Pedestrian Route & Natural Therms, Carcavelos Rehab & Library Proposed, Estoril Sports Hall, Prince’s Island Moutain Retreat, Lousã Hills selected works | pedro nunes
2005
Academic project Third year Arquitecture
Pedestrian Route & Natural Therms Carcavelos, Lisboa, Portugal. As a starting point for the exercise intervention, we see a strong territory by their physical and material side, and especially in all the relations he suffers with the environment. We are on the Estoril coastline. Erosive territory in his nature, given its direct confrontation with the sea, exposed to tides that vary in their altimtry for around 2.40m (z) coordinate. All this coast, appears to us still quite virgin, without human intervention, marked by deep and wide cuts in the rocks, which naturally form large basins and desirable public baths. . The peculiar aspect of empowerment with the need for a reclassification of a pedestrian path, gave rise to the real character of architectural approach to the territory. The pedestrian tries to establish a limit as well as physical space qualification of a bathing area, and selfdefined and characterized by fragmentation of local rock.
Location plant 0m
1
10
20
30
40
50
2
Site plan 1/200
Currently all the Coastline is served by pedestrian paths, and so, the proposal tries to solve his nonexistence in this particular site, where today people do not have another way to go and know the place better. The route starts in Carcavelos beach and extends to the neighboring village of “Parede”.
Pedestrian route
1
Section 1 1/100
Academic project Third year Arquitecture
2005
The project proposes about 1.5 km, traveled by all who want to breathe and enjoy this beautiful and power landscape.
3 1
2
1. Oceanic water 2. Mineral water 3. Warm Mineral water
Site plan 1/200
in turn helps to achieve a better
The baths include three distinct zones of bath, including an area of oceanic water, a mineral water and another of warm mineral water. Through the gaps in the coverage gets a good use of light to its interior, which makes the space acquires a more open character. One of the major factors in the design of the structure had to do with the height of it, because it is not intended to create any kind of visual obstacle between the road and the sea.
Section 2 1/100
Academic project Fifth year Architecture
Rehabilitation and Library proposed Monte do Estoril, Cascais, Portugal. Monte do Estoril
The intervention comes on the purpose of the discipline of rehabilitation (project IV) taught during the last year of arquitecture course. During the development work throughout the year the survey was made of much of the building, preparing it to chips built, contained in its characterization and conservation status of the "monte do Estoril" region, which served as a basis for future plan of safeguarding the Architectural heritage built. The practical exercise was based on the identification and future rehabilitation, of an arquitectural specimen that somehow help to characterize the “popular architecture” felt in Portugal, especially in this region, "Estoril coast" by the mid 40 / 50. The choice of built heritage to intervene held mainly with architectural features, exposure, and especially the existence of a large outdoor area, which gave the opportunity to study a new programmatic demand that should established a certain bridge to modernity, from his form / funcion meaning.
Cascais
Cascais coastline 0m
10
20
30
40
50
The project thus proposes a contribution of a social nature, dropping anchor to another cultural deprivation, lack of reading / knowledge. the definition of the principal During parameters intervention has been taken into account the legislation to "Center of social support", which regulates areas and equipment. On this line of conduct the recovery turns out to be almost complete, except for the exterior walls and their openings.
2007
Estoril
The project thus proposes a contribution of a social nature, dropping anchor to another cultural deprivation, lack of reading / knowledge. During the definition of the principal parameters intervention has been taken into account the legislation to "Center of social support", which regulates areas and equipment. On this line of conduct the recovery turns out to be almost complete, except for the exterior walls and their openings.
implantation plan 1/200
wh
Prior study Project to ArchDesign LX and What Group Consultors
With the programmatic definition to be distributed over three floors, the reception area / entrance / dining hall has been studied over the entire floor 0, while the floors are laid superiors playground / physician office (1st floor) and 5 single rooms to support the elderly. (second floor)
The proposed reading room, comes stapled to the building through a deconstructed passage ramp in order to reflect light and release some levity to the seam between the pre existing and the new proposal. This same plane continues into the volume assuim contributing to the demarcation of the space and to server storage of books. The form as defined in the outer skin of the facade, which comes from the light necessary to control a reading area, which allows a more or less intensely according to the time of day.
2007
Costa Pinto Street Section 1/200
For the restoration of the pre existing building traditional techniques were used such as the use of pre stressed slabs, convenient treatment of the openings and placing a new floor. The entire area of coverage, the work of the eaves, stucco and would also be targeted for restoration.
For a more interactive space was created with the population more access, ajuzante the lot, the continuation of the volume itself.
Prior study Project to ArchDesign LX and What Group Consultors
Sports Hall Santo António, São Tomé e Principe.
