Vol. 02
Philip Junaeus
Architecture Portfolio
Philip Junaeus | Architecture Portfolio | Vol. 02 2016-2018
Royal University of Technology, Stockholm, Sweden Master of Science in Architecture
2015-2016
Scott Carver Architects, Sydney, Australia Project Manager / 2IC
2014
Mirvac, Sydney, Australia Graduate of Architecture
2011-2013
University of New South Wales, Sydney, Australia Bachelor of Architecture
E: philipjunaeus@gmail.com P: +46765699888
Š Philip Junaeus, 2018. All rights reserved. No part of this publication may be printed or reproduced or utilised in any form by electronic, mechanical or other means, now known or hereafter invented, including photocopying and recording, or in any storage or retrieval system, without permission in writing from the author.
0 Part 0 | Master
I
II
Part 1 | Bachelor
Part 2 | Work
0 Part 0 | Master
SELECTED WORKS
COP
25 UN Climate Expo 2019
INTRODUCTION Architecture composed of massive timber elements have recently gained a lot of interest and come with the promise of lowering our carbon footprint. What if prefabricated timber systems could be transported from Sweden to other parts of the world in a sustainable way? These are the foundations for my project. Early on in my thesis work I formulated a series of questions that reflect my interests in climate issues, and also allow me to explore how computerized adaptive componential design can help generate future architectural tectonic expression and of course help to mitigate climate-related issues. What if prefabricated timber systems could be transported from Sweden to other parts of the world in a sustainable way? These are the foundations for my project. Early on in my thesis work I formulated a series of questions that reflect my interests in climate issues, and also allow me to explore how computerized adaptive componential design can help generate future architectural tectonic expression and of course help to mitigate climate-related issues.
EUROPE
NORTH AMERICA
49% total FSCcertified area
34.7% total FSCcertified area
ASIA 4.4% total FSCcertified area
OCEANIA
SOUTH AMERICA
1.3% total FSCcertified area
6.9% total FSCcertified area
AFRICA 3.6% total FSCcertified area
RAW MATERIAL SUPPLY
CO2 CONCEPT PAVILION
LOCAL TRANSPORT
MANUFACTURING
PACKAGING
GLOBAL TRANSPORT
LOCAL TRANSPORT
CONSTRUCTION
DESIGN
X
33
To commence my study, I needed a ‘client’ with great exposure to global climate policy making, seeking a large exhibition and conference space to showcase new emerging technologies and connect policymakers from around the globe. With these considerations, I was able to select a site on the main UN campus grounds in Bonn, Germany where various climate summits are held including the past COP 23 summit and Tanaloa Dialogue. Located the beautiful banks of the river Rhine, the site is currently occupied by a parking lot, which sits directly adjacent to the temporary event site used by past climatic summits. The COP 23 event was held late last year in a dreary temporary plastic tent venue, devoid of any architectural expression. I believe that architecture has a vital role to play by setting the stage for global climate strategy talks.
236
With this in mind, I sought to provide a permanent addition to the UN climatic dialogue, by creating a space that could host future events like the COP 25 and Tanaloa Dialogue summits on the main campus grounds.
533 533 NA 2226 1854 265
UN CAMPUS
58
BONN, GERMANY
10 4
SHIPPING CONTENTS
EXPLODED ISO
SECTION CONFERENCE POD
13:33
12:25
EMERGENTS CANOPY
UNDERSTORY FOREST FLOOR
WINTER SOLSTICE
SUMMER SOLSTICE
SILHOUETTE ROOF
STRUCTURE PODIUM
ANATOMY OF PARTS
INTERIOR PERSPECTIVE
IDENTIFIED ISSUES OF TODAY
BACKGROUND 1980THE AGE OF INFORMATION
POTENTIALS
APP LAUNCH 2020
Data should be owned & shared within a community. Citizens are their own resources and build up metadata collectively.
Limited access & use of data
Welcome to build!
Isolation Connectedness to others start digitally. Matchmaking with other individuals and groups in society can be generated through personal preferences.
93%
Use of internet
81%
Smart phone users
Homogeneous living areas
FUTURE?
9/15 H
Limited influence of city planning
STRONGER COMMUNITY
Public and private functions distributed across an invisible grid ensures diversity throug city planning.
