Victoria House, North Cheam

Page 1

1. Massing Cheam North and Worcester Park Local CommitteeCOUNCILLORS’ MEETING 15.12.14 1. Massing COUNCILLORS’ MEETING 15.12.14 Thursday,- Maintain 5th March, 2015 ‘gap’ to maximise sunlight and

Site of Victoria House, London Road London BoroughRoad of Sutton Proposals forLondon Victoria House, North Cheam, London Borough of Sutton North Cheam, London Borough of Sutton North Cheam, Borough of Sutton Proposals for Victoria House, North Cheam, London Borough of Sutton

create an active enlivened rear courtyard. Maintain ‘gap’an to maximiseNorth sunlight and -for Site ofCheam, Victoria House, Proposals Victoria House, Cheam, London Borough of Sutton North London Site of Victoria House, London Road North create an active anHouse, enlivened rear courtyard. Proposals for Victoria Cheam, London Borough of Sutton


Competition Collective Architecture Winning Submission

Sheet 1 - Site Analysis and Concept Diagrams 5.1 Proposal for Victoria House, Cheam, LB Sutton

5.2 Enhancing Cheam's Urban Realm twin towers form distinctive landmark

strong residential neighbourhoods connect and feed the commercial

good public transport links

creating a gap forms a south facing communal garden linked to the public realm on London Road

towers allow multiple aspect

to St Helier Railway Station & Morden Underground

strong street trees carried along Church Hill Road and into the urban realm on London Road connecting neighbourhoods

towers step down linking residential and commercial neighbourhoods

'all day' parking not convenience

to Cheam Railway Station

end on parking well policed makes for good convenience parking

mass steps down to match scale of residential neighbourhood

bus stops to Worcester Park Railway Station

distinctive landmark strengthens node / intersection and creates an identity for Cheam

to Stoneleigh Railway Station

busy commercial street

Existing site, Neighbourhood and Analysis bad connection / break in street frontage

Identity and Connectivity

private space overshadowed

ll

i hH

nd

on

Ro

light material bounces the sunlight for all

stepped connection continues the street frontage

c

ur

Ch

Lo

mass broken down

d

a Ro

Enhancing Urban Realm and Neighbourhood

strong street trees not continued at site

ad

the sunny communal rear garden is accessed by all bringing a sense of belonging

towers minimise overshadowing and let light through

multi functional sunny and vibrant urban realm, linked directly to the shops which benefit from footfall

poor urban realm prohibits foot fall and weakens commercial

morning

evening oad

en R

Mald

good solar aspect not exploited on

mm

o mC

morning

evening good solar aspect fully exploited

ad

the communal garden enjoys direct sunlight

sunlight steams between the towers

Ro

ea

Ch

poor landmark alien character afternoon

Existing Massing, Urban Realm and Orientation

afternoon

Proposed Massing, Orientation and linking Commercial to Urban Realm

noon

Connecting the Sun to the Urban Realm


Competition Collective Architecture Winning Submission

Sheet 2 - Ordering Principles,Tenures, Public Realm and Distribution Neighbourhoods

Connectivity

Distinctive

Legacy

Precedents

Pedestrian through flow

London Road Prominent positions for new retail with clear visibility from main junction Open public realm

Tree lined street

Cafe opens out Possible market area Bike racks

South facing public realm

Church Hill Road

Visual connections through

Two distinct building forms carefully orientated to maximise sun All apartments with corner windows (either south facing or with panoramic views across London) South facing terraces stepping upwards to maximise daylighting. Crevis-like apertures created to allow trees to grow though. Colourful planting. Climbing plants and feature trellises. The greening of the terraces and balconies to echo the predominant tree-lined street scape. A visual connection south. Existing parking reconfigured along Church Hill Road. To be developed in discussions with the Roads department. Consideration given to lighting in the evening time. A pleasant and safe 24 hour public realm. Affordable housing units predominently at ground level. To assist in reducing the service charges associated with lifts. All with access to outdoor terrace or private garden. Upper storey affordable housing in block C.

