Pedare Christian College
One College Feasibility Study Introduction Ms Katey Elding Chair of the Pedare Board
Pedare Christian College
Feasibility Study Overview Mr Lindsay Jackson Acting Principal
2 Options OPTION 1 One College Two Campuses i.e we stay as we are and improve the infrastructure and learning environments of both campuses
OPTION 2 One College One Campus i.e. we move the JS campus to the current MS/SS campus on Surrey Farm Drive, and so all 3 schools (Junior, Middle and Senior) would be on one site
Background to Feasibility Study • Early 2015 Strategic Review and Community Consultation (Kathy Carruthers Consulting)
• Second half of 2015 - Review findings transformed into Strategic Direction, Towards 2020 • Term 1 of 2016 - Booklet for community Towards 2020 Pedare Christian College Strategic Direction
5 Areas of Strategic Focus • One College • Quality Teaching and Learning • Beliefs and Wellbeing • Communication and Celebration • Sustainable Future, Place and Space.
Strategic Priority #1: One College Aim: Explore, foster and develop a strong One College culture
1.1 Explore and develop a feasibility and business plan for a “One College One Campus� school 1.2 Explore opportunities and develop a plan for inclusion of an Early Learning Centre at the College 1.3 Articulate and celebrate transition through the College 1.4 Ensure consistency of processes and expectations across the College
Performance Task Develop a new College Master Plan based on either a: • “One College One Campus” or • “One College Two Campuses” scenario. That’s what the College Board and Management has done over the last 12 months! The Feasibility and Master Plan is now complete
“Stars Aligning” 1. First star – Vacant Corner Block sale 2. Second star – Schools Low Interest Loan Scheme • Would enable the One College Two Campus option to be pursued • Substantial improvements on both campuses
One College One Campus Feasibility 3. Third star – potential sale of the JS Campus
One College One Campus Scenario - advantages • Educational • Cultural • Economic • Brand & Marketing • Advantages for Junior Campus
Pedare Christian College
Combined Campus Draft Concept Designs Mr Mark Watson Business Manager
Artists impression of a potential new Junior School Administration and Early Learning building
Pedare Christian College (including Reception Ready, Reception and Year 1 classrooms)
Artists impression of a potential new Middle School STEM building
HEADING TEXT LEGEND TRANSPORTABLE TO BE RELOCATED/REMOVED
NEW TRANSPORTABLE LOCATION
OVAL
TRANSPORTABLE TO REMAIN IN EXISTING LOCATION
CHI L D CARE CENTRE
RELOCATE EXISTING PHYS. ED. STORE TO EASTERN SIDE OF OVAL
CARPARK
Re l o c a t e d Pr o p e r t y & Ma i n t e n a n c e St o r e
5
PL AYI NG FI EL DS
6
Re l o c a t e d Ph y s . Ed . St o r e
DEMOLISH EXISTING PROPERTY & MAINTENANCE STORE
SAL TBUSH
7
SALT BUSH TRANSPORTABLE TO REMAIN IN EXISTING LOCATION. OFFICES TO REMAIN AND EXISTING YR 8 CORE CLASSROOM TO BE RE-USED AS NEW CHINESE
8
5 NEW TRANSPORTABLES
10
CAL ADENI A
MALLEE
9
MALLEE TRANSPORTABLE TO REMAIN IN EXISTING LOCATION. RE-USE AND REFURBISH FOR JUNIOR SCHOOL LIBRARY
CRI CKET NETS
L I NK TO ONE+ RELOCATED TRANSPORTABLES FOR TEMPORARY STUDENT SERVICES
GREVI L L EA
4
PLAYGROUND
7 1 RELOCATED TRANSPORTABLES 1, 2 & 7 + NEW TRANSPORTABLES 10 & 11 FOR TEMPORARY PERFORMING ARTS
10
11
CHAPEL
3
St u d e n t
RELOCATE TO SIDE OF EXISTING PHYS. ED. STORE ON EASTERN SIDE OF OVAL
6
2
Se r v i c es
DEMOLISH REDGUM
11
Pe r f o r mi n g Ar t s
4
ADMI N.