75%
Lack of physical interaction
Weekly time spent People on social media
ISOLATED INDIVIDUALS
1995
2015
2%
92%
Access to internet in Sweden over time
Public opinion can be voiced in a digital interactive environment. Collective realtime metadata also allows for a smarter city planning informed by current needs.
NETWORK | COMMUNITY | HOME
DIGITAL PLATFORM
Realtime information shows where physical interaction can be made in a community. This could be an event, market place, service etc.
login
Affordable housing Power in numbers. Individuals forming a community are finan cially stronger together.
Lack of neighbourhood info sharing
register
Neighbourhood updates could be distributed and access on a shared digital platform in real time.
login
first name last name date of birth email address
PLOT No: 254 Location: 59°4'0.6"N 17°58'21.6"E
STATUS: UNDER CONSTRUCTION_
How can social media and other digital platforms inform the way we come together, build and experience life?
confirm email address password confirm password
CONFIRM
login
I am a very creative and innovative person currently studying architecture at KTH (...)
*description of yourself
food production colour permanent
nature
MATILDA LUNDMARK
art
timber
1991/03/31 lundmark@kth.se
garden
*key words
10
20
40+
*preferred number of shareholders
Where does the digital vs physical overlap?
100k
500k
1000k+
*financial contribution
CONFIRM
welcome
to the network!
see more matches...
MATILDA LUNDMARK 1991/03/31 lundmark@kth.se
food production colour
art
garden
PATRIK SVENSSON 1983/11/12
permanent
m.svensson@gmail.com timber
nature food production account settings
inbox messages
requests
my home
grid view
HEMFOSA SITE
APP CONCEPT
colour
events
nature
food energy
art education
MODULAR CONFIGURATIONS
SECTION
SW ELEVATION
EXPLODED ISO
URBAN FABRIC
MAIN ROADS
INNER STREET GRID
WALKING PATHS
TRAIN LINE & STATION
MASTERPLAN
11:51 Participating in community decision making
13:50 Sending a request for transport 09:32 Receiving updates about social events within neighbourhood 14:45 Selling products at sunday market
19:06 Virtual viewing of proposed building extension
A
61˚56'40.92"N 6˚46'11.59"E
7
A B
ER
A
AS T
C
M
B D
7 4
00 12
G IN DIN
3
ER
A3
M M
2 1
6
0
C 12 00 12 0 20
40 00 H
00 12
G
HO US GR EE N TR AC K
CH EN
L RO IVIN OM
G
FIR EP LA C KIT
W TA AT N ER K
FIRST FLOOR PLAN
BE DR
OO M
1
BE DR OO M
40 00
BA TH
RO OM
2
W DIN INT IN ER G
27 00
CU
RT IA N
27 00
3
PA N
TR Y
4
40 00
C ST REA UD TIV IO E SP AC E
E
1
5
40 00
C PL HIL AY DR AR EN EA S
BE DR OO M BE DR OO M W TA AT N ER K
GROUND FLOOR PLAN
IN
E
6
AIR LO C
SU
K
OR AG E
2
ST
RO OM BA TH
M M
W
U
ER
DIN
40 00
3
W
C S OL BIK TOR D E AG RO E OM &
3
7
AR DE RO BE
4
TR AC K
CH EN
RT IA N CU W DIN INT IN ER G
27 00
2 40 00
1
00
8
5 L RO IVIN OM G
FIR EP LA C KIT
27 00
3
PA N
TR Y
4
40 00
C ST REA UD TIV IO E SP AC E
E
M
1
AS T
B
ER
A
BE DR OO M
GR EE N
5
40 00
C PL HIL AY DR AR EN EA S
HO US
E
1:1 00
@
SU
K AIR LO C
6
E
5m
D
32 C S OL BIK TOR D E AG RO E OM &
7 40 00
U W H
OR AG E ST
E
00
W AR DE RO BE
40 00
12
8
00
C
12
00
8
5 4 3
2
massive concrete slabs, where heat is stored and later released throughout the night when the family sleeps. A basalt brick wall facing south passively gathers and retains energy from the sun which is then released back into the building during cold winter nights. In summer, the design of the building envelope shelters the same wall and much of the floor from direct sunlight, preventing the building from overheating. Large glazed windows at the eastern and western ends open up sightlines up and down the coast while also providing ventilation. At the northern facade, immersive window pods punctuate the facade and provide a dramatic perspective of the mountains above.
