian through flow
London Road Prominent positions for new retail with clear visibility from main junction Open public realm
Tree lined street
Cafe opens out Possible market area Bike racks
South facing public realm
Church Hill Road
Visual connections through
Two distinct building forms carefully orientated to maximise sun All apartments with corner windows (either south facing or with panoramic views across London) South facing terraces stepping upwards to maximise daylighting. Crevis-like apertures created to allow trees to grow though. Colourful planting. Climbing plants and feature trellises. The greening of the terraces and balconies to echo the predominant tree-lined street scape. A visual connection south. Existing parking reconfigured along Church Hill Road. To be developed in discussions with the Roads department. Consideration given to lighting in the evening time. A pleasant and safe 24 hour public realm. Affordable housing units predominently at ground level. To assist in reducing the service charges associated with lifts. All with access to outdoor terrace or private garden. Upper storey affordable housing in block C.
Clapham One, Egret West
Timber yard Dublin by O'Donnell + Tuomey Architects
Stair well B
Views across London
Precedents
Scottish Parliament Terraced Roof
High line New York Byron Street Collective Architecture
Harvest, Collective Architecture
Simple, cost effective measures to enhance the public realm. Making the most of the existing features: the variety of semi mature trees and ornamental planting. Opportunity to work with LB Sutton in the development of the planting proposals. Consulting a landscaping architect with specialist consideration given to seasonal and native planting Public realm retained as open-planned for maximum flexibility. Allowing street markets to take place. Designed to be low maintenance and robust. Terrace in three types of paving slab. Hard wearing. Reclaimed slate feature beds. Rainwater harvesting. Solar photovolatics roof mounted in optimum orientation, no overshadowing. Consideration given to ensuring all PV panels are easily accessible for maintenance. All residents with access to a sun terrace. Areas for outdoor seating. Ground floor residents with access to a balcony or their own private terrace. Private parking courtyard, no access for the public. Semi undercroft as an alternative to basement parking. 50% residential parking (in accordance with requirements for a maximum of 1 parking space per apartment) Covered cycle parking for residents and staff. All bins, recycling and service areas hidden from view.
All apartments with corner windows
Panoramic views
Stair well A Orientated to suit the sun path
Affordable housing positioned at ground floor/ terrace level Additional affordable housing units in block C Green balconies Private parking courtyard
Stair well C
Tree lined street pattern continued into courtyard
Open aspect
Roof mounted photovoltaics South facing Parking undercroft
Planted boundary
Wheelchair accessible apartments at end terrace
Sun filters through to basement level South facing terrace
Neighbouring private lane
Competition Collective Architecture Winning Submission
Sheet 4 - Dwelling Types and the Needs of Residents RB
views dual aspect
7.4 sqm
RB
WM DW
3 Bed 5 Person 89sqm
33.4 sqm
views dual aspect
5 sqm
DW
1 Bed 2 Person 51.6sqm FF
RB
maximise solar gain
FF
views dual aspect
27 sqm Roofl light over stairwell
ST
12 sqm 12.7 sqm
ST
8 sqm
ST
Glass blocks (1hr f.r.)
ST
WM
access zones
seat
communal areas encourage social interaction
13.5 sqm sh
3.5
1
ST
character and materiality supports saleability
sqm
WM
Common terrace
ST
.2
12
WM
.5
13
2 Bed 4 Person 73sqm
sqm
growing balconies
sqm views dual aspect FF
.2
12
sqm
RB
FF
27
RB
sqm 5.6
sqm
DW DW
accomodate furniture compliance with LHDG
27
views dual aspect 0
1m
5.6
maximise solar gain
sqm
sqm views dual aspect
5m
5.1 Proposal for Victoria House, Cheam, LB Sutton
5.2 Enhancing Cheam's Urban Realm
interior quality
Context
The 1960’s concrete building located on the eastern corner of the Queen Victoria junction is a potential candidate for redevelopment considering its prominent location and potential to improve the legibility and attractiveness of the area. This site could be an important gateway site given its crossroads location and should emphasise the urban structure of its location. London Borough of Sutton - Tall Building Study: Gillespies. 2008.
Historical context London Road follows the line of a Roman Road (Stane Street) that connects London and Chichester.
c.1910 Picture of Lower Cheam Farm on Cheam Common Road, grew mostly mint and lavender, giving Lavender Corner its name.
1920 Queen Victoria Pub timber construction
1935 replaced by a bigger Queen Victoria Pub often used as a jazz club.