3 1
CARPARK
2
CARPARK
RELOCATE 3 + 4 FOR STUDENT SERVICES RELOCATE 1 + 2 FOR PERFORMING ARTS
CARPARK P & F SHOP TO BE DEMOLISHED. NEW P & F SHOP IN EXISTING RESIDENCE
CARPARK
Re l o c a t e P & F Sh o p i n Ex i s t i n g Bu i l d i n g 44 Currie Street
THE RESI DENCE
Adelaide SA 5000 P (08) 8205 0111 F (08) 8205 0112 E hm@hardymilazzo.com.au
COURTS
W www.hardymilazzo.com.a
PEDARE CHRISTIAN COLLEGE 'ONE COLLEGE' FEASIBILITY STUDY
EXISTING SITE PLAN & TRANSPORTABLE RELOCATION PLAN
COMBINED CAMPUS
3 April 2017
6839-1 C Copyright
HEADING TEXT J STAGE 1
A. B.
I
C. D.
E. F. G. H.
OVAL
I.
J. K.
L. M.
CHI L D CARE CENTRE
N.
J UNI OR SCHOOL
H +U
C
Re l o c a t e d Pr o p e r t y & Ma i n t e n a n c e St o r e
C
C
Re l o c a t e d Ed . St o r e
Ph y s . RELOCATED COURTS
F COVERED OUTDOOR L EARNI NG
MALLEE
A
CRI CKET NETS
CAL ADENI A
A Pe r f o r mi n g Ar t s
SENI OR SCHOOL
E
L I BRARY RESOURCE CENTRE
L I NK TO ONE+
T
Q
A
A
St u d e n t Se r v i c e s
CONSTRUCTION OF NEW LIBRARY RESOURCE CENTRE CONSTRUCTION OF CARPARK BELOW NEW MIDDLE SCHOOL BLOCK CONSTRUCTION OF PERMANENT STUDENT SERVICES (2 STOREY) REFURBISH EXISTING LIBRARY IN BORONIA BUILDING - CONVERSION OF FIRST FLOOR LIBRARY TO 3 GLA's - INSTALLATION OF LIFT TO BORONIA U. CONSTRUCTION OF GYM IN PLACE OF RELOCATED COURTS V. REFURBISHMENT OF CHAPEL AND CONSTRUCTION OF FUNCTION CENTRE & PERMANENT GROUNDS WORKSHOP, OFFICES AND STORES BELOW W. REFURBISHMENT OF STUDENT NURSE AND STUDENT RECEPTION IN ADMINISTRATION BUILDING
N
CHAPEL
V
S
OPEN LANDSCAPED COMMUNAL ACTI VI TY
L
A V
RECONFIGURE EXISTING SOUTHERN CARPARK REFURBISHMENT OF EXISTING GROUND FLOOR OF SANDALWOOD BUILDING FOR NEW SCIENCE & FOOD TECHNOLOGY
Q. R. S. T.
PLAYGROUND
A
O. P.
A
FUTURE WORKS
G
A
STAGE 2
SAL TBUSH
GREVI L LEA
A
RELOCATE TRANSPORTABLES (REFER TO 01 EXISTING SITE PLAN & TRANSPORTABLE RELOCATION PLAN) DEMOLISH EXISTING P&F SHOP AND PERMANENTLY RELOCATE INTO EXISTING RESIDENCE CONSTRUCT NEW JUNIOR SCHOOL BLOCK & ADJACENT COVERED OUTDOOR LEARNING AREA CONSTRUCT NEW MIDDLE SCHOOL BLOCK & ADJACENT COVERED OUTDOOR LEARNING AREA REFURBISH EXISTING MALLEE TRANSPORTABLE FOR JUNIOR SCHOOL LIBRARY RELOCATE CHINESE INTO EXISTING YR 8 CORE ROOM IN SALTBUSH TRANSPORTABLE (OFFICES IN SALTBUSH TO REMAIN) PROVISION OF OHSC INTO GREVILLEA RELOCATE BASKETBALL COURTS CONSTRUCT TEMPORARY NORTHERN CARPARK ON OVAL RECONFIGURE NORTHERN CARPARK RELOCATED CRICKET NETS PROVISION OF OHSC KITCHEN FACILITIES INTO EXISTING KITCHEN TEMPORARILY RELOCATE LEAP AND LEARNING SUPPORT IN EXISTING RESIDENCE PERMANENTLY RELOCATE LEAP AND LEARNING SUPPORT INTO FIRST FLOOR OF BORONIA BUILDING
W V
COVERED OUTDOOR L EARNI NG
W P
ADMI N.