BE DR OO M
6
Design The Solar Arc House is home to a family of four. The dwelling is located in the threshold between the the mountains and the sea. It aims to inspire a regional specific model of architecture, centered on progressive and sustainable living concepts. With the aim of pushing sustainable living performance, the building adopts passive heating strategies and the latest advancements in sustainable materials without diverging from the poetic narrative of the site and its context. A centripetal composition with a basalt block fireplace form the center of the plan, radiating heat outwards and upwards long after the fire has been extinguished. Pipes with water heated from around the fireplace and chimney is pumped around thermally
E
D
8
C
B
Solar Arc House
Charred cedar wood roof to match cladding. Recessed gutter to concealed downpipe
Skylights provide indirect lighting to drafting office and bedroom as well as providing ventilation to prevent overheating in summer
Structural glulam frame
Seaweed bale insulated building envelope with charred cedar cladding
Enflo wind generators providing 24h power
Water heated by the central fireplace is pumped through ground and first floor concrete slabs and used for hot showers. The thermal mass of the slabs retain the heat throughout the night
The slanted roof structure responds to the path of the solar arc and prevailing winds for efficient passive performance throughout the year
FRONT VIEW
Water storage collected from pitched roof after passing through a first flush valve
A thermally massive basalt brick wall retains the energy collected from the sun throughout the day and disperse it back into the dwelling at night
Outdoor area sheltered from the prevailing winds
Central massive basalt brick fireplace core extending upwards throughout the building. A glass screen moves up and down to regulate radiant heat exposure Thick wool curtains extend out at night controlling privacy and prevent heat loss through glazed facade
Window pods provide immersive views to the mountains behind
REAR VIEW
EXPLODED ISO
I
Part 1 | Bachelor
SELECTED WORKS
GROUND FLOOR PLAN
SECTION G
SECTION F
GANGUDDY RECREATIONAL CENTRE 2013 Glenn Murcutt Studio - Hand Drawings
ELEVATION A
ELEVATION B
ELEVATION C
ELEVATION D
SECTION A
SECTION B
SECTION C
SECTION D
SECTION E
GANGUDDY RECREATIONAL CENTRE
2013 Glenn Murcutt Studio - Site + Construction Models
II Part 2 | Work
SELECTED WORKS
01
KYUBI MODERN ASIAN DINING Campbelltown, Sydney
