C O N T E N T STUDIO WORK
THE NEST, CAMPBELL HALL, UVa ARCHITECTURE SCHOOL I ARCH 4020................................................................................................................................................ CONDUITS OF FORM: CHARLOTTESVILLE’S SKY CARRIER, CHARLOTTESVILLE, VA I ARCH 4020............................................................................................................. WASTE HEIGHTS PARK, WASHINGTON HEIGHTS, NEW YORK I ARCH 3020 ............................................................................................................................................
COMMUNITY RESOURCE CENTER, RICHMOND, VA I ARCH 2020.............................................................................................................................................................
STRANDBEEST CENTER, HIGHLINE PARK, NEW YORK I ARCH 3010........................................................................................................................................................
MARRIOT DOOMSDAY INN, CHARLOTTESVILLE, VA I ARCH 4010.............................................................................................................................................................
UVa CAMPBELL HALL PAPER WASTE INSTILLATION I ARCH 3020............................................................................................................................................................
COMPETITIONS
HONDURAS HEALTH BUILD CHALLENGE I 2012......................................................................................................................................................................................
RIVANNA RIVER TRAIL COMPETITION I 2013..........................................................................................................................................................................................
BELMONT BRIDGE COMPETITION I 2012................................................................................................................................................................................................
.......................................................................................................................................................................................................................................
1-6
.......................................................................................................................................................................................................................................
7-18
.......................................................................................................................................................................................................................................
19-24
.......................................................................................................................................................................................................................................
25-30
.......................................................................................................................................................................................................................................
31-38
........................................................................................................................................................................................................................................ 39-42
.......................................................................................................................................................................................................................................
43-44
.......................................................................................................................................................................................................................................
45-46
........................................................................................................................................................................................................................................
47-50
.......................................................................................................................................................................................................................................
51
1
the NEST The Nest is the product of a collaborative effort in an advanced material research studio focused on a speciality high performance concrete, Ductile Concrete. The Nest acts as resting , meeting, or standing piece, hoping to encourage interaction and activity in a previously dead space. The strength of ductile concrete allows for very thin hollow sections , which are each connected by a nest like interior structure of welded rebar. This instillation proves the new capabilities potentials of concrete, an ancient material.
THE NEST I ARCH4020 I ALEXANDER KITCHIN
I
SPRING 2013
2
3
process
3d model
formwork 3d model
CNC routing
welding
4
sanding
lamination
pouring
mixing
5
6
7
C O N D U I T S O F F O R M I M Y S E L F + DA N I E L L E E A D S I A R C H 4 0 2 0 I A L E X A N D E R K I T C H I N
I
SPRING 2013
Conduits of Form: Charlottesville’s Sky Carrier A new connective transportation network carries cable cars above the city and country, piercing the hotel’s facade to create spatial voids in the preexisting Landmark grid. A network of paths circulate throughout the structure, acting as a means of transit for both people and goods, and also serving as stationary cable car hotel rooms. Sustainable modes of transportation, they traverse from the agrarian Rivanna River villages to the core of Charlottesville to serve the local food network of the Downtown Mall, stocked with produce farmed on the Rivanna’s banks. Concrete ribbons act as a permeable boundary between the southern and northern ends of the building. Peeling away to puncture the open ground spaces, they act as structural reinforcement, utilitarian pipelines and impromptu furniture pieces. Conduits of Form promotes the restitching of Downtown Charlottesville with its agrarian past, acting as a catalyst for public interaction and community exchange.
8
9
The first iteration was the marriage of the tree and the triangle--both figures that exemplify strength and stability. The ribbon-like structure is an amorphous, ambiguous conglomerate. The screen wall is porous and permeable, illustrated by the low roots on the northern end that pass through to become the roof on the southern end. The barrier divides the gallery into public gathering space for many and private resting space for one.
plan2_open public space
plan3_administrative
plan4_main transit level + hotel reception
ground plan_open public space
plan2_open public space
ground plan_open public space
plan3_administrative
plan2_open public space
ground plan_open public space
10
13
plan5_cable car rooms + enclosed rooms + transit
plan4_main transit level + hotel reception
plan6_cable car rooms + enclosed rooms + transit
plan5_cable car rooms + enclosed rooms + transit
cable car circulation loops within the hotel
plan3_administrative
cable car circulation moving in and out
plan4_main transit level + hotel reception
plan7_cable car rooms + enclosed rooms + transit
plan6_cable car rooms + enclosed rooms + transit
hotel room cable cars
plan5_cable car rooms + enclosed rooms + transit
9th 8th 7th 6th plan2_open public space
plan3_administrative
plan4_main transit level + hotel reception
5th 4th 3rd
2nd 1st ground plan_open public space
water st.