1965 Modernist avant-garde style concrete building. Multipurpose design; combining a shopping centre, office block and car park. It is now derelict after being left empty since 2006.
6
2
1
2
3 5
1
4 3
4
5
6
Context Materials
1
2
1
2
3
4
3
5
4
5
Context Open Spaces
Design Approach Existing Street
Sheet 1 - Site Analysis and Concept Diagrams 5.1 Proposal for Victoria House, Cheam, LB Sutton strong residential neighbourhoods connect and feed the commercial
good public transport links
twin to form distinctive land
to St Helier Railway Station & Morden Underground
'all day' parking not convenience
to Cheam Railway Station
end on parking well policed makes for good convenience parking
bus stops to Worcester Park Railway Station
busy commercial street
to Stoneleigh Railway Station
Existing site, Neighbourhood and Analysis bad connection / break in street frontage
Identity and Conn
private space overshadowed
d
ll
i hH
a Ro
rc
u Ch
Lo
nd
on
Ro
a
distinc strengthens and creates a
strong street trees
mass
stepped connectio continues the street frontag
Design Approach Connectivity and Identity and Concept Diagrams
am, LB Sutton
5.2 E
sidential neighbourhoods and feed the commercial
eet
twin towers form distinctive landmark
creating a gap forms a south facing communal garden linked to the public realm on London Road
towers allow multiple aspect
towers step down linking residential and commercial neighbourhoods
'all day' parking not convenience
to Cheam Railway Station
to Stoneleigh Railway Station
Analysis
distinctive landmark strengthens node / intersection and creates an identity for Cheam
Identity and Connectivity
ce wed
d
ll
u Ch
rc
i hH
a Ro
mass broken down stepped connection continues the street frontage
Enhancing Urban R light material bounces the sunlight for all
the sunny communal rear garden is accessed by all bringing a sense of belonging
Design Approach Urban Realm and Neighbourhood
5.2 Enhancing Cheam's Urban Realm creating a gap forms a south facing communal garden linked to the public realm on London Road
allow e aspect
strong street trees carried along Church Hill Road and into the urban realm on London Road connecting neighbourhoods
towers step down linking residential and commercial neighbourhoods
mass steps down to match scale of residential neighbourhood
on am
Enhancing Urban Realm and Neighbourhood light material bounces the sunlight for all
the sunny communal rear garden is accessed by all bringing a sense of belonging
towers minimise overshadowing and let light through
to Stoneleigh Design Approach Railway Station
Orientation and Frontage
nalysis
distinctive landmark strengthens node / intersection and creates an identity for Cheam
Identity and Connectivity
d
mass broken down
d oa
ll R
i hH
light material bounces the sunlight for all
stepped connection continues the street frontage
rc
u Ch
Enhancing Urban Rea
strong street trees not continued at site
multi functional sunny and vibrant urban realm, linked directly to the shops which benefit from footfall
poor urban realm prohibits foot fall and weakens commercial
en Mald
Road
morning
the sunny communal rear garden is accessed by all bringing a sense of belonging
evening good solar aspect fully exploited
the communal garden enjoys direct sunlight
ark ter
Orientation
afternoon
Proposed Massing, Orientation and linking Commercial to Urban Realm
noon
Connecting the Sun
Design Approach
n am
Maximise Direct Sunlight
Enhancing Urban Realm and Neighbourhood
light material bounces the sunlight for all
nd linking
the sunny communal rear garden is accessed by all bringing a sense of belonging
towers minimise overshadowing and let light through
multi functional sunny and vibrant urban realm, linked directly to the shops which benefit from footfall
morning
the communal garden enjoys direct sunlight
sunlight steams between the towers
noon
Connecting the Sun to the Urban Realm
Design Development
esign Development ners and Design Panel Design Development Planners and Design Panel
esign Development
nners and Design Panel
1. Massing 2. Urban Realm 3. Transport
GROUND FLOOR PLAN
1. Massing - Maintain ‘gap’ to maximise sunlight and create an active an enlivened rear courtyard. - Building steps and upper floors set back so that lower floors reflect adjacent building heights. - Building line pulled back to maximise urban realm.
GROUND FLOOR PLAN
1. Massing
FIRST FLOOR PLAN
_02
UPPER FLOORS
_03
_04
_05
_06
_07
_08
_09
_10
1. Massing - Building steps and upper floors set back so that lower floors reflect adjacent building heights.
1. Massing - Maintain ‘gap’ to maximise sunlight and create an active an enlivened rear courtyard.
2. Urban Realm and Neighbourhood The South, West and East corners are lined with many local, independent shops alongside a few restaurants, a bank and the local Post Office.