The sports pavilion project that proposes born about two programmatic constraints, in order to enhance and improve the conditions for the practice of various cultural traditions existing in the country. The first charge as a contribution infrastructure for sports, the second as a versatile element can accommodate different programs and uses for example, shows, events and conferences. The inclusion of the element in society will certainly bring a strong link between the younger population and sport. The concept design attached to the sports hall is born the idea to recreate a space that could be lived on the importance of their visual relationships.
ajhdsjhdsj sduhsjh dsf d
sduhsjh d djfhon dha fdsf The object dfjhdsfjhdsfj is ajhdsjhdsj born "based" high dfjhdsfjhdsfj djfhjdhfj dh f d dfdhfjdhfjdshfjdsf dfdhfjdhfjdshfjdsf plateau, jdhfjsdfjdsf working as jdhfj stage, jdshfjdsf sd d jdhfjsdfjdsf jdshfjdsf sd exacerbating the importance of the sddssdddsdd assasasa sddssdddsdd assasasa event and somehow connects it with dsjfhsdjfdjsfhjdshf jdsjh the issue of sport as a "show". dsjfhsdjfdjsfhjdshf jdsjh dfh djfhjdshfjdfsjfd dsjhf dfh djfhjdshfjdfsjfd dsjhf dfskh dsfhdjsfhjdshfjh The event born of internal relations, as dfskh dsfhdjsfhjdshfjh dsfh dshfdsfdjsfhjdshf dsfh dshfdsfdjsfhjdshf with its own exterior dsfsdfjdhf jdshfjds djfd dsfsdfjdhf jdshfjds djfd As factor cyclical balance the pavilion kdjf kdsfhjsdfhjsh fsdkd kdjf kdsfhjsdfhjsh fsdkd fds is designed kdhfkdsfhksdfkds and structured according kdhfkdsfhksdfkds fds dskfhskfhkds fhdsfkdhskf dskfhskfhkds fhdsfkdhskf to a logical harmony of its different kdfhkdsfhkdsfhk dsfhk sd kdfhkdsfhkdsfhk dsfhk ksdfhkd fkdsfhk fd sd parts. kdhf kdhf ksdfhkd fkdsfhk fd k k of The audience the flag is set to an kdsf dkshfkdfhkkf efwerg kdsf dkshfkdfhkkf efwerg regregregerwgreg upper bound, allowing the notion of regregregerwgreg ergrewgrewgewrg regre suspending ergrewgrewgewrg the object from regre the
2008
t he inclusion of two lateral slots, designed to function as access points, not only increase the idea of the strong relationship visual thus crossing the whole perimeter of the sports fields, as in turn helps to achieve a better balance between the volume and constructed and its geographical context.
Prior study Project to ArchDesign LX and What Group Consultors
The deployment strategy of the program content is resolved by physical separation of three different sectors that make up the flag. The tops are defined the two sectors corresponding traffic areas and spaces whether public and medical assistance. In the center there is the sports arena as a nerve center of the program. The public sector is defined as a level 0, the reception area, ticket office, toilets and a lounge. In the first floor are the general sanitary facilities and a bar area. The technical sector, located in the top contrary, is composed of three units, toilets and foyers, a zone and a first aid room exercises, these spaces also sub divided by two floors.
The deployment strategy of the program content is resolved by physical separation of three different sectors that make up the flag.
The tops are defined the two sectors corresponding traffic areas and spaces whether public and medical assistance. In the center there is the sports arena as a nerve center of the program.
Academic project Fifth year Architecture
Moutain Retreat Talasnal, Serra da Lousã, Portugal Based on the work of masters of recovery and rehabilitation of Serra da Lousã Schist Villages, the study proposes a retreat in the mountains, studied and conceptualized as a simple embodiment of a small home, fully aware of its territorial impact. The idea was aimed at the interpretation of a space that could be created using local resources, which consequently self sustain the approach. The project in its form and content, suggests a small retreat, designed in two different spaces and although its small size, (6x4) achieve through their equipment, a different set up and a new useful space. Enjoy the steep slopes of the hills and their existing use for agriculture, to consolidate its deployment. Its shape appears tied to their ruled and functional character, which is expressed through his own rational structure. Talasnal Village 0m
10
20
30
40
50
2009
Is fundamentally a contemplative space, which enjoys privileged views of the mountains and the Castelo da Lousã. Using a construction method, which incorporates wellinsulated timber, gives the user a pleasant stay.
0
1
model 1.20
The audience of the flag is set to an upper bound, allowing the notion of suspending the object from the
Academic project Fifth year Architecture
Its materiality was designed according color to the idea of establishing in its and texture, a harmonious relationship, due to the preexistence of the "Schist Castles".
2009
Contributes to a strong symbiosis with its surroundings, respecting the patrimonial character that all these villages still behave.
Pedro Abrantes Nunes Profissional Experience
12th year in Arts at modern college of Lisbon in july 97 Degree in Architecture at Lusíada University, in 07 Master Degree in Architecture, "Urban Rehabilitation and Recovery," at Lusíada University, in 09 Final course work on "Recovery and Rehabilitation of the historical center of Cascais, safeguarding the urban plan and delineate the classified heritage"
Worked as freelancer in Architecture Photography and 3D rendering (20002002) 2D/3D designer at Atelier of Architecture, "Architects Joseph Alves" (20022005) Technical collaboration Urban Recovery Society (SRU) On the analysis and diagnosis to the built heritage of “ Baixa Pombalina”. Engineering Designer EngiarCAD Projects licensing and enforcement of fuel filling stations GALP. (20062008) Project architect in the planning and design of the Enterprise Center of Kunene in Ondjiva (Angola) to Sulparques Constructions SA (200920011)
Software
ExtraCurricular
Autocad | Archicad | Sketchup | Artlantis | Photoshop | Illustrator | Powerpoint | Excel.
Sports, Travel, Lecture and Expositions
Born in Lisbon, Portugal, on the 13th april of 1979
Contacts
e pedronunesferreira@gmail.com t (+351) 91 989 8090 w http://issuu.com/pedro.nunes/docs/drafts