D
P
ADMI N. ENTRY
D
MI DDLE SCHOOL (R BELOW)
O
Re l o c a t e d P & F Sh o p i n Ex i s t i n g Bu i l d i n g
B
M
M
Te mp o r a r y Re l o c a t i o n o f L EAP a n d L e a r n i n g Su p p o r t 44 Currie Street
THE RESI DENCE
Adelaide SA 5000 P (08) 8205 0111 F (08) 8205 0112 E hm@hardymilazzo.com.au W www.hardymilazzo.com.a
PEDARE CHRISTIAN COLLEGE 'ONE COLLEGE' FEASIBILITY STUDY
COMBINED CAMPUS
NEW WORKS & STAGING PLAN
3 April 2017
6839-1 C Copyright
HEADING TEXT STAGE 1
RELOCATE TRANSPORTABLES (REFER TO 01 EXISTING SITE PLAN & TRANSPORTABLE RELOCATION PLAN) B. DEMOLISH EXISTING P&F SHOP AND PERMANENTLY RELOCATE INTO EXISTING RESIDENCE C. CONSTRUCT NEW JUNIOR SCHOOL BLOCK & ADJACENT COVERED OUTDOOR LEARNING AREA D. CONSTRUCT NEW MIDDLE SCHOOL BLOCK & ADJACENT COVERED OUTDOOR LEARNING AREA E. REFURBISH EXISTING MALLEE TRANSPORTABLE FOR JUNIOR SCHOOL LIBRARY F. RELOCATE CHINESE INTO EXISTING YR 8 CORE ROOM IN SALTBUSH TRANSPORTABLE (OFFICES IN SALTBUSH TO REMAIN) G. PROVISION OF OHSC INTO GREVILLEA H. RELOCATE BASKETBALL COURTS I. CONSTRUCT TEMPORARY NORTHERN CARPARK ON OVAL J. RECONFIGURE NORTHERN CARPARK K. RELOCATED CRICKET NETS L. PROVISION OF OHSC KITCHEN FACILITIES INTO EXISTING KITCHEN M. TEMPORARILY RELOCATE LEAP AND LEARNING SUPPORT IN EXISTING RESIDENCE PERMANENTLY RELOCATE LEAP AND LEARNING SUPPORT INTO N. FIRST FLOOR OF BORONIA BUILDING A.
STAGE 2
O. P.
RECONFIGURE EXISTING SOUTHERN CARPARK REFURBISHMENT OF EXISTING GROUND FLOOR OF SANDALWOOD BUILDING FOR NEW SCIENCE & FOOD TECHNOLOGY
FUTURE WORKS
Q. R. S. T. U. V.
CONSTRUCTION OF NEW LIBRARY RESOURCE CENTRE CONSTRUCTION OF CARPARK BELOW NEW MIDDLE SCHOOL BLOCK CONSTRUCTION OF PERMANENT STUDENT SERVICES (2 STOREY) REFURBISH EXISTING LIBRARY IN BORONIA BUILDING - CONVERSION OF FIRST FLOOR LIBRARY TO 3 GLA's - INSTALLATION OF LIFT TO BORONIA CONSTRUCTION OF GYM IN PLACE OF RELOCATED COURTS REFURBISHMENT OF CHAPEL AND CONSTRUCTION OF FUNCTION CENTRE & PERMANENT GROUNDS WORKSHOP, OFFICES AND STORES BELOW
W. REFURBISHMENT OF FIRST AID ROOM AND STUDENT RECEPTION IN ADMINISTRATION BUILDING
44 Currie Street Adelaide SA 5000 P (08) 8205 0111 F (08) 8205 0112 E hm@hardymilazzo.com.au W www.hardymilazzo.com.a
PEDARE CHRISTIAN COLLEGE 'ONE COLLEGE' FEASIBILITY STUDY
MASTERPLAN GROUND LEVEL PLAN
COMBINED CAMPUS
4 April 2017
6839-1 C Copyright
HEADING TEXT STAGE 1
RELOCATE TRANSPORTABLES (REFER TO 01 EXISTING SITE PLAN & TRANSPORTABLE RELOCATION PLAN) B. DEMOLISH EXISTING P&F SHOP AND PERMANENTLY RELOCATE INTO EXISTING RESIDENCE C. CONSTRUCT NEW JUNIOR SCHOOL BLOCK & ADJACENT COVERED OUTDOOR LEARNING AREA D. CONSTRUCT NEW MIDDLE SCHOOL BLOCK & ADJACENT COVERED OUTDOOR LEARNING AREA E. REFURBISH EXISTING MALLEE TRANSPORTABLE FOR JUNIOR SCHOOL LIBRARY F. RELOCATE CHINESE INTO EXISTING YR 8 CORE ROOM IN SALTBUSH TRANSPORTABLE (OFFICES IN SALTBUSH TO REMAIN) G. PROVISION OF OHSC INTO GREVILLEA H. RELOCATE BASKETBALL COURTS I. CONSTRUCT TEMPORARY NORTHERN CARPARK ON OVAL J. RECONFIGURE NORTHERN CARPARK K. RELOCATED CRICKET NETS L. PROVISION OF OHSC KITCHEN FACILITIES INTO EXISTING KITCHEN M. TEMPORARILY RELOCATE LEAP AND LEARNING SUPPORT IN EXISTING RESIDENCE N. PERMANENTLY RELOCATE LEAP AND LEARNING SUPPORT INTO FIRST FLOOR OF BORONIA BUILDING A.