plan2_open public space
hotel
grou
plan3_administrative
downtown mall
plaza + commercial
plan8_cable car rooms + enclosed rooms + transit
plan9_cable car rooms + enclosed rooms + transit + skybar/restaurant
plan7_cable car rooms + enclosed rooms + transit
plan8_cable car rooms + enclosed rooms + transit
plan9_cable car rooms + enclosed rooms + transit + skybar/restaurant
plan6_cable car rooms + enclosed rooms + transit
plan7_cable car rooms + enclosed rooms + transit
plan8_cable car rooms + enclosed rooms + transit
plan6_cable car rooms + enclosed rooms + transit
plan7_cable car rooms + enclosed rooms + transit
12
fl fl fl fl fl
plan5_cable car rooms + enclosed rooms + transit
fl fl
d fl fl
und fl
plan4_main transit level + hotel reception
plaza + commercial
downtown mall
plan5_cable car rooms + enclosed rooms + transit
hotel
plan6_cable car rooms + enclosed rooms + transit
water st.
15
construction detail
The ribbons will be constructed through precast cast pieces connected by joints that will be cast within each segment, creating a seamless flow of concrete throughout the structure, The concrete ribbons are multi-functional and ambiguously programmed, hoping to keep the open and public nature of the large public plaza on the ground floor. The ribbons create a textured wall that acts against the shear forces caused by the movement of cable cars within the structure. Next, they act as conduits, containing necessary resources for the hotel and its inhabitants. The water flow within the conduit, works successfully due to the water tight and strength of ductile.
16
17
18
19
Wa s t e H e i g h t s P a r k REcycle + REgenerate + REpurpose B ROA DWAY 1 , 0 0 0 S T E P S I A R C H 3 0 2 0 I K A R E N VA N L E N G E N + E R I N H A N N E G A N
I
SPRING 2012
20
WASTE SORTING DIAGRAM I SKETCH WASTE SORTING DIAGRAM I SKETCHES I RECYCLE SQUARE PARK I P.2 I STUDIO VAN LENGEN I ARCH 3020 I BRENNAN
WASTE SORTING DIAGRAM I SKETCHES I RECYCLE SQUARE PARK I P.2 I STUDIO VAN LENGEN I ARCH 3020 I BRENNAN
Waste Heights Park began as an in-depth research project on the topic of medical waste within New York City, more specifically, the area of Washington Heights. I focused on rerouting the non-infectious waste produced by hospitals, by localizing it within the neighborhood. In reaction, I designed a single stream sorting center within the confines of Mitchell Square Park, Washington Heights. The system within this structure collects the waste from surrounding hospitals and moves it through the building, where each type of machinery removes a specific material and deposits it into vertical holding bins. I took this system and intertwined it within a second system of public circulation, consisting of catwalks and platforms, creating a constructed park.
21
MATERIAL PROCESS DIAGRAM I SKETCHES I RECYCLE SQUARE PARK I P.2 I STUDIO VAN LENGEN I ARCH 3020 I BRENNAN
22
23
24
The waste circulated and sorted throughout the park will be moved from the storage bins to specific hubs or stations that occupy vacant space throughout the city. Each hub reflects a specific material, whether its in the physical building itself or how the materials are distributed for re-use. The park and hub facilitate a constant cycle of material re-use and distribution within the city. of New York.
25
R I C H M O N D R E F U G E E C E N T E R I A R C H 2 0 2 0 I A L I C I A C L A R K E - S AVAG E
Community Resource Center
A programmatic strategy defined by three groupings of spaces, “A PROGROMMATIC STRATEGY DEFINED BY THREEsurrounded GROUPINGS OF SPACES, individual instruction, group instruction, and groupwork....all NDIVIDUAL INSTRUCTOR INSTRUCTION, AND GROUP WORK... by a dense, collaged community, GROUP bulletin board.
ALL SURROUNDED BY A COMMUNITY BULLETIN BOARD.”
I
SPRING 2011
26
27
28
“... in order to incorporate the alleyway, it is open to the back to encourage community traffffc...”