Clapham One, Egret West

Timber yard Dublin by O'Donnell + Tuomey Architects

Stair well B

Views across London

Precedents

Scottish Parliament Terraced Roof

High line New York Byron Street Collective Architecture

Harvest, Collective Architecture

Simple, cost effective measures to enhance the public realm. Making the most of the existing features: the variety of semi mature trees and ornamental planting. Opportunity to work with LB Sutton in the development of the planting proposals. Consulting a landscaping architect with specialist consideration given to seasonal and native planting Public realm retained as open-planned for maximum flexibility. Allowing street markets to take place. Designed to be low maintenance and robust. Terrace in three types of paving slab. Hard wearing. Reclaimed slate feature beds. Rainwater harvesting. Solar photovolatics roof mounted in optimum orientation, no overshadowing. Consideration given to ensuring all PV panels are easily accessible for maintenance. All residents with access to a sun terrace. Areas for outdoor seating. Ground floor residents with access to a balcony or their own private terrace. Private parking courtyard, no access for the public. Semi undercroft as an alternative to basement parking. 50% residential parking (in accordance with requirements for a maximum of 1 parking space per apartment) Covered cycle parking for residents and staff. All bins, recycling and service areas hidden from view.

All apartments with corner windows

Panoramic views

Stair well A Orientated to suit the sun path

Affordable housing positioned at ground floor/ terrace level Additional affordable housing units in block C Green balconies Private parking courtyard

Stair well C

Tree lined street pattern continued into courtyard

Open aspect

Roof mounted photovoltaics South facing Parking undercroft

Planted boundary

Wheelchair accessible apartments at end terrace

Sun filters through to basement level South facing terrace

Neighbouring private lane


Competition Collective Architecture Winning Submission

Sheet 4 - Dwelling Types and the Needs of Residents RB

views dual aspect

7.4 sqm

RB

WM DW

3 Bed 5 Person 89sqm

33.4 sqm

views dual aspect

5 sqm

DW

1 Bed 2 Person 51.6sqm FF

RB

maximise solar gain

FF

views dual aspect

27 sqm Roofl light over stairwell

ST

12 sqm 12.7 sqm

ST

8 sqm

ST

Glass blocks (1hr f.r.)

ST

WM

access zones

seat

communal areas encourage social interaction

13.5 sqm sh

3.5

1

ST

character and materiality supports saleability

sqm

WM

Common terrace

ST

.2

12

WM

.5

13

2 Bed 4 Person 73sqm

sqm

growing balconies

sqm views dual aspect FF

.2

12

sqm

RB

FF

27

RB

sqm 5.6

sqm

DW DW

accomodate furniture compliance with LHDG

27

views dual aspect 0

1m

5.6

maximise solar gain

sqm

sqm views dual aspect

5m

5.1 Proposal for Victoria House, Cheam, LB Sutton

5.2 Enhancing Cheam's Urban Realm

interior quality


Context

The 1960’s concrete building located on the eastern corner of the Queen Victoria junction is a potential candidate for redevelopment considering its prominent location and potential to improve the legibility and attractiveness of the area. This site could be an important gateway site given its crossroads location and should emphasise the urban structure of its location. London Borough of Sutton - Tall Building Study: Gillespies. 2008.


Historical context London Road follows the line of a Roman Road (Stane Street) that connects London and Chichester.

c.1910 Picture of Lower Cheam Farm on Cheam Common Road, grew mostly mint and lavender, giving Lavender Corner its name.

1920 Queen Victoria Pub timber construction

1935 replaced by a bigger Queen Victoria Pub often used as a jazz club.

1965 Modernist avant-garde style concrete building. Multipurpose design; combining a shopping centre, office block and car park. It is now derelict after being left empty since 2006.


