General View
1. General Note -
Scheduled Quantities
-
Scheduled Openings
-
Not Scheduled
All quantities have been taken as per the V13Structural Model Issued on the 13.06.2014. Please see Quantities Base and Roof Slab for itemised quantity.
3 BGE0002-T620-01 Quantities Base and Roof Slabs.docx
2. Totals Base Slab, kerb and slab edge Openings were manually placed in the Base Slab to account for the pile penetrations.
Item Base Slab Kerb Slab Edge Upstand Walls
Level Lounge Level Lounge Level Lounge Level Lounge Level
Total Volume 8922.66 m³ 57.66 m³ 311.04 m³ 44.33 m³
Total Area
160.71 m²
4 BGE0002-T620-01 Quantities Base and Roof Slabs.docx
Roof Slab The volume of the Roof Slab Openings was calculated as a scheduled mass and was manually introduced to enable quantification.
Item Roof Slab Upstand Beams Upstand Walls Openings Capitals
Level Bus Port Level
Total Volume 7707.6 m³
Bus Port Level
241.97 m³
Bus Port Level
192.88 m³
Bus Port Level Bus Port Level
328.13 m³ 297.2 m³
Area
491.3 m²
5 BGE0002-T620-01 Quantities Base and Roof Slabs.docx
3. Lounge Pits Dimensions
The dimensions for the Lounge Pits have to manually annotated and manually tabled. If agreed the volume or area or each individual pit can be calculated including slab and walls as well as notions of slab thickness and walls height can be provided.