29
MOVEMENT
MOVEME
30 MOVEMENT
MOVEMENT
A series of displaced planes, intersected by A series of displaced planes, intersected by ve vertical pieces create constricted spaces pieces createplanes, constricted spaces adjaecnt A series of displaced intersected by vertical adjacent to tovast visitor vastspaces. spaces.The The visitor isisencouraged pieces create constricted spaces adjaecnt encouragedthroughout to move throughout these these ecclectic spaces by a to vast spaces. The visitor is encouraged consistent motif of a community ecclectic spaces by consistent motifbyofaa bulletin throughout these ecclectic spaces board which is signified by a materialby change community bulletin board which is signified consistentand motif of a community is flexible in order to bulletin preserve the idea a material change and is flexible in order to board which is signified a material change of adapting to aby constantyl changing preserve the idea ofsociety. adapting to a the constantly and is flexible in order to preserve idea industrial of adapting to a constantyl changing industrial society.. changing industrial society.
Interior Perspectives I Project 3 I Studio Savage I Peggy Brennan I ARCH2020
Interior Perspectives I Project 3 I Studio Savage I Peggy Brennan I ARCH2020
31
STRANDBEEST CENTER I ARCH3010 I ALEXANDER KITCHIN
T h e o J a n s e n ’s High Line S t ra n d b e e s t C e n t e r
L o c a t e d a l o n g t h e H i g h L i n e Pa r k i n N e w Yo r k C i t y, t h e s t r u c t u r e i s d e d i c a t e d t o t h e l i fe a n d d e a t h o f T h e o J a n s e n ’s S t r a n d b e e s t c r e a t u r e s . T h e s t r a n d b e e s t a r e a fo r e i g n specie that is released upon the inhabitants o f N e w Yo r k , t r y i n g t o d r aw v i s i t o r s i n t o t h e c e n t e r.
I
FA L L 2 0 1 1
32
33
MATERIAL PALLETE: VENETIAN PLASTER CONCRETE STEEL
NATURAL LIGHT
MAHOGANY
GLASS OAK
1
COOLING - The massive concrete floor which houses the park vegetation cools the large space during warmer weather.
5
2 4
4 6
8 3
REFLECTED LIGHT- The Venetian plaster which lines the wall of the adjacent building provides a reflective surface for light to be filtered throughout the building
6
7
1. BONEYARD OBSERVATORY
2. BIRTHING ROOM
3. WORKSHOP
4. LIGHT WELLS
5. STUDIO
6. LIVING SPACES
7. PUBLIC PARK
8. STRANDBEEST ELEVATOR
34
ARCH 3010 I FALL 2011 I STUDIO KITCHIN I PROJECT 3 I TRANSVERSE SECTIONS I BRENNAN
35
ARCH 3010 I FALL 2011 I STUDIO KITCHIN I PROJECT 3 I OBSERVATORY I W
36
The center houses living spaces for Theo Jansen, his apprentices, and the Strandbeest, which is all connected by a series of catwalks, that follows the Strandbeest process.
37 T h e b e a s t e x i t o n t o t h e H i g h L i n e t h r o u g h t h e o p e n a i r p a r k o n t h e fi r s t f l o o r o r a ve r t i c a l s h a f t , c o n n e c t e d t o t h e s u b w ay s y s t e m . T h e n a s e i t h e r t h e p u bl i c o r t h e c r e a t o r s m ove t h r o u g h o u t t h e s t r u c t u r e t h e y a r e c o n s t a n t ly g e t t i n g g l i m p s e s a n d s h a d ow s o f t h e c r e a t u r e s l i fe c y c l e , w h i c h ter minates along the roof tops of the sur rounding buildings.
38
39
MARRIOTT DOOMSDAY INN The prevailing attitude among our group of preppers is one of paranoia. They are tied together by their mutual distrust and contempt of those who are not preppers. They are driven primarily by a survival of the fittest mentality, which dictates their various activities, from hoarding to arming. Thus the idea of community is one that can only be loosely associated with these preppers, as it is not unity against the world, but a streak of individualism that results. This paranoia manifests itself in the architecture of the Marriott Doomsday Inn
MARRIOTT DOOMSDAY INN I THE END OF THE WORLD AS WE KNOW IT I ARCH4010 I MATTHEW JULL
I
FALL 2012
40
41
42
B ROA DWAY 1 , 0 0 0 S T E P S I A R C H 3 0 2 0 I K A R E N VA N L E N G E N + E R I N H A N N E G A N
U Va C a m p b e l l H a l l P ap e r Wa s t e Instillation
I
SPRING 2012
44
45
G l o b a l A rc h i t e c t u re B r i g a d e s ’ BUILD Health Challenge
Our proposal is more than just a structure that provides basic public health care: it is a center to actively promote the health of individuals in the community of El Canton. The goal is to provide a comfortable and relaxing environment for patients and their families.