25SHS WELDED STEEL FRAME FINISHED IN MATT BLACK
6mm VERTICAL BRASS ROD NOTCHED INTO BRASS BASE JF-210 GLUE FIXED TO 10mm MDF
25SHS FRAME MATT BLACK
Sim
5
AD-CD464
35
IWF-160
LED STRIP
CURVED FLOOR TRACK
FIXING JF-105
70
100
15
750 TOP OF 25mm CFW WELDED/GROUND/POLIS HED STEEL FRAME. BLACK POWDERCOATED FINISH
T
BRASS FOOTRAIL CURVED HEAD TRACK
SECTION DETAIL B - WINE WALL
7
1:5
35
JF-623
70
FCL 2700
PACKER, MATT BLACK FINISH
25mm STEEL FRAME BEHIND. BLACK POWDERCOATED FINISH
8
1:5
RACK D - WINE WALL SECTION DETAIL C -ELEVATION WINE WALL - BAR & BOTTLE SECTION DETAIL 1 9 1:5 1:5
JOINS IN BRASS LAMINATE. POSITION 1 FULL SHEET CENTRALLY
1 : 20
100
6
6mm GL-153 TOUGHENED GLASS PANEL
JF-105
JF-623
SECTION DETAIL A - WINE WALL
LED STRIP
PLASTERBOARD BEHIND PAINTED MATT BLACK AD 30 FIXING
JF-210
PLASTERBOARD BEHIND PAINTED MATT AD 15 BLACK
225
30
15
20X6mm FLAT BAR. CENTRED AND CFW WELDED /GROUND/POLISHED TO 25mm STEEL FRAME. BLACK POWDERCOATED JF-211 FINISH
8mm BRASS PIN SHELF SUPPORTS
35
5 5
5
JF-623
FFL ASIAN FUSION
EQ 20 EQ
6mm GL-153 TOUGHENED GLASS SHELF
1150
FRAME. WELDED/GROUND/POLI SHED JF-622
5
JF-105
JF-623
SHELF
FRAME BENCH BEHIND 25mm SHS STEEL
EQ
25mm PLY PLATE TO STUD JF-622 HEADS
JF-105
AD 15 FIXING
JF-211 COUNTERSUNK INTO SHS STEEL
JF-302
EQ
JF-624 AD 30 FIXING
5
20
IWS-109
90
300
25
CONCEALED PLUNGER SCREW 25mm JF-109
5
4
AD-CD465
AD-CD465
NOM 15
NOM 15
IWF-160
NOM 15
476
460
LOWER FRONT PANEL CENTERED ON CABINET ABOVE
LOWER REAR PANEL CENTERED ON CABINET ABOVE
NOM 15
FFL ASIAN FUSION
6mm VERTICAL BRASS ROD A 4mm GL-152
225
767
120
120
CONTINUOUS 6mm STEEL PLATE WELDED TO SHS FRAME FINISHED IN MATT BLACK. 6mm FLATRODS BAR PROVIDE HOLES TO TAKE
910 NOM
SHS
20
SHS
20
225 767
12mm STRUCTURAL GRADE CD PLY PANEL
T
TO REAR OF CABINET
1595
ELEVATION DETAIL - WINE RACK (TYP) JF-211 COUNTERSUNK INTO 25X25mm BLACK POWDERCOATED SHS STEEL FRAME
7
JF-622
AD 30 FIXING
70 LED STRIP
16 7 16
PROPRIETARY GLASS HANGING RACKS FIXED TO UNDERSIDE OF SHELF. IWS-109
AD 30 FIXING
JF-623
JF-623
15
FFL ASIAN FUSION
30
JF-623 25mm SHS WELDED STEEL FRAME - MATT FFL ASIAN BLACK LED UPLIGHT STRIP FUSION REFER TO LIGHTING DESIGN 30 33mm HMR MDF SHELF JF-104
6
71
820
350
790
820
IWS-109
820
CONTINUOUS DOWN JF-108 LIGHT OVER GLASS RACKS. REFER TO LIGHTING DESIGN
JF-108
JF-105
JF-622
25 25
35
25mm PLY PLATE TO STUD HEADS
LED STRIP
AD 15 FIXING
JF-210 476 PACK OUT TO PROVIDE FLUSH FINISH WITH TILE LOWER FRONT PANEL CENTERED ON CABINET ABOVE
BLACK
9x 6MM VERTICAL BRASS RODS POWDERCOATED STEEL FRAME PER SECTION SHS EQUALLYSPACED.