STAGE 2
O. P.
RECONFIGURE EXISTING SOUTHERN CARPARK REFURBISHMENT OF EXISTING GROUND FLOOR OF SANDALWOOD BUILDING FOR NEW SCIENCE & FOOD TECHNOLOGY
FUTURE WORKS
Q. R. S. T. U.
V. W.
CONSTRUCTION OF NEW LIBRARY RESOURCE CENTRE CONSTRUCTION OF CARPARK BELOW NEW MIDDLE SCHOOL BLOCK CONSTRUCTION OF PERMANENT STUDENT SERVICES (2 STOREY) REFURBISH EXISTING LIBRARY IN BORONIA BUILDING - CONVERSION OF FIRST FLOOR LIBRARY TO 3 GLA's - INSTALLATION OF LIFT TO BORONIA CONSTRUCTION OF GYM IN PLACE OF RELOCATED COURTS REFURBISHMENT OF CHAPEL AND CONSTRUCTION OF FUNCTION CENTRE & PERMANENT GROUNDS WORKSHOP, OFFICES AND STORES BELOW REFURBISHMENT OF FIRST AID ROOM AND STUDENT RECEPTION IN ADMINISTRATION BUILDING
44 Currie Street Adelaide SA 5000 P (08) 8205 0111 F (08) 8205 0112 E hm@hardymilazzo.com.au W www.hardymilazzo.com.a
PEDARE CHRISTIAN COLLEGE 'ONE COLLEGE' FEASIBILITY STUDY
MASTERPLAN UPPER LEVEL PLAN
COMBINED CAMPUS
4 April 2017
6839-1 C Copyright
GoogleEarth view of proposed Pedare Christian College Junior School access road
Pedare Christian College
Separate Campuses Draft Concept Designs Mr Mark Watson Business Manager
LEGEND
PERFORMING ARTS TO BE DEMOLISHED
L OWER L EVEL OVAL
HEADING TEXT
MUSIC SUITES TO BE DEMOLISHED TRANSPORTABLE TO BE RELOCATED/REMOVED
PERFORMI NG ART S
NEW TRANSPORTABLE LOCATION
GROUNDSKEEPER SHEDS TO BE DEMOLISHED
DI ANEL LA EXISTING DIANELLA RELOCATED SOUTH OF ACACIA
MUSI C SUI TES
BL UE GUM
EXI T
CAR PARK
TEA TREE TOI L ETS TEA TREE TO BE DEMOLISHED
YR 5
CORREA ENTRY
ADMI NI STRATI ON
MI D L EVEL COURTYARD
HARD PL AY
AMPHI THEATRE
BANKSI A
UNDERCOVER ASSEMBL Y AREA
ACACI A J UNI OR PRI MARY PLAYGROUND
MI DDL E PRI MARY PLAYGROUND
TOI L ETS & SPORTS STORE
BASKETBAL L COURTS
DI ANEL LA 44 Currie Street Adelaide SA 5000
TEMPORARY PERFORMI NG ARTS
P (08) 8205 0111 F (08) 8205 0112 E hm@hardymilazzo.com.a W www.hardymilazzo.com.
