1 minute read
Start of the Build
The image to the left shows PCE’s Capella on site multi-disciplinary construction team celebrating the erection of the projects first structural component being a basement wall panel.
As with the complete assembly process, the PCE site team assembled the basement components off an in situ reinforced concrete basement slab. The process of assembly of components had been carefully digitally predetermined and planned during the design process.
START OF THE BUILD
The image to the left shows PCE’s Capella on site multi-disciplinary construction team celebrating the erection of the projects first structural component being a basement wall panel.
As with the complete assembly process, the PCE site team assembled the basement components off an in situ reinforced concrete basement slab. The process of assembly of components had been carefully digitally predetermined and planned during the design process. 3
Corner of Basement level 5 4
6