530 NOM
JF-105
HMR MDF SHELF
JF-211 COUNTERSUNK
INTO 25X25mm JF-210 TO VERTICAL FACE
25mm JF-109
AD-CD465
70
6mm GL-153 TOUGHENED GLASS SHELF
135
135
JF-62 2
6mm FLAT BAR
6
6mm FLAT BAR
35
1 : 10
350
5
25mm SHS AD 15 FIXING WELDED STEEL STRUCTURE JF-108
NOM 15
1045
2700
1045
6mm FLAT BAR
6mm GL-153 TOUGHENED GLASS SHELF
..375
61
6mm GL-153 TOUGHENED GLASS SHELF
6mm GL-153 TOUGHENED GLASS SHELF
100
6 350
EQ
6
EQ
EQ EQ 6mm FLAT BAR EQ
350
6 350
EQ
6mm FLAT BAR
JF-210 GLUE FIXED TO 10mm MDF 6mm GL-153 TOUGHENED GLASS SHELF
1595
25 71
EQ
AD-CD465
61
350
6
SHS
8
5
FFL ASIAN FUSION NOM 15
5
FFL ASIAN FUSION
BLACK SHADOW GAP BETWEEN PANELS
SHS
5
BLACK SHADOW GAP BETWEEN PANELS
25mm BLACK POWDERCOATED SHS FRAMED 'GATE' WITH FLAT BAR HORIZONTALS CENTRED & CFW WELDED/GROUND/POLISHED TO INSIDE OF FRAME. KEY LOCKABLE
MIRROR LINING 6mm VERTICAL BRASS ROD B
6mm FLAT BAR
90
6mm GL-153 TOUGHENED GLASS SHELF
LED STRIP
1150
BLACK SHADOW GAP BETWEEN PANELS
6mm FLAT BAR
820
2 BH01 900mm CD-466 ABOVE FLOOR LEVEL. JF-108 CONCEALED FIXING STEEL POTS AND FRAME TO KITCHEN CONSULTANT DETAILS
820
820
900 NOM
350
JF-623
JF-108
2700
UNDERBENCH LIGHTING TO LIGHTING CONSULTANT JF-623 DETAILS
TOUGHENED BRONZE GLASS GL-153 REBATED INTO 25mm JF-109 FRAME
25mm JF-109
25 25
25
JF-622
JF-622
JF-623
GRIND & POLISHED WELDS TROUGHOUT ON 25mm FRAME
CONTINUOUS STEEL ANGLE WELDED TO SHS FRAME FINISHED IN MATT BLACK. PROVIDE HOLES TO TAKE RODS FCL 2700 120 PACKER, MATT BLACK FINISH
790
JF-211
BRACING AS REQUIRED TO SLAB
SHS
FCL 2700
6
1550
6mm GL-153 TOUGHENED GLASS SHELF BEHIND
JF-302 SERVERY 6mm FLAT WITH PENCIL ROUND BAR MITRE CORNERS
135
JF-302
2700
130
100
85
BRACING AS REQUIRED TO SLAB
375
NOM 762 6 350
SHELF 1570
6 350 350
350
SHELF
2700 6mm FLAT BAR
25
140
350
SHELF
1020
6 350
2600 COS
1020
350
SHELF
6
6mm GL-153 TOUGHENED GLASS SHELF BEHIND
CD-466
SHS
JF-211
6mm FLAT BAR
3
400
150
25SHS WELDED STEEL JF-211 FRAME FINISHED IN MATT BLACK
6mm GL-153 TOUGHENED GLASS SHELF BEHIND
BENCH AND POSTS BY KITCHEN CONTRACTOR
820
2700 COS
SHELF
6
6mm FLAT BAR
SHS
PACKER, MATT BLACK FINISH
6mm FLAT BAR
6
350
SHELF
SHELF 1570
6
TOUGHENED GLASS SHELF BEHIND
JF-622
JF-108
6mm FLAT BAR
AD-CD464
6mm GL-153 TOUGHENED GLASS SHELF BEHIND
SHELF
6
6
6mm GL-153 TOUGHENED GLASS SHELF
6mm FLAT BAR
25
4
Sim
BLACK STAINLESS STEEL PIANO HINGE TO INSIDE OF FRAME
2 SHEETS OFBEHIND 16MM HMRMDF WITH 7MM PLY FLATIN INTERLAYER 6mm SHELF FINISH TO BEBAR LAMICOLOUR BLACK GRAPHITE U007LIN AROUND VERTICAL STEEL 6mm GL-153 FRAME.