PEDARE CHRISTIAN COLLEGE 'ONE COLLEGE' FEASIBILITY STUDY
EXISTING SITE PLAN AND TRANSPORTABLE RELOCATION PLAN
SEPARATE CAMPUS JUNIOR SCHOOL
15 March 2017
6839-1
01
C Copyright
PROPERTY MAINTENANCE SHED BELOW
HEADING TEXT
12 CARPARKS BELOW
L OWER L EVEL OVAL
MUSI C SUI TES
B
F L I BRARY RESOURCE CENTRE
E
COVERED OUTDOOR L EARNI NG AREA PERFORMI NG ARTS
E
YR 5
B
H
OUTDOOR PL AY AREA
TOI L ETS
BL UE GUM
G
G
CORREA
B A
I
ADMI NI STRATI ON
MI D L EVEL COURTYARD
EARL Y L EARNI NG CENT RE
AMPHI THEATRE
UNDERCOVER ASSEMBL Y AREA
BANKSI A
STAGE 1 A. CONSTRUCT ELC, ADJACENT COVERED OUTDOOR LEARNING AREA AND MINOR REFURBISHMENT OF EXISTING ADMIN ENTRY B. RECONFIGURE CARPARK AND SLIP LANE C. REFURBISH ACACIA AS PER SALT STUDIO PLAN
ACACI A
STAGE 2
MI DDL E PRI MARY PLAYGROUND
J UNI OR PRI MARY PLAYGROUND
J
D. E. F.
G.
C
TOI L ETS & SPORTS STORE
H.
RELOCATE DIANELLA TRANSPORTABLE CONSTRUCT PERFORMING ARTS & MUSIC SUITES (1ST) CONSTRUCT LIBRARY RESOURCE CENTRE, UNDERGROUND CARPARK & PROPERTY MAINTENANCE SHED (2ND) CONSTRUCT NEW OUTDOOR PLAY AREA AND COVERED OUTDOOR LEARNING AREA (3RD) CONSTRUCT EXTENSION TO BLUEGUM (CANTEEN) & REFURBISH EXISTING FOYER/BATHROOMS
FUTURE WORKS
I. J.
BASKETBAL L COURTS
REFURBISH CORREA SIMILAR TO SALT STUDIO PLAN REFURBISH BANKSIA AND CONSTRUCT EXTENSION
DI ANEL LA
D
TEMPORARY PERFORMI NG ARTS
44 Currie Street Adelaide SA 5000 P (08) 8205 0111 F (08) 8205 0112 E hm@hardymilazzo.com.a W www.hardymilazzo.com.
PEDARE CHRISTIAN COLLEGE 'ONE COLLEGE' FEASIBILITY STUDY
PROPOSED STAGING PLAN
SEPARATE CAMPUS JUNIOR SCHOOL
15 March 2017
6839-1
02
C Copyright
HEADING TEXT LEGEND TRANSPORTABLE TO BE RELOCATED/REMOVED
NEW TRANSPORTABLE LOCATION
TRANSPORTABLE TO REMAIN IN EXISTING LOCATION
OVAL CHI L D CARE CENTRE
CARPARK
5
Ne w Pr o p e r t y & Ma i n t e n a n c e St o r e Ph y s . Ed. St o r e
PL AYI NG FI EL DS
NEW TRANSPORTABLES
9
EXISTING PROPERTY & MAINTENANCE STORE TO REMAIN
10
SAL TBUSH
6
EXISTING MALLEE TRANSPORTABLES TO REMAIN
TRANSPORTABLE TO REMAIN IN EXISTING LOCATION. TO BE USED AS TEMPORARY SPACE
B
CAL ADENI A
MALLEE
RELOCATED TRANSPORTABLES FOR TEMPORARY STUDENT SERVICES
7 L I NK TO ONE+ CRI CKET NETS
GREVI L L EA
3
PLAYGROUND
CHAPEL
9 1
RELOCATED TRANSPORTABLES 1, 2, 9 & 10 FOR TEMPORARY PERFORMING ARTS
St u d e n t
4
RELOCATE TO SIDE OF EXISTING PHYS. ED. STORE FOR NEW PROPERTY & MAINTENANCE STORE
5
10
Se r v i c es
DEMOLISH REDGUM
2
Pe r f o r mi n g Ar t s
RELOCATE 3 + 4 FOR STUDENT SERVICES
4
ADMI N.