North Cheam Farmers’ Market held on the third Saturday of each month organised by Ecolocal and started as part of the Outer London Fund. Current market located outside Post Office, Lavender Corner 9am - 1.30pm
North Cheam Crossroads
2. Urban Realm and Neighbourhood - Public space radiates from each block - Building and public realm acts as a continuation of the street as it leads around the corner. - Emphasises the spatial quality of the corner.
2. Urban Realm and Neighbourhood - Green area encloses the extent of the public area; therefore, creates a separation from the road. - Forms a space sheltered from wind and noise. - Edges better defined through tree planting.
2. Urban Realm and Neighbourhood - Lavender beds. - Lavender planted around green area. - Historic connection to Lavender Corner.
2. Urban Realm and Neighbourhood - Shopfronts - Shops on ground floor integrate with existing pattern of local street.
2. Urban Realm and Neighbourhood
3. Transport - Access relocated to allow continuation of public realm around the corner. - Safer configuration. - Access and egress arrangement maintained.
GROUND FLOOR PLAN
3. Transport Parking levels Residential - 50 spaces (no stackers) Commercial - 9 spaces 6 spaces more than previous presentation
BASEMENT PLAN
3. Transport
esignAccommodation Development Schedule Schedule ners and Design Panel AccommodationAccommodation Schedule Design Development Planners and Design Panel
12.11.14 Competition
12.11.14
15.12.14
12.11.14
15.12.14
15.12.14
Commercial - Approx 760 sqm Commercial - Approx 840 sqm esignCommercial Development Commercial - Approx 7 Commercial - Approx 840 sqm - Approx Commercial 840 sqm - Approx 840 Commercial - Approx 760 sqm sqm
nners and Design Panel Residential Residential Ground Ground First First Second Second Third Third Fourth Fourth Fifth Fifth Sixth Sixth Seventh Seventh Eighth Eighth Ninth Ninth Tenth Tenth Eleventh
Residential 05 units 05 units 13Ground units 10 units 13First units 13 units 10Second units 11 units 09Third units 11 units 08Fourth units 10 units 06Fifth units 07 units 06Sixth units 05 units 04Seventh units 05 units 04Eighth units 05 units 02Ninth units 02 units Tenth 02 units
Total Total
80 units 86 units Total
Residential
Residential Ground 05 units First 13 units Second 13 units Third 10 units Fourth 09 units Fifth 08 units Sixth 06 units Seventh 06 units Eighth 04 units Ninth 04 units Tenth 02 units Total 80 units
Ground 05 units First 13 units Second 13 units Third 10 units Fourth 09 units Fifth 08 units Sixth 06 units Seventh 06 units Eighth 04 units Ninth 04 units Tenth 02 units Eleventh 80 units
Total
Residential 05 units Ground 14 units (+1) First 13 units Second 10 units Third 09 units Fourth 09 units (+1) Fifth 08 units (+2) Sixth 05 units (-1) Seventh 05 units (+1) Eighth 05 units (+1) Ninth 05 units (+3) Tenth 03 units (+3) Eleventh 91 units Total
Residential Ground 05 units First(+1) 14 units Second 13 units Third 10 units Fourth 09 units Fifth(+1) 09 units Sixth(+2) 08 units Seventh 05 units (-1) Eighth 05 units (+1) Ninth 05 units (+1) Tenth 05 units (+3) Eleventh 03 units (+3)
05 un 14 un 13 un 10 un 09 un 09 un 08 un 05 un 05 un 05 un 05 un 03 un
Total 91 units
91 un
esign Development ners and Design Panel Design Development Planners and Design Panel
esign Development
nners and Design Panel
- Location of circulation cores - Rationalise blocks - Review of parking
esign Development ners and Design Panel Design Development Planners and Design Panel
esign Development
nners and Design Panel
esign Development ners and Design Panel Design Development Planners and Design Panel
esign Development
nners and Design Panel
Next Steps
Victoria House – Target Key Dates
Jan Design Development Public Consultation Planning Application Planning Determination Period Planning Decision Demolition Main Build - Start on Site
Feb
Mar
Apr
May
2015 Jun Jul
Aug
Sep
Oct
Nov
Dec
Jan
2016 Feb
Mar
Next Steps Next steps
Community Engagement: Cheam Fields Primary School