6mm FLAT BAR
CFW WELD, GRIND & POLISHED TROUGHOUT ON 25mm FRAME
25mm BLACK POWDERCOATED SHS FRAMED 'GATE' WITH FLAT BAR HORIZONTALS CENTRED & CFW WELDED/GROUND/POLI SHED TO INSIDE OF FRAME. KEY LOCKABLE
CFW WELD, GRIND & POLISHED TROUGHOUT ON 25mm FRAME
25SHS WELDED STEEL FRAME FINISHED IN MATT BLACK
6mm GL-153 TOUGHENED GLASS SHELF
JF-211
CABINET TYPE B
150
20 80
TOUGHENED BRONZE GLASS GL-153 REBATED INTO 25mm JF-109 FRAME
687
NOM 767
6mmSTEEL FLAT FRAME 25SHS WELDED BAR FINISHED IN MATT BLACK
6mm GL-153 TOUGHENED GLASS SHELF BEHIND
6mm GL-153 TOUGHENED GLASS SHELF
460
350
ABS EDGE TO MATCH JF-109
6mm FLAT BAR
350
AD-CD465
460 CABINET TYPE A
6mm FLAT BAR
145
20
CFW WELD, GRIND & POLISHED TROUGHOUT ON 25mm FRAME
9
FCL
25mm BLACK POWDERCOATE D SHS FRAMED 'GATE' WITH FLAT BAR HORIZONTALS CENTRED & CFW WELDED/GROU ND/POLISHED TO INSIDE OF FRAME. KEY LOCKABLE
460 CABINET TYPE A
AD-CD465
12
197
213
12
289
12
410
1
FRONT ELEVATION CABINET TYPE A 1 : 10
2
REAR ELEVATION CABINET TYPE A 1 : 10
2
WINE RACK PLAN DETAIL
50mm ANTIQUE
3
FOOT REST FRONT ELEVATIONBRASS CABINET TYPE B WITH BLACK PC SPIGOT
1 : 10
4
SECTION CABINET TYPE A 3 1 : 10
1 : 10
5
SECTION CABINET TYPE B 1 : 10
SECTION - BAR AND BOTTLE RACK 4
1 : 10 Scott Carver Pty Ltd Level 8, 71 Macquarie Street
Telephone +61 2 9957 3988 hello@scottcarver.com.au
CAMPBELLTOWN CATHOLIC CLUB RESTAURANT FITOUT 2015 Project
Callout of SECTION 1:2
As indicated @ A1
02
CAMPBELLTOWN CATHOLIC CLUB DINING Campbelltown, Sydney
Status:
FOR CONS
D
Nom. Architect
6/
FRAME
BLACK STEEL SUSPENSION ROD WELDED TO PRIMARY FRAME. CONTRACTOR TO CONFIRM REQUIREMENTS NOM 30Ø PRIMARY STEEL FRAME. PAINTED MATT BLACK PACKERS MATT BLACK FINISH. ANGLED AT 5° DEGREES TO TILT BLADE BLADE A
NOM 464
2000
2000 700
Rev. B C D 1
BLACK STEEL PLATE FIXED THROUG SLAB
NOM 464
700
BLACK STEEL SUSPENSION ROD WELDED TO PRIMARY FRAME. CONTRACTOR TO CONFIRM REQUIREMENTS
180 180 180
NOM 515
BLACK STEEL PLATE FIXED THROUG SLAB
3 AD-CD423
TOP OF FRAME
Print Date:
Description FOR CO-ORDINATION PRE TENDER ESTIMATE FOR TENDER FOR CONSTRUCTION
LEGEND 1
1
TAG
AD-CD424
3
ROOM TAG
BLADE B AD-CD423
SUSPENDED LIGHT
DOOR
WINDOW
4
Elevation - Blade Light Fixture
5
1 : 20
Section - Ceiling Blade Light Fixture 1 : 20
SYMBOL KITCHEN
W01 03
WINDOW FLOOR LE
RCP CEILING CODE
CLG-102 +2700 AFFL
WALL TYPE
IWS-110
PAINT FINISHES
CEILI HEIG
TRS CODE
JOINERY UNIT
JU07 IWF-413
APPLIED FINISH
20.00°
5
ROO
DOOR NU ROOM NU
JOINERY UNIT
4928
ROO
DG09
DG01 G01
CO SCH
PT.101.E
TYP
TYPICAL
BLADE A
20.00°
AD-CD423
FIN
20.00° BLADE TYPE B. 16 BLADES