6

2

1

2

3 5

1

4 3

4

5

6

Context Materials


1

2

1

2

3

4

3

5

4

5

Context Open Spaces


Design Approach Existing Street

Sheet 1 - Site Analysis and Concept Diagrams 5.1 Proposal for Victoria House, Cheam, LB Sutton strong residential neighbourhoods connect and feed the commercial

good public transport links

twin to form distinctive land

to St Helier Railway Station & Morden Underground

'all day' parking not convenience

to Cheam Railway Station

end on parking well policed makes for good convenience parking

bus stops to Worcester Park Railway Station

busy commercial street

to Stoneleigh Railway Station

Existing site, Neighbourhood and Analysis bad connection / break in street frontage

Identity and Conn

private space overshadowed

d

ll

i hH

a Ro

rc

u Ch

Lo

nd

on

Ro

a

distinc strengthens and creates a

strong street trees

mass

stepped connectio continues the street frontag


Design Approach Connectivity and Identity and Concept Diagrams

am, LB Sutton

5.2 E

sidential neighbourhoods and feed the commercial

eet

twin towers form distinctive landmark

creating a gap forms a south facing communal garden linked to the public realm on London Road

towers allow multiple aspect

towers step down linking residential and commercial neighbourhoods

'all day' parking not convenience

to Cheam Railway Station

to Stoneleigh Railway Station

Analysis

distinctive landmark strengthens node / intersection and creates an identity for Cheam

Identity and Connectivity

ce wed

d

ll

u Ch

rc

i hH

a Ro

mass broken down stepped connection continues the street frontage

Enhancing Urban R light material bounces the sunlight for all

the sunny communal rear garden is accessed by all bringing a sense of belonging


Design Approach Urban Realm and Neighbourhood

5.2 Enhancing Cheam's Urban Realm creating a gap forms a south facing communal garden linked to the public realm on London Road

allow e aspect

strong street trees carried along Church Hill Road and into the urban realm on London Road connecting neighbourhoods

towers step down linking residential and commercial neighbourhoods

mass steps down to match scale of residential neighbourhood

on am

Enhancing Urban Realm and Neighbourhood light material bounces the sunlight for all

the sunny communal rear garden is accessed by all bringing a sense of belonging

towers minimise overshadowing and let light through


to Stoneleigh Design Approach Railway Station

Orientation and Frontage

nalysis

distinctive landmark strengthens node / intersection and creates an identity for Cheam

Identity and Connectivity

d

mass broken down

d oa

ll R

i hH

light material bounces the sunlight for all

stepped connection continues the street frontage

rc

u Ch

Enhancing Urban Rea

strong street trees not continued at site

multi functional sunny and vibrant urban realm, linked directly to the shops which benefit from footfall

poor urban realm prohibits foot fall and weakens commercial

en Mald

Road

morning

the sunny communal rear garden is accessed by all bringing a sense of belonging

evening good solar aspect fully exploited

the communal garden enjoys direct sunlight

ark ter

Orientation

afternoon

Proposed Massing, Orientation and linking Commercial to Urban Realm

noon

Connecting the Sun


Design Approach

n am

Maximise Direct Sunlight

Enhancing Urban Realm and Neighbourhood

light material bounces the sunlight for all

nd linking

the sunny communal rear garden is accessed by all bringing a sense of belonging

towers minimise overshadowing and let light through

multi functional sunny and vibrant urban realm, linked directly to the shops which benefit from footfall

morning

the communal garden enjoys direct sunlight

sunlight steams between the towers

noon

Connecting the Sun to the Urban Realm


Design Development


esign Development ners and Design Panel Design Development Planners and Design Panel

esign Development

nners and Design Panel


1. Massing 2. Urban Realm 3. Transport

GROUND FLOOR PLAN


1. Massing - Maintain ‘gap’ to maximise sunlight and create an active an enlivened rear courtyard. - Building steps and upper floors set back so that lower floors reflect adjacent building heights. - Building line pulled back to maximise urban realm.

GROUND FLOOR PLAN


1. Massing

FIRST FLOOR PLAN

_02

UPPER FLOORS

_03

_04

_05

_06

_07

_08

_09

_10


1. Massing - Building steps and upper floors set back so that lower floors reflect adjacent building heights.


1. Massing - Maintain ‘gap’ to maximise sunlight and create an active an enlivened rear courtyard.


2. Urban Realm and Neighbourhood The South, West and East corners are lined with many local, independent shops alongside a few restaurants, a bank and the local Post Office.

