SPA 3 WRF - Project Profile

Page 1

Project Profile

Innovative Water Recycling

PHOTO GOES HERE

SPA 3 Water Recycling Facility The City of Surprise has been named Arizona’s fastest-growing city and was challenged to provide the necessary infrastructure to support this growth. The developers and home builders, knowing it would be years before the City of Surprise could provide water and sewer services for new developments, contracted with PERC Water to design, build, and operate four new regional water recycling facilities to support Special Planning Areas (SPA) 2, 3, 4, and 5. PERC Water commenced construction on the SPA 3 Water Recycling Facility in July 2007 and completed it in September 2008.

Facility Facts Location:

Surprise, Arizona

Project Type:

Design-Build-Operate

Capacity:

1.8 MGD

Footprint:

1.0 acres

Process Design:

Hybrid Sequencing Batch Reactor (SBR)


Project Profile

Key Design Features The SPA 3 Water Recycling Facility has a design rating of 1.8 MGD and is based on the PERC ASP® hybrid-sequential batch reactor process. A significant advantage of the Facility is that it is designed to treat low initial flows to avoid prolonged vault and hauling costs typically associated with treatment facilities that are built for developing communities.

• Total tank area of 20,000 square feet (less than half an acre) • Performance guarantee to meet Arizona Title 18 Class A+ Effluent and Class B Biosolids • Can support 7,200 homes and 21,000 people in the first phase

Commitment to Community The Facility’s unique design, whereby all treatment of wastewater occurs in below ground, covered tanks with 7,200 square feet of aesthetically pleasing operations buildings built above the tanks, results in reduced land use, noise, and odors.

The SPA 3 Water Recycling Facility in Surprise, Arizona was honored with the “Best Project-Water” Regional Award from the Western Pacific Region’s Design-Build Institute of America (DBIA) in honor of it exemplifying “the principles of interdisciplinary teamwork, innovation and problem solving that characterize design-build delivery.” PERC Water’s utilization of the design-build-operate delivery approach created a fast-track infrastructure solution for the city of Surprise, one of Arizona’s fastest growing cities.

959 South Coast Drive, Suite 315, Costa Mesa, CA 92626 office 714.352.7750 fax 714.352.7765 www.percwater.com


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.