TYPICAL
BLADE B
SUSPENDED LIGHT. REFER LIGHTING SCHEDULE
NOM 30Ø PRIMARY STEEL FRAME. PAINTED MATT BLACK
BLADE TYPE A. 15 BLADES
TRS
NOM 30Ø PRIMARY STEEL FRAME. PAINTED MATT BLACK
ELEVATION
NOM 30Ø STEEL CONNECTOR RODS PAINTED MATT BLACK. WELDED TO PRIMARY FRAME
NOM 30Ø STEEL CONNECTOR RODS PAINTED MATT BLACK. WELDED TO PRIMARY FRAME
BOLT FIX 2 LAYERS TOGETHER
BOLT FIX 2 LAYERS TOGETHER
ELEVATION FLOOR LEVEL
TECHNICAL REFERENC SCHEDULE 20140087-AS-CD001 2
AD-CD111
FLO
NAME FFL 29.010
PLAN FLOOR LEVEL
FFL 29.010
SPOT LEVEL
FFL 29.010
REVISION
1 DESCRIPTION
339
SETOUT POINT
ARCHITECT:
SCOTT C
LIGHTING:
MALAYA B
STRUCTURAL/HYDRUALIC: NORTHRO
4512
1
RCP - The Palms Ceiling Feature
2
1 : 20
Scott Carver Pty Ltd Level 8, 71 Macquarie Street Sydney NSW 2000 Australia
Telephone +61 2 9957 3988 hello@scottcarver.com.au www.scottcarver.com.au
3
1 : 20
CAMPBELLTOWN CATHOLIC CLUB RESTAURANT FITOUT 2015
Project
ENGINEE
Plan - Top View - A Top Blades 1 : 20
THE PALMS CEILING FEATUR
1 : 20 @ A1
Client
CAMPBELLTOWN CATHOLIC CLUB
HARON R
MECHANICAL:
REFER TO COVER SHEET FOR FU CONSULTANT COMPANY CONTAC INFORMATION
4928
Plan - Top View - B Bottom Blades
ELECTRICAL:
Reference No.
0
0.5
1
1.
2m
20140087
Discip
AD
03
ONE ONE - SCOTT CARVER RECEPTION Chifley Square, Sydney
JF-10 BENCHTOP BEHIND
650
750
JF-09
6
JF-10 BENCHTOP BEHIND
AD-SK707
JF-10 BENCHTOP BEHIND
ANGLED BIRCH LEGS B.
B.
40
7
FRONT
1500
1500
PANEL B 4500
PANEL C
ANGLED BIRCH LEGS
JF-10 TO RETURN 40mm OVER EDGE. MITRE JOINT (TBC)
ANGLED BIRCH LEGS
40
40
STRUCTURAL PLYWOOD BEHIND TO JOINERS SPEC
40
1
610
100
100
120
1320
1380
120
120
1320
600
PANEL D
JF-09
JF-09
4
120
40
40
600
AD-SK707
JF-09
FRONT
JF-09
100
1 : 20
REAR
JF-09
ELEVATION - RECEPTION DESK FRONT
JF-09
PANEL E
ELEVATION - RECEPTION DESK SIDE A
5
1 : 10
ELEVATION - RECEPTION DESK SIDE B 1 : 10
4500
3
ELEVATION - RECEPTION DESK REAR 1 : 20
4
5
AD-SK707
AD-SK707
50
POWER AND DATA CABLES AT GROUND LEVEL SIDE B
90
CORNER POST TO JOINERS SPEC
JF-10 BENCHTOP
JF-10 BENCHTOP FEET AT BASE OF DESK JF-09 PANEL
RISE OF POWER AND DATA CABLE
150
JF-10 TO RETURN 40mm OVER REAR EDGE (TBC)
7
JF-10 TO RETURN 40mm OVER REAR EDGE (TBC)
AD-SK706
JF-09 PANEL
STRUCTURAL PLYWOOD TO JOINERS SPEC
STRUCTURAL PLAYWOOD TO JOINERS SPEC
CABLE TRAY AS SHOWN IN SECTION DETAIL CABLE HATCH SK-707
REAR
FRONT
BLACK FINISH
REAR
FRONT
PIVOT ACCESS PANEL
JF-10 CONCEALED BUTT JOINT. ALL JF-10 JOINTS TO BE INVISIBLE
REAR
4500
FRONT
DATA POINT. LID CUT THROUGH JF-10 PIN JOINT
200
750
REAR
650
AD-SK707
1500 PANEL A
2
A.
750
100
A.