North Cheam Farmers’ Market held on the third Saturday of each month organised by Ecolocal and started as part of the Outer London Fund. Current market located outside Post Office, Lavender Corner 9am - 1.30pm

North Cheam Crossroads


2. Urban Realm and Neighbourhood - Public space radiates from each block - Building and public realm acts as a continuation of the street as it leads around the corner. - Emphasises the spatial quality of the corner.


2. Urban Realm and Neighbourhood - Green area encloses the extent of the public area; therefore, creates a separation from the road. - Forms a space sheltered from wind and noise. - Edges better defined through tree planting.


2. Urban Realm and Neighbourhood - Lavender beds. - Lavender planted around green area. - Historic connection to Lavender Corner.


2. Urban Realm and Neighbourhood - Shopfronts - Shops on ground floor integrate with existing pattern of local street.


2. Urban Realm and Neighbourhood


3. Transport - Access relocated to allow continuation of public realm around the corner. - Safer configuration. - Access and egress arrangement maintained.

GROUND FLOOR PLAN


3. Transport Parking levels Residential - 50 spaces (no stackers) Commercial - 9 spaces 6 spaces more than previous presentation

BASEMENT PLAN


3. Transport


esignAccommodation Development Schedule Schedule ners and Design Panel AccommodationAccommodation Schedule Design Development Planners and Design Panel

12.11.14 Competition

12.11.14

15.12.14

12.11.14

15.12.14

15.12.14

Commercial - Approx 760 sqm Commercial - Approx 840 sqm esignCommercial Development Commercial - Approx 7 Commercial - Approx 840 sqm - Approx Commercial 840 sqm - Approx 840 Commercial - Approx 760 sqm sqm

nners and Design Panel Residential Residential Ground Ground First First Second Second Third Third Fourth Fourth Fifth Fifth Sixth Sixth Seventh Seventh Eighth Eighth Ninth Ninth Tenth Tenth Eleventh

Residential 05 units 05 units 13Ground units 10 units 13First units 13 units 10Second units 11 units 09Third units 11 units 08Fourth units 10 units 06Fifth units 07 units 06Sixth units 05 units 04Seventh units 05 units 04Eighth units 05 units 02Ninth units 02 units Tenth 02 units

Total Total

80 units 86 units Total

Residential

Residential Ground 05 units First 13 units Second 13 units Third 10 units Fourth 09 units Fifth 08 units Sixth 06 units Seventh 06 units Eighth 04 units Ninth 04 units Tenth 02 units Total 80 units

Ground 05 units First 13 units Second 13 units Third 10 units Fourth 09 units Fifth 08 units Sixth 06 units Seventh 06 units Eighth 04 units Ninth 04 units Tenth 02 units Eleventh 80 units

Total

Residential 05 units Ground 14 units (+1) First 13 units Second 10 units Third 09 units Fourth 09 units (+1) Fifth 08 units (+2) Sixth 05 units (-1) Seventh 05 units (+1) Eighth 05 units (+1) Ninth 05 units (+3) Tenth 03 units (+3) Eleventh 91 units Total

Residential Ground 05 units First(+1) 14 units Second 13 units Third 10 units Fourth 09 units Fifth(+1) 09 units Sixth(+2) 08 units Seventh 05 units (-1) Eighth 05 units (+1) Ninth 05 units (+1) Tenth 05 units (+3) Eleventh 03 units (+3)

05 un 14 un 13 un 10 un 09 un 09 un 08 un 05 un 05 un 05 un 05 un 03 un

Total 91 units

91 un


esign Development ners and Design Panel Design Development Planners and Design Panel

esign Development

nners and Design Panel

- Location of circulation cores - Rationalise blocks - Review of parking


esign Development ners and Design Panel Design Development Planners and Design Panel

esign Development

nners and Design Panel


esign Development ners and Design Panel Design Development Planners and Design Panel

esign Development

nners and Design Panel


Next Steps

Victoria House – Target Key Dates

Jan Design Development Public Consultation Planning Application Planning Determination Period Planning Decision Demolition Main Build - Start on Site

Feb

Mar

Apr

May

2015 Jun Jul

Aug

Sep

Oct

Nov

Dec

Jan

2016 Feb

Mar


Next Steps Next steps

Community Engagement: Cheam Fields Primary School


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.