46
.45 m 6.25 m
6.17 m
SUMMER SUNLIGHT
.15 m
3.05m .1.7 m
.40 m
2.04 m
2.44 m
.76 m
.37 m
.37 m
1.52m
.92 m
WINTER SUNLIGHT
1 1: 1�
2 1: 1�
.60 m
.20 m
metal parcialmente cortado
.60 m .20 m
1.83 m
1.02 m
.41 m 4.57 m
3.96 m
22.17 m
1.02 m
1
2
We designed our health center so that the main public reception space can extend towards the southwest end of the site, allowing future community centers to be integrated into the health center itself.
47 Rivanna River Vortex Comepition
RIVANNA reSTITCHED
Rather than a simple boundary between city and county, this project seeks to understand the river as a restorative seam—culturally fertile and productively utilized. In this scheme, existing power lines are buried and the remaining tower corridors become arteries for a new connective transportation network throughout the city. Floating farms anchor the development at the river banks. Natural filtration systems and new commercial development occupies the county-side of the river bank to encourage growth. An elevated art-walk provides a new cultural layer while offering pedestrian crossings above the farms and between the river’s banks.
residential
run-off filtration
forest barrier
hydrophyte pond
run-off crossing
channels
floating farms and gard
water circulation the power line
run-off collection
run-off + pedestrian crossing
return to river
expedited trail
river
commericial cliff dwellings
Pantops
dens
48
49
50 The result of RIVANNA RE-STITCHED is a fertile landscape of interconnective ecologies providing resources and enjoyment for the citizens of Charlottesville
51
WILBr: Charlottesville’s WEB
WILBr is a system of elevated interweaving pathways that reconnect the communities of Belmont and Char lottesville . Our new urban ground provides the oppor tunity for multi-modal tr avel between Belmont and the downtown mall in an area full of separ ation and urban neglect.
professional work assistant project manager sm+p architects
CONTENT PROJ E C T MA N AGE R BAGBY PIZZA I PIKESVILLE , MD ............................................................................................................................................................................................... 1 - 4 A S S I STAN T P ROJE CT M A NAGE R MULTI - FAMILY RESIDENCE ...................................................................................................................................................................................................... 5 - 11 PRIVATE COUNTRY CLUB CONCEPT PROPOSAL........................................................................................................................................................................ 12 - 14 PHYSICAL MODELS..................................................................................................................................................................................................................... 15
1
BAGBY PIZZA RESTAURANT A 2,000 sf fast casual restaurant located in Pikesville, MD. The focus of this design was to effeciently and tactfully move customers through the ordering and dining experience. The aesthetic was to create a comfortable astomsphere with a series of warm woods contrasted by industrial metal . Also worked closely with the graphic team to integrate and develop a recognizable brand and image.
2 FLOOR PLAN
C O N S T R U C T I O N D E TA I L S
3 I N T E R I O R E L E VAT I O N S
4
MULTI-FAMILY RESIDENCE
Eight story mixed-use development, ground floor retail, three stories of parking and seven stories of residential units.
5
6
UNIT MIX DIAGRAMS
APARTMENT UNIT FLOOR PLANS
7
8
3D MODEL APARTMENT UNIT STUDIES
BUILDING SECTION
9
UNIT TYPES
1 BED
1 BED LOFT
2 BED CORNER
1 BED CORNER
1 BED + DEN
2 BED + TERRACE
10
DETAILS
10 11
12
PRIVATE COUNTRY CLUB CONCEPT PROPOSAL A CONCEPT DESIGN IN RESPONSE TO A DESIGN COMPETITION TO BUILD A BRAND NEW CLUBHOUSE FOR A PRIVATE COUNTRY CLUB ON THE WATER IN THE MID-ATLANTIC. THE DESIGN WAS FOCUSED ON RETURNING THE CLUBHOUSE TO THE ORIGINAL 1923 PLAN. THIS PLAN WAS FOCUSED ON INTEGRATING THE CLUBHOUSE INTO THE LANDSCAPE, BRINGING LIGHT AND WATER FRONT VIEWS INTO THE DINING SPACES.
13 FLOOR PLAN
CONCEPT ELEVATION SKETCHES
14 NORTH ELEVATION
SOUTH ELEVATION
15
3D PRINTED MODELS
3D printing physical models is an effectective method to develop and present proposed designs to clients.