40
6 AD-SK706
PIVOT ACCESS PANEL
6 2
AD-SK707
1
PLAN - RECEPTION DESK OPTION 2 1 : 20
600
3
AD-SK707 SIDE A
ANGLED BIRCH LEGS
ANGLED BIRCH LEGS
STRUCTURAL PLYWOOD TO JOINERS SPEC
SECTION A - RECEPTION DESK 1:5
STRUCTURAL PLYWOOD TO JOINERS SPEC
7
SECTION B - RECEPTION DESK 1:5
04
NORTH KELLYVILLE SQUARE Kellyville, Sydney
Status:
11
10
9
8
7
6
5
4
3
2S
2
Nom. Architect
1
FOR INFORMATION ROBERT SANDERSON 5150
File:
10s
8s
4s
Rev .
LVR-102
ECS-205 ENS-102
PT-50 1
CON-201
PT-5 01
ECS-205 ENS-102
Level - Mezzanine
CON-201
ECS-1 01
FFL 81.85
WITHERS ROAD
4500
BY PASS ROAD
FFL 77.35 Level - Basement
1
ECS-501 CON-202
BLK-102
3350
Level - Ground
SCN-101
FFL 74.00
ECS-501 CON-202
EAST (HEZLETT ROAD) 1 : 200
R
Q
P
O
N
M
L
K
J
I
H
Is
ECS-501 CON-202
ECS-501 CON-202
PT-50 1
SCN-20 1 TYPICA L
ECS-205
ECS-501 CON-202
CON-201
ECS-501 CON-202
TS-101
Hs2 Hs1
G
F
Gs
E
Fs
D
Es
Ds
C Cs1 Cs
B
A
Bs
RFS-102
HEZLETT ROAD
Level - Mezzanine
CON-201
4500
FFL 81.85
W11 B
W09 B
W10 B
W08 B
W07 B
W06 B
W05 B
2
Level - Basement
FX-115
CON-201
ECS-501 CON-202
AWN-102
AWN-102
CON-201
ECS-50 1
ECS-501 CON-202
ECS-501 CON-202
ECS-501
CON-201 CON-202
ECS-501
CON-201 CON-202
CON-201
ECS-501 CON-202 CON-201
ECS-501 CON-202
CON-201
3350
Level - Ground FFL 77.35 FFL 74.00
ECS-501 ECS-501 CON-202 CON-201 CON-202
ECS-501 CON-202
NORTH (WITHERS ROAD) 1 : 200
Cs Cs1
Bs B
A
Ds
Es
D
C
Fs
E
Gs
F
Hs1 Hs2
G
H
Is I
J
K
L
M
N
O
P
Q
R
PT-501
ECS-10 1
LVR-102
P J
P J
SIGN FOR TRUCK DRIVEWAYS TO READ "TURN OFF ENGINS ONCE BLK-105 IN PLACE AT DOCK" REN-102
BLK-105 REN-102
P J
BLK-105 REN-102
P J
LVR-101
BLK-105 REN-102
P J
BLK-105 REN-102
LVR-101
?
ECS-10 1
HEZLETT ROAD
BLK-105 REN-102
Level - Ground
SCN-10 2
SCN-1 02
SCN-10 2
SCN-1 02
SCN-1 02
SCN-1 02
BAL-101
1 : 200
4s 2 ECS-501 CON-202
2S
3 ECS-501 CON-202
4
8s 5
6
7
8
10s 9
10
11
PT-50 1
Level - Basement FFL 74.00
SOUTH (BY PASS ROAD)
1
LVR-101
FFL 81.85
P J
FFL 77.35
SCN-10 2
3
SCN-2 01 TYPIC AL
Level - Mezzanine P J
4500
P J
SCN-2 01 TYPIC AL
3350
P J
Description
1 D&C TENDER ISSUE 2 ISSUED FOR CONSTRUCTION CERTIFICATE 3 REVISED TILT UP PANELS
ECS-205
CON-201
ECS-501 CON-202
6/27/2017 10:47:44 PM
Print Date:
Date
28.10.2015 24.03.2016 08.07.2016
Status: Nom. Architect
FOR I
ROB
File: Print Date:
Rev .
Descripti
1 D&C TENDER ISS 2 ISSUED FOR CONSTRUCTION CERTIFICATE
SIT E
146
000
2 AD-CD002
1
LOCATION PLAN 1 : 15000
SIT E
2
LOCALITY PLAN 1 : 2500
1 AD-CD005