3 1
CARPARK
2
CARPARK
RELOCATE 1 + 2 FOR PERFORMING ARTS
CARPARK P & F SHOP TO BE DEMOLISHED. NEW P & F SHOP IN EXISTING RESIDENCE
CARPARK
Re l o c a t e P & F Sh o p i n Ex i s t i n g Bu i l d i n g 44 Currie Street
THE RESI DENCE
Adelaide SA 5000 P (08) 8205 0111 F (08) 8205 0112 E hm@hardymilazzo.com.au
COURTS
W www.hardymilazzo.com.a
PEDARE CHRISTIAN COLLEGE 'ONE COLLEGE' FEASIBILITY STUDY
EXISTING SITE & TRANSPORTABLE PLAN
SEPARATE CAMPUS
6839-1 C Copyright
HEADING TEXT STAGE 1
A. B. C. D.
RELOCATE TRANSPORTABLES (REFER TO 01 EXISTING SITE & TRANSPORTABLE RELOCATION PLAN) DEMOLISH EXISTING P&F SHOP AND PERMANENTLY RELOCATE INTO EXISTING RESIDENCE CONSTRUCT NEW STEM BUILDING BLOCK & ADJACENT COVERED OUTDOOR LEARNING AREA RELOCATE CRICKET NETS
STAGE 2
E. F.
OVAL
CHI L D CARE CENTRE
Ne w Pr o p e r t y & Ma i n t e n a n c e St o r e
A
FUTURE WORKS CONSTRUCT NEW MIDDLE SCHOOL BLOCK & ADJACENT COVERED OUTDOOR LEARNING AREA H. RELOCATE HOMS, AHOMS, EXTRA CURRICULAR & DIRECTOR OF SPORT TO CALADENIA BUILDING I. INSTALLATION OF LIFT IN THE BORONIA BUILDING J. CONSTRUCTION OF PERMANENT STUDENT SERVICES K. REFURBISHMENT OF CHAPEL AND CONSTRUCTION OF FUNCTION CENTRE WITH PERMANENT GROUNDS WORKSHOP, OFFICE AND STORES BELOW L. REFURBISHMENT OF STUDENT NURSE AND STUDENT RECEPTION IN ADMINISTRATION BUILDING M. CONSTRUCTION OF TECHNOLOGY HUB FOR WOODWORK AND METAL WORKSHOPS G.
Ph y s . Ed. St o r e
PL AYI NG FI EL DS
G
SAL TBUSH
MI DDL E SCHOOL BL OCK MALLEE
H
CAL ADENI A
SENI OR SCHOOL CRI CKET NETS
G
L I NK TO ONE+
D H
GREVI L LEA
I PLAYGROUND
K A A Pe r f o r mi n g Ar t s
CHAPEL
K A
L
L ADMI N. ADMI N. ENTRY
St u d e n t
Se r v i c es
J M
COVERED OUTDOOR L EARNI NG
F
A
A
OPEN LANDSCAPED COMMUNAL ACTI VI TY
A
K
RECONFIGURE EXISTING SOUTHERN CARPARK REFURBISHMENT OF EXISTING GROUND FLOOR OF SANDALWOOD BUILDING FOR NEW SCIENCE ROOM AND FOOD TECHNOLOGY
C
F
C
TECHNOL OGY HUB
NEW STEM BUI L DI NG
E
Re l o c a t e P & F Sh o p i n Ex i s t i n g Bu i l d i n g
B 44 Currie Street
THE RESI DENCE
Adelaide SA 5000 P (08) 8205 0111 F (08) 8205 0112 E hm@hardymilazzo.com.au
COURTS
W www.hardymilazzo.com.a
PEDARE CHRISTIAN COLLEGE 'ONE COLLEGE' FEASIBILITY STUDY
SEPARATE CAMPUS
NEW WORKS & STAGING PLAN
6839-1 C Copyright
1 5 M ar ch 2 HEADING TEXT 0 1 7
STAGE 1 A.
B. C. D.
RELOCATE TRANSPORTABLES (REFER TO 01 EXISTING SITE & TRANSPORTABLE RELOCATION PLAN) DEMOLISH EXISTING P&F SHOP AND PERMANENTLY RELOCATE INTO EXISTING RESIDENCE CONSTRUCT NEW STEM BUILDING BLOCK & ADJACENT COVERED OUTDOOR LEARNING AREA RELOCATE CRICKET NETS
STAGE 2
E. F.
RECONFIGURE EXISTING SOUTHERN CARPARK REFURBISHMENT OF EXISTING GROUND FLOOR OF SANDALWOOD BUILDING FOR NEW SCIENCE ROOM AND FOOD TECHNOLOGY
G.
CONSTRUCT NEW MIDDLE SCHOOL BLOCK & ADJACENT COVERED OUTDOOR LEARNING AREA RELOCATE HOMS, AHOMS, EXTRA CURRICULAR & DIRECTOR OF SPORT TO CALADENIA BUILDING INSTALLATION OF LIFT IN THE BORONIA BUILDING CONSTRUCTION OF PERMANENT STUDENT SERVICES REFURBISHMENT OF CHAPEL AND CONSTRUCTION OF FUNCTION CENTRE WITH PERMANENT GROUNDS WORKSHOP, OFFICE AND STORES BELOW REFURBISHMENT OF STUDENT NURSE AND STUDENT RECEPTION IN ADMINISTRATION BUILDING CONSTRUCTION OF TECHNOLOGY HUB FOR WOODWORK AND METAL WORKSHOPS
FUTURE WORKS
H. I. J. K. L. M.
44 Currie Street Adelaide SA 5000 P (08) 8205 0111 F (08) 8205 0112 E hm@hardymilazzo.com.au W www.hardymilazzo.com.a
PEDARE CHRISTIAN COLLEGE 'ONE COLLEGE' FEASIBILITY STUDY
MASTERPLAN GROUND LEVEL PLAN
SEPARATE CAMPUS
6839-1
03
C Copyright
1 5 M ar ch 2 HEADING TEXT 0 1 7
STAGE 1 A.
B. C. D.
RELOCATE TRANSPORTABLES (REFER TO 01 EXISTING SITE & TRANSPORTABLE RELOCATION PLAN) DEMOLISH EXISTING P&F SHOP AND PERMANENTLY RELOCATE INTO EXISTING RESIDENCE CONSTRUCT NEW STEM BUILDING BLOCK & ADJACENT COVERED OUTDOOR LEARNING AREA RELOCATE CRICKET NETS
STAGE 2
E. F.
RECONFIGURE EXISTING SOUTHERN CARPARK REFURBISHMENT OF EXISTING GROUND FLOOR OF SANDALWOOD BUILDING FOR NEW SCIENCE ROOM AND FOOD TECHNOLOGY
G.
CONSTRUCT NEW MIDDLE SCHOOL BLOCK & ADJACENT COVERED OUTDOOR LEARNING AREA RELOCATE HOMS, AHOMS, EXTRA CURRICULAR & DIRECTOR OF SPORT TO CALADENIA BUILDING INSTALLATION OF LIFT IN THE BORONIA BUILDING CONSTRUCTION OF PERMANENT STUDENT SERVICES REFURBISHMENT OF CHAPEL AND CONSTRUCTION OF FUNCTION CENTRE WITH PERMANENT GROUNDS WORKSHOP, OFFICE AND STORES BELOW REFURBISHMENT OF FIRST AID ROOM AND STUDENT RECEPTION IN ADMINISTRATION BUILDING CONSTRUCTION OF TECHNOLOGY HUB FOR WOODWORK AND METAL WORKSHOPS
FUTURE WORKS
H. I. J. K. L. M.
44 Currie Street Adelaide SA 5000 P (08) 8205 0111 F (08) 8205 0112 E hm@hardymilazzo.com.au W www.hardymilazzo.com.a
PEDARE CHRISTIAN COLLEGE 'ONE COLLEGE' FEASIBILITY STUDY
MASTERPLAN UPPER LEVEL PLAN
SEPARATE CAMPUS
6839-1
04
C Copyright
FAQ Q. Will school fees increase as a result of any Capital works? A. Fee increases are expected to be similar to previous years only to cover increases in operational costs such as salaries and wages, utilities, maintenance etc. School fees will not be used to fund any Capital works program under either option. Q. Has the College considered how traffic will be impacted under a Combined Campus option? A. The College has engaged GTA Consultants to undertake work in this area and provide options and recommendations for the best way to accommodate the flows that could occur under this option.
additional traffic
FAQ Q. Under the Combined Campus option, will the Junior Campus site have to be sold? A. Yes. It is central to the Combined Campus option to sell this site. The Combined Campus option cannot be achieved otherwise. Q. Has a decision been made on whether it will be a Combined Campus or Separate Campus outcome? A. Not yet. Both options are now with the Board for consideration. A decision will be made in the coming months by the Board, based on the best interests of the College to ensure a sustainable future and for the best interests of the learning and welfare of the students. It is not yet possible to provide a